UNITEDPOLYNSEUnited Polyfab Gujarat Limited· Textiles & ApparelsHighNegative
Announced Thu, 19 Feb, 2026 · 19:11 IST

Fire at United Polyfab Gujarat factory in Ahmedabad, operations halted

Plant Fire AccidentCapex & Operations View source PDFExplain this filing

UNITEDPOLY · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
-5.0%Reaction day
₹23.98
prior close
₹22.79
announcement price
After-mkt
timing
Nifty Microcap 250market · in no size index; the smallest one is used-0.2%-4.8% vs market
Other Textile Products peers, median of 178sector-0.1%-4.8% vs sector

On the reaction day the stock moved 4.8 pts less than Nifty Microcap 250 and 4.8 pts less than its Other Textile Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
+0.0
10m
+0.9
15m
+0.9
30m
+8.4
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
-5.0-0.2-4.8-0.1-4.8
Next day
-8.9-0.0-8.9-0.4-8.5
2d
-11.1-1.3-9.8-1.6-9.5
3d
-6.7-1.1-5.6-2.1-4.6
4d
-2.0-0.8-1.2-2.0-0.0
5d
+2.8-1.9+4.7-2.0+4.9
1w
-3.5-6.6+3.1-6.9+3.3
15d
+3.8-9.7+13.6-9.6+13.4
1m
+16.3-8.2+24.6-8.7+25.1
2m
+23.9+3.1+20.8-0.2+24.1
3m
+46.0+5.9+40.1-3.0+49.0
UpDownMarket · Nifty Microcap 250Sector · Other Textile Products peers, median of 178Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

United Polyfab Gujarat's factory in Timba, Ahmedabad caught fire on 19 Feb 2026, causing damage to the factory building and machinery and assets. No injuries or casualties were reported. Operations at the affected shed have been temporarily halted. The exact loss quantum is being assessed and insurance claims are being filed with the insurer.

Likely market impact

Negative near-term due to halted operations and asset damage. Insurance may cover part of losses. Quantum still being evaluated.