NMDC commissions Rs 5,427 cr pellet plant and slurry pipeline project
NMDC · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.5 pts less than Nifty Midcap 150 and 2.5 pts less than its Industrial Minerals peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
NMDC has commissioned a Rs 5,427 crore integrated project in Bastar, Chhattisgarh. It includes a 2 million-tonne-per-year pellet plant at Nagarnar, a new iron ore processing plant at Bacheli, and a 135 km slurry pipeline linking the two. The facility will turn low-grade iron ore fines from Bailadila mines into pellets for steelmakers. The project supports NMDC's long-term plan to lift iron ore output to 100 million tonnes.
Adds value-added pellet capacity and strengthens NMDC's supply chain integration. Supports long-term output target of 100 million tonnes.