NTPCGREENNSENTPC Green Energy Limited· PowerHighPositive
Announced Tue, 16 Dec, 2025 · 21:34 IST

243.66 MW solar capacity begins commercial operation at Khavda-I project

NTPCGREEN · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
+0.1%Reaction day
₹90.26
prior close
₹90.50
announcement price
After-mkt
timing
Nifty Midcap 150market · index membership as recorded later (tracked since Jun 2026)-0.5%+0.6% vs market
Power Generation peers, median of 25sector-0.6%+0.7% vs sector

On the reaction day the stock moved 0.6 pts more than Nifty Midcap 150 and 0.7 pts more than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
-0.7
10m
-0.8
15m
-0.8
30m
-0.4
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
+0.1-0.5+0.6-0.6+0.7
Next day
-0.3-0.3+0.0-1.0+0.8
2d
-0.2+0.8-1.1+0.3-0.5
3d
+0.5+1.7-1.1+0.2+0.3
4d
+0.1+1.8-1.7+1.0-0.9
5d
+3.3+1.3+2.0+0.7+2.6
1w
+5.2+0.6+4.6-1.9+7.1
15d
+2.4+1.0+1.5-0.9+3.3
1m
+2.3-0.4+2.7-7.1+9.4
2m
-0.4+0.3-0.8-6.9+6.4
3m
+6.3-7.3+13.6-12.2+18.5
UpDownMarket · Nifty Midcap 150Sector · Power Generation peers, median of 25Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

NTPC Green Energy's wholly owned subsidiary NTPC Renewable Energy has declared 243.66 MW of solar capacity on commercial operation at Khavda-I Solar PV Project in Gujarat under CPSU Scheme Phase-II Tranche-III, effective December 17, 2025. Total group installed capacity rises from 7,645.675 MW to 7,889.335 MW.

Likely market impact

Adds to operating capacity and supports future revenue from solar power generation for the group.