Axiscades Tech Q1 FY26 earnings call

Fri 8 Aug 2025AXISCADES

In brief

Q1 FY26 revenue ₹244cr (+9% YoY); chairman commits to 40%+ core growth backed by ₹3,087cr order visibility, eyes $1B by 2030.

Management's tone
Confident
What was said
Leaned positive
Guidance
Guidance held
Analyst pushback
Low
Stock, next session
−5.00% (Nifty 50 −0.95%)
  • Chairman committed to 40%+ YoY growth in core verticals (defense, aerospace, ESAI) for FY26, backed by ₹3,087 cr order book plus forecast visibility.
  • FY26 guidance: ~25% consolidated revenue growth and 300 bps EBITDA margin improvement (after factoring ESOP), accelerating from H2 FY26.
  • Core verticals (defense, aerospace, ESAI) grew 17% YoY to ₹182 cr in Q1: ESAI +34%, defense +23%, aerospace +8%; core normalized EBITDA margin rose from 13.5% to 18.6%.
  • Q1 FY26 normalized EBITDA grew 86% YoY after adjusting out a one-time ₹12.9 cr ESOP provision write-back in Q1 FY25; reported EBITDA ₹34 cr at 14% margin.
  • New global partnerships signed: MBDA for missile and Indra for radar; AAIPL strategic-partner funding for infrastructure expected in Q2 (small) and Q4 (major).

An AI read of the company's transcript · the filing

The numbers

The quarter, Q1 FY26

This quarterA year agoLast quarterMargin
Revenue₹244 cr+9.0%−9.1%
EBITDA (excl. other income)₹34.1 cr+8.8%−3.9%14% (14% a year ago)
Net profit₹20.8 cr+21.6%−32.5%8.5% (7.6% a year ago)
EPS (₹)₹4.88+19.9%−32.6%

From the company's filed results for the quarter ended 30 Jun 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

Where management's figures differ from the filing

  • Consolidated PAT YoY growth (Q1 FY26): said Up 25% year-on-year, from Rs.17 crores in Q1 FY25 to Rs.21 crores in Q1 FY26; filed Net profit to owners ₹20.75 cr, +21.6% YoY (margin 8.5%). Stated 25% growth and Rs.17 cr base imply a Q1 FY25 PAT of ~Rs.16.6-16.8 cr; filed base of ~Rs.17.06 cr yields 21.6% YoY, ~3.4pp gap.

What moved the numbers, as management explained it

  • Defense revenue and profitability back-ended to H2 FY26; Q1 traditionally lean as defense revenues aggregate in Q3-Q4 due to customer-acceptance/approval cycles.
  • Q1 FY25 reported EBITDA of ₹31 cr included a one-time ESOP provision write-back of ₹12.9 cr; Q1 FY26 ESOP cost was only ~₹3 cr, so normalized EBITDA growth was 86% YoY. (one-off)
  • Non-core verticals (Heavy Engineering, Automotive, Energy) declined 9% YoY due to automotive macro pressures and energy order-timing shifts.
  • ESAI grew 34% YoY on ramp-up in Texas Instruments business and new hyperscaler engagements (Amazon, Apple).
  • Core segment normalized EBITDA margin expanded from 13.5% to 18.6% YoY (consolidated diluted to 14% by lower-margin non-core).

The numbers management led with

  • Order book FY26 (firm): Rs 1,260 crores
  • Total order book + forecast visibility (FY26 + FY27): Rs 3,087 crores
  • Power 930 long-term revenue target: Rs 9,000 crores ($1 billion) by 2030
  • Infrastructure investment: ~$200 million (~Rs 1,500 crores) before FY27

Guidance

Guidance on this call

WhatForWhat management saidFiled
Core verticals YoY growth FY26 (Core (Defense, Aerospace, ESAI))FY26Over 40% year-on-year growth in core verticals (defense, aerospace, ESAI) for FY26—
Consolidated revenue growth FY26FY26Around 25% growth in revenue in FY26, including core and non-core12.5%, below the figure guided
EBITDA margin improvement FY26FY26300 bps improvement in EBITDA over the previous year (after factoring ESOP cost)—
Core revenue CAGR FY26-FY28 (Core (Defense, Aerospace, ESAI))FY26-FY2840% CAGR in revenue in core verticals over three fiscal years up to FY28—
Core EBITDA margin by FY28 (Core (Defense, Aerospace, ESAI))FY28EBITDA margin of around 19.5% in the three fiscal years up to FY28 in core verticals—
Core EBITDA margin FY27 onwards (Core (Defense, Aerospace, ESAI))FY27Years to come: 20-21% EBITDA margin in core sector (this year 19.2-19.8%)—
Power 930 revenue targetFY30Power 930: $1 billion (Rs.9,000 crores) revenue by 2030—
Power 930 EBITDA margin targetFY30Power 930: 24% EBITDA margin by 2030—
Power 930 infrastructure capexFY27Investing about $200 million (~Rs.1,500 crores) in infrastructure before the beginning of FY27—
Post-infrastructure revenue growthFY28-FY30Tremendous jump growth of more than 70% once infrastructure and facilities are ready—
ESOP cost FY26FY26ESOP cost in FY26 will be slightly lower than Rs.50-60 cr earlier guidance, around Rs.40-50 crores—
Defense order book FY26+FY27FY26-FY27Defense order book of close to Rs.1,500 crores for FY26 and FY27 (already booked and secured)—

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

What changed since the Tue 27 May 2025 call

WhatOn the Tue 27 May 2025 callOn this call
FY26 core growth target (restated)Aerospace 35%, ESAI 60-75%, Defense 60-75% growth (per-vertical)Over 40% year-on-year growth in core verticals (defense, aerospace, ESAI) - consolidated
ESOP cost FY26 (cut)Rs 50-60 crores in FY26 (vs <Rs 5 cr in FY25)Maybe slightly lower than that - around Rs 40-50 crores
EBITDA margin 300 bps basis (restated)Minimum 50% EBITDA growth in FY26 excluding ESOP cost; 300 bps margin improvement300 bps improvement in EBITDA after factoring in ESOP cost
DAC Phase-1A completion (delayed)Complete DAC Phase-1A by Jan 2026Phase 1A of our DAC also will be ready by March
Power 930 infrastructure investment (new)No specific infrastructure capex figure called outInvesting about $200 million (~Rs.1,500 crores) in infrastructure before the beginning of FY27
New hyperscaler wins at ESAI (new)Not mentionedNew relationships with Amazon and Apple; world-class acoustic lab being set up
Global partnerships in defense (new)Not called outSigned partnerships with MBDA (missile activities) and Indra (radar-related activities)

Guided on earlier calls, and what was filed

WhatForGuidedFiled
FY25 EBITDA marginFY2515–15.5% (on the Q4 FY24 call)13.4%, below the range
FY26 PAT targetFY26₹160–180 cr (on the Q4 FY24 call)₹72 cr, below the range
Minimum EBITDA growth ex-ESOPFY26at least 50% (on the Q4 FY25 call)20.7%, below the range
EBITDA margin (at-least average)FY26at least 17% (on the Q4 FY25 call)14.4%, below the range

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Defense

Grew 23% YoY in Q1 FY26; order book ~₹540 cr deliverable in FY26 and ~₹1,500 cr across FY26+FY27. Includes DRDO/PSU/OEM orders, counter-drone systems, and tank trailer (~₹200 cr). H2-back-ended; margin ~19%+.

Revenue growth 23% YoY · Order book ₹540 cr FY26 deliverable · Order book ₹1,500 cr FY26+FY27 · Tank trailer order ₹200 cr · Margin 19%+ · KUSHA: 474 radar systems (~1,976 missiles)

Outlook: H2 FY26 ramp-up; 20-21% core margin in years to come; BrahMos wire harness to qualify into production in ~6 months; AAIPL funding tranches in Q2 and Q4.

Aerospace

Grew 8% YoY in Q1 FY26; margin ~16% this quarter (lower due to mix); order book ~₹450 cr for FY26. Q1 lean, Q2 affected by European Airbus holidays; ramp from H2.

Revenue growth 8% YoY · Order book ₹450 cr FY26 · Margin 16% Q1 FY26 · Q1+Q2 ~35% of annual sales · LCA per-aircraft Rs 12-13 cr

Outlook: Ramp-up in H2 FY26; tooling work to yield results from Q3-Q4; passenger-to-fleet conversion under early evaluation; non-linearity to come in FY27-28.

ESAI

Grew 34% YoY in Q1 FY26; new wins with Amazon and Apple (hyperscalers); Texas Instruments business ramped; margin 22-23%. Order book ~₹210 cr FY26.

Revenue growth 34% YoY · Order book ₹210 cr FY26 · Margin 22-23% · 27% of revenue from US · EHWT homing receiver ₹1.5 cr/unit, ~100 units over 5 years

Outlook: Continued growth momentum; new hyperscaler engagement to be highlighted next call; ADAS/SDV wins in last two weeks; acoustic lab for hyperscaler ready by Oct-Nov 2025.

Non-core (Heavy Engineering, Automotive, Energy)

Declined 9% YoY in Q1 FY26 due to automotive macro pressures and energy timing-related order shifts; segment diluted consolidated EBITDA margin from 18.6% (core) to 14% (consolidated).

Revenue decline 9% YoY · Marginal profitability turnaround in Q1

Outlook: Recalibrating business with mix/cost optimization and strategic-advisor engagement; restructuring underway; non-core growth path to be clarified by beginning of FY27.

Balance sheet, capex and funding

  • Working capital debt ~₹48 cr at ~9.5% weighted average; long-term debt ~₹101 cr with AIF; blended finance cost ~8-8.5%.
  • Power 930 infrastructure investment of ~$200M (~₹1,500 cr) planned before beginning of FY27; funded via AAIPL strategic partner, no listed-company borrowings or equity dilution.
  • DAC Phase-1A capex ~₹120 cr (last-call guidance); AAIPL strategic-partner funding tranches expected in Q2 (small) and Q4 (major) FY26.
  • Defense payment cycle averaging ~120 days (range 90-180 days including performance guarantees and LD clauses).
  • Additional working capital required for FY27 will be organized at that point; management sees no major funding issue for current growth.

The industry, as management sees it

Management sees strong tailwinds in Indian defense procurement (recent DAC approval of Rs 67,000 cr covering 8-9 platforms including mountain radar and BrahMos) and rising global demand for missile/radar systems. They highlighted partnerships with MBDA and Indra as evidence of growing international collaboration, and emphasized India's positioning as an alternative supply chain destination amid global tariff disruptions. Aerospace is described as cyclical with Q1-Q2 weakness tied to European summer holidays and Q3-Q4 ramp driven by Airbus/Bombardier demand.

Risks management named

  • Customer acceptance trials create ~3-month lag between product readiness and revenue recognition
  • Non-core verticals (heavy engineering, automotive, energy) under macro pressure; restructuring underway
  • Attrition elevated at 19% in Q1 FY26; upskilling programs underway for core domains

Q&A

The Q&A was dominated by forward-looking questions on growth trajectory, infrastructure build-out, and tier-1 progression. Chairman Dr. Ravinarayanan handled the bulk of responses with very specific quantitative commitments, while CFO Shashidhar SK addressed margin/ESOP/debt questions with precision. The most notable non-answer was Mahek Talati's question on promoter share selling — the moderator cut off mid-question without any management response. Several substantive queries on AI efficiency metrics, Tejas/ELTA competitive impact and maritime patrol radar involvement were also deferred or deflected to future calls.

Not answered directly

  • AI efficiency quantification (deferred to next quarter)
  • Tejas/ELTA competitive impact (deferred to next investor call)
  • Promoter share selling rationale (cut off by moderator, no answer)
  • Maritime patrol radar involvement (denied participation)

Asked for a number, answered without one

  • AI-empowered engineering efficiency: Working on it; chairman said he will be able to highlight more next quarter, possibly in the next one or two months.
  • Tejas Mk1A / Israeli partner impact: Chairman said he will give much better and good news regarding this in the next investor call; declined to disclose specifics now.
  • Maritime patrol radar: Chairman said, 'I do not think we have given a projection' and stated the company is not involved in that program.
  • Aerospace non-linearity areas: Stated this year is from existing set of customers; did not quantify specific non-linear growth areas for FY26.
  • Order book split by program (SU-30, counter-drone): Gave combined figures (Rs.540 cr defense, Rs.210 cr ESAI, Rs.450 cr aerospace) and broad buckets (DRDO, PSU, OEM, counter-drone, tank trailer) but no program-level split.

Every question, with its answer

  1. 1. Defense & aerospace exposure, order book, AI

    Balasubramanian, Arihant Capital Markets Limited

    Question. On the defense and aerospace side — we are targeting ~75% revenue contribution; how exposed are we to budget cuts or delays in Indian defense procurement, SU-30 upgrades, LRDE projects? Could you break down the Rs 1,800 cr order book by program size and delivery timelines? And on AI-empowered engineering — what kind of efficiency gains (reduced design cycles, premium pricing, market share gains) can we expect?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman outlined order book split: defense ~Rs 540 cr (DRDO, PSU, OEM work including MBDA/Indra), ESAI ~Rs 210 cr, aerospace ~Rs 450 cr. Stressed no dependency or delay in current programs, with long-term visibility; products like Direction Finder feature across multiple platforms. On AI, mentioned working on various defense AI combinations and foreign collaborations for anti-drone; deferred AI efficiency metrics to next quarter.

    Follow-up. On AI and Powered Engineering strategy — is there any measurable efficiency we can expect?

    Answer. Chairman said 'We are working on that. I will be able to highlight more next quarter. We may find something very interesting in the next one or two months and we will be in a position to explain further by next quarter.' Government of India is focused on certain activities and we are working on that.

    Not answered directly.

  2. 2. Customer diversification & tariff impact

    Balasubramanian, Arihant Capital Markets Limited

    Question. On tier-1 stability — what tangible progress have we made diversifying into other OEMs and tier-1s? And is there any tariff impact on global levels — US has imposed various tariff rates; how do we have an advantage compared to other countries?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman addressed tariff impact: 27% of revenues come from the US, mainly from ESAI, with other revenues booked in US via US Inc. to avoid India/US dependency. KP Mohanakrishnan (joined in April) added that they are expanding into new customers — wins with tier-1s like Mubia and engagement with Boeing, with results expected in Q3 and Q4. Some small wins with Indian tier-1s as well for risk mitigation.

    Follow-up. On attrition — it rose to 19% in this quarter; as we move to defense and aerospace, what steps have we taken for talent retention and training/upskilling programs, especially for critical defense and aerospace roles?

    Answer. D. Murali Krishnan (COO) responded that attrition control is important; significant upskilling programs for core domains (aerospace design, concession, repair, manufacturing engineering) and collaborations with external agencies to reskill/retrain employees.

  3. 3. CAPEX funding & seasonal Q1 weakness

    Varun Kulkarni, InCred Asset Management

    Question. Two questions. On the new facilities contributing 30% and 50% of total revenues in FY27 and FY28 — how are we planning to fund this capex? JV or equity dilution or debt? If JV, have we found a partner? And why is Q1 generally lower? What is the timeline of contracts and revenue flow once awarded? What is the payment cycle in defense?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman said facilities are being developed by AXISCADES Aerospace Infrastructure Pvt Ltd (AAIPL), owned by ACAT; raising money / seeking strategic partnership at AAIPL level. Have 'oral commitment in two tranches' — first small portion in Q2/early Q3, major portion by Q4 — from strategic partners. No plan to borrow or dilute at listed company level. Defense payment cycle ~120 days (range 90 days to longer). Some additional working capital needed for FY27. CFO added Q1 is lean because defense revenues (~30%+ share) are back-ended to Q3-Q4; Q1 predominantly reflects engineering services revenue.

  4. 4. ESAI growth drivers

    Saurabh Sadhwani, Sahasrar Capital

    Question. Two questions for Anurag: what led to the growth in ESAI? And what are we doing with the Apple win we announced?

    Answer, Anurag Sharma, President (ESAI) & CEO (Add-Solution). Anurag Sharma said growth driven by new engagements with hyperscalers Amazon and Apple; semiconductor market is moving to application/use-oriented chip design. ESAI growth specifically came from business with Texas Instruments, which has grown significantly vs last year.

    Follow-up. On Apple — are we trying to build ASICs for them now? And for Amazon too?

    Answer. Chairman clarified they are NOT building ASICs directly. For 'phone company' (Apple), working on support activities — building boards for test/evaluation — through Apple's local manufacturing partner in India. For 'marketplace company' (Amazon), working on Kindle, Alexa product sides; setting up a world-class acoustic lab for them, to be ready by Oct/Nov. Growth driver: broke dependency on Qualcomm and Texas Instruments, now working with AI chip manufacturers. Major recent wins in ADAS, SDV, transportation-related ESAI areas.

  5. 5. Margin trajectory, Power 930 math, ESOP cost

    Deepak Poddar, Sapphire Capital

    Question. Three questions. On core business targeting 40% CAGR over next three years — what margin aspirations can we have? First quarter was at 18.6% EBITDA margin — how should one look at it as scale picks up? If this year we grow ~25%, we will reach ~Rs 1,300 cr consol — to reach Rs 9,000 cr in next four years requires 60% CAGR. Is that doable? And what was ESOP cost this quarter? Rs 12.9 cr right? When you say 300 bps margin improvement, do you exclude ESOP cost?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman on margins: ESAI at 22-23%, defense 19%+, aerospace 16%. Core verticals may end FY26 at 19.2-19.8%, then 20-21% in years after. On Power 930 math: not optimistic or hypothetical — investing ~$200M (~Rs 1,500 cr) in infrastructure before 2027 should lead to 'tremendous jump growth' of 70%+ to compensate. First two years 40-45% core growth, then steeper growth. CFO on ESOP: Rs 3 cr in Q1 (only chairman grant active); full year FY26 estimate Rs 40-50 cr; rest of plan starts showing in Q2. 300 bps margin improvement is AFTER factoring ESOP cost.

  6. 6. DAC approval programs, BrahMos wiring harness

    Harshit Kapadia, Elara Securities

    Question. On recent defense acquisition approval of Rs 67,000 cr — could you share which areas AXISCADES is involved in among the disclosed platforms? Also on BrahMos — there was an order of ~Rs 11,000 cr; are we supplying wiring harness?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Sunil (delivery head, defense) confirmed involvement in mountain radar — distal beam forming and signal blocking systems. On BrahMos wiring harness: D. Murali Krishnan (COO) confirmed ongoing order; will qualify into production soon and be part of later deliveries. Also working on critical electronic systems for BrahMos. Chairman added: BrahMos has 71 wire harnesses; already selected in major one; within six months should be part of it; remaining also a shot at it. Also onboard computers, strategic electronic units, and major development under way to be disclosed in Q2.

  7. 7. Tier-1 trajectory and system integration

    Vijay Sarathy, Subhkam Ventures

    Question. Most growth comes with us being a core system supplier/integrator and not just a component player. For instance, Project Kusha — we are doing digital beam forming unit. Moving up the scale — do we see ourselves moving up to platform level? Would we qualify as a tier-1 player in next 3-4 years?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman said do not want to single out a particular project. Have own modules going into subsystems across every major product (Direction Finder, Direct RF, exciter receiver, digital beam forming). On missile side (BrahMos, Kusha) — already setting up competencies in rocket motors, seekers, onboard computers, electronics — everything except warhead. On radar side — attempting full radar in many cases, looking at foreign OEMs for radar maintenance/support/integration. With Indra collaboration making products, working on TACAN antenna for exports and total systems. Once facility is ready, will be among largest for radar. Not merely system integrator — make own subsystems, integrate, develop from ground.

  8. 8. Order book bifurcation, aerospace confidence

    Ruchita, iWealth

    Question. On the order book side — could you give bifurcation of defense order book vs other components? Last quarter we said defense order book was ~Rs 1,000 cr — what is closing order book today? And this quarter aerospace revenue grew only 6% — full year guidance is steeper — what gives confidence on full year growth?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman: defense order book ~Rs 540 cr this year (could be Rs 600 cr depending on delivery), comprising DRDO, PSU, OEM orders, counter-drone systems, and tank trailer order (Rs 200 cr, targeting 20 systems/month). For FY26-27 combined, defense order book ~Rs 1,500 cr (already booked and secured). Includes offset orders via OEM contracts and MoUs/agreements as recurring arrangements. On aerospace: KP Mohanakrishnan said order book Rs 450 cr; Q1 and Q2 usually lean (~35% of overall sale), remaining in Q3-Q4 — tradition; confident of meeting numbers.

  9. 9. Tejas/ELTA competitive impact, promoter selling

    Mahek Talati, Agility Advisors

    Question. News about HAL providing letter of intent to Israeli company for Tejas Mk1 for 31st airplane — how will this impact us? Apart from rare components, what is company providing for Tejas? What is estimated value derived per aircraft? And one more — promoter has been consistently selling shares. What is the reason behind the selling?

    Answer, Dr. Sampath Ravinarayanan, Chairman. On Tejas/ELTA: Chairman said 'We are aware of that. In next investor call, I will be able to give you a much better and good news regarding that.' Sunil (delivery head, defense) said per LCA value ~Rs 12-13 cr currently; looking at few more systems in LCA Mk1A which could add couple of more crores. Components include EW, ERP of radar, mission computer, smart multifunction display. On promoter selling — moderator cut off mid-question and went to next analyst; no management answer provided.

    Not answered directly.

  10. 10. Execution timing, debt structure

    Rohan Mehta, Ficom Family Office

    Question. Given strong growth guidance — when precisely does execution pick up in the core segment? Do you expect Q2 to be similar to Q1 or with improvements? And if orders are already in hand, why is execution pushed to H2? Could you also provide average interest rate on outstanding debt?

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman on execution: Q2 will show fairly good improvement vs Q1, despite being weak for aerospace (Airbus Europe closed ~1 month for holidays, services-only). Q2 has sluggishness from foreign company holidays. Q1 and Q2 don't reflect full year — defense customer-readiness is the issue: products ready but customers need to inspect/approve/ship — ~3 months lag. Manpower constraints in certain order types. Q3-Q4 are the strong defense cycles. CFO on debt: working capital debt ~Rs 48 cr at weighted average ~9.5%; long-term debt ~Rs 101 cr with AIF; average finance cost ~8-8.5%.

  11. 11. Aerospace ramp-up, tooling, MBDA & Indra status

    Akshay, XponentTribe

    Question. Four questions. On aerospace — what specific areas will ramp up to reach ~Rs 450 cr FY26 revenue? Airbus has been steady but not non-linear — which areas add nonlinearity? On tooling — what kind of tooling are we going to do? Is it similar to Unimech? On MBDA — have we sent a sample test bench and when do we start commercial supplies? On Indra — TACAN antenna — where are we on development?

    Answer, Dr. Sampath Ravinarayanan, Chairman. KP Mohanakrishnan on aerospace: order book Rs 450 cr from existing customers (predominantly Airbus, Bombardier); not talking non-linear growth this year. Tooling plan is for flying parts (components, assemblies) and non-flying parts (GSE, GHE). Started some work; results likely in Q3, Q4 and next year. One small order from Indian tier-1s likely to help win more from international customers. Sharadhi Babu on MBDA: already partner; center of excellence for test benches; ongoing test bench program; enhanced volume this year. Indra: short cycle prototype, then production; production orders either H2 this year or next year.

    Follow-up. On EHWT — what is the value of the homing receiver and how many EHWTs will be procured?

    Answer. Chairman said homing receiver ~Rs 1.5 cr per torpedo; looking at ~20 per year, total ~100 numbers in next five years. Already started first of production; will deliver first unit by November/December this year.

  12. 12. KUSHA program & OEM test benches

    Rupesh Tatya, Shree Rama Managers PMS

    Question. Two questions. On KUSHA — how many radars and digital beam forming units are in the long-range battle management radar? In the past we said Rs 5 cr per KUSHA missile (IFF, on-board computer, rocket motor casing) — are prototypes approved or under testing? Are we single source supplier? On OEM business — generic test benches for MBDA, has the prototype been made and sent? When will it be qualified? Same question for Indra TACAN antenna.

    Answer, Dr. Sampath Ravinarayanan, Chairman. Chairman: KUSHA acceptance of necessity is for 474 batteries (radar part). Other than that, very confident of major value but going behind schedule — will discuss in next meeting. Sunil: DBF order received now, will deliver by March this financial year; once trials complete, production starts; right now order book for 5 numbers initially; will take 4-5 years total. Chairman confirmed OEM test bench status already covered by previous answer (MBDA enhanced volumes ongoing; Indra prototype then production).

    Follow-up. On maritime patrol radar — I think my understanding is Dornier 228 upgrade, DRDO has missed the bus, and it is not present in any other LUH. Where are we on this and which platform will it be?

    Answer. Chairman: 'On maritime patrol radar, I do not think we have given a projection, right?' Analyst asked if they are not involved. Chairman: 'No.'

  13. 13. Aerospace manufacturing vs technology provider

    Varun Kulkarni, InCred AMC

    Question. Most of my questions have been answered. Just one small touch up — what will we be exactly manufacturing in the aerospace segment going forward, or would we be focused on being a technology provider since we are classified as a tier 2 and tier 3 in the value chain?

    Answer, KP Mohanakrishnan, Deputy CEO & President (Aerospace). Mohan said they are leveraging engineering expertise and moving to next level for manufacturing. In tooling, already tool design experts and graduating into tool manufacturing for end-to-end solution. Addressing ramp-up requirement via spares/speed-shop for final assembly line partners. Other early-stage opportunities like passenger-to-fleet conversion to be addressed in Q3. MRO, component repair and testing also planned. Same missionaries/capability required across all, allowing efficient asset management.

What was said

Topic by topic, in the order it was spoken

Welcome and Forward-Looking Statement · Sangeeta Tripathi (Head, Investor Relations)

  • Welcomed participants to the Q1 FY26 earnings conference call
  • Introduced the leadership team present on the call
  • Issued standard forward-looking statement disclaimer
  • Handed over the call to the Chairman for opening remarks

Chairman's Strategic Initiatives · Dr. Sampath Ravinarayanan (Chairman)

  • Announced 40%+ YoY growth target for FY26-FY27, backed by Rs 1,260 cr FY26 order book plus Rs 1,827 cr FY27 forecast visibility (Rs 3,087 cr combined)
  • Revealed 'Power 930' long-term plan to reach Rs 9,000 cr ($1 billion) revenue by 2030, supported by ongoing infrastructure build-out
  • Highlighted new global partnerships with MBDA (missile systems) and Indra (radar systems), expected to deliver annuity revenue and technological edge
  • Clarified partnerships span all three core domains — defense, ESAI and aerospace
  • Tone was decisively forward-looking, emphasizing pipeline visibility and execution confidence

CFO's Financial Review and FY26 Guidance · Shashidhar S.K. (Chief Financial Officer)

  • Q1 FY26 consolidated revenue at Rs 244 cr, up ~9% YoY; reported EBITDA Rs 34 cr at 14% margin (normalized +86% YoY after Rs 12.9 cr ESOP write-back in base)
  • PAT rose 25% YoY to Rs 21 cr; core verticals revenue grew 17% to Rs 182 cr, with ESAI +34%, defense +23%, aerospace +8%
  • Core vertical normalized EBITDA grew 61% YoY to Rs 34 cr; margin expanded from 13.5% to 18.6%
  • Non-core verticals (heavy engineering, automotive, energy) declined 9% YoY due to macro headwinds; restructuring underway with a strategic advisor
  • Reaffirmed FY26 guidance: ~25% consolidated revenue growth and ~300 bps EBITDA margin improvement, including ESOP cost; H2 FY26 expected to drive the bulk of defense revenue and margin expansion
  • Reiterated 40% CAGR core-vertical revenue target through FY28 with EBITDA margin of ~19.5% by FY28

In their words

we have set up a target of over 40% year-on-year growth and we are all set for that. We have an order book of Rs.1,260 crores for this financial year FY26 and Rs.1,827 crores for the next financial year, that is FY27
Dr. Sampath Ravinarayanan (Chairman, AXISCADES Technologies Limited)
we are almost investing about $200 million, about Rs.1,500 crores in infrastructure before the beginning of '27. So, that should lead us to a tremendous jump growth of nearly about, I would say, more than 70%, which will compensate for
Dr. Sampath Ravinarayanan (Chairman, AXISCADES Technologies Limited)
The current year FY26 guidance is around 25% growth in revenue, including core and non-core and 300 bps improvement in EBITDA over the previous year, driven by our core verticals.
Shashidhar S.K. (Chief Financial Officer, AXISCADES Technologies Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • Q2 ESOP cost impact as other grants begin vesting (chairman was only beneficiary in Q1)
  • AI-empowered engineering efficiency gains - chairman committed more detail next quarter
  • Tejas Mk1A/ELTA (Israeli partner) update - chairman committed positive news on next call
  • KUSHA prototype testing and component supply progress (5 DBF units to deliver by March 2026)
  • Phase 1A DAC facility completion now targeted March 2026 (delayed from January 2026)
  • Aerospace tooling first revenue; new hyperscaler engagement at ESAI to be highlighted next call

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Fri 8 Aug 2025₹1,295.10−5.00%−0.95%
5 sessions Thu 14 Aug 2025₹1,210.80−11.18%+0.14%
20 sessions Mon 8 Sept 2025₹1,508.60+10.67%+0.72%

From the close of Thu 7 Aug 2025, ₹1,363.20: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Axiscades Tech's other calls