SHAKTIPUMPNSEShakti Pumps (India) Limited· Industrial ProductsHighPositive
Announced Fri, 17 Oct, 2025 · 16:11 IST

Rs 25 crore funding for 2.20 GW solar manufacturing plant

SHAKTIPUMP · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
+1.9%Reaction day
₹803.80
prior close
₹808.65
announcement price
After-mkt
timing
Nifty Microcap 250market · index membership as recorded later (tracked since Jun 2026)+1.0%+0.9% vs market
Compressors Pumps & Diesel Engines peers, median of 12sector+0.8%+1.1% vs sector

On the reaction day the stock moved 0.9 pts more than Nifty Microcap 250 and 1.1 pts more than its Compressors Pumps & Diesel Engines peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
-0.0
10m
-0.2
15m
-0.3
30m
-0.5
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
+1.9+1.0+0.9+0.8+1.1
Next day
+2.4+2.0+0.3+0.9+1.5
2d
+1.1+1.6-0.4+1.2-0.1
3d
+2.0+1.2+0.8+1.1+0.9
4d
+1.0+1.6-0.6+2.6-1.6
5d
+0.8+1.9-1.0+3.3-2.4
1w
+0.6+2.1-1.5+3.8-3.1
15d
-7.3+1.0-8.3-0.4-6.9
1m
-12.8+0.2-13.0-4.1-8.7
2m
-11.5-3.1-8.4-8.0-3.5
3m
-18.1-10.9-7.2-13.9-4.3
UpDownMarket · Nifty Microcap 250Sector · Compressors Pumps & Diesel Engines peers, median of 12Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Shakti Pumps will invest Rs 25 crore through equity shares in wholly owned subsidiary Shakti Energy Solutions to set up a greenfield solar cell and module plant in Pithampur, Madhya Pradesh, with planned capacity of 2.20 GW. The subsidiary's turnover rose from Rs 99.15 crore in FY23 to Rs 216.53 crore in FY25. The plant has not yet started operations.

Likely market impact

The funding expands Shakti Pumps' solar manufacturing exposure, but construction costs, start-up timing and returns remain uncertain.