Gas explosion at NHPC Teesta VI project in Sikkim, 10 casualties reported
NHPC · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.4 pts less than Nifty Midcap 150 and 1.4 pts less than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
A methane gas explosion occurred on July 20, 2026 inside the under-construction Head Race Tunnel of NHPC's 500 MW Teesta Stage VI Hydroelectric Project in Sikkim. 25 workers were trapped; 10 casualties confirmed. NDRF, SDRF and DG Mines Safety rescue teams deployed. A detailed investigation will follow.
Serious safety incident at under-construction site; likely construction delays, cost overruns and negative near-term sentiment.