Denta Water N Infra Sol Q3 FY26 earnings call

Thu 19 Feb 2026DENTA

In brief

Denta Q3 FY26 revenue up 4% YoY at Rs 53.5 cr; FY26 guided 20-25% vs prior Rs 300 cr, FY27 at 30% with Rs 841 cr order book.

Management's tone
Mixed
What was said
Mixed
Guidance
Guidance cut
Analyst pushback
High
Stock, next session
−3.03% (Nifty 50 −1.41%)
  • Q3 FY26 revenue rose 4% YoY to Rs 535.20 million; margins improved on better project mix, execution and cost control.
  • FY26 full-year top line now seen at 20-25% YoY growth; management conceded Rs 300 crore target is likely to be missed.
  • FY27 revenue growth guided at 30% over FY26 base, supported by Rs 841.48 crore order book as of December 31, 2025.
  • Working capital cycle widened to 95-120 days versus earlier guidance of 40-50 days; management aims to reduce it.
  • Long-term (3+ years out) growth anticipated at 15% YoY as base expands; near-term focus on JJM, AMRUT and STP schemes.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q3 FY26

This quarterA year agoLast quarterMargin
Revenue₹53.5 cr+4.2%−27.9%
EBITDA (excl. other income)₹17.5 cr−5.0%−26.1%32.7% (35.8% a year ago)
Net profit₹14.3 cr−4.4%−24.4%26.7% (29.1% a year ago)
EPS (₹)₹5.36−31.2%−24.4%

From the company's filed results for the quarter ended 31 Dec 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Q3 revenue grew only 4% YoY (Rs 535.20 million) due to project-based timing and delayed billing in certain government projects, even as 9M FY26 revenue rose 30.8% YoY to Rs 1,950.67 million.
  • Margins improved on better project mix, improved execution efficiency, greater cost control and focus on higher-margin water infrastructure projects, per management.
  • Karnataka received healthy monsoon from June to end of October, compressing the Q3 execution window to one or two months, per management. (one-off)

The numbers management led with

  • 9M FY26 revenue: Rs 1,950.67 million (up 30.8% YoY from Rs 1,491.33 million)
  • Order book position: Rs 8,414.82 million (Rs 841 crores) as of December 31, 2025
  • Pending Karnataka Mining Environment Restoration Fund orders: Rs 400 crores (tender notification yet to be issued; no committed timeline)
  • Receivables flagged by monitoring agency: Rs 169.51 crores outstanding on 4 projects; ~Rs 65 crores expected to convert in Q4 FY26
  • FY27 revenue growth guidance: 30% over FY26 base

Guidance

Guidance on this call

WhatForWhat management saidFiled
Q4 FY26 revenue growthQ4 FY26expecting 20% growth when compared to last year fourth quarter2.1%, below the figure guided
FY27 revenue growthFY27we expect 30% increase in revenue when compared to '25-26—
FY26 revenue growth (revised)FY26we may see 20-25% increase in revenue when compared to last year revenue earnings—
Long-term revenue growth (3+ years out)—we are anticipating 15% increase in growth after three years—

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

What changed since the Mon 18 Aug 2025 call

WhatOn the Mon 18 Aug 2025 callOn this call
FY26 revenue target (cut)Targeting Rs 300 crore top line in FY2620-25% YoY growth; Rs 300 cr no longer expected
Order book size (raised)Rs 593.68 crore at end of Q1 FY26Rs 8,414.82 million (~Rs 841.48 cr) as on Dec 31, 2025
Working capital cycle (raised)40-50 days95-120 days
Sandur Rs 850 cr tender (delayed)Q2 FY26 finalization expectedStill before committees; no timeline committed
FY27 revenue growth (held)30% growth over FY26 base of ~Rs 300 cr30% growth over FY26 base
FY26 new order inflow target (restated)Targeting ~Rs 1,000 crore of new order inflows in FY26Bidding actively in water infrastructure; no specific Rs target stated

Guided on earlier calls, and what was filed

WhatForGuidedFiled
Q1 FY26 revenue (deferred billing)Q1 FY26₹55–60 cr (on the Q4 FY25 call)₹67 cr, above the range
FY26 revenue (conservative, incl. new orders)FY26₹300 cr (on the Q4 FY25 call)₹250 cr, below the figure guided
FY26 revenue (alt estimate)FY26₹260–275 cr (on the Q4 FY25 call)₹250 cr, below the range
FY26 revenue (modest level)FY26₹300 cr (on the Q1 FY26 call)₹250 cr, below the figure guided
EBITDA margin sustainedFY2636% (on the Q1 FY26 call)29.7%, below the figure guided
FY26 revenueFY26at least ₹300 cr (on the Q2 FY26 call)₹250 cr, below the range
EBITDA marginFY26at least 30% (on the Q2 FY26 call)29.7%, below the range
PAT marginFY26at least 25% (on the Q2 FY26 call)24.3%, below the range

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Jal Jeevan Mission (JJM)

Three projects under Jal Jeevan Mission forming the largest chunk of the order book; projects involve multi-village water supply schemes drawing from reliable sources like Tungabhadra reservoir.

3 projects · Order book Rs 3,870.80 million

AMRUT

Two AMRUT schemes in order book covering urban water supply to towns of Kuknuru and Yelburga with 24/7 delivery systems.

2 schemes · Order book Rs 2,258.36 million

Sewage Treatment Plants (STP)

Five STP projects bagged in Q3 FY26 across Karnataka using technologies like NaBr and camera-based; targets wastewater collection, treatment and groundwater recharging.

5 projects · Order book Rs 1,405.30 million · Rs 208 million water supply project in Basavana Bagewadi, Kolhar

Outlook: Won 4-5 STPs and one water supply project in Q3 FY26; bidding actively for additional orders in core water infrastructure.

Balance sheet, capex and funding

  • Cash reserves at ~Rs 85 crore at end of H1 FY26; management said no significant change in Q3, without giving exact figure.
  • Working capital cycle widened to 95-120 days versus 40-50 days guided earlier; H1 inventory Rs 108 cr and receivables Rs 64 cr; management targets reduction in Q4 FY26.
  • Monitoring agency flagged Rs 169.51 cr receivable from four project counterparties; management expects ~Rs 65 cr to convert to Q4 FY26 revenue.

The industry, as management sees it

Management views the Indian water sector as structurally bright over 5-10 years, citing scarcity, rising household expectations (135 LPCD rural / 150 LPCD urban), shift to multi-village 24/7 supply schemes, and a large supply gap (claimed 1 in 3 Indians lacks good quality water). Union Budget infrastructure outlay seen as supportive of tender flow.

Risks management named

  • Project milestone and billing cycle dependencies on government departments
  • Climatic seasonality in Karnataka limiting Q3 execution window
  • Working capital days elevated and inventory conversion slow
  • Concentration risk in Karnataka with limited non-Karnataka wins
  • Dependency on delayed Karnataka Mining Environment Restoration Fund order

Q&A

Q&A was dominated by analyst pushback on the FY26 guidance walk-back and the repeated delay of the Rs 400 crores Karnataka Mining order. Utkarsh Somaiya (Eiko Quantum) and Shabat Hussain were the most pointed, with Somaiya explicitly telling management to "be mindful of your guidance going forward" and Hussain forcing a direct admission that the Rs 300 crores target would be missed. Management conceded the FY26 miss but hedged heavily on the bid pipeline, the Karnataka Mining timeline, and FY27 specifics. Topics most heavily deflected: bid pipeline sizing, exact timeline for the Rs 400 crores Karnataka Mining order, and the gap between original Rs 300 crores guidance and current 20-25% YoY growth trajectory.

Not answered directly

  • FY27 bid pipeline sizing
  • Karnataka Mining Rs 400 crores order timeline
  • Reconciliation of original Rs 300 crores FY26 guidance with 20-25% YoY revised outlook

Asked for a number, answered without one

  • Bid pipeline size: depends on the tender notification which will be issued from the concerned departments; searching for projects between Rs 100 cr to Rs 300 cr
  • Sandur Rs 850 cr project timeline: It is before some committees which has to clear the projects and we are continuously following it up. I cannot commit for the exact timeline.
  • Q3 FY26 cash position: almost on the same line. We have not seen any significant change in the cash reserve position.
  • Working capital improvement target: trying to improve quarter-on-quarter basis; working cycle situation will improve in Q4 of FY25-26 further (no specific days target given).

Every question, with its answer

  1. 1. Q3 execution and forward outlook

    Deepak Poddar, Sapphire Capital

    Question. What led to the Q3 underperformance and execution slowdown? Is it government/PSU billing delays? What is the Q4 execution outlook? How should we think about FY27 growth, order book execution timeline, bid pipeline size, and the elevated working capital position?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Q3 revenue was Rs 535.20 million vs Rs 513.53 million in Q3 FY25 (~4% growth), but 9M is up 30.8% YoY. Modulation is attributed to project-milestone timing, delayed government billing, and a strong Karnataka monsoon (June-October) that limited execution windows to 1-2 months in the quarter. Q4 FY26 is guided at 20% YoY growth (implies ~Rs 65 crores vs Rs 54 crores base). FY27 is guided at 30% revenue growth over FY26, supported by Rs 841 crores order book. Most projects are sub-Rs 100 crores with 12-month execution timeline. Active bidding is in the Rs 100-300 crores range; pipeline specifics will be shared once tender notifications are published. Working capital cycle is being normalized to 95-120 days, expected to improve further in Q4 FY26.

    Partly answered.

  2. 2. FY26 guidance walk-back

    Utkarsh Somaiya, Eiko Quantum Solutions

    Question. In the prior con call, Rs 300 crores FY26 top line was guided and half of Q3 was already over. What went wrong? Is the prior Rs 1,000-1,100 crores March-end order book target also going to falter?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Management acknowledged the dependence on fixed project milestones, government billing cycles, and progress achievement. Pointed to 31% YoY 9M growth as the actual delivery. Confirmed December-end order book at Rs 841 crores and said the company is bidding aggressively and waiting for good projects to add to the book. Did not reaffirm the Rs 1,000-1,100 crores March target — committed only to informing investors when new orders are won.

    Not answered directly.

  3. 3. Receivables, working capital, pending orders

    Shabat Hussain, Individual Investor

    Question. The monitoring agency flagged Rs 169.51 crores outstanding on four projects. How much converts to Q4 revenue? Working capital days have almost doubled vs March 2025. What is the status of the Rs 400 crores Karnataka Mining Environment Restoration Fund orders that were promised in the last two calls? Is the Rs 300 crores FY26 top line still intact? Should we expect 30% growth in FY27?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Management expects ~Rs 65 crores to convert to Q4 revenue out of the receivables identified by the monitoring agency (Chairman said he would verify the Rs 169.51 crores figure). Acknowledged working capital stretch and committed to reducing it in coming quarters. On the Rs 400 crores Karnataka Mining order: it is pending committee clearance, tender notification is yet to be issued, and management declined to commit a specific timeline ("I cannot commit for the exact timeline. It will be done very quickly"). Explicitly conceded Rs 300 crores FY26 top line is unlikely — guided to 20-25% YoY growth instead. Confirmed hope of 30% FY27 growth.

    Not answered directly.

  4. 4. Cash position and debt plans

    Anil Shenoy, Individual Investor

    Question. What is the Q3 cash position vs the Rs 85 crores reported at end of Q2? Will you raise debt for the working capital needed to support the 30% FY27 revenue growth, given that you have obtained debt approvals?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Cash reserves are largely on the same line as Q2 — no significant change. No plans to raise fund-based debt. The approved credit limits from Kotak Bank and SBI will be used only for non-fund-based instruments (bank guarantees) as performance security on government projects, typically held for 1-2 years. Implies the growth plan remains debt-light.

  5. 5. Geographic diversification

    Yash Nisar, Individual Investor

    Question. As part of the company's diversification strategy, have you secured any new orders outside Karnataka?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. No orders outside Karnataka as of date; the company is actively trying to bid for projects in other states. Will inform the investing community when new orders are won.

  6. 6. Competition, strategy, and regional expansion

    Yashwanti, Individual Investor

    Question. What competitive threats does Denta face in Karnataka? Is consolidation likely — would you acquire? How do you see regional diversification opportunities/risks? Will you go independently or via JV with local partners? What is the 3-5 year outlook for order book, top line, and profitability? Any project delay or outlay announcement delays in the last 4-5 months? What is the maximum order size you can bid for individually?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Competitive landscape in Karnataka: SNC Construction, Amrutha Construction, Brindavan Constructions, Srinivasa Constructions — but limited competition in groundwater recharging. No acquisition plans; focus is on completing existing projects. Strategy for non-Karnataka states: bid individually based on technical/financial capability, enter strategic JV for projects requiring technical partners. Anticipates strong 2-3 year growth. Denied project delay on the award side (claimed bagged 4 STPs and 1 water project worth ~Rs 160 crores last quarter). Max individual project size: Rs 150-200 crores; beyond that, JV with 51% Denta stake. Existing Rs 841 crores order book provides ~2-2.5 years of execution visibility but new orders will keep adding.

  7. 7. Government schemes and project pipeline

    Disha Shah, Individual Investor

    Question. How is the recent Union Budget positive for the company? What is Denta's role in AMRUT, Jal Jeevan Mission, and STP projects, and how important are these programs? Do government projects give better or lower margins vs private? What is the maximum project size you can execute independently?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Union Budget: heavy infrastructure outlay translates to more tender flow, which is positive. Scheme exposure: Jal Jeevan Mission — 3 projects worth Rs 3,870.80 million; AMRUT — 2 schemes worth Rs 2,258.36 million; STP — 5 projects worth Rs 1,405.30 million. Margins depend on execution efficiency, raw material sourcing, and project selection — not on public vs private classification. Max individual project execution capacity stated as Rs 10-150 crores (Chairman gave two slightly different ranges across the call — initial Rs 150-200 crores, then Rs 10-150 crores).

    Partly answered.

  8. 8. Long-term water sector outlook

    Anil Shenoy, Individual Investor

    Question. What macro data supports sustained growth in India's water sector over the next 5-10 years? Is it scarcity, rural demand, or something else? You have guided 20-30% near-term revenue growth — what growth rate do you aspire to beyond 2-3 years as the base effect kicks in?

    Answer, C. Mruthyunjaya Swamy, Chairman & Executive Director. Macro drivers: water is scarce, households expect 135 LPCD (rural) and 150 LPCD (urban), demand is shifting to multi-village schemes with 24/7 supply from reliable sources (e.g., Tungabhadra reservoir), and there is a large supply gap (cited statistic: 1 in 3 Indians lacks good quality water). Denta is positioned in end-to-end water solutions plus groundwater recharging. Long-term growth: after 2-3 years, anticipates ~15% YoY growth as the base effect kicks in.

What was said

Topic by topic, in the order it was spoken

9M FY26 Financial Performance · C. Mruthyunjaya Swamy (Chairman & ED)

  • 9M FY26 revenue at Rs 1,950.67 million, up 30.8% YoY from Rs 1,491.33 million in 9M FY25
  • 9M FY26 EBITDA at Rs 708.47 million, up 34.02% YoY from Rs 528.60 million in 9M FY25
  • Q3 FY26 revenue at Rs 535.20 million vs Rs 513.53 million in Q3 FY25 — only ~4% YoY growth
  • Order book stood at Rs 8,414.82 million (Rs 841 crores) as on December 31, 2025
  • Management framed Q3 moderation as project-milestone and billing-cycle timing

Order Book and New Wins · C. Mruthyunjaya Swamy (Chairman & ED)

  • Bagged 4-5 sewage treatment plant orders across Karnataka using NaBr and camera-based technologies
  • Won a water supply project in Basavana Bagewadi, Kolhar (Bijapur) valued at ~Rs 208 million
  • Order book execution timeline: 12 months for projects up to Rs 100 crores; 24 months for Rs 100-250 crores; 36 months above Rs 250 crores
  • Almost all current projects fall under Rs 100 crores single-project size
  • Pursuing projects in Rs 100-300 crore band selectively for healthy margins

End-to-End Water Sustainability Positioning · C. Mruthyunjaya Swamy (Chairman & ED)

  • Positions Denta as offering full water cycle: procurement → treatment → distribution → wastewater collection → treatment → groundwater recharge
  • Differentiator is integrated groundwater recharging expertise vs pure-play EPC peers
  • Holds orders across Jal Jeevan Mission (Rs 3,870.80 million across 3 projects), AMRUT (Rs 2,258.36 million across 2 projects), and STP (Rs 1,405.30 million across 5 projects)
  • Seeks to bid independently up to Rs 200 crores and via JV (with 51% Denta stake) above that threshold

Capital Structure and Working Capital · C. Mruthyunjaya Swamy (Chairman & ED)

  • Company is almost debt-free; only non-fund-based bank facilities for project execution
  • Has sanctions from Kotak Bank and SBI for non-fund-based limits (bank guarantees)
  • Working capital cycle targeted at 95-120 days; expected to improve in Q4 FY26
  • Acknowledged elevated inventory (~Rs 108 crores) and receivables (~Rs 64 crores) at H1
  • Cash reserves largely unchanged Q2 to Q3 at ~Rs 85 crores

In their words

No, probably we may not achieve Rs.300 crores for this year. When compared to last year revenue earnings, we may see 20-25% increase in revenue.
C. Mruthyunjaya Swamy (Chairman & ED, Denta Water)
I cannot commit for the exact timeline. It will be done very quickly.
C. Mruthyunjaya Swamy (Chairman & ED, Denta Water)
After two to three years, we are anticipating 15% increase in growth. Since base amount has got increased substantially in the next two to three years, we hope to strive for 15% increase when compared to the previous year, after three years.
C. Mruthyunjaya Swamy (Chairman & ED, Denta Water)

To check next time

What management committed to on this call, or the dates they gave.

  • Whether Q4 FY26 delivers guided 20% YoY revenue growth (~Rs 65 cr)
  • Status of Sandur Rs 850 cr and Karnataka water supply Rs 750-800 cr tenders
  • Whether working capital cycle narrows back toward 40-50 days from 95-120 days
  • Update on Rs 169.51 cr monitoring agency flagged receivables and Q4 conversion of ~Rs 65 cr
  • Whether FY27 30% growth trajectory materializes given Rs 841 cr order book execution within 12 months
  • Concrete orders outside Karnataka under geographic diversification push

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Thu 19 Feb 2026₹257.90−3.03%−1.41%
5 sessions Wed 25 Feb 2026₹252.10−5.21%−1.30%
20 sessions Thu 19 Mar 2026₹240.40−9.61%−10.91%

From the close of Wed 18 Feb 2026, ₹265.95: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Denta Water N Infra Sol's other calls

  • Q2 FY27Mon 16 Nov 2026Tone: Mixed
  • Q4 FY26Thu 25 Jun 2026Tone: Mixed
  • Q2 FY26Mon 17 Nov 2025Tone: Confident
  • Q1 FY26Mon 18 Aug 2025Tone: Confident
  • Q4 FY25Tue 3 Jun 2025Tone: Confident