SERVOTECHNSESERVOTECH REN POW SYS LTD· Electrical EquipmentHighPositive
Announced Thu, 16 Jul, 2026 · 19:04 IST

Servotech wins 900 kW solar rooftop order from UP Rural Development

Govt Defence OrderBusiness Updates View source PDFExplain this filing

SERVOTECH · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
+2.3%Reaction day
₹96.95
prior close
₹100.00
announcement price
After-mkt
timing
Nifty Microcap 250market · in no size index; the smallest one is used-1.1%+3.4% vs market
Other Electrical Equipment peers, median of 50sector-1.1%+3.4% vs sector

On the reaction day the stock moved 3.4 pts more than Nifty Microcap 250 and 3.4 pts more than its Other Electrical Equipment peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
-0.7
10m
+1.7
15m
+1.0
30m
-0.4
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
+2.3-1.1+3.4-1.1+3.4
Next day
+3.6-0.5+4.1-1.4+5.1
2d
+3.4-0.1+3.6-1.6+5.0
3d
+2.9-1.3+4.3-2.9+5.8
4d
+0.4-2.0+2.4-3.3+3.7
5d
-0.3-1.6+1.3-3.5+3.3
1w
-4.0-1.5-2.4-4.9+0.9
15d
-12.7+2.9-15.6-0.8-11.8
1m
-14.8+3.4-18.2-3.8-11.0
2m
-25.3+2.5-27.8-6.0-19.3
3m
-29.7-0.1-29.6-11.3-18.3
UpDownMarket · Nifty Microcap 250Sector · Other Electrical Equipment peers, median of 50Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Servotech Renewable Power System has secured a domestic order from UPSRLM, Rural Development Department Uttar Pradesh, for a 900 kW grid-connected rooftop solar project across 12 locations. Scope includes design, supply, installation, commissioning and maintenance of hybrid solar plants with battery storage. Execution timeline is 6 months.

Likely market impact

Government order boosts near-term revenue visibility in solar rooftop segment. Positive for order book; execution must complete within 6 months.