DEE Development Eng Q2 FY27 earnings call
In brief
Q2 EBITDA margin reached 20.1%; order book rose to ₹2,531 crore, and management reaffirmed FY27 revenue guidance of ₹1,500 crore.
- Management's tone
- Optimistic
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- High
- Stock, next session
- −3.24% (Nifty 50 −0.63%)
- Q2 revenue rose 8.5% to ₹293 crore; operating EBITDA rose 33.7% to ₹58.9 crore and margin reached 20.1%, while PAT rose 31.8% to ₹23.5 crore.
- Order book rose 94% YoY to ₹2,531 crore at September-end and reached ₹2,586 crore by October-end.
- Management reaffirmed FY27 revenue guidance of ₹1,500 crore and EBITDA margin guidance of more than 19%.
- About 45% of H1 execution was customer-supplied-material job work; management expects more than 70% of H2 execution to be with material.
- Debt repayment of ₹225 crore reduced finance costs from ₹17.2 crore in Q1 to ₹15.3 crore in Q2.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹293 cr | +8.5% | −0.5% | |
| EBITDA (excl. other income) | ₹58.9 cr | +33.7% | +18.4% | 20.1% (16.3% a year ago) |
| Net profit | ₹23.4 cr | +31.1% | — | 8% (6.6% a year ago) |
| EPS (₹) | ₹3.14 | +22.2% | +34.8% |
From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- About 45% of H1 execution was customer-supplied-material job work, which management said held back reported revenue; H2 execution is expected to be more than 70% with material.
- Higher Anjar fabrication and seamless-pipe utilisation lifted operating leverage, helping Q2 EBITDA margin reach 20.1% with a largely stable cost base.
- Power accounted for over 60% of the piping order book and carried superior margins, improving the overall order mix.
- The improved Malwa FY27 tariff of ₹5.44/kWh supported non-core contribution in Q2, alongside biomass pellet operations.
- The 72,000 MTPA pellet business benefited from a weak prior-year base caused by cautious procurement, monsoon moisture and absent offtake; raw material was secured for most of the current year.
- Finance cost fell from ₹17.2 crore in Q1 to ₹15.3 crore in Q2 after ₹225 crore of preferential-issue proceeds was used for debt repayment.
The numbers management led with
- Order book: Rs. 2,531 crore at 30 September 2026, up 94% from Rs. 1,308 crore a year earlier
- Order inflow: Rs. 1,179 crore in H1 FY27, up 97% from Rs. 598 crore and about 60% of the Rs. 2,000 crore FY27 target
- Debt repayment: Rs. 225 crore of borrowings repaid from Rs. 293 crore of preferential-issue proceeds
- Nuclear expansion: Domestic nuclear framework agreement plus advanced talks for a global nuclear-piping JV, with closure expected by FY27-end
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 revenue guidance | FY27 | FY27 revenue guidance of Rs. 1,500 crores was reaffirmed. |
| FY27 EBITDA margin guidance | FY27 | FY27 EBITDA margin guidance of plus 19% was maintained. |
| FY27 order inflow guidance | FY27 | Full-year order inflow guidance was Rs. 2000 crores; H1 inflow was close to 60% of it. |
| FY28 revenue | FY28 | Management remains committed to Rs. 1,800 crore for next year. |
| Non-core revenue (Non-core segment) | FY27 | Both plants should run fully in H2, with FY27 non-core revenue around Rs. 80 crore. |
| Seamless pipe revenue (Seamless pipe plant) | FY28 | Seamless pipe revenue may be around Rs. 300 crores in FY28; the 7,000-tonne plant is expected to be almost fully utilised. |
| Working capital cycle | FY27 | By year-end, working capital should be around 225-240 days, although it may not reach 200. |
| Order book at start of FY28 | FY28 | The order book should be more than Rs. 2,500 crore when FY28 opens. |
| Siemens HRSG and GT business (HRSG and GT piping business) | FY28 | At least 25 to 30 million Euros of Siemens HRSG and GT business is expected in FY28, mostly GT. |
| Nuclear piping revenue | FY28 | Nuclear revenue was projected at ₹50-60 crore in FY28. |
| Nuclear piping revenue | FY29 | Nuclear revenue may be Rs. 200 crores at the most in FY29. |
| With-material execution mix | H2 FY27 | In H2, more than 70% of execution is expected to be with material and around 30% on job work. |
| Export mix (Export business) | FY27 | Export should definitely be above 50% most of the time. |
| Nuclear piping JV closure | FY27 | Closure of the global-partner nuclear piping JV is expected by end of FY27. |
| Pipe purchasing savings (Piping business) | — | Savings on pipe purchasing are expected to be almost 10-15%. |
What changed since the Thu 6 Aug 2026 call
| What | On the Thu 6 Aug 2026 call | On this call |
|---|---|---|
| FY27 revenue guidance (held) | FY27 revenue guidance of ₹1,500+ crore, described as the bare minimum. | Management remained firmly on course for ₹1,500 crore by FY27-end. |
| FY27 EBITDA margin guidance (held) | FY27 EBITDA margin guidance of more than 19%, versus 16.9% in Q1. | Management reiterated its plus-19% FY27 EBITDA margin guidance. |
| FY27 order inflow guidance (held) | FY27 order inflow guidance of ₹2,000+ crore, with ₹700 crore booked at Q1. | H1 inflow was ₹1,179 crore, and the full-year guidance remained ₹2,000 crore. |
| Order book (raised) | Order book of ₹2,428 crore at 30 June 2026. | Order book was ₹2,531 crore at 30 September and ₹2,586 crore at 31 October. |
| Working-capital target (cut) | Working-capital cycle target of 180-200 days. | Year-end working capital was now expected at around 225-240 days. |
| Inventory days (delayed) | Inventory days were targeted at 160-150 by end-Q2 FY27. | Inventory days were 188 at this call, and the earlier target was not restated. |
| Debt repayment (achieved) | ₹225 crore of preferential-issue proceeds was earmarked for debt repayment. | ₹225 crore had been repaid, reducing finance cost. |
| Nuclear partnership (delayed) | Nuclear-sector partner tie-up was targeted by Q2 FY27. | Global-partner nuclear piping JV talks were advanced, with closure expected by end-FY27. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Q4 FY25 revenue | Q4 FY25 | ₹260–270 cr (on the Q3 FY25 call) | ₹286 cr, above the range |
| Full-year average EBITDA margin | FY25 | 15–16% (on the Q3 FY25 call) | 15%, within the range |
| EBITDA margin from this quarter onwards | Q4 FY25 | 19–20% (on the Q3 FY25 call) | 22.2%, above the range |
| Top line | FY26 | ₹1,100 cr (on the Q3 FY25 call) | ₹1,142 cr, above the figure guided |
| EBITDA margin | FY26 | 19–20% (on the Q3 FY25 call) | 16.6%, below the range |
| Execution from current order book | FY26 | ₹1,150 cr (on the Q3 FY25 call) | ₹1,142 cr, below the figure guided |
| FY26 revenue | FY26 | at least ₹1,300 cr (on the Q4 FY25 call) | ₹1,142 cr, below the range |
| FY26 EBITDA margin | FY26 | 19–20% (on the Q4 FY25 call) | 16.6%, below the range |
| FY26 revenue | FY26 | at least ₹1,300 cr (on the Q1 FY26 call) | ₹1,142 cr, below the range |
| FY26 EBITDA margin (base case) | FY26 | 19–20% (on the Q1 FY26 call) | 16.6%, below the range |
| FY26 EBITDA margin (PSERC downside) | FY26 | 16–18% (on the Q1 FY26 call) | 16.6%, within the range |
| Revenue growth over FY25 base | FY26 | 40–45% (on the Q2 FY26 call) | 38%, below the range |
| Operating EBITDA margin | FY26 | 16–18% (on the Q2 FY26 call) | 16.6%, within the range |
| EBITDA margin if biomass tariff revised | FY26 | 18–20% (on the Q2 FY26 call) | 16.6%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Core piping, heavy fabrication and exports
Core piping and heavy fabrication anchored revenue and orders across power, oil & gas, processing and exports. The order book includes the stated 40 million GE LOI but excludes Nooter framework orders.
Power piping and fitting order book ₹1,476 crore · Oil and gas piping and fitting order book ₹871 crore · US-based EPC modules and off-skid piping order ₹46 crore
Outlook: H2 execution should be more than 70% with material and around 30% job work; power is expected to remain the larger-margin mix.
Nuclear piping
A 16 October framework agreement covered shop-manufactured piping for PHWR, light-water and small modular reactors; global-partner JV talks were advanced.
Outlook: Global-partner JV closure is expected by end-FY27; projected nuclear revenue is ₹50-60 crore in FY28 and up to ₹200 crore in FY29.
Seamless pipe plant at Anjar
The 7,000-tonne Anjar seamless plant was fully operational, with output initially directed to captive consumption and some direct sales.
Plant capacity 7,000 tonnes
Outlook: FY28 revenue is projected around ₹300 crore with 7,000 tonnes almost fully utilised; one or two additional machines may be needed if inflow supports.
Non-core: Malwa Power and biomass pellets
Q2 was the first near-full quarter for the 72,000 MTPA biomass pellet plant; improved Malwa tariff and pellet operations lifted non-core contribution.
Biomass pellet plant capacity 72,000 MTPA · Malwa tariff ₹5.44/kWh
Outlook: Both plants are expected to run fully in H2; FY27 non-core revenue remains targeted at around ₹80 crore.
Balance sheet, capex and funding
- Approximately ₹293 crore of preferential-issue net proceeds was earmarked for and used to repay ₹225 crore of borrowings.
- Finance cost declined from ₹17.2 crore in Q1 to ₹15.3 crore in Q2 after the debt repayment.
- The dedicated nuclear piping plant at Anjar is under construction, with basic infrastructure started and machinery ordered and received.
- Management said inventory days had fallen to 188 from 223, while debtor days increased slightly.
- Year-end working capital was expected at around 225-240 days, although management said it may not reach 200 days.
- ₹72 crore of bank trade credit/factoring was outstanding; management said its cost is normally below the company's cash-credit rate.
The industry, as management sees it
Management expects India's capital-expenditure cycle to continue strengthening across thermal power, refining and process industries, while overseas markets are already showing a pickup. These trends support a multi-year opportunity for piping and heavy fabrication, although the pace of GE HRSG conversion remains uncertain.
Risks management named
- GE's HRSG LOI has not converted to a purchase order, delaying FY27 execution.
- BHEL and L&T tender and price-finalisation delays could defer order inflows.
- Achieving FY27 guidance requires materially faster execution from December.
- Working-capital days are expected at 225-240, above the earlier 200-day goal.
- Nuclear ramp depends on customer approvals and slow material delivery cycles.
- Malwa's Rs. 5.44/kWh tariff remains under appeal at APTEL.
- H1's 45% job-work mix constrained reported revenue despite stronger margins.
Q&A
Most scrutiny focused on the achievability of FY27 guidance, GE HRSG purchase-order conversion and the shift from job work to with-material execution. Management was highly confident on revenue and margin but repeatedly declined to explain the GE delay, instead emphasising customer service and other HRSG activity. Analysts also probed order-book comparability, working capital, nuclear ramp-up and seamless-pipe economics.
Not answered directly
- GE HRSG purchase-order delay rationale
- Non-core power revenue and segmental-representation discrepancy
- Exact cost of factoring or securitisation
- Nuclear revenue ramp certainty and customer approvals
Asked for a number, answered without one
- Non-core power revenue discrepancy: Management said it would check the difference and revert; no explanation was provided on the call.
- Factoring cost: Management only said factoring is normally cheaper than the company's cash-credit rate and gave no percentage.
- Seamless pipe captive versus external split: Management said current output would go to captive use and some would be sold directly, without quantifying either share.
- Seamless FY28 margin: Revenue of around ₹300 crore and near-full utilisation were indicated, but no FY28 margin figure was given.
- Nuclear margin: Management said it may be even higher, but gave no quantified margin.
Every question, with its answer
1. FY27 revenue, HRSG and margin guidance
Ankit Soni, Mirae Asset
Question. H1 revenue of Rs. 587.4 crore against FY27 guidance of Rs. 1,500 crore requires roughly Rs. 900 crore in H2. Is that target easily achievable? What is the status of GE HRSG and Siemens orders, and what FY27 margin guidance should investors use?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said H1 revenue was nearly Rs. 600 crore and identified Rs. 100-125 crore of WIP and RFP within the remaining requirement, implying net execution of about Rs. 750 crore. It reiterated certainty on Rs. 1,500 crore. GE had not taken HRSG offtake; Siemens discussions and other power jobs continued. Management also stood by the 19% guidance, citing fixed-cost leverage.
Partly answered.
2. Order inflows and customer mix
Ankit Gupta, Bamboo Capital
Question. Why have significant orders not come from BHEL, L&T, Mitsubishi and JSW despite the domestic power upcycle? When can larger orders arrive in H2, and will they involve material or job work?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management attributed the delay to BHEL's slow tender process and L&T's difficult price finalisation. It said large JSW and Adani orders were in advanced finalisation, potentially materialising by December or January-February. Management prioritised timely execution, customer retention and service of existing job-work orders over chasing additional volume.
Follow-up. Could BHEL and L&T orders bunch up in FY28?
Answer. Management said it expected new BHEL tenders after another one or two months and believed positive news would emerge shortly. It said no available orders had been lost and that the company was reducing dependence on BHEL and L&T by developing private-sector customers.
Partly answered.
3. JSW and Adani order composition
Ankit Gupta, Bamboo Capital
Question. Will the prospective JSW and Adani orders carry material, or will they be job work?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said one of the two orders would definitely include material, while the other could be either with material or job work. It was still trying to persuade the second customer to include material but said job work would still be available.
Follow-up. When will GE issue formal purchase orders, and will any HRSG execution occur in Q3 or Q4 FY27 or only in FY28?
Answer. Management said no GE execution would occur in Q3 or Q4 because only an LOI existed. A formal purchase order for two units was expected within one or two months, after which procurement and execution would begin in FY28. Siemens had already generated two orders in the preceding two to three months.
4. Siemens FY28 business
Ankit Gupta, Bamboo Capital
Question. What order inflow or execution can be expected from Siemens on the HRSG and GT sides in FY28?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said Siemens business would be at least €25-30 million in FY28. It expected the mix to be mostly GT, with a smaller HRSG contribution, and said this would support FY28 order inflow above Rs. 2,500 crore.
Follow-up. Does the €25-30 million include both HRSG and GT, or mainly HRSG?
Answer. Management clarified that the expected mix was mostly GT, although HRSG would also make some contribution.
5. Order-book execution mix
Chandresh Malpani, Niveshaay
Question. What is the with-material versus job-work split of the unexecuted order book, given that job work represented a high proportion of H1 execution?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management expected more than 70% of H2 execution to be with material and approximately 30% to remain job work. It confirmed that job work had been almost 40-45% in H1 because BHEL, L&T and Dow work was prioritised.
Follow-up. Is the 19% EBITDA-margin guidance achievable?
Answer. Management said it was achievable because fixed expenses were expected to remain broadly unchanged while turnover increased, allowing operating leverage to lift EBITDA materially.
6. GE HRSG order conversion
Chandresh Malpani, Niveshaay
Question. Why has GE's HRSG order not converted into a purchase order or execution despite growth in the HRSG market and work for other HRSG customers?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said it could not explain GE's delay. It noted that HRSG work for Nooter Eriksen, John Cockerill and Siemens continued regularly and that it had no capacity constraint because GE had not released an order. It nevertheless reiterated that revenue and profit targets were fully on track.
Follow-up. How much of the seamless plant output has been captive, and how much is expected to generate external revenue?
Answer. Management said the plant was fully operational and streamlined, with substantially more revenue expected in H2. Most output would initially support captive consumption, while direct sales would include pipe supplied for an L&T order.
Not answered directly.
7. Seamless plant ramp-up
Chandresh Malpani, Niveshaay
Question. How much of the seamless plant's production has been captive, and how much should be expected to contribute from H2?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said the plant was fully operational, its processes had been established and a significant quantity of output had already been produced. It expected a materially higher H2 contribution, with most output used captively and some sold directly, including pipes for an L&T order.
8. Job-work versus material margins
Aashav Patel, Molecule Ventures PMS
Question. How do margins differ between full-material contracts and job-work orders, and should the higher H1 job-work share have produced stronger margins?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said job-work orders had materially higher margins than full-material orders, estimating a difference of roughly 5-10%. It did not provide exact segment margins and said the reported improvement was already more than 3.5%, which it viewed as consistent with the change in business mix.
Follow-up. Why was the margin improvement not larger given the 40-45% job-work contribution?
Answer. Management said the improvement was already more than 3.5% and reiterated that this was consistent with the approximately 40% increase in job-work volume.
Not answered directly.
9. Order-book composition
Aashav Patel, Molecule Ventures PMS
Question. Does the reported Rs. 2,500 crore order book include GE's LOI, or only firm purchase orders?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management confirmed that the order book included the 40 million GE order, although the currency was not stated. It excluded a Nooter framework order for the Thailand plant, where 60% of capacity was already reserved. Management said the key priority was timely execution and customer confidence rather than adding more orders.
10. Non-core revenue disclosure
Kamlesh Bagmar, Lotus Asset Managers
Question. The presentation shows about Rs. 13 crore of non-core power revenue while segmental revenue shows roughly Rs. 5 crore. Why is there a gap?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said it would check the difference and revert to the analyst, but could not reconcile it during the call.
Follow-up. Will upcoming pellet capacity be operated through an InvIT?
Answer. Management initially requested clarification and then stated that the pellet business was part of the company, not an InvIT.
Not answered directly.
11. Biomass losses and ramp-up
Kamlesh Bagmar, Lotus Asset Managers
Question. Despite pellet commissioning, losses appear to have increased year on year. What is the current operating position and outlook for the biomass business?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management disputed the premise and said losses had dropped drastically. It attributed the prior-year weakness to cautious procurement, lack of offtake and rainy-season moisture that damaged pellet quality, but said raw material had now been secured for most of the year and weather should remain conducive through April-May.
Follow-up. What is the average cost of the approximately Rs. 72 crore of bank trade-credit or securitisation exposure?
Answer. Management said factoring was normally cheaper than the company's cash-credit rate but did not disclose the actual cost.
Partly answered.
12. Order-book execution mix
Prateek Srivastava, Nivesh Wisdom
Question. Why was job work 45% of H1 despite the large order book, and what will the with-material versus job-work mix be for H2 and the full Rs. 2,500 crore book?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management reiterated that H2 should be more than 70% with material and about 30% job work. BHEL job-work orders were nearing completion, L&T work would continue into H2 and Dow remained a job-work order, keeping the job-work share higher than originally anticipated.
Follow-up. Will the prospective JSW and Adani orders be job work or include material?
Answer. Management repeated that one order would definitely include material, while the other could be with material or job work. One customer had already decided to use material; the other decision remained pending.
13. JSW and Adani order timing
Prateek Srivastava, Nivesh Wisdom
Question. When are the JSW and Adani orders expected to be received?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said both developments should occur by December or, at the latest, the following January.
14. Order book by major customer
Nirvana Laha, Badrinath Holdings
Question. How much of the order book is attributable to BHEL, L&T and Adani?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said there was currently no Adani order in the book, while BHEL and L&T orders were being executed. It also said it had no other domestic player order for the relevant coal-fired boiler business.
Follow-up. Can you provide a rough split between BHEL and L&T within the order book?
Answer. Management estimated BHEL at about Rs. 300 crore and L&T at about Rs. 150 crore, caveating that the figures could be slightly off.
15. Seamless order pipeline
Nirvana Laha, Badrinath Holdings
Question. Are there further seamless-pipe orders under consideration beyond the existing BHEL order?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said two tenders had already been submitted and that more opportunity could arise from JSW and Adani orders using the company's own pipe.
Follow-up. What is the tonnage in those two seamless tenders?
Answer. Management said the two tenders represented more than 8,000 metric tons.
16. Order delivery timelines
Nirvana Laha, Badrinath Holdings
Question. Do the orders, excluding the GE LOI, have firm client delivery timelines?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said all orders were tied to delivery schedules. It described the normal horizon as six to 18 months, while noting that larger orders such as Dow could run for two years.
Follow-up. Is FY28 revenue of Rs. 1,800 crore firmly achievable, and could the company exceed it?
Answer. Management said it remained firmly committed to Rs. 1,800 crore and believed it was well paced to surpass that figure, but would continue guiding only to Rs. 1,800 crore.
17. Export and HRSG outlook
Ashray Sheth, Ventura Securities
Question. Is export order momentum slowing because of concerns over US gas-generator capital expenditure, particularly in HRSG?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said exports were on track above 60% and might fall only to around 55%. GE's HRSG business had not taken off, but GT piping volumes, Siemens orders, work for Nooter Eriksen and John Cockerill, and the Dow export project remained strong. It expected exports to stay above 50% and cited a recent Rs. 60-70 crore skid export order.
Follow-up. Will inventory grow more slowly than revenue, given the job-work mix and the 200-day working-capital target?
Answer. Management said inventory days had fallen to 186-188 from 223 in H1, although debtor days had increased slightly. It expected year-end working capital around 225-240 days rather than the earlier 200-day target.
18. Seamless integration savings
Ashray Sheth, Ventura Securities
Question. What quantified margin benefit is expected from integrating the seamless pipe plant, given the plan for 80% captive use and 20% external sales?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management estimated savings of approximately 10-15% on pipe purchases that could be brought in-house. It acknowledged that current plant capacity was limited and that the net contribution would therefore remain modest.
19. FY30 revenue ambition
Kartik Naik, Vimson Group
Question. Does the Rs. 2,500 crore FY30 revenue ambition include nuclear or other sectors not currently served?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said the FY30 ambition did not currently include nuclear or additional sectors.
Follow-up. How well positioned is the company to capture data-centre demand?
Answer. Management said existing customers and orders kept its bandwidth constrained. It cited a small German trial order of roughly ₹30-40 lakhs that was on hold after a merger, and said discussions with a large US player had begun regarding a possible back-to-back arrangement.
20. Order conversion and spillover
Kartik Naik, Vimson Group
Question. Was the expected Rs. 20-25 crore spillover not executed because of the Middle East crisis?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said the spillover had already been executed in the prior quarter and nothing remained pending. It said WIP and RFP was about Rs. 125-150 crore and represented a recurring one to one-and-a-half-month production cycle.
21. FY28 seamless economics
Ankit Gupta, Bamboo Capital
Question. What volumes, revenue and margins should be expected from the seamless plant in FY28 as it becomes the first fully stabilised year of operation?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management forecast seamless revenue of around Rs. 300 crore in FY28, comprising roughly Rs. 150-200 crore of direct sales and Rs. 150-200 crore of internal consumption. It did not provide a specific margin forecast in this response.
Follow-up. What capacity utilisation should be expected in FY28?
Answer. Management expected almost full use of the 7,000 MT capacity and said one or two additional machines might be needed depending on the order inflow.
Not answered directly.
22. Nuclear revenue ramp
Ankit Gupta, Bamboo Capital
Question. When should the first meaningful nuclear revenue be recognised, in FY29 or FY30?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said FY29 should generate nuclear revenue. It projected a small FY28 contribution of roughly Rs. 50-60 crore, subject to approvals and order timing, and said FY29 could reach a maximum of about Rs. 200 crore because nuclear material deliveries and revenue conversion are slow.
Follow-up. Are nuclear margins expected to be above 25%?
Answer. Management said margins might be even higher than 25%, but reiterated that revenue take-off would be slow.
23. Current order-book mix
Ankit Gupta, Bamboo Capital
Question. What is the current with-material versus job-work split of the approximately Rs. 2,500 crore order book?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said more than Rs. 400 crore of the order book remained job work, with the balance being with-material orders.
Follow-up. October execution was around Rs. 80 crore; can the company accelerate to Rs. 160-170 crore per month over the remaining five months?
Answer. Management said execution would begin moving much faster from December. It expected tonnage to be about 20% above the current run-rate and revenue to increase by approximately 40-50% as higher-value with-material orders were dispatched.
24. Nuclear plant development
Saksham Tyagi, Desvelado Advisory Private Limited
Question. What progress and expected contribution does the nuclear piping manufacturing facility at Anjar, Gujarat, have?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said basic infrastructure had been built and machinery ordered, with deliveries beginning. It projected Rs. 50-60 crore of nuclear revenue in the coming year and potentially more than Rs. 200 crore the year after, while stressing that the plan depended on formal customer approvals and remained at a blueprint stage.
Follow-up. What progress has been made with JSW and Hindustan Energy?
Answer. Management said JSW discussions had made good progress and another meeting was planned for the following week after the Diwali holidays. It did not provide a specific update on Hindustan Energy.
Partly answered.
25. Prospective major orders
Saksham Tyagi, Desvelado Advisory Private Limited
Question. Are there large players expected to contribute to the current order book?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management identified JSW and Adani as very large orders under discussion and said TBWES orders were also being discussed, though at a smaller scale than JSW or Adani. These were prospective orders rather than confirmed additions to the reported book.
Follow-up. Is the expected PAT growth sustainable, or is it mainly a one-time benefit from debt reduction?
Answer. Management said the growth was sustainable because fixed costs were expected to remain stable while revenue increased by more than 40-50%. It said the resulting operating leverage would flow through to EBITDA and PAT.
Not answered directly.
26. PAT growth sustainability
Saksham Tyagi, Desvelado Advisory Private Limited
Question. Is the expected PAT growth sustainable, or is it mainly a one-time benefit from debt reduction?
Answer, Krishan Lalit Bansal, Promoter, Chairman & Managing Director. Management said the PAT growth was sustainable. It expected no substantial increase in fixed expenses over the following six months and said a 40-50% revenue increase would sharply reduce fixed-cost allocation, with the benefit flowing through to EBITDA and PAT.
What was said
Topic by topic, in the order it was spoken
Q2 & H1 Financial Performance · Krishan Lalit Bansal (Chairman & Managing Director)
- Q2 FY27 revenue was Rs. 293 crore, up 8.5% YoY, led by piping fabrication and manufacturing and steady power-sector supplies.
- Q2 operating EBITDA was Rs. 58.9 crore, up 33.7% YoY, with margin improving to 20.1% from 16.3% in Q2 FY26.
- Q2 PAT was Rs. 23.5 crore, up 31.8% YoY, with an 8% margin.
- H1 revenue was Rs. 587.4 crore, up 19% YoY; operating EBITDA rose 35.9% to Rs. 108.6 crore and margin reached 18.5%.
- H1 PAT was Rs. 39.5 crore, up 27.8% YoY.
Execution Mix & Margin Drivers · Krishan Lalit Bansal (Chairman & Managing Director)
- Approximately 45% of H1 execution was job work with customers supplying material, which management said held back reported revenue.
- Management expected the mix to shift toward with-material contracts as the order book converted into execution.
- Higher utilization at Anjar and the seamless pipe plant provided operating leverage while the cost base remained broadly stable.
- A greater contribution from power-sector orders and improved Malwa power and biomass operations also supported margins.
- Finance cost declined sequentially from Rs. 17.2 crore in Q1 to Rs. 15.3 crore in Q2 after repayment of Rs. 225 crore of debt.
Core Business & Order Book · Krishan Lalit Bansal (Chairman & Managing Director)
- Piping and heavy fabrication remained the core business and accounted for the large majority of revenue and the order book.
- Customers spanned power, oil and gas, and process industries in India and export markets.
- The order book was Rs. 2,531 crore at 30 September 2026, up 94% from Rs. 1,308 crore a year earlier and from Rs. 2,428 crore in June.
- Power accounted for Rs. 1,476 crore and oil and gas Rs. 871 crore of the piping and fittings order book.
- With power above 60% of the piping order book, management expected strong revenue visibility.
Order Inflows, Exports & Nuclear Pipeline · Krishan Lalit Bansal (Chairman & Managing Director)
- H1 FY27 order inflow was Rs. 1,179 crore, up 97% YoY and about twice H1 execution; it represented close to 60% of Rs. 2,000 crore FY27 guidance.
- September added Rs. 125 crore of domestic power-piping and Rs. 70 crore of oil-and-gas orders.
- October order flow was Rs. 148 crore, taking the order book to Rs. 2,586 crore at 31 October.
- A US-based EPC awarded a Rs. 46 crore order for modules and off-skid piping, extending the company's North American presence.
- A domestic EPC framework agreement covered nuclear projects, while talks for a global nuclear-piping JV were at an advanced stage.
Demand Environment & Seamless Capacity · Krishan Lalit Bansal (Chairman & Managing Director)
- Management said India's capital-expenditure cycle was gaining momentum across thermal power, refining and process industries.
- Overseas markets were also showing a clearer pickup in demand.
- Domestic and export tailwinds were presented as creating a multi-year opportunity for the core piping and fabrication portfolio.
- The fully operational 7,000 MT seamless pipe plant at Anjar was positioned to support import substitution and Make in India requirements.
- A dedicated nuclear piping plant was already under construction.
Malwa Power & Biomass Operations · Krishan Lalit Bansal (Chairman & Managing Director)
- Q2 was the first near-full quarter for the 72,000 MTPA biomass pellet plant co-located with Malwa Power.
- The improved FY27 Malwa tariff of Rs. 5.44 per kWh remained under appeal at APTEL.
- New biomass fuel became available from October.
- Management expected both plants to operate fully in H2 and retained around Rs. 80 crore of FY27 non-core revenue guidance.
Deleveraging & Capital Allocation · Krishan Lalit Bansal (Chairman & Managing Director)
- The preferential issue generated approximately Rs. 293 crore of net proceeds.
- Around Rs. 225 crore was earmarked for borrowing repayment, and this amount had been repaid.
- Management said the repayment was reducing finance cost on a run-rate basis and strengthening the balance sheet.
- FY27 capital allocation would remain focused on asset turns, cash generation and return ratios.
FY27 Execution Outlook & Guidance · Krishan Lalit Bansal (Chairman & Managing Director)
- Management said FY27 performance should be judged over the full year because H1 had historically been weaker than H2.
- Expected H2 drivers included a better power mix, continued non-core improvement, a stronger balance sheet and lower finance costs.
- The company remained on course to deliver Rs. 1,500 crore of FY27 revenue.
- Management framed the existing order book as providing strong visibility for the H2 execution ramp.
In their words
With strong visibility across our order book, we remain firmly on course to deliver our FY27 revenue guidance of Rs. 1,500 crores.
Nothing will happen in Q3, Q4, because still we do not have any order from them officially.
our performance is best judged over the full year and H1 has historically been leaner than H2.
To check next time
What management committed to on this call, or the dates they gave.
- Check whether faster execution from December supports FY27 revenue guidance of ₹1,500 crore.
- Check whether H2 with-material execution exceeds 70% as job work declines to around 30%.
- Track the GE formal PO expected within one or two months and JSW/Adani orders expected by December or January.
- Check whether the global-partner nuclear piping JV closes by end-FY27.
- Check full running of Malwa Power and pellets in H2 against around ₹80 crore of FY27 non-core revenue.
- Track year-end working capital against the stated 225-240-day range and inventory days.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Wed 18 Nov 2026 | ₹556.05 | −3.24% | −0.63% |
From the close of Tue 17 Nov 2026, ₹574.65: the last close before the call, which began at 15:00 IST. Adjusted daily closes; the move includes everything else that happened in those sessions.