JAI Balaji Industries Q1 FY25 earnings call
In brief
Q1 revenue rose 16% to INR1,718 cr and adjusted EBITDA reached INR325 cr, with 18%-20% EBITDA margin guidance.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Low
- Stock, next session
- +0.40% (Nifty 50 +0.38%)
- Q1 revenue rose 16% YoY to INR1,718 crores, adjusted EBITDA rose 58% to INR325 crores and PAT rose 23% to INR209 crores.
- Management reported a record adjusted EBITDA of INR325 crores, up 58% YoY at a 19% margin versus 14% a year earlier.
- The INR1,000 crore expansion plan remains internal-accrual funded, with FY25 capex guidance of INR300-350 crores.
- Q1 net debt was INR384 crores versus INR871 crores in FY23; management targets INR225-250 crores by FY25-end.
- DI pipe volume is targeted at 4-4.5 lakh tons in FY25, with a six-to-seven-month order book and robust domestic demand.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q1 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,718 cr | +15.9% | −6.9% | |
| EBITDA (excl. other income) | ₹316 cr | +53.9% | +31.1% | 18.4% (13.8% a year ago) |
| Net profit | ₹209 cr | +22.5% | −23.5% | 12.2% (11.5% a year ago) |
| EPS (₹) | ₹12.10 | +6.7% | −28.6% |
From the company's filed results for the quarter ended 30 Jun 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Other income: said INR7-8 crores; filed ₹9.50 cr. Management described its Q1 figure as approximate and did not reconcile the range with the filed amount.
What moved the numbers, as management explained it
- Sales rose YoY across TMT bars (16%), ferro alloys (19%) and DI pipes (4%); production rose 18%, 39% and 4%, respectively, supporting the 16% revenue increase.
- DI pipe realization rose 10% YoY to INR77,000 per ton, while ferroalloy realization declined 5% to INR1,71,000 per ton, creating divergent price contributions.
- DI pipe realization rose 10% to INR77,000 per ton, and management is shifting toward DI pipes and specialized ferroalloys; Q1 EBITDA per ton was INR21,000 and INR37,000, respectively.
- Contracts are linked to raw-material indexes, with steep price changes partly passed through; iron ore is under 15% of DI pipe cost and 4-5 months of inventory delays P&L impact.
- Q1 other income was INR7-8 crores after Q4 included a one-off provision write-off/reversal, so the sequential drop reflects a non-recurring base effect. (one-off)
The numbers management led with
- Highest-ever quarterly EBITDA: INR325 cr, up 58% YoY; margin 19% vs 14%
- EBITDA per ton — DI pipes: INR21,000
- EBITDA per ton — ferro alloys: INR37,000
- Net debt reduction: INR384 cr in Q1 FY25 vs INR871 cr at FY23-end; FY25 target INR225-250 cr; net-debt-free in 12 months
- Total capex plan: INR1,000 cr, of which ~INR605-685 cr incurred by Q1; balance INR395 cr over next 12 months; FY25 guide INR300-350 cr; Q1 spent INR108-112 cr
Guidance
Guidance on this call
| What | For | What management said | Filed |
|---|---|---|---|
| Gross turnover EBITDA margin | FY25 | Management said its guidance was 18%-20% on gross turnover and it was sticking to that guidance. | 13.6%, below the range |
| Net debt | FY25 | Net debt is guided to INR225-250 crores by the end of FY25. | — |
| Net debt-free status | — | Management was optimistic about becoming net debt free within the next 12 months. | — |
| FY25 capex | FY25 | Our guidance for FY 25 capex is INR300-350 crores. | — |
| Capacity expansion capex plan | — | The INR1,000 crores capex plan is funded from internal accruals; INR395 crores was stated to remain over the next 12 months. | — |
| DI pipe production volume (DI pipes) | FY25 | DI pipe production is expected to finish FY25 in the region of 4 lakh to 4.5 lakh tons. | — |
| DI pipe and specialized ferroalloy contribution (DI pipes and specialized ferroalloys) | — | DI pipe and specialized ferroalloy contribution is targeted to rise from the present 45%-50% to 80%. | — |
| DI pipe capacity expansion (DI pipes) | FY25-FY26 | DI pipe capacity is planned at 6.6 lakh tons, with 1.4 lakh tons in FY25 and 2.2 lakh tons in FY26. | — |
| FY26 DI pipe capacity target (DI pipes) | FY26 | In Q&A, management said the FY26 DI pipe capacity target was 6 lakh tons; prepared remarks cited 6.6 lakh tons. | — |
| Ferroalloy capacity (Ferro alloys) | FY25 | Ferroalloy capacity is expected to increase from 1.66 lakh tons to 1.9 lakh tons by FY25. | — |
| Blast furnace capacity (Blast furnace operations) | Q1 FY26 | After the second blast furnace is completed in Q1 FY26, capacity is expected to rise from 6.3 lakh tons to 7.5 lakh tons. | — |
| Sinter capacity (Sinter operations) | FY25 | Total sinter capacity is expected to reach approximately 12 lakh tons per annum after the balance 3 lakh tons is commissioned in FY25. | — |
| Blast furnace waste heat gas boiler (Captive power operations) | — | The 35 TPH waste heat gas boiler is expected to be commissioned within the next two months. | — |
| DI pipe EBITDA per ton (DI pipes) | — | DI pipe EBITDA per ton is indicated at INR21,000-22,000 plus/minus 500 for the next two quarters. | — |
| DI and ferroalloy price and margin stability (DI pipes and ferro alloys) | — | Management expects DI and ferroalloy prices to be stable YoY and margins to be maintained. | — |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
What changed since the Mon 29 Apr 2024 call
| What | On the Mon 29 Apr 2024 call | On this call |
|---|---|---|
| FY25 revenue growth guidance (not repeated) | Revenue growth guidance was 25%-30% for FY25. | Not mentioned |
| FY25 EBITDA margin (raised) | EBITDA margin guidance was 17%-18% for FY25. | Management guided 18%-20% on gross turnover and said it was sticking to the guidance. |
| Net debt-free deadline (raised) | Net debt-free was targeted within 15 months through internal accruals. | Management said it was optimistic about becoming net debt free within the next 12 months. |
| FY25 net debt (held) | Net debt guidance was INR225-250 crores by end-FY25. | The same INR225-250 crores end-FY25 target was reaffirmed. |
| FY25 capex (raised) | FY25 capex guidance was INR250-300 crores. | FY25 capex guidance was raised to INR300-350 crores. |
| INR1,000 crore capex plan and timing (restated) | INR1,000 cr over next 15 months; INR497 cr incurred and INR503 cr balance. | INR1,000 cr from internal accruals; remarks cited INR685 cr done and INR395 cr balance, while another passage cited INR605 cr done. |
| FY25 DI pipe production volume (raised) | DI pipe production volume was guided above 4 lakh tons in FY25. | Management now expects 4-4.5 lakh tons of DI pipe production in FY25. |
| Value-added product contribution (restated) | Value-added products were targeted at 80%-85% of sales within 18 months, versus 50% currently. | DI pipe and specialized ferroalloy contribution was targeted to rise from 45%-50% to 80%, with no timeframe stated. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| FY25 revenue growth | FY25 | 25–30% (on the Q4 FY24 call) | -1%, below the range |
| FY25 EBITDA margin | FY25 | 17–18% (on the Q4 FY24 call) | 13.6%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
DI pipes
Q1 production rose 4% to 64,000 tons and sales 4% to 61,000 tons; realization rose 10% YoY to INR77,000 per ton. EBITDA per ton was INR21,000.
Production 64,000 tons · Production growth 4% YoY · Sales 61,000 tons · Sales growth 4% YoY · Realization INR77,000 per ton · Realization growth 10% YoY · EBITDA per ton INR21,000
Outlook: FY25 volume is expected at 4-4.5 lakh tons. Capacity is planned at 6.6 lakh tons, though a later FY26 answer cited 6 lakh tons; DI EBITDA/ton is indicated at INR21,000-22,000 plus/minus 500 for two quarters.
Ferro alloys
Q1 production rose 39% to 34,000 tons and sales 19% to 19,000 tons; realization fell 5% to INR1,71,000 per ton. EBITDA per ton was INR37,000.
Production 34,000 tons · Production growth 39% YoY · Sales 19,000 tons · Sales growth 19% YoY · Realization INR1,71,000 per ton · Realization decline 5% YoY · EBITDA per ton INR37,000
Outlook: Capacity is expected to rise to 1.9 lakh tons in FY25, with more specialized-grade output; management expects the blended margin to remain stable.
TMT bars
Q1 production rose 18% to 60,000 tons and sales 16% to 58,000 tons; management stated EBITDA per ton of INR6,000.
Production 60,000 tons · Production growth 18% YoY · Sales 58,000 tons · Sales growth 16% YoY · EBITDA per ton INR6,000
Pig iron and sponge iron
Pig iron and sponge iron EBITDA per ton were INR7,000 and INR5,000; hot metal not used for DI pipes is sold as pig iron.
Pig iron EBITDA per ton INR7,000 · Sponge iron EBITDA per ton INR5,000
Outlook: As DI pipe capacity increases, management expects the entire hot metal requirement to shift into DI pipe production.
Balance sheet, capex and funding
- Q1 net debt was INR384 crores, compared with INR871 crores in FY23; the debt is associated with Tata Capital and its lenders.
- FY25 net-debt guidance is INR225-250 crores by year-end, with net-debt-free status targeted within 12 months.
- The INR1,000 crore expansion capex plan is to be funded entirely from internal accruals.
- Management said INR685 crores had been incurred by Q1 and INR395 crores remained over 12 months; another passage cited INR605 crores incurred.
- FY25 capex guidance is INR300-350 crores; Q1 spend was stated as INR108 crores in prepared remarks and INR112 crores in Q&A.
- No additional power capex was planned for expanded capacity; incremental power would be sourced from the grid.
The industry, as management sees it
Management sees a structurally tight Indian DI pipe market for the next 5-7 years, driven by Jal Jeevan Mission, AMRUT-2, river-linking and replacement/irrigation demand — and views OPVC/PVC as not a near-term substitute given longevity and lifecycle gaps.
Risks management named
- Coking coal price volatility with limited near-term margin pass-through (4-5 month inventory lag)
- Other-income line was boosted by one-off reversal of past provisions in Q4
- Election/monsoon-driven short-term demand pacing (not structural)
- Implied ~INR1,000 cr annual margin sensitivity if iron ore/coal move adversely
Q&A
Q&A was dominated by capacity, capex, demand visibility and segment-level margin questions from eight participants across 22 exchanges. Management was unusually forthcoming with hard numbers (EBITDA per ton for every segment, captive power details, debt glide path) while deflecting only on customer-mix and project-payback specifics. Pushback was light — most exchanges were clarifying or confirmatory rather than confrontational — but the OPVC disruption question and the overcapacity query from Wallfort PMS drew extended confident rebuttals from Jajodia. There were no surprises on guidance, which was maintained across the board (18-20% EBITDA margin, INR300-350 cr FY25 capex, INR225-250 cr FY25 net-debt target).
Not answered directly
- Customer concentration breakdown (deferred to email follow-up)
- Coking coal March/June/July benchmark averages (deferred to email)
- Project payback period in months (declined)
- Specialized vs standard ferro alloy split (declined)
Asked for a number, answered without one
- Specialized versus standard ferroalloy EBITDA: Management said specialized grades were not shared separately and that only standard numbers were being disclosed.
- Sinter ramp-up savings: Management only said sinter is cheaper than iron ore by approximately INR1.5 per kg and gave no ramp-up savings figure.
- Jal Jeevan Mission revenue share: Management said orders are blended across Jal Jeevan, AMRUT-2 and state departments, so a single-mission revenue split was unavailable.
- Top-five client concentration: Management said the percentage detail was unavailable, would change with the quarter, and would be provided later.
- Capacity-expansion payback period: Management called the payback very quick but declined to state a number of months.
- Domestic versus export ferroalloy economics: Management disclosed only blended margins and said geographic realizations and EBITDA per ton were not disclosed.
- Coking coal benchmark averages: Management said the data would be sent by email and only stated that prices were trending lower.
- Raw-material sensitivity: Management said DI prices adjust with raw materials, iron ore has limited impact, and coal and ore inventory creates a 4-5 month P&L lag.
Every question, with its answer
1. Segment EBITDA per ton
Vikas, PhillipCapital
Question. Could you give EBITDA per ton separately for DI pipes and ferro alloys for the quarter?
Answer, Aditya Jajodia, Chairman and Managing Director. EBITDA per ton: DI INR21,000, ferro alloys INR37,000, pig iron INR7,000, TMT bars INR6,000 and sponge iron INR5,000.
Follow-up. With iron ore and coking coal prices softening in 2Q, can DI and steel EBITDA per ton go further up?
Answer. DI realizations will adjust to raw material moves; partially there may be a temporary gap. For DI pipes, iron ore is a small share of cost so impact is limited. Coking coal has a 4-5 month inventory/pipeline lag before changes flow through P&L.
2. Ferro alloy mix
Vikas, PhillipCapital
Question. What is the break-up between normal and specialized ferro alloy in the INR37,000 blended number? And EBITDA per ton differential?
Answer, Aditya Jajodia, Chairman and Managing Director. Management declined to split the specialized vs standard grade within ferro alloys, saying it only shares standard blended numbers.
Follow-up. Sinter capacity is being enhanced — how does it change our cost of production on a per-ton basis once fully ramped up?
Answer. Sinter replaces pellet and lumpy iron ore in the blast furnace and is approximately INR1.5/kg cheaper than iron ore.
Partly answered.
3. Volume guidance
Vikas, PhillipCapital
Question. Any volume guidance for the year?
Answer, Aditya Jajodia, Chairman and Managing Director. Volume guidance: DI pipes 4 lakh to 4.5 lakh tons for the year; ferro alloys to roughly match Q1 run-rate (capacity 1.9 lakh tons), with the value-added/specialized-grade mix tilting higher.
4. Future capex
Manav Gogia, Yes Securities
Question. Out of the INR1,000 cr capex, around INR395 cr is left. Has management decided on any new plans once this capex is over?
Answer, Aditya Jajodia, Chairman and Managing Director. As of now guidance remains restricted to the INR1,000 cr; first focus is to complete this capex plan.
Follow-up. FY25 capex guidance of INR350 cr — can you quantify Q1 capex?
Answer. Q1 capex was INR112 cr.
5. Realization outlook
Manav Gogia, Yes Securities
Question. On realizations, DI pipes and ferro alloys saw a Q-on-Q fall — guidance on where these head from Q1 figures and how Q2 is shaping up?
Answer, Aditya Jajodia, Chairman and Managing Director. Prices see minor changes; on a YoY basis realizations are stable for DI and ferro alloys. Q4 spikes reflect year-end demand. Annual realizations to stay at similar levels.
Follow-up. Other income dropped significantly in Q1 standalone vs Q4 — was that a one-time?
Answer. Yes — those were one-off items, an extra provision taken in earlier years that was written back into other income in Q4. Q1 other income was only INR7-8 cr.
6. Q4 segment EBITDA
Shweta Dikshit, Systematix Group
Question. On realizations — what were the margins for DI pipes and ferro alloy in Q4, given Q1 was INR21,000?
Answer, Aditya Jajodia, Chairman and Managing Director. Doesn't have exact Q4 numbers but said Q4 was INR1,000-2,000 better than Q1.
Follow-up. If realizations fall further on coking coal moves, what margins are we looking at for the next quarter?
Answer. For ferro alloys, the increasing share of crystallized grades will lift the blended margin. For DI pipes, ~INR21,000-22,000 (±500) is expected for the next two quarters given the order book is at the same price level; new-plant ramp will add volume benefits.
Partly answered.
7. Ferro alloy export mix
Shweta Dikshit, Systematix Group
Question. In ferro alloys, what is the domestic vs export margin difference, and what is the export-domestic mix?
Answer, Aditya Jajodia, Chairman and Managing Director. Management declined to disclose split or specific realization; only shares blended numbers. Company exports to 42 countries with different specialized grades and geographies.
Follow-up. What could be the exit EBITDA per ton for ferroalloys when we ramp to 190,000 tons by year-end?
Answer. Guidance remains on 18-20% on gross turnover of the company; Q1 already achieved 18.5% so very close to guidance. Sticking to the same guidance.
Partly answered.
8. Jal Jeevan Mission demand
Pradeep Rawat, Yogya Capital
Question. On Jal Jeevan Mission (JJM) — how is DI pipe demand, and are PVC pipes increasingly being used in place of DI under this scheme?
Answer, Aditya Jajodia, Chairman and Managing Director. JJM is not over; demand remains more than supply. PVC/plastic pipes have been around for years and do not replace DI given longevity/lifecycle advantages.
Follow-up. How much of DI pipe revenue comes from JJM?
Answer. It's a blended order book — primarily JJM, AMRUT-2 and various state departments on a Pan-India basis. No single-mission split maintained.
9. Demand pacing
Pradeep Rawat, Yogya Capital
Question. Did we witness any demand slowness with respect to the elections?
Answer, Aditya Jajodia, Chairman and Managing Director. There is some fund/monsoon-driven timing impact, but demand is robust — an annual phenomenon, not specific to elections.
Follow-up. For DI pipe raw materials, is the price held on the order-winning date or hedged later?
Answer. Not held on order date. Raw materials are secured for pig iron / hot metal production as an integrated producer; coking-coal and iron-ore pipelines are maintained 4-5 months based on production plan, not DI orders.
10. Captive consumption
Pradeep Rawat, Yogya Capital
Question. What % of products is captively consumed?
Answer, Aditya Jajodia, Chairman and Managing Director. ~30% of ferro alloys is consumed in-house; hot metal required for DI pipes is allocated to DI pipes, balance sold as pig iron currently. As DI capacity scales, all hot metal will be diverted to DI pipes.
11. Credit rating upgrade
Koustubh Shah, Wallfort PMS
Question. We have been consistently earning INR200 cr+ PAT for 4-5 quarters — when do we see a credit rating upgrade?
Answer, Aditya Jajodia, Chairman and Managing Director. Management has already approached the credit rating agency after Q1 numbers and expects ratings to improve based on the numbers.
Follow-up. After capacity expansion, will the current power plant suffice or do you plan to add?
Answer. Sticking to the announced capex plan; incremental power will be sourced from the grid. No new power capex announced.
12. Overcapacity risk
Koustubh Shah, Wallfort PMS
Question. Given competitors are also ramping DI capacity, could overcapacity hit realizations in 1-2 years?
Answer, Aditya Jajodia, Chairman and Managing Director. Existing backlog is large — export orders already getting diverted to domestic. Pipeline includes river-linking, AMRUT-2 and other projects. Supply-demand gap persists over next 2-3 years. New-entry barrier is high (full integrated steel plant). Replacement demand 5-7 years out plus irrigation adds upside.
13. Customer concentration
Dipesh, Manya Finance
Question. Who are the top 5 clients of DI pipes and ferro alloys, and what % of revenue do they contribute?
Answer, Management, Management. Top 5 DI clients named: Megha Engineering, NCC, Kalpatru Group, plus state governments (J&K, Maharashtra, Haryana, West Bengal). Detailed % not available; offered to share offline later.
Follow-up. Approximately what % of revenue?
Answer. Said client list changes quarter-to-quarter so the top 5 set is not fixed; offered to provide breakdown in a follow-up email.
Not answered directly.
14. Project payback / ROE
Dipesh, Manya Finance
Question. What is the payback period of the DI and ferro alloy capacity expansion? And ROE?
Answer, Aditya Jajodia, Chairman and Managing Director. ROE and ROCE are 40-45%+. Refused to quote a payback period in months, calling it unrealistically quick given this is forward integration of existing INR1,000 cr sunk-cost facilities.
Follow-up. Should we expect this ROE to be sustained over the next several years?
Answer. Absolutely — Jai Balaji 2.0 strategy is absolutely focused on ROC and ROE.
Partly answered.
15. Dividend policy
Dipesh, Manya Finance
Question. Do we have a dividend policy in place?
Answer, Aditya Jajodia, Chairman and Managing Director. Acknowledged past compliance issues; expects to announce some dividend within this financial year.
Follow-up. Guidance on raw material cost going ahead and prices?
Answer. Iron ore, coal and coking coal — all three are weak; expecting further price decline in coming quarters. Margin for DI and ferro expected maintained; commodity margin may vary slightly.
16. Cost pass-through
Dipesh, Manya Finance
Question. If raw material cost falls, will the savings be passed on to customers or absorbed in margins?
Answer, Management, Management. Iron ore contribution to DI pipe is <15%, so small moves won't materially shift margins. Many contracts are indexed — so on sharp moves partial pass-through occurs in either direction, keeping margins stable.
Follow-up. What is the max component of the raw material — coal?
Answer. Major is coking coal and coal, followed by iron ore.
17. Coal linkages
Dipesh, Manya Finance
Question. Coal linkages — do we have them?
Answer, Management, Management. Yes, from Coal India.
18. Coking coal inventory & prices
Saket Kapoor, Kapoor and Company
Question. On RM prices, how are they trending? How many months of coking-coal inventory do we carry? Trends for Q1 and July?
Answer, Aditya Jajodia, Chairman and Managing Director. Coking-coal inventory held 4-5 months (including pipe inventory); similar levels for iron ore. Iron-ore prices on the lower side. Offered to send coking-coal benchmark averages (March/June/July) over email.
Follow-up. Are current margins sustainable for DI pipes? Bid pipeline visibility?
Answer. Confident of maintaining the current guidance for DI and ferro margins. Demand is robust for the next 3-5 years and beyond.
Partly answered.
19. DI pipe demand-supply
Saket Kapoor, Kapoor and Company
Question. Given tendering from government agencies, is DI pipe demand outstripping supply currently?
Answer, Aditya Jajodia, Chairman and Managing Director. Demand is too robust; new supply is coming up but government tenders and spending are in place. Has annual direct government tenders and back-to-back orders with big EPCs; healthy order book.
Follow-up. What tonnage should one expect for the current fiscal?
Answer. DI pipe tonnage guidance reiterated at 4-4.5 lakh tons for FY25.
20. Specialized ferro alloys
Saket Kapoor, Kapoor and Company
Question. On specialized ferro alloys that command a premium — how are price trends there given commodity corrections?
Answer, Aditya Jajodia, Chairman and Managing Director. Specialized grades are priced in line with base ferro alloys; if base reduces, some reduction follows but margin remains similar. Contribution similar.
21. OPVC competition threat
Aditya, Unknown
Question. OPVC players (Supreme, Tentrag, Fastgear) are setting up capacity and claiming OPVC is cheaper than DI and easier to handle. Some DI manufacturers are also entering OPVC. Could this disrupt DI pipe demand?
Answer, Aditya Jajodia, Chairman and Managing Director. OPVC is still <5% of India's demand; there are longevity/lifecycle issues vs DI. Big demand coming up; supply increase will be absorbed. May replace HDPE rather than DI.
Follow-up. What is the long-term impact on our business?
Answer. For the next 5-6 years, DI demand-supply is not an issue.
22. Export market potential
Pradeep Rawat, Yogya Capital
Question. If domestic DI supply matches or overshoots demand, can we see exports of DI pipes from India?
Answer, Aditya Jajodia, Chairman and Managing Director. Export market is viable; the product is well accepted and all approvals are in place; can enter export markets whenever chosen.
Follow-up. Is there a major cost-competitive threat from China in DI pipes?
Answer. India has strong cost competitiveness vs China in export markets; many countries restrict Chinese products.
What was said
Topic by topic, in the order it was spoken
Jai Balaji 2.0 Strategy and Q1 Highlights · Aditya Jajodia (CMD)
- Anchors strategy on value-added DI pipes and specialized ferro alloys; targets increasing their share from 45-50% to 80% of mix.
- Targeting capacity utilization above 90% and EBITDA margin band of 18-20% on consolidated turnover.
- Net-debt-free goal within 12 months; entire INR1,000 cr capex funded from internal accruals.
- Positions Jai Balaji 2.0 as framework for ROCE-focused capital allocation.
Capacity Expansion Plan · Aditya Jajodia (CMD)
- DI pipes capacity to scale from 3 lakh tons to 6.6 lakh tons — 1.4 lakh tons to commission in FY25, balance 2.2 lakh tons in FY26.
- Ferro alloy capacity to expand from 1.66 lakh tons to 1.9 lakh tons by FY25; one blast furnace revamped in FY24, second due Q1 FY26, taking total blast furnace capacity from 6.3 to 7.5 lakh tons.
- Sinter capacity raised to 9 lakh tons in FY24 with the remaining 3 lakh tons to be added in FY25, taking total to ~12 lakh tons per annum.
- Setting up a 35 TPH blast furnace waste-heat boiler for captive power — green energy project commissioning within ~2 months.
Capex Pacing and Funding · Aditya Jajodia (CMD)
- Total capex announced around INR1,000 cr; ~INR605-685 cr incurred by Q1 (per different parts of the transcript).
- Balance INR395 cr to be spent over the next 12 months.
- FY25 capex guided at INR300-350 cr; Q1 FY25 spent ~INR108-112 cr.
Net Debt Reduction · Aditya Jajodia (CMD)
- Net debt declined to INR384 cr in Q1 FY25 from INR871 cr at end of FY23.
- FY25 net debt target: INR225-250 cr; net-debt-free in 12 months.
- Operational levers cited: ownership of three railway sidings, captive power facilities.
Operational Performance · Aditya Jajodia (CMD)
- Production YoY: TMT +18% to 60,000 tons, ferro alloys +39% to 34,000 tons, DI pipes +4% to 64,000 tons.
- Sales YoY: TMT 58,000 tons (+16%), ferro 19,000 tons (+19%), DI pipes 61,000 tons (+4%).
- DI realization +10% YoY to INR77,000/ton; ferro realization -5% to INR1,71,000/ton.
Financial Performance · Aditya Jajodia (CMD)
- Revenue up 16% YoY to INR1,718 cr.
- Highest-ever adjusted EBITDA of INR325 cr, up 58% YoY; margin 19% vs 14% in Q1 FY24.
- PAT up 23% to INR209 cr; PAT margin jumped to 12%.
Demand Outlook & Closing · Aditya Jajodia (CMD)
- Tailwinds cited: Jal Jeevan Mission, AMRUT-2, river-linking and other state programmes.
- Capacity additions described as fully consumable given backlog and replacement demand 5-7 years out.
- Management confident of sustaining Q1 momentum through FY25.
In their words
We are already approaching the credit rating agency after this Q1 numbers and we expect the ratings to improve based on the numbers.
I am pleased to announce that Jai Balaji has started FY '25 on a very strong note with its highest ever adjusted EBITDA, an adjusted EBITDA margin of 19%.
We are optimistic that within the next 12 months we will achieve our goal of becoming a net debt free company.
To check next time
What management committed to on this call, or the dates they gave.
- DI pipe sales progress toward 4-4.5 lakh tons in FY25 after Q1 sales of 61,000 tons.
- DI pipe EBITDA per ton versus INR21,000-22,000 plus/minus 500 indicated for the next two quarters.
- FY25 capex against INR300-350 crore guidance, including reconciliation of Q1 spend stated as INR108 crore and INR112 crore.
- Net debt against the INR225-250 crore FY25 year-end target and progress toward net-debt-free status.
- FY25 commissioning of 1.4 lakh tons DI pipe, 1.9 lakh tons ferroalloy and 3 lakh tons sinter capacity; 35 TPH waste-heat boiler due within two months.
- Progress toward lifting DI pipes and specialized ferroalloys' contribution from 45%-50% to 80%.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Wed 31 Jul 2024 | ₹186.45 | +0.40% | +0.38% |
| 5 sessions Tue 6 Aug 2024 | ₹177.90 | −4.20% | −3.48% |
| 20 sessions Wed 28 Aug 2024 | ₹183.25 | −1.32% | +0.78% |
From the close of Tue 30 Jul 2024, ₹185.70: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.