Finolex Cables Q2 FY26 earnings call
In brief
Q2 FY26: revenue +5%, EBITDA +26%, PAT +35% YoY; preform plant ready, fiber draw by Mar '26; Q2 capex INR 75 cr
- Management's tone
- Cautious
- What was said
- Even-handed
- Guidance
- None given
- Analyst pushback
- Low
- Stock, next session
- −0.79% (Nifty 50 +0.12%)
- Q2 revenue grew ~5% YoY; EBITDA up ~26% and PAT up ~35% YoY, with H1 revenue +9%, EBITDA +19%, PAT +21%.
- Cables volume grew ~60% YoY in Q2; wires and cables segment revenue +8% Q2, +12% H1 despite muted agri and flat building wire.
- Preform plant ready; trials in next couple of weeks; fiber draw plant machines expected, completion targeted by March 2026.
- Working capital widened to 33 days in H1 FY26 from 22 days in H1 FY25 on lower payables; receivables 15 days, inventory 65 days.
- Communication cable EBITDA fell ~51% YoY (per analyst); no wins in 12 BharatNet orders placed; retender of 4 packages expected in September.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,376 cr | +4.9% | −1.4% | |
| EBITDA (excl. other income) | ₹183 cr | +64.7% | +34.3% | 13.3% (8.5% a year ago) |
| Net profit | ₹163 cr | +38.0% | 0.0% | 11.8% (9% a year ago) |
| EPS (₹) | ₹10.63 | +37.9% | 0.0% |
From the company's filed results for the quarter ended 30 Sept 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Q2 FY26 EBITDA growth YoY: said Quarter was up by about 26%; filed +64.7% YoY (EBITDA excl. other income, Rs 183.22 cr). Gap well above 3% with no reconciliation offered on the call; management gave a single growth figure without definition or base.
What moved the numbers, as management explained it
- Cable volume +60% YoY drove wires and cables segment revenue +8% Q2 and +12% H1.
- Prolonged monsoon depressed agricultural application volumes, which contribute ~10-12% of revenue.
- Building wire was flat YoY on real estate moderation and GST-related wait-and-watch on launches and affordable housing offtake.
- Commodity volatility: prices dipped in July then surged from late August; 3-3.5% price correction taken in September to recover.
- Communication cable EBITDA down ~51% YoY on low fiber prices, no BharatNet wins and contract negotiation delays.
- Ad/promotion spend INR 20 cr vs INR 11 cr PY continues the Q1 step-up (base effect from prior spot commitments).
The numbers management led with
- Capex in H1 FY26: ~₹100 crore (₹75 cr in Q2)
- Cables segment volume growth Q2 FY26: ~60% YoY
- Communication cable EBITDA margin — current vs target: Lower single digits currently; traditional 8-10% targeted post plant stabilisation
- FMEG revenue aspiration by FY28: ₹500 crore
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Preform plant production trials start (Communication Cables) | Q3 FY26 | Preform plant production trials to start in next couple of weeks. |
| Fiber draw plant completion (Communication Cables) | Q4 FY26 | Fiber draw plant to complete by March 2026. |
| FMEG revenue target | FY28 | FMEG target of INR 500 cr by 2028 still within reach. |
| Communication cable margin (target on stabilisation) (Communication Cables) | — | Once preform plant and additional fiber draw stabilise, communication cable margin can return to 8-10% levels. |
| State government telecom cable tenders (Communication Cables) | — | About seven state government tenders expected to be floated in the next two to four months. |
| Real estate demand pickup (Wires and Cables (Electrical)) | Q4 FY26 | Real estate-driven demand pickup expected in 1-2 quarters. |
What changed since the Thu 14 Aug 2025 call
| What | On the Thu 14 Aug 2025 call | On this call |
|---|---|---|
| Preform plant commissioning timeline (delayed) | Awaiting trials within ~1 month (Q1 FY26 call, August 2025) | Plant ready, trials to start in next couple of weeks (Q2 FY26 call, November 2025) |
| Real estate-driven wire demand pickup (delayed) | Pickup expected from Q3 FY26, lasting 4-6 quarters | Pickup 1-2 quarters away; new launches down, affordable housing offtake soft, GST clarity awaited |
| Electrical cable segment EBIT margin target (not repeated) | Target ~12% segment EBIT margin; recovery in another couple of quarters | No margin target stated for electrical cables; only noted utilization slightly under 70% |
| Cables segment volume growth (raised) | Electrical segment volumes grew 16% in Q1 FY26 | Cables volume grew ~60% YoY in Q2 FY26 |
| Communication cable margin target (new) | No specific margin target stated for communication cables in prior call reference | Once preform and fiber draw stabilise, margin can return to traditional 8-10% levels |
The business
By business
Wires and Cables (Electrical)
Revenue +8% Q2, +12% H1; cable volumes +60% on industrial and solar demand; agri (10-12% of revenue) hit by prolonged monsoon; building wire flat on real estate moderation; took 3-3.5% price correction in September.
Revenue +8% Q2 · Revenue +12% H1 · Cable volume +60% Q2 · Price correction 3-3.5% in Sept · Agri 10-12% of revenue · Electrical cable market ~INR 25,000 cr · Finolex cable revenue ~INR 200-250 cr
Outlook: Real estate pickup 1-2 quarters away; infra/cable demand substantial but choosy on L1 tender dynamics; electrical cable utilization slightly under 70%.
Communication Cables
Volumes muted, fiber prices low; no meaningful BharatNet contribution; metal-based cable soft on protracted yearly contract talks; private-side factory booking ~60% of capacity; largest supplier to Bharti.
EBITDA -51% YoY (analyst figure) · Factory booking ~60% of capacity
Outlook: Preform trials in next couple of weeks; fiber draw plant completion by March '26; traditional 8-10% margin levels possible once both stabilise; fiber prices showing signs of hardening.
FMEG
Fans hit by long monsoon; lighting price erosion nearing bottom; switches and switchgear seeing new variants next quarter; ad/promotion spend INR 20 cr in Q2 vs INR 11 cr PY on safety messaging.
Ad spend INR 20 cr in Q2 · Ad spend INR 11 cr PY Q2 · FMEG target INR 500 cr by 2028
Outlook: Switches/switchgear new variants next quarter; fan and water heater redesigns in ~6 months; in-house manufacturing 'not this year'; INR 500 cr by 2028 target still within reach.
Balance sheet, capex and funding
- Working capital 33 days in H1 FY26 vs 22 days in H1 FY25; payables decline the main driver, expected to self-correct.
- Receivables 15 days; inventory 65 days (slightly elevated due to site-related disruptions).
- Q2 capex INR 75 cr; H1 FY26 capex INR 100 cr; two major programs nearing completion.
- Preform plant ready, awaits production trials in next couple of weeks.
- Fiber draw plant building nearing completion; machines expected anytime, target completion by March 2026.
- Management characterises balance sheet as strong and working capital at 'slightly over a month' as ahead of peers.
The industry, as management sees it
Management sees housing demand moderation persisting 1-2 quarters pending GST-related clarity, while infrastructure and industrial cable demand is substantial but L1-tender driven. Lighting price erosion in LEDs appears to have bottomed. Fibre prices show early signs of hardening though not yet visible. New large entrants (UltraTech and another) entering cables will reshape competitive intensity in FY27.
Risks management named
- UltraTech and another large business house entering cables — competitive pressure on retail wires
- Prolonged monsoon suppressed agricultural cable volumes which are 10-12% of revenue
- Real estate moderation in affordable housing may persist 1-2 quarters, hitting building wire
- Communication cable margins to remain under pressure until preform plant stabilises
- Fibre price volatility continues to depress cable revenue realisation
Q&A
Q&A was a friendly, exploratory session with five sell-side/buy-side analysts probing top-line gap, competitive entry, working capital, comms cable margins, FMEG strategy and demand outlook. The strongest pushback was on muted topline versus peers, which management attributed to small cable base and monsoon-impacted agriculture; details on UltraTech/second-entrant response were light. Guidance questions were systematically declined consistent with the company's long-standing policy, and the shareholder legal case was deflected. The most concrete new datapoint was the 8-10% target communication-cable margin range contingent on March 2026 plant commissioning.
Not answered directly
- Forward guidance (revenue, margins, capex for FY26/FY27)
- Timeline to peak capacity of ₹6,500 cr
- Shareholder legal case status and settlement prospects
- Counter-strategy specifics for UltraTech/second-entrant cable entry
Asked for a number, answered without one
- FY26 and FY27 revenue/margin guidance: We have never given out any guidance, whether it is for the quarter or for full year or for future years. We prefer not to do that.
- Preform plant margin accretion: It would be too quick to give a number; should be margin accretive; 5% import duty saved vs US/other origins.
- FMEG in-house manufacturing timing: It is still on the cards. We need to hit the volumes first. Not this year, for sure.
- Real estate pickup timing: Pickup is something I am yet to see. Probably a quarter, two quarters away.
- Communication cable peak revenue potential: Depends on configuration of designs... It is kind of difficult to put a rupee value on that.
Every question, with its answer
1. Topline growth gap vs peers
Vidit Trivedi, Asian Market Securities
Question. Topline growth is muted at around 5% versus double-digit growth at peers — where are we lacking?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. Two factors. First, cable side is a small base — total market is ~₹25,000 cr and we do ~₹200-250 cr, so cable growth doesn't move the needle much. Second, the prolonged monsoon hit agricultural applications which are 10-12% of our revenue. Building wire also flat on real-estate moderation.
Follow-up. How are we planning for UltraTech's Q3 cable production start and January 2026 market entry, and the broader competitive threat from new entrants?
Answer. Two major business houses have announced entry; one is very specific, the other is yet to spell out plans. We have a well-entrenched brand at retail. Actions necessary to protect our turf will be taken.
2. Pricing action
Vidit Trivedi, Asian Market Securities
Question. What was the price hike taken during the quarter?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. We took a 3% to 3.5% price correction in September, after commodity prices surged from the second half of August.
3. Working capital and receivables management
Balasubramanian, Arihant Capital
Question. Net working capital days rose to 33 in H1 FY26 from 22 in the prior year. Is this a new normal driven by project mix, when can we revert, and what initiatives are in place on receivables for discount and utility clients?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. Major change was on the payable side which came down drastically — a cyclical issue that should self-correct. Receivables at 15 days, inventory at 65 days held higher due to site-disruption safety stock. On project pricing for large builders, we follow a discipline of bagging orders but not at any cost — protecting the bottom line.
Follow-up. Communication cable EBITDA fell ~51% YoY. With the new preform facility, what margin improvement is expected? What is the tangible BharatNet Phase-3 order pipeline and capacity underwriting?
Answer. BharatNet: 16 tenders floated; 12 ordered to suppliers, 4 going for retender. We participated but won none of the 12. Retender expected September. Of the 12 winners, we are following up with those lacking cabling/fibre capacity. State tenders: 7 states expected in 2-4 months, only Gujarat floated so far. Private side: largest supplier to Bharti with yearly contract; also supply Reliance and Vodafone. Factory booking ~60% of capacity.
4. Ad and promotion spend
Balasubramanian, Arihant Capital
Question. Ad and promotion spend rose to ₹20 cr this quarter from ~₹11 cr last quarter. Where is the money being spent — supporting new FMEG launches or defending premium wire brand?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. It's brand promotion across the board. We command a premium and need visual impact with end users, not just trade. Messaging is on safety, long life (40-50 years), and forget-about-it reliability. No direct correlation to short-term numbers — it's an investment.
Follow-up. FMEG strategy — we have been missing internal targets for a while. What is the strategic review, new product launches in next 2-3 quarters, and 2-3 year outlook? Which products are picking up vs slowing?
Answer. Fans faced monsoon headwinds; lighting hit by price erosion in LEDs that has now bottomed — volumes should improve. Switches and switchgears: multiple models under development, new variants next quarter. ₹500 cr by 2028 target still within reach.
5. Demand outlook and guidance
Vishal Shah, Sameeksha Capital
Question. What demand trends are we seeing post Q2 from housing, industrial and infrastructure for electrical cables? And any guidance for FY26 and FY27?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. We have never given any guidance, whether for the quarter, full year or future years — we prefer not to. On housing, moderation in real estate with new launches down; affordable housing offtake has dropped, possibly waiting on GST clarifications. Pickup is probably 1-2 quarters away. On infra cables, demand is substantial but we will be choosy as it is L1-tender driven.
Not answered directly.
6. Product pipeline
Yashi Shah, Shatrunjaya Investments Managers LLP
Question. Any product-line developments currently, particularly in switches, switchgear and other cables?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. Switches and switchgears: multiple variants under development with regulatory certifications; 6-8 month product cycle. Fans and water heaters: new designs and features in next six months. Cables: variants in fire-retardant, low-smoke, halogen-free; E-beam cured cables for high-rise applications with 40-50 year life. Optical fibre designs being extended beyond telecom customers.
7. Shareholder case and guidance
Darshika Khemka, AV Fincorp
Question. Two questions: status of the current legal case and any settlement prospects; and guidance for electrical cables, communication cables and FMEG over the next few years and current year?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. On the case, it is between two shareholders; at company level I have nothing to say. On guidance, we do not give it for any period — that's how we handle this.
Follow-up. Earlier concall mentioned ₹6,500 cr electrical-cable revenue capacity at peak. By when do we aim to achieve it, and what is the equivalent number for communication cables?
Answer. ₹6,500 cr figure was at certain price levels with the capacity then; we have since added multiple machines at multiple places, so number has changed. Current electrical-cable utilisation is just under 70%. For comms cables, revenue per km varies widely with fibre count — hard to put a rupee value.
Not answered directly.
8. Communication cable margin recovery
Darshika Khemka, AV Fincorp
Question. With preform facility starting soon, what margin accretion can we expect in communication cables?
Answer, Mahesh Viswanathan, Deputy CEO and CFO. If importing preform from US there is 5% duty vs zero from Japan — that 5% is straight savings. Beyond that, depends on realised plant efficiency post-trials; should be margin accretive. Currently margins in lower single digits due to utilisation and low fibre prices; once preform and additional fibre-draw stabilise, should revert to traditional 8-10% levels depending on design mix.
Follow-up. Are we still considering in-house manufacturing for FMEG?
Answer. Absolutely, still on the cards. We need to hit the volumes first. Not this year, for sure.
What was said
Topic by topic, in the order it was spoken
Q2 and H1 FY26 financial performance overview · Mahesh Viswanathan (Deputy CEO & CFO)
- Revenue grew 5% YoY in Q2 and 9% in H1 FY26 — characterised as modest vs peers
- EBITDA up 26% in Q2 and 19% in H1, indicating strong margin expansion
- PAT up 35% in Q2 and 21% in H1 on operating leverage
- Management noted EBITDA and PAT growth materially outpaced topline
Wires and cables segment · Mahesh Viswanathan (Deputy CEO & CFO)
- Wires and cables revenue +8% Q2 and +12% H1 YoY
- Industrial cables and solar applications were key growth drivers
- Cables volumes grew nearly 60% in the quarter — small base (~₹200-250 cr vs ₹25,000 cr market) but accelerating
- Agriculture application (~10-12% of revenue) hit by prolonged monsoon; building wire flat on real-estate moderation
Communication cables segment · Mahesh Viswanathan (Deputy CEO & CFO)
- Most product lines muted; metal-based volumes depressed by protracted yearly contract negotiations
- Fibre prices remained low, dragging cable revenue; signs of hardening but not yet visible
- BharatNet still no meaningful contribution; ongoing retender watch
- Catch-up on metal-cable contracts expected in coming quarters
Commodity pricing dynamics · Mahesh Viswanathan (Deputy CEO & CFO)
- Commodity prices dipped in first two months of the quarter then surged from second half of August
- Single pricing action of 3-3.5% taken in September to reflect input cost moves
- Pricing actions timed to lag commodity moves, protecting gross margins
Balance sheet and working capital · Mahesh Viswanathan (Deputy CEO & CFO)
- Balance sheet described as strong; working capital slightly over a month — ahead of most peers
- Inventory held higher due to site-disruption safety stock; receivables at 15 days
- Management views higher working capital days as transient, driven by payables cycle
Capex programmes · Mahesh Viswanathan (Deputy CEO & CFO)
- Capex of ~₹75 cr in Q2, ~₹100 cr in H1 FY26 — front-loaded against full-year plan
- Preform plant is ready and awaiting production trials in next couple of weeks
- Fibre-draw plant building nearing completion; machines expected imminently, completion targeted March 2026
- Both major capex programmes announced a year ago slated to be operational by March 2026
In their words
We have never given out any guidance, whether it is for the quarter or for full year or for future years. I think it is a little future-looking, and we prefer not to do that.
While we participated in the tenders, we were not successful in any of the tenders. I think the retender is expected to come in September.
We are a rather small player on the cable side... in a total market size of about INR 25,000 crores, we do approximately INR 200 crores - INR 250 crores. Whereas some of our peers are fairly big on that, and their focus is on that.
To check next time
What management committed to on this call, or the dates they gave.
- Preform plant production trial results and start of commercial runs.
- Fiber draw plant: machine arrival and March 2026 completion status.
- BharatNet retender (4 packages) outcomes and 7 state government tenders due in 2-4 months.
- Real estate demand pickup signal after GST clarification and post-festive season.
- Communication cable margin recovery as fiber prices harden and preform stabilises.
- FMEG: new switches/switchgear variants launch and any path to in-house manufacturing.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Fri 14 Nov 2025 | ₹783.05 | −0.79% | +0.12% |
| 5 sessions Thu 20 Nov 2025 | ₹767.45 | −2.77% | +1.21% |
| 20 sessions Thu 11 Dec 2025 | ₹738.55 | −6.43% | +0.07% |
From the close of Thu 13 Nov 2025, ₹789.30: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Finolex Cables's other calls
- Q2 FY27Fri 13 Nov 2026Tone: Mixed
- Q1 FY27Thu 13 Aug 2026Tone: Mixed
- Q4 FY26Fri 29 May 2026Tone: Cautious
- Q3 FY26Mon 16 Feb 2026Not read
- Q1 FY26Thu 14 Aug 2025Tone: Cautious
- Q4 FY25Mon 2 Jun 2025Tone: Mixed
- Q2 FY25Thu 14 Nov 2024Tone: Cautious
- Q1 FY25Sat 28 Sept 2024Tone: Confident
- Q1 FY25Wed 14 Aug 2024Tone: Cautious
- Q4 FY24Mon 27 May 2024Tone: Confident