Prostarm commences operations at 3 new manufacturing facilities
PROSTARM · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 6.0 pts more than Nifty Microcap 250 and 7.6 pts more than its Other Electrical Equipment peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Prostarm Info Systems is starting operations at three facilities from September 25, 2026. These include a 1.2 GWh Battery Energy Storage System plant in Jhajjar, Haryana, a new UPS and lithium battery manufacturing unit in Bakrol, Gujarat, and servo stabilizer and isolation transformers operations in Mahape, Maharashtra. The company has completed plant installation, relocation, trial runs and commissioning activities.
Capacity expansion across BESS, UPS, lithium battery and stabilizer segments, potentially driving future revenue growth.