Univastu bags Rs 391.76 Cr E&M order from L&T for Mumbai Metro Line 4 and 4A
UNIVASTU · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 10.5 pts more than Nifty Microcap 250 and 10.5 pts more than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Univastu India has received a work order worth Rs 391.76 Crores (including GST) from Larsen & Toubro for Electrical and Mechanical works on Mumbai Metro Line 4 and 4A corridor, an MMRDA project. Scope covers design, manufacture, supply, installation, testing and commissioning for 32 stations plus 2 years defect liability and 5 years comprehensive maintenance. Timeline is 100 weeks for design and build, with commencement from 27 Nov 2025. The embedded long-term maintenance provides multi-year revenue visibility.
Major order strengthens multi-year revenue visibility and positions Univastu as a trusted partner for marquee urban infrastructure projects.