WABAGNSEVA Tech Wabag Limited· EngineeringHighPositive
Announced Thu, 12 Mar · 08:27 IST

WABAG bags Mega PPP order from CMWSSB, towards 45 MLD TTRO Plant in Chennai, reinforcing Water Reuse Leadership

Order Above 5pct RevenueGovt Defence OrderBusiness Updates View source PDF

WABAG · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reaction · full curve

Awaiting price reaction for this filing.

AI summary

VA Tech Wabag has won a 'Mega' order (defined as above INR 1,000 Crores) from the Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) for the Refurbishment, Finance, Operate, Maintain and Transfer (RFOMT) of a 45 MLD Tertiary Treatment Reverse Osmosis (TTRO) plant at Kodungaiyur, Chennai, under a Public-Private Partnership model. WABAG will refurbish and upgrade the existing facility to its full 45 MLD capacity within 18 months, and then operate and maintain it for 18.5 years, supplying treated wastewater to industrial consumers in the Manali–Ennore and Manali–Minjur corridors. This adds to WABAG's existing 45 MLD Koyambedu TTRO plant in Chennai and a 40 MLD plant in Ghaziabad, further strengthening its leadership in water reuse and recycling.

Likely market impact

This is a significant order win that adds a long-tenure (18.5 years O&M) revenue stream alongside a sizeable upfront refurbishment contract, likely boosting order book visibility. It reinforces WABAG's dominance in India's water reuse segment and is a positive signal for revenue and earnings stability over the long term.