Announced Wed, 16 Sept, 2026 · 12:37 IST

Solar Power Project commences operations at Poojaa Precision

Greenfield plant commissionedCapex & Operations View source PDFExplain this filing

Price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
-3.9%Reaction day
₹706.45
prior close
₹688.00
announcement price
In-mkt
timing
Nifty Microcap 250market · in no size index; the smallest one is used-0.1%-3.7% vs market

On the reaction day the stock moved 3.7 pts less than Nifty Microcap 250, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
+0.7
10m
+0.0
15m
+0.0
30m
+0.0
Sessions after the filingfrom the prior close
StockMarketvs market
Reaction day
-3.9-0.1-3.7
Next day
-3.2+0.7-3.9
2d
+0.4+2.3-2.0
3d
+1.3+2.2-0.8
4d
+6.6+2.6+3.9
5d
+11.5+3.9+7.6
1w
+16.1+2.7+13.4
15d
+10.7-1.2+11.9
1m
+22.4-0.2+22.6
2m
+31.9-1.5+33.4
3m
———
UpDownMarket · Nifty Microcap 250Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Poojaa Precision Engineering has commenced commercial operations of its 4.95 MWp Solar Power Project at Bhaganurwadi, Nanded, Maharashtra on September 16, 2026, funded entirely through IPO proceeds at a cost of about Rs 14.81 crore. The project will supply captive power to the company's manufacturing plants, expected to save roughly Rs 40 to 45 lakh per month in power costs, reducing reliance on conventional energy and lowering carbon footprint.

Likely market impact

Positive: captive solar power to cut Plant 1 and 2 power costs by about Rs 40 to 45 lakh monthly, supporting margins and ESG profile.