Axiscades Tech Q1 FY27 earnings call
In brief
AXISCADES Q1 FY27: continuing revenue ₹183 cr (+94% YoY); reported PAT loss ₹14.8 cr from divestment one-offs; ₹1,255 cr gain due Q2-Q3.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −2.92% (Nifty 50 −0.12%)
- Continuing revenue ₹183 cr (+94% YoY); reported PAT loss ₹14.8 cr from divestment one-offs (₹13.1 cr provision + ₹21.81 cr deal cost).
- Defense business delivered ₹125 cr revenue (+112% YoY) with ₹13 cr underlying EBIT (+15% YoY); assured forecast visibility at ₹4,557 cr through FY30.
- Zeta (eSi) business posted ₹49.5 cr revenue (+63% YoY) at 33% EBITDA margin, adding two global technology customers.
- ₹1,255 cr extraordinary gain on divestment to be recorded in Q2-Q3 FY27 as Cordis closes; FY27 guidance of ₹1,477 cr revenue and ₹270 cr EBITDA reaffirmed.
- Aerospace manufacturing at ₹6.1 cr revenue in pre-revenue build phase; ₹378 cr annualized run rate and ₹84 cr EBITDA targeted by Q4 FY27.
An AI read of our transcription of the recording · the filing
The numbers
The quarter, Q1 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹183 cr | −24.8% | −32.8% | |
| EBITDA (excl. other income) | ₹8.7 cr | −74.5% | −71.3% | 4.7% (14% a year ago) |
| Net profit | ₹-14.8 cr | — | — | -8.1% (8.5% a year ago) |
| EPS (₹) | ₹-3.49 | — | — |
From the company's filed results for the quarter ended 30 Jun 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Revenue YoY growth (continuing operations): said +94% YoY (continuing vs continuing like-for-like); filed -24.8% YoY. Management compares on continuing-only like-for-like basis; filed comparison uses prior year consolidated as originally reported pre-restatement.
- EBITDA (continuing operations, normalized): said ₹18.3 cr (after receivables provision normalization); filed ₹8.69 cr. Normalized figure adds back ₹9.62 cr one-off conservative provision on aged defense receivable from Ministry of Defense.
What moved the numbers, as management explained it
- Ind AS 105 split: combined ₹346 cr into ₹183 cr continuing and ₹163 cr discontinued; YoY comparisons on continuing-only like-for-like basis. (accounting)
- ₹13.1 cr one-off provision inside EBITDA: ₹9.62 cr conservative provision on aged Ministry of Defense receivable and ₹3.5 cr hedge provision from unwinding positions. (one-off)
- ₹21.81 cr transaction cost (~half of estimated ₹45 cr, ~2% of total transaction value) on Cordis divestment taken as exceptional item below EBITDA. (one-off)
- ADD Solutions (non-core European unit) recorded ₹4.8 cr EBITDA loss and ₹6.7 cr PAT loss in continuing; constitutes most of continuing loss of ₹7.04 cr. (one-off)
- Borrowings, corporate costs, finance cost (₹8.9 cr) and depreciation (₹8.8 cr) remain in continuing while earnings business leaves on cash-free, debt-free basis.
The numbers management led with
- Consolidated revenue: Rs 346 cr in Q1 FY27 (+42% YoY, +27% QoQ) - highest in company history
- Cordis transaction value: $237M (~Rs 2,250 cr) approved July 27, 2026; two-phase close
- Extraordinary gain on divestment: Rs 1,255 cr to be recognized on close in Q2-Q3 FY27
- Defense revenue (continuing): Rs 125 cr in Q1 FY27 (+112% YoY); underlying EBIT Rs 13 cr (+15% YoY)
- Defense assured forecast visibility: Rs 4,557 cr across three years; broader pipeline Rs 24,000+ cr
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 continuing operations revenue (annualized pro forma) | FY27 | ₹1,477 cr continuing operations revenue on annualized pro forma basis. |
| FY27 EBITDA (normalized pro forma) | FY27 | ₹270 cr EBITDA on normalized pro forma basis. |
| FY27 PAT (continuing operations) | FY27 | PAT broadly around 50% of ₹270 cr EBITDA, around ₹135 cr. |
| FY27 defense revenue growth | FY27 | Defense to grow at over 75% YoY in FY27. |
| FY27 ZIDA revenue growth (ZIDA (eSi/Zeta)) | FY27 | ZIDA business to grow by over 100% YoY in FY27. |
| Aerospace manufacturing annualized run rate | Q4 FY27 | Targeted annualized run rate of ₹378 cr revenue by Q4 FY27. |
| Aerospace manufacturing annualized run rate | Q4 FY27 | Targeted annualized run rate of ₹84 cr EBITDA by Q4 FY27. |
| Power 930 PAT target | FY30 | PAT target of ₹930 cr by FY30 (Power 930). |
| Aerospace revenue target (Aerospace Manufacturing) | FY29 | Aerospace platform targeting ₹1,000 cr revenue by FY29. |
| Extraordinary gain on Cordis divestment | Q2-Q3 FY27 | ₹1,255 cr extraordinary gain on Cordis divestment to be recorded in Q2-Q3 FY27. |
| Assured forecast visibility (defense) | FY30 | Assured forecast visibility of ₹4,557 cr across defense to be executed by FY30. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Minimum EBITDA growth ex-ESOP | FY26 | at least 50% (on the Q4 FY25 call) | 20.7%, below the range |
| EBITDA margin (at-least average) | FY26 | at least 17% (on the Q4 FY25 call) | 14.4%, below the range |
| Consolidated revenue growth FY26 | FY26 | 25% (on the Q1 FY26 call) | 12.5%, below the figure guided |
| Overall EBITDA growth | FY26 | at least 45% (on the Q2 FY26 call) | 20.7%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Defense
Strongest continuing business; ₹125 cr revenue up 112% YoY driven by directed energy, missile, radar and helicopter electronics wins.
Revenue ₹125 cr (+112% YoY) · Underlying EBIT ₹13 cr (+15% YoY) · Assured forecast visibility ₹4,557 cr · Order wins since April: 8
Outlook: 75%+ YoY revenue growth for FY27; visibility extends through FY30.
Zeta (eSi)
Electronics/semiconductor equipment business re-domiciiled to US; ₹49.5 cr revenue up 63% YoY at 33% EBITDA margin, adding two global logos.
Revenue ₹49.5 cr (+63% YoY) · EBITDA ₹14.7 cr · EBITDA margin 33%
Outlook: 100%+ YoY growth targeted in FY27 on organic + acquisitions.
Aerospace Manufacturing
Pre-revenue build phase with ₹6.1 cr revenue; signed NBO on AS9100-certified precision manufacturing target (₹180 cr revenue, ₹39 cr EBITDA at 22% margin).
Revenue ₹6.1 cr · Aerospace leadership team 13 members
Outlook: ₹378 cr annualized revenue and ₹84 cr EBITDA by Q4 FY27; ₹1,000 cr by FY29.
Balance sheet, capex and funding
- Cash on balance sheet grew 78% to ₹81 cr ahead of first tranche of divestment money.
- PP&E rose by ₹40 cr in Q1 as capacity is built for Power 930 ramp-up.
- Capex plan ~₹1,600 cr for facilities + ₹600 cr for acquisitions; bridge facility of ₹100-150 cr to cover timing gap.
- Cordis Phase 1 by 31 Aug 2026 with ₹190 cr post-tax cash; Phase 2 by 30 Nov 2026 with ₹525 cr further cash.
- Finance cost ₹8.9 cr and depreciation ₹8.8 cr remain in continuing; engineering services closes this quarter, aerospace services next quarter; total proceeds ~₹920 cr.
The industry, as management sees it
Management views the Indian aerospace, defense and electronics sectors as moving into a Make-in-India manufacturing phase with global OEMs seeking local supply-chain partners and willing to take equity stakes; directed energy weapons, missile subsystems (BrahMos-NG seekers), and space are positioned as high-growth verticals where AXISCADES is investing ahead of demand. The Rs 24,000+ cr defense pipeline cited suggests management sees a multi-year structural upcycle in indigenous defense manufacturing.
Risks management named
- ADD Solutions (non-core European unit) lost Rs 4.8 cr EBITDA / Rs 6.7 cr PAT in Q1; planned divestment by Q4 FY27
- Rs 100-150 cr bridge facility required to fund capex pending divestment proceeds
- Rs 140 cr revenue deferral carried into Q2-Q3 FY27 from prior supply-chain constraints
- Acquisition timing is binary - several deals still at non-binding stage
Q&A
Q&A was substantive and largely unblocked: management handled detailed questions on the divestment rationale, FY27 PAT guidance (Rs 135 cr on ~50% of EBITDA), acquisition timeline (two by Q2 FY27, two by Q3-Q4), defense order book execution (Rs 4,557 cr through FY30), and BrahMos seeker commercialization (FY28 start). Pushback was strongest around acquisition binary risk and capex year-wise deployment - on both, management deflected into inflow-matching and refused a hard schedule. The most interesting moment was CFO Shashidhar Ramarao confirming strategic OEM JV conversations continue post-divestment, with two space-business partnerships to be announced at the Bangalore Space Expo and Paris World Space Business Week.
Not answered directly
- Year-by-year capex schedule
- Space business specifics beyond partnership announcements
- Strategic OEM JV timing and identity
Every question, with its answer
1. Aerospace services divestment rationale + provisions accounting
Deepak Boddar, Independent
Question. What is the thought process behind divesting the aerospace services business given it generates Rs 70-80 cr EBITDA annually? Could the company have retained both services and manufacturing? Also, where in the balance sheet have the Rs 22 cr provision (Rs 10 cr fuel/old order + Rs 3.5 cr hedge + Rs 22 cr deal costs) been accounted for?
Answer, Mukund Dattatraya Rajapure, Managing Director. Management chose to exit aerospace services because OEM customers are consolidating and the sale price redeployed into Power 930 manufacturing delivers more value than organic services growth would have. Mohan added that manufacturing is sticky, long-term-contract business that leverages defense, space and electronics capabilities. Shashi clarified that the Rs 21.81 cr transaction cost sits in discontinued operations as an exceptional item in the notes to accounts; the Rs 6.5 cr defense ministry receivable provision, Rs 3.14 cr defense PSU provision and Rs 3.5 cr hedge unwind sit in continuing operations as 'other expenses'.
Follow-up. Couldn't the company have kept both services and manufacturing simultaneously?
Answer. Mohan acknowledged this is hypothetical but confirmed the strategic decision is to grow more into a product-based business, hence the divestment.
2. FY27 PAT guidance + acquisition pipeline
Kaushik Mohan, Independent
Question. What is the normalized PAT guidance for FY27? And what is the acquisition status - any specific dates for the ZIDA and aerospace deals?
Answer, Mukund Dattatraya Rajapure, Managing Director. FY27 EBITDA guided at Rs 270 cr; PAT will be broadly ~50% of that (i.e., around Rs 135 cr) and could be higher as divestment proceeds pay down debt and reduce interest cost. Q2-Q4 will ramp as deals kick in. Aerospace AS9100 acquisition NBO issued, advanced DD, expected close before end of Q2; second aerospace transaction by Q4; ZIDA business-transfer acquisition closing this quarter; third and fourth acquisitions targeted for Q3 and Q4.
Follow-up. How is next year (FY28) shaping up given this is a transformation year?
Answer. Mukund said a majority of acquisitions will be in place by end-FY27 and start generating revenue/EBITDA. Smaller follow-on acquisitions will continue into FY28 but at much smaller scale than the FY27 pipeline.
3. Defense order book execution + Power 930 reaffirmation
Prafful Rai, Independent
Question. What is the execution timeline for the Rs 4,500+ cr defense order book? What is the FY27 defense order intake target? Is the Power 930 Rs 930 cr PAT by FY30 target still intact given the restructuring, and is there any slippage risk on the binary acquisitions?
Answer, Mohan, Head of Aerospace Manufacturing. Defense forecast visibility covers through FY30 (~3 years) with possible spillover in year 4; defense guided +75% YoY in FY27 and 'very strong growth next year'. Pipeline exceeds Rs 24,000 cr but converges into the Rs 4,557 cr assured visibility. Power 930 target 'absolutely firm' - aerospace acquisition in advanced stage, ZIDA in advanced stage, other deals at non-binding stage where slippage risk exists. Mukund added the company has a pipeline to fall back on if individual deals fall off.
4. Project Kusha, LUH maritime order, MBDA expansion
Mahek Talati, Independent
Question. What is the update on Project Kusha? Is the LUH maritime order worth Rs 150-170 cr backed by a confirmed order? What is the competitive landscape on Kusha qualification? MBDA test bench revenue outlook and launcher maintenance update?
Answer, Mohan, Head of Aerospace Manufacturing. Project Kusha: engaged on mobile mast, electronics, digital beam forming radar unit; RFPs in progress. LUH maritime Rs 150-170 cr visibility is backed by confirmed order, on track. Kusha competitive landscape not disclosed but working on four different modules. MBDA test bench: ~5/yr delivery for next three years intact across MICA/METEOR/CAMM/ASTER platforms; Make-in-India announcements for Rafale coming soon; launcher maintenance ongoing with new Rafale-related activities.
5. MBDA expansion + BrahMos seeker progress
Piyush Saraf, JM Financial
Question. Specific update on MBDA product expansion and when first set of orders will be seen? Update on BrahMos seeker where Dr. Salian spoke last call?
Answer, Dr. Ananthapadmanabhan Salian, Head of R&D & Engineering. MBDA: test bench three-year plan intact; expanding into Make-in-India local missile assembly and large electronics production for Rafale; detailed announcements coming. BrahMos seeker: in advanced prototype realization stage for BrahMos-NG; customer acknowledgement received; developing two variants - AESA-based and proprietary direct RF - to replace phased-out gimbal seekers; also working on a seeker for one additional missile; commercial business from seekers starts next financial year onwards.
Follow-up. When do we start seeing business from seekers?
Answer. Next financial year onwards (FY28).
6. Strategic OEM partnerships + Space business update
Mayur Phadke, Independent
Question. Given significant funds are now available post aerospace services divestment, is the strategic partnership at the subsidiary level for capex still on the cards? Any update on the space business besides acquisitions and partnerships?
Answer, CFO Shashidhar Ramarao, Chief Financial Officer. Strategic JV conversations with OEM partners continue - many OEMs interested in taking a stake in India's precision manufacturing/electronics as global supply chain source. Conversations still at early stage; graduation path is customer to partner to JV. On space, two strategic partnerships to be announced at Bangalore Space Expo and Paris World Space Business Week (within a month) - covering technology, orders and capability leg-up. No further space detail disclosed.
Not answered directly.
7. Deferred revenue recovery + Capex schedule + Bridge financing
Bala Subramaniam A, Independent
Question. What are the operational/customer milestones to recover the Rs 140 cr deferred defense revenue in Q2/Q3? Can management provide year-wise capex guidance on the Rs 1,600 cr facility + Rs 600 cr acquisition capex, and timing of the Rs 1,255 cr extraordinary gain recognition between Q2/Q3? Will 20-30% capex be funded via short-term bridge debt?
Answer, Shashi Kiran Chandra, Deputy CFO. Deferred revenue: Rs 60+ cr recovered in Q1; balance to be recovered in Q2; not related to the 20 units but a separate item already resolved. Extraordinary gain: Rs 200+ cr to be recognized in Q2 on August first-tranche close; bigger Rs 1,255 cr piece pushed to early Q3 on November closing. Capex plan deliberately not given year-by-year because (i) acquisition timing depends on partner readiness and (ii) capex built to specific partner requirements; will be timed to inflows with bridge financing. Bridge facility drawdown will not exceed Rs 100-150 cr.
Follow-up. Is 20-30% of capex funded through short-term bridge debt?
Answer. Shashi confirmed bridge facility pending divestment proceeds; actual drawdown not more than Rs 100-150 cr.
Partly answered.
8. Antenna beam controller value chain + Directed energy weapon roadmap
Jatin Jhaveri, Independent
Question. Does AXISCADES manufacture the Butler matrix for the antenna beam controller or own the full architecture? On directed energy weapons, is the solution mobile or portable given power-output challenges?
Answer, Mukund Dattatraya Rajapure, Managing Director. Antenna beam controller: AXISCADES covers complete design, qualification and production; full module including digital part handled in-house; architecture specifics out of scope for the call. Directed energy weapons: current drive is mobile solution with companion power plant; portable solution also on the cards with internal modules being designed; Dr. Salian added 30 kW lasers are modular - size and combination vary by power requirement - so power hurdle is solvable.
Follow-up. Is the power hurdle a major obstacle?
Answer. Power optimization path is already in front of the team; will be handled appropriately. Lasers are modular by design so power scaling is a known engineering problem, not a structural one.
Partly answered.
What was said
Topic by topic, in the order it was spoken
Opening remarks and transition framing · Mukund Dattatraya Rajapure (MD / Chief Strategy & Growth Officer)
- Chairman Dr. Arunan assumed role in Feb 2025; focus on sharpening strategy and rebuilding for high-quality growth
- Divestment of non-core and services business largely complete; only Actelion remains with exit underway
- Prepared remarks split between Mukund's strategy intro and CFO financial walkthrough after a technical glitch disconnected management mid-opening
- Format shift: management team to present directly instead of Chairman reading speech
Q1 FY27 financial performance · Shashi Kiran Chandra (Deputy CFO)
- Consolidated revenue Rs 346 cr (+42% YoY, +27% QoQ) - highest in company history; split Rs 163 cr discontinued + Rs 183 cr continuing
- Continuing operations revenue grew 94% YoY from Rs 94 cr base
- Reported combined EBITDA Rs 27.9 cr; reported PAT loss Rs 14.8 cr vs Rs 20.9 cr profit in Q1 FY26
- Normalized EBITDA Rs 41 cr at 11.8% margin; normalized PAT Rs 20.2 cr - 'this is the business we actually ran'
One-off charges and Ind AS 105 accounting · Shashi Kiran Chandra (Deputy CFO)
- Rs 13.1 cr one-off inside EBITDA: Rs 9.62 cr receivable provision on aged defense transaction plus Rs 3.5 cr hedge unwinding
- Rs 21.81 cr divestment transaction cost (~half of estimated Rs 45 cr; ~2% of deal value) booked as exceptional item below EBITDA
- Rs 1,255 cr extraordinary gain will be recorded on completion in Q2-Q3 FY27 as timing offset
- Loss is presented as identifiable and fully recoverable rather than recurring
Continuing business performance by vertical · Shashi Kiran Chandra and Mukund Dattatraya Rajapure
- Retained defense + aerospace manufacturing + ZEDAR posted Rs 8.7 cr EBITDA (Rs 18.3 cr normalized for receivables); Rs 8.9 cr finance cost + Rs 8.8 cr depreciation not yet covered
- Mistral: Rs 122 cr revenue at 14.5% EBITDA margin while absorbing own provisions
- Zeta: Rs 49.5 cr revenue at 33% EBITDA margin (+63% YoY); two global tech customers added
- Defense: Rs 125 cr revenue (+112%), Rs 13 cr EBIT (+15% YoY); aerospace manufacturing Rs 6.1 cr revenue but negative EBITDA reflecting front-loaded investment
Cash, balance sheet and capex · Shashi Kiran Chandra and CFO Shashidhar Ramarao
- Cash on balance sheet up 78% to Rs 81 cr ahead of first divestment tranche
- PP&E up Rs 40 cr in one quarter - capacity being built on ground for Power 930 ramp
- Rs 100-150 cr bridge facility being raised pending divestment proceeds; not more than this to be drawn
- Capex plan deliberately matched to divestment inflow timing rather than committed to specific quarterly figures
Cordis / Quess divestment · Mukund Dattatraya Rajapure (MD)
- Cordis transaction valued at $237M (~Rs 2,250 cr); shareholder approval July 27
- Phase 1 by Aug 31, 2026: Rs 190 cr post-tax cash; Phase 2 by Nov 30, 2026: Rs 524-525 cr cash
- Both engineering services (May) and aerospace services (June) approvals progressing to close
- Funded Power 930 build-out without any equity dilution
Defense business detail · Shardi Babu (Head of Defense)
- 30 kilowatt laser directed energy weapon - TOT approved; missile subsystem orders for electronic and mechanical subsystems received
- Development-cum-production order for anti-tank missile onboard electronics and BrahMos; ERP for helicopters; antenna beam control for Uttam radar
- Forecast visibility now Rs 4,557 cr; eight design and order wins since April
- LUH maritime order of Rs 150-170 cr visibility backed by confirmed order; test bench delivery (~5/yr) intact for MICA, METEOR, CAMM, ASTER platforms
Aerospace manufacturing build-out · Mohan (Head of Aerospace Manufacturing)
- Non-binding offer signed for AS9100 certified precision manufacturing company; due diligence in advanced stages, expected to close Q2 FY27
- Target adds Rs 180 cr annualized revenue and Rs 39 cr EBITDA at 22% margin; second transaction being evaluated
- Combined target Rs 378 cr revenue / Rs 84 cr EBITDA run-rate by Q4 FY27 - replaces divested EBITDA
- Path to Rs 1,000 cr aerospace revenue by FY29; 13-member aerospace leadership team already in place ahead of acquisition
Infrastructure and facilities · Mukund Dattatraya Rajapure (MD)
- Devanahalli Aero Land (DAL) commissioned and functional with SMT lines and testing labs
- Devanahalli Atmanirbhar Complex (DAC): 20-acre plot near Bangalore airport; satellite manufacturing facility being built
- Missile Atmanirbhar Complex (MAC) in Hyderabad: groundbreaking July 2025; construction begun
- Center for Advanced Manufacturing (CAN): 240,000 sq ft on 20 acres near DAC and DAL
Guidance and commitments · Mukund Dattatraya Rajapure (MD)
- FY27 continuing-operations revenue Rs 1,477 cr reaffirmed on pro forma basis
- FY27 EBITDA Rs 270 cr; PAT ~50% of EBITDA
- Defense +75% YoY in FY27; ZIDA +100% YoY in FY27
- Power 930 target of Rs 930 cr PAT by FY30 still 'absolutely firm'
Power 930 strategy rationale · Mukund Dattatraya Rajapure (MD)
- Move from services to product/solutions company without equity dilution or material long-term debt
- Acquire manufacturing capability rather than grow services in consolidation cycle
- Aerospace services sold because OEM customers seeking consolidation; chose to redeploy into higher-multiple manufacturing
- FY24 revenue of Rs 930 cr is the FY30 PAT target - 'today's revenue will be tomorrow's PAT'
In their words
The results declared are expensive for a quarter but will compound for the next 40 quarters.
This quarter, we have delivered the highest revenue in the company's history. And we also reported a net loss. This is nothing but the arithmetic of doing two things inside the same quarter: divesting one business and building another, while the costs overlap.
Today's revenue will be tomorrow's PAT. And that was a FY24 revenue of 930 crores, which we believe will be the PAT target by FY30 of 930 crores. We believe all these acquisitions, these divestments, the capital that's come in, and the growth that we have in the organic business, will help us achieve those targets. So our Power 930 targets remain still absolutely firm.
To check next time
What management committed to on this call, or the dates they gave.
- Cordis Phase 1 close on 31 Aug 2026 with ₹190 cr post-tax cash inflow.
- Cordis Phase 2 close on 30 Nov 2026 with ~₹525 cr further cash inflow.
- Recognition of ₹1,255 cr extraordinary gain on divestment in Q2-Q3 FY27.
- Aerospace acquisition (AS9100-certified, ₹180 cr revenue target) closing in Q2 FY27.
- ZIDA business transfer acquisition closing in Q2 FY27.
- Space strategic partnerships to be announced at Bangalore Space Expo and Paris World Space Business Week.
Transcript
Read along with the recording
The whole call, 264 lines from 25 speakers over 1:17:27. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Fri 14 Aug 2026 | ₹1,484.80 | −2.92% | −0.12% |
| 5 sessions Thu 20 Aug 2026 | ₹1,600.60 | +4.66% | −0.67% |
| 20 sessions Thu 10 Sept 2026 | ₹1,869.70 | +22.25% | −3.76% |
From the close of Thu 13 Aug 2026, ₹1,529.40: the call began at 17:30 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.
Axiscades Tech's other calls
- Q2 FY27Mon 16 Nov 2026Tone: Confident
- Q4 FY26Thu 18 Jun 2026Not read
- Q4 FY26Thu 4 Jun 2026Not read
- Q4 FY26Sat 30 May 2026Tone: Mixed
- Q3 FY26Sat 14 Feb 2026Not read
- Q3 FY26Tue 10 Feb 2026Not read
- Q2 FY26Thu 13 Nov 2025Tone: Confident
- Q1 FY26Fri 8 Aug 2025Tone: Confident
- Q4 FY25Tue 27 May 2025Tone: Confident
- Q3 FY25Mon 3 Feb 2025Tone: Confident
- Q2 FY25Thu 5 Dec 2024Tone: Confident
- Q2 FY25Wed 13 Nov 2024Tone: Mixed