14.43 MW capacity starts commercial operation at Khavda-I Solar Project
NTPCGREEN · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.2 pts more than Nifty Midcap 150 and 1.2 pts more than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
NTPC Green Energy has declared commercial operation of an 14.43 MW part (the eleventh tranche) of the 1255 MW Khavda-I Solar PV Project in Gujarat, run by its wholly owned subsidiary NTPC Renewable Energy Limited under the CPSU scheme Phase-II Tranche-III, effective 10 Feb 2026. The group's total commercial capacity rises from 8813.25 MW to 8827.68 MW.
Small incremental capacity addition of about 0.16 percent to total capacity; routine project commissioning, limited near-term impact on stock.