Pace Digitek bags Rs 375.7 Cr solar EPC order from Bondada Engineering
PACEDIGITK · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.1 pts less than Nifty Microcap 250 and 1.1 pts less than its Telecom - Infrastructure peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Pace Digitek received an order worth Rs 3757.25 Million (including GST) from Bondada Engineering Limited for Balance of System works on a 300 MW AC solar power project. Scope covers design, supply, erection and commissioning under EPC mode, plus 3 years of operations and maintenance. Execution timeline is 15 months from receipt of LOA. Order is domestic with no related party interest.
Large new order strengthens revenue visibility and adds to order book from the fast-growing solar EPC segment.