JAI Balaji Industries Q2 FY25 earnings call
In brief
Q2 FY25 PAT fell despite higher revenue, EBITDA and PBT, as a non-cash deferred tax provision offset operating gains.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Low
- Stock, next session
- +1.10% (Nifty 50 +0.28%)
- H1 FY25 revenue rose 8%, EBITDA 30% and PBT 34%, which management linked to efficient operations and cost management.
- PAT declined in Q2 and H1 because a deferred tax provision, described as non-cash, reduced reported profit.
- Quarter-on-quarter revenue and profitability fell as production and sales realizations weakened in TMT bars, pig iron and sponge iron.
- Management remained confident of becoming net debt free within 12 months, citing strong EBITDA and pending CAPEX.
- Management targeted 4 lakh tons of DI-pipe volume in FY25 and FY26, expecting volumes to increase incrementally each quarter.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,557 cr | +0.6% | −9.4% | |
| EBITDA (excl. other income) | ₹228 cr | +6.9% | −27.7% | 14.7% (13.8% a year ago) |
| Net profit | ₹153 cr | — | −26.7% | 9.8% (0% a year ago) |
| EPS (₹) | ₹8.42 | −34.2% | −30.4% |
From the company's filed results for the quarter ended 30 Sept 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- H1 FY25 revenue rose 8%, EBITDA 30% and PBT 34%; adjusted EBITDA margin improved to 17% from 14% as management cited efficient operations and cost management.
- Quarter-on-quarter revenue and profitability fell as production and sales realizations declined in TMT bars, pig iron and sponge iron.
- PAT declined because deferred tax provisions created a non-cash charge; pending deferred tax assets were expected to be consumed further in Q3. (accounting)
- H1 realization rose 8% for DI pipes and was similar for ferro alloys, while other products saw realizations decline 5%-7%.
- Coking-coal and coal prices were lower, though chrome ore was rising substantially; management expected the input-cost benefit in Q3-Q4.
- Q2 other income included around Rs. 9.48 crores from railway-rake compensation, with a further claim pending.
The numbers management led with
- DI pipe capacity expansion: From 3 lakh MT to 6.6 lakh MT (Phase 1 +1.4 lakh MT in FY25, Phase 2 +2.2 lakh MT in FY26)
- Capex plan: Rs 1,000 crore total — Rs 700 crore incurred, Rs 300 crore remaining over next 9 months; FY24 Rs 350 crore; FY25 spent Rs 200 crore
- Net term debt: Rs 355 crore at H1 FY25 (up YoY from Rs 308 crore); target Rs 225–250 crore by FY25 end; net debt free within 12 months
- Stock split: 1 equity share of Rs 10 face value to be split into 5 equity shares of Rs 2 face value
Guidance
Guidance on this call
| What | For | What management said | Filed |
|---|---|---|---|
| Revenue growth | FY25 | Full-year FY25 revenue growth guidance of 25%-30% was retained. | -1%, below the range |
| EBITDA margin | FY25 | Full-year FY25 EBITDA margin guidance of 17%-18% was retained. | 13.6%, below the range |
| Blended EBITDA margin | FY26 | A broad 17%-20% range was discussed for FY26 blended EBITDA margin. | 5.9%, below the range (standalone) |
| Net term debt | FY25-FY26 | Management targeted becoming net term debt free within the next 12 months. | — |
| Term debt | FY25 | FY25 guidance was to reduce term debt to Rs. 225-250 crores. | — |
| CAPEX | FY25 | Management stated CAPEX guidance of Rs. 350 crores and FY25 spend of around Rs. 200 crores. | — |
| Balance CAPEX for Rs. 1,000 crores plan | FY25-FY26 | The remaining Rs. 300 crores of the Rs. 1,000 crores plan was expected over the next 9 months. | — |
| DI pipes capacity | FY26 | DI-pipe capacity was to rise from 3 to 6.6 lakh metric tons; 1.4 lakh was due in FY25 and 2.2 lakh in FY26. | — |
| Ferro alloy capacity (Ferro alloys) | Q1 FY26 | Ferro-alloy capacity was expected to increase from 1.6 to 1.9 lakh metric tons by Q1 FY26. | — |
| Blast furnace capacity (Blast furnaces) | Q1 FY26 | Completion of a second revamped blast furnace was expected to lift total capacity to 7.5 lakh metric tons. | — |
| Centre capacity (Centre operations) | Q1 FY26 | Centre capacity was expected to reach approximately 12 lakh metric tons per annum by Q1 FY26. | — |
| Revenue contribution of DI pipes and ferro alloys | FY25 | The revenue contribution of DI pipes and ferro alloys was expected to reach 65% by FY25-end. | — |
| Revenue contribution of DI pipes and ferro alloys | FY26 | The revenue contribution of DI pipes and ferro alloys was expected to be 75%-80% by FY26-end. | — |
| DI pipe volume (DI pipes) | FY25-FY26 | DI-pipe volume was targeted at 4 lakh tons in FY25 and FY26; management expressed confidence at plus or minus 10%. | — |
| Export share of production | — | With capacity expansion, management targeted exports at around 5% of production. | — |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
What changed since the Wed 31 Jul 2024 call
| What | On the Wed 31 Jul 2024 call | On this call |
|---|---|---|
| FY25 EBITDA margin (cut) | Maintain EBITDA margin band of 18-20% on consolidated turnover | Management affirmed FY25 EBITDA margin guidance of 17%-18% after the analyst restated it. |
| Net-debt-free target (held) | Management targets net-debt-free status within 12 months | Management reiterated becoming net term debt free within the next 12 months. |
| FY25 debt level (restated) | FY25-end net debt target was INR225-250 cr | FY25 guidance shifted in wording to term debt of Rs. 225-250 crores. |
| FY25 CAPEX plan (held) | FY25 capex guided at INR300-350 cr (Q1 INR108-112 cr spent) | CAPEX guidance remained Rs. 350 crores, with FY25 spend around Rs. 200 crores. |
| DI-pipe capacity (held) | DI pipe capacity to scale from 3 to 6.6 lakh tons by FY26 | The 6.6 lakh-metric-ton target was phased into 1.4 lakh metric tons in FY25 and 2.2 lakh metric tons in FY26. |
| Ferro-alloy capacity (held) | Ferro alloy from 1.66 to 1.9 lakh tons | Capacity was stated at 1.6 lakh metric tons and targeted to reach 1.9 lakh metric tons by Q1 FY26. |
| Value-added product contribution (restated) | Raise share of value-added/specialized products from 45-50% to 80% of mix | Management set a staged path: 65% by FY25-end and 75%-80% by FY26-end. |
| DI-pipe volume target (new) | No absolute DI-pipe tonnage target was stated. | Management targeted 4 lakh tons of DI-pipe volume in FY25 and FY26. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| FY25 revenue growth | FY25 | 25–30% (on the Q4 FY24 call) | -1%, below the range |
| FY25 EBITDA margin | FY25 | 17–18% (on the Q4 FY24 call) | 13.6%, below the range |
| Gross turnover EBITDA margin | FY25 | 18–20% (on the Q1 FY25 call) | 13.6%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
DI pipes
H1 FY25 production increased 3% while sales fell marginally; H1 realization rose 8% and Q2 realization rose 7%. Management reported Q2 DI-pipe EBITDA of Rs. 22,000 per ton.
H1 production +3% YoY · H1 realization +8% YoY · Q2 production +3% YoY · Q2 realization +7% YoY · Q2 EBITDA Rs. 22,000 per ton · FY25 volume target 4 lakh tons · FY26 volume target 4 lakh tons · Capacity target 6.6 lakh metric tons
Outlook: Phase 1 capacity of 1.4 lakh metric tons was due in FY25 and Phase 2 of 2.2 lakh metric tons in FY26; exports were targeted at around 5% of production.
Ferro alloys
H1 FY25 production increased 18% while sales fell marginally; H1 realization was broadly unchanged and Q2 realization rose 3%. Q2 ferro-alloy EBITDA was Rs. 25,000 per ton.
H1 production +18% YoY · Q2 realization +3% YoY · Q2 EBITDA Rs. 25,000 per ton · Current capacity 1.6 lakh metric tons · Capacity target 1.9 lakh metric tons
Outlook: Capacity was expected to reach 1.9 lakh metric tons by Q1 FY26; H2 volume was expected to remain similar and specialized realization within plus or minus 2%.
Blast furnace and centre operations
One blast furnace was revamped, with the second due by Q1 FY26; centre capacity was raised to 9 lakh tons in FY24, with another 3 lakh tons expected by Q1 FY26.
Blast furnace capacity 6.3 lakh metric tons · Expanded blast furnace capacity target 7.5 lakh metric tons · Centre capacity 9 lakhs tons · Additional centre capacity 3 lakh tons · Total centre capacity target approximately 12 lakh metric tons per annum · Blast furnace gas boiler 35 TPH
Outlook: The second blast furnace and additional 3 lakh tons of centre capacity were expected by Q1 FY26; a 35 TPH blast-furnace-gas boiler was commissioned.
Other finished products
H1 FY25 realizations for other products fell 5%-7%. Q-on-Q revenue and profitability weakened on lower production and sales realization in TMT bars, pig iron and sponge iron.
H1 realization -5% to -7% YoY · Pig iron Q2 EBITDA around Rs. 5,000 per ton · TMT Q2 EBITDA Rs. 4,000 per ton · Sponge iron Q2 EBITDA Rs. 3,000 per ton · Pig iron expected EBITDA increase Rs. 1,000 per ton · TMT expected EBITDA increase Rs. 1,000 per ton · Sponge iron expected EBITDA increase Rs. 1,000 per ton
Outlook: Management expected Q3-Q4 EBITDA per ton to rise Rs. 1,000 for pig iron, TMT and sponge iron; lower coking-coal and coal prices were expected to help.
Balance sheet, capex and funding
- Management stated H1 FY25 net debt at Rs. 355 crores, versus Rs. 308 crores in the comparison given.
- Total term debt was around Rs. 300-350 crores; management reiterated a net-debt-free goal within 12 months.
- FY25 guidance was to reduce term debt to Rs. 225-250 crores; management remained optimistic about the target.
- The Rs. 1,000 crores CAPEX plan had incurred approximately Rs. 700 crores; the balance was expected over the next 9 months.
- All CAPEX under the current plan was funded through internal accruals.
- FY25 CAPEX spend was around Rs. 200 crores, excluding Rs. 8 crores of other repair CAPEX.
The industry, as management sees it
Management sees robust demand for DI pipes driven by Jal Jeevan Mission, AMRUT 2.0, multiple irrigation schemes, and water network infrastructure. River-interlinking projects could provide a multi-year demand boost once DPRs are finalised. Specialised ferro alloys is a niche market with steady, slow-and-steady growth — JBIL is one of the few organised Indian producers exporting to ~40 countries. Near-term risk: post-election central government fund releases have slowed across schemes, expected to normalise over the next 4–5 months.
Risks management named
- Slower central government fund releases post-election across Jal Jeevan Mission and related schemes
- Commodity price pressure linked to China's macroeconomic trends
- Monsoon-quarter production softness in West Bengal operations
Q&A
Q&A covered six dominant topics: guidance reaffirmation, debt reduction trajectory, segment-wise volume/realisation outlook, next-phase capex intentions, value-added product mix trajectory, and government policy/fund flow dynamics (Jal Jeevan Mission, AMRUT 2.0, river-linking). Pushback was minimal — most analysts accepted management's framing on demand robustness and deferred to management on future capex plans. The two notable deflected areas were next-phase capex specifics (Kirtan Mehta) and CWIP breakup (Saket Kapoor) — management referred both to board/IR materials. The clearest surprise was management's specific Q2 FY25 segmental EBITDA-per-ton disclosure (DI pipe Rs 22,000/ton, ferro alloy Rs 25,000/ton) and the stock split announcement.
Not answered directly
- Next-phase capex plan beyond Rs 1,000 crore (deferred to board)
- Capital work-in-progress breakup (referred to investor presentation)
- Special grade ferro alloy standalone share (combined disclosure only)
Asked for a number, answered without one
- DI-pipe bid pipeline and order book: Management called the pipeline extremely robust and cited 6-7 million tons of country demand, but gave no company order-book value or tonnage.
- Ken-Betwa project contribution: Management said the contribution could not be envisaged until the DPR was completed and that other materials would also be used.
- Capital work-in-progress breakup: Management directed the analyst to pages 3 and 13 of the investor presentation and did not provide a verbal breakup.
- Special-grade ferro-alloy share: Management gave no separate share, saying special grade was reported together; it said only that the combined ferroalloy figure would be 18%-19%.
- CAPEX beyond the current plan: Management said no additional plan had been announced; opportunities were being examined and any board-approved plan would come no earlier than FY25-end.
Every question, with its answer
1. H2 FY25 guidance reaffirmation
Aditya Welekar, Axis Securities
Question. Post H1 performance, management indicated 25–30% revenue growth guidance and 17–18% EBITDA margin. How does H2 FY25 look and how confident is management of hitting the full-year guidance?
Answer, Aditya Jajodia, Chairman & Managing Director. Management is sticking to its guidance. Expects volumes of DI pipes — the major topline and bottomline contributor — to increase, with sequential rise in the share of value-added products.
Follow-up. What is the net debt trajectory — will the company be net debt free within 12 months as guided?
Answer. Total term debt currently Rs 300–350 crore. Pending capex Rs 300 crore and pending term debt Rs 300 crore. With strong EBITDA, net debt free within 12 months is on track.
2. Deferred tax and tax outlook
Aditya Welekar, Axis Securities
Question. On the deferred tax provision taken in the quarter, what tax run-rate should investors estimate for future quarters?
Answer, Management (Joint CFO Sharma), Joint CFO. Deferred tax assets have been consumed over the last 3 quarters; ~Rs 70–75 crore still to be consumed in Q3. Opening carry-forward tax losses were Rs 1,000 crore; after Q2 ~Rs 500 crore (±5%) remains to be utilised against future profits.
3. DI pipes and ferro alloy volumes/realisation
Punit Gupta, YES Securities
Question. Could you share expectations for operational performance of DI pipes and ferro alloys in H2 FY25 and FY26?
Answer, Management, Management team. Ferro alloy capacity addition only in Q1 FY26, so H2 volume stays similar; realisation ±2% on global/Red Sea dynamics. DI realisation ±2–3% with 6 months of orders booked; volumes to rise incrementally each quarter. Target 4 lakh MT for FY25 and next year.
Follow-up. Any capex plans after the current Rs 1,000 crore plan completes in 9 months?
Answer. Nothing announced yet. Exploring opportunities but will take time; next announcement only after board approval.
4. Next capex plans
Kirtan Mehta, BOB Capital Markets
Question. As the company moves toward net debt free status, what are the areas being considered for the next capex? What is on the drawing board?
Answer, Aditya Jajodia, Chairman & Managing Director. No further capex plans announced beyond the current Rs 1,000 crore plan. Plans not yet finalised by the board. Announcement will follow board approval.
Follow-up. How long to finalise this plan?
Answer. Will take more than 3–5 months.
Not answered directly.
5. Capital raising for expansion
Kirtan Mehta, BOB Capital Markets
Question. Could the company access the capital markets for a larger expansion plan given strong market conditions?
Answer, Joint CFO Sharma, Joint CFO. Not discussed at board level yet. Last 3 years' priority was turnaround, value-added shift and conversion to DI pipes/ferro alloys — 90% achieved. 70% of current capex done, balance ~30% by Q1/Q2 FY26. Priority for next 3 quarters is debt reduction, then expansion.
6. Value-added product mix trajectory
Deepesh Sancheti, Manya Finance
Question. By when will DI pipes and ferro alloys revenue contribution rise to 80% from the current ~50%?
Answer, Aditya Jajodia, Chairman & Managing Director. Should reach ~65% by end of current FY; after Phase 3 of ductile expansion, north of 75% in broad terms. By end of next FY (Q4 FY26), expect 75–80%.
7. DI pipe and ferro alloy demand outlook
Deepesh Sancheti, Manya Finance
Question. How is demand expected to grow for DI pipes and specialised ferro alloys? Industry players reportedly planning OPVC entry due to reduced DI pipe demand.
Answer, Aditya Jajodia, Chairman & Managing Director. DI pipe demand robust — driven by Jal Jeevan Mission, AMRUT 2.0, multiple irrigation schemes and government water network spend. DI pipe is internationally accepted best material for water transport. Specialised ferro alloys: niche market; already exporting to 40 countries. Growth will be slow and steady rather than exponential — capacity raised to 1.9 lakh MT. Blended EBITDA margin of 17–18% (FY25) and ~20% (next FY) reflects this glide path.
8. Export plans
Deepesh Sancheti, Manya Finance
Question. Are exports planned for DI pipes and ferro alloys?
Answer, Aditya Jajodia, Chairman & Managing Director. DI pipe export market is currently <1% of production as local demand is robust. Plan is to lift exports to ~5% as capacity increases.
9. Segmental EBITDA per ton
Deepesh Sancheti, Manya Finance
Question. What are segmental EBITDA per ton for Q2 FY25 and the expectations for H2 FY25?
Answer, Aditya Jajodia, Chairman & Managing Director. Q2 FY25 EBITDA/ton: DI pipe Rs 22,000; ferro alloy Rs 25,000; pig iron ~Rs 5,000; TMT Rs 4,000; sponge iron Rs 3,000. H2 outlook: DI pipe and ferro alloy flat with positive bias; pig iron, TMT and sponge iron each up ~Rs 1,000/ton. Raw material cost reduction will benefit Q3/Q4; volume increase in DI pipe also adds to margin.
Follow-up. Has the raw material price reduction been across all products?
Answer. Coking coal substantially down vs prior quarters; coal prices cooled; iron more or less flat with global downward bias. Only Chrome Ore rising substantially.
10. DI pipe demand and order outlook
Rajesh Agrawal, Moneyore
Question. What is the outlook for DI pipes given reports from other industry players of government order slowdown and exports not feasible due to freight rates?
Answer, Aditya Jajodia, Chairman & Managing Director. Outlook extremely positive. Order slowdown was due to monsoon period and post-election government recast. Robust enquiry and tendering expected to start this quarter. Exports can be raised anytime but local demand is currently so strong that exports are not the priority.
Follow-up. Will domestic realisation come under pressure?
Answer. Long-term 4–5% realisation pressure possible given falling raw material prices, but order book is already booked so no immediate reduction in other products.
11. River interlinking and AMRUT 2.0
Rajesh Agrawal, Moneyore
Question. Can this bullish view extend to interlinking of rivers and sewage DI pipe projects?
Answer, Aditya Jajodia, Chairman & Managing Director. Yes, absolutely. Many announced projects to be finalised; AMRUT 2.0 still incomplete. River interlinking orders will take 6–8 months due to project gestation.
12. DI pipe monthly run rate
Saket Kapoor, Kapoor and Company
Question. Could the company provide QoQ product-wise EBITDA per ton comparison and DI pipe tonnage expectations for Q3 and Q4?
Answer, Aditya Jajodia, Chairman & Managing Director. Full-year DI pipe target ~4 lakh MT; H1 achievement ~1.5 lakh MT. Required run rate ~35,000–40,000 MT/month. October ~30,000 MT, November ~31,000 MT, December to step up further as new plant commissions. Confidence in hitting 4 lakh MT ±10%.
Follow-up. Breakup of capital work-in-progress balance of Rs 280 crore?
Answer. Detailed breakup is already provided on page #3 and page #13 of the investor presentation; management does not wish to repeat here.
Not answered directly.
13. Other income composition
Saket Kapoor, Kapoor and Company
Question. What constitutes the Q2 FY25 other income of Rs 22 crore (vs Rs 28 crore last year)?
Answer, Management, Management. Mainly partial compensation of Rs 9.48 crore for railway rakes supplied earlier; further claim still pending. Otherwise in line with prior quarter.
14. DI pipe bid pipeline and demand-supply
Saket Kapoor, Kapoor and Company
Question. What is the bid pipeline for DI pipes, country-level annual requirement, and demand-supply balance considering fresh and planned capacities?
Answer, Aditya Jajodia, Chairman & Managing Director. Internal estimate: country-level DI pipe demand ~6–7 million MT this year. Bid pipeline robust — orders being booked every month above supply. Demand expected to track GDP growth with potential boost from river-linking projects.
15. Ken-Betwa project DI pipe share
Saket Kapoor, Kapoor and Company
Question. What will be DI pipe contribution from the Ken-Betwa river-linking project (~$7 billion)?
Answer, Aditya Jajodia, Chairman & Managing Director. DPR not yet completed; once finalised, share will be known. DI pipe expected to be the major material due to superior quality and economic viability.
16. Jal Jeevan Mission & central fund release
Saket Kapoor, Kapoor and Company
Question. Update on Jal Jeevan Mission order slowdown (75–80% reach achieved), delayed central fund release, and direct-to-government vs EPC sales mix.
Answer, Aditya Jajodia, Chairman & Managing Director. About 25–30% of DI pipe sales go directly to government, balance to EPC contractors executing government projects. Government is the major end-buyer. Q2 FY25 fund release slower across Jal Jeevan Mission and other schemes — post-election effect, observed across all sectors. Expect robust spending recovery in next 4–5 months.
17. DI pipe volume decline
Pinal Kothari, Systematix
Question. Why have DI pipe volumes declined sequentially and YoY?
Answer, Aditya Jajodia, Chairman & Managing Director. There has been no real decline — only ~2–3% drop, which is marginal. Sequential production up from 63 to 65 (units in thousand MT).
Follow-up. Sales volumes actually fell from 61 in Q1 to 60 in Q2 — a 2% decline. Why?
Answer. Q2 is the monsoon quarter and West Bengal has its festive season in this quarter — explains the modest softness.
Partly answered.
18. Special grade ferro alloy share
Pinal Kothari, Systematix
Question. What is the current share of special grade ferro alloys?
Answer, Management, Management. Special grade ferro alloys are reported together with the broader ferro alloy segment. Ferro alloys will be ~18–19%.
Not answered directly.
What was said
Topic by topic, in the order it was spoken
Welcome & Jai Balaji 2.0 context · Aditya Jajodia (CMD)
- JBIL maintained healthy H1 FY25 performance despite challenging working dynamics.
- Strategic priorities aligned with Jai Balaji 2.0: focus on value-added and specialised products (DI pipes, specialised ferro alloys).
- Aiming for net term debt-free status in next 12 months and pursuing balance sheet strengthening.
- Targeting revenue mix shift to 80% from current 45–55% from value-added products in the near future.
Capacity expansion plan · Aditya Jajodia (CMD)
- DI pipes capacity expanding from 3 lakh MT to 6.6 lakh MT — Phase 1 (1.4 lakh MT residual) to commission in FY25, Phase 2 (2.2 lakh MT) in FY26.
- Ferro alloy capacity to rise from 1.6 lakh MT to 1.9 lakh MT with expansion by Q1 FY26.
- Sinter capacity raised from 6.3 lakh MT to 7.5 lakh MT after one revamp; further 3 lakh MT to take total to ~12 lakh MT by Q1 FY26.
- Blast furnace gas-based 35 TPH boiler commissioned as green energy/captive power initiative, reducing carbon emissions.
Capex plan and debt reduction · Aditya Jajodia (CMD)
- Total Rs 1,000 crore capex plan — Rs 700 crore already incurred; balance Rs 300 crore over next 9 months.
- FY24 capex Rs 350 crore; FY25 capex spent so far Rs 200 crore (excluding Rs 8 crore repair capex).
- All capex funded through internal accruals — no equity raise.
- Net debt at H1 FY25 stood at Rs 355 crore (up YoY from Rs 308 crore); FY25 guidance is to reduce term debt to Rs 225–250 crore.
- Term loan syndicate with Tata Capital and other lenders; management confident of debt-free status in 12 months.
- Stock split announced: 1 share of Rs 10 face value to become 5 shares of Rs 2 face value.
Operational performance H1 FY25 · Aditya Jajodia (CMD)
- H1 FY25 production up YoY: ferro alloys +18%, DI pipes +3%; sales of both dropped marginally.
- DI pipe realisation up 8% YoY in H1; other products saw realisation drop of 5–7%.
- Q2 FY25: ferro alloy production stable, DI pipe production up 3% YoY; sales declined YoY.
- Q2 FY25 realisations: ferro alloys +3% YoY, DI pipes +7% YoY.
Financial performance H1 FY25 · Aditya Jajodia (CMD)
- H1 FY25 revenue +8% YoY, EBITDA +30% YoY, PBT +34% YoY — strong core operating performance.
- Adjusted EBITDA margin expanded to 17% in H1 FY25 from 14% in H1 FY24.
- PAT declined due to deferred tax provisioning (non-cash).
- Sequential Q-on-Q revenue and profitability softness in TMT bars, pig iron and sponge iron; value-added product margins held.
Conclusion & outlook · Aditya Jajodia (CMD)
- Despite global operating complexity and China-linked commodity pricing pressure, value-added product focus has offset headwinds.
- Management optimistic on H2 FY25, expecting improved outcomes from value-added capex investments.
- Long-term strategy: drive topline and bottomline growth via DI pipes and specialised ferro alloys value chain.
In their words
We remain very focused on the value chain of the ductile iron pipes and ferro alloys, which will continue to play a very significant role in driving both the company's topline and bottomline growth.
Since the EBITDA is so strong, we are definitely going to be net debt free within next 12 months.
Our outlook is extremely positive... expecting a very robust inquiry and the tendering process will be starting from this quarter itself.
To check next time
What management committed to on this call, or the dates they gave.
- Q3 DI-pipe deliveries and the monthly run rate against the FY25 target of 4 lakh tons.
- Q3 consumption of the remaining deferred tax asset, which management put at Rs. 70-75 crores.
- Progress on commissioning the remaining 1.4 lakh metric tons of DI-pipe Phase 1 capacity in FY25.
- Term-debt reduction toward Rs. 225-250 crores by FY25-end and progress toward net-debt-free status.
- Value-added product contribution moving from 50% toward the 65% FY25-end milestone.
- Any additional CAPEX plan, which management said would be announced no earlier than FY25-end.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Tue 19 Nov 2024 | ₹184.35 | +1.10% | +0.28% |
| 5 sessions Tue 26 Nov 2024 | ₹178.90 | −1.89% | +3.16% |
| 20 sessions Tue 17 Dec 2024 | ₹188.40 | +3.32% | +3.76% |
From the close of Mon 18 Nov 2024, ₹182.35: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.