Addendum to capex disclosure: machining capacity details for greenfield facility
PITTIENG · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.2 pts more than Nifty Microcap 250 and 0.9 pts more than its Industrial Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Pitti Engineering has filed an addendum to its 14 May 2026 disclosure about capex approval for a greenfield casting and machined components facility. The addendum adds previously omitted machining capacity details: current capacity is 7,20,000 hours with about 81 percent utilisation, proposed to increase to 10,80,000 hours. All other disclosed details remain unchanged.
Clarification on greenfield capex gives shareholders fuller picture of expansion from 7.2 lakh to 10.8 lakh hours of machining capacity.