Shree Cement Baloda Bazar plant lockout lifted, ops resume
SHREECEM · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 0.8 pts more than Nifty 100 and 0.7 pts more than its Cement & Cement Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Shree Cement's cement plant at Baloda Bazar, Raipur, Chhattisgarh was under lockout from 18th Dec 2025 due to a labor standoff. The company has informed that management and workmen have reached an amicable settlement, and the lockout has been withdrawn effective 22nd Dec 2025 at 11:00 PM. No property damage was reported. The disruption caused a production loss of around 10,000 tonnes per day during the five-day lockout period.
Short-term production loss of about 10,000 tonnes per day for 5 days. Plant is now operational, limiting long-term financial impact.