Univastu bags Rs 23.74 crore CCTV order from L&T for Mumbai Metro Line 4
UNIVASTU · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 3.4 pts more than Nifty Microcap 250 and 4.3 pts more than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Univastu India received a Rs 23.74 crore work order (including 18% GST) from Larsen and Toubro for design, supply, installation, testing and commissioning of CCTV systems for Mumbai Metro Line 4 and 4A (Wadala to Kasarvadvali to Gaimukh). Scope also covers 2 years defect liability and 5 years comprehensive maintenance. Execution timeline is 67 weeks for design and build. Domestic order with no related party interest.
Strong order inflow from a reputed client lifts order book and provides multi-year revenue visibility through 7 years of maintenance.