KP Green Engineering Q4 FY25 earnings call

Tue 20 May 2025

In brief

FY25 revenue up 99% to ₹702 cr, PAT up 109% to ₹73.5 cr; CMD commits to 60-70% YoY growth in FY26.

Management's tone
Confident
What was said
Leaned positive
Guidance
First guidance issued
Analyst pushback
Low
Stock, next session
−3.22% (Nifty 50 −1.05%)
  • FY25 total income rose 99% YoY to ₹702 cr from ₹352 cr, driven by Matar plant ramp-up and renewable and infrastructure demand.
  • FY25 EBITDA margin expanded 110 bps to 16.4%; PAT grew 109% to ₹73.5 cr and EPS rose to ₹14.7 from ₹9.6.
  • CMD Dr Faruk Patel committed to 60-70% YoY growth for FY26 with PAT margin guidance of 9-10%.
  • Order book stands at ₹800+ cr; internal plus external pipeline crosses ₹2,000 cr; orders typically executed in 30-90 days.
  • FY25 capex ₹185 cr; total capacity scales to 4,00,500 MT in FY26 including Asia's largest 90,000 MT galvanizing kettle.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q4 FY25

This quarterA year agoLast quarterMargin
Revenue₹432 cr+76.4%—
EBITDA (excl. other income)₹67.6 cr——15.6%
Net profit₹46 cr——10.6%
EPS (₹)₹9.20+41.1%—

From the company's filed results for the quarter ended 31 Mar 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Volume: Successful ramp-up of Matar plant (36,000 MT operational) plus order execution in renewable and infrastructure segments drove the 99% revenue growth.
  • Mix: Shift towards higher-value customised products (Lattice Wind Towers, PEB) supported the 110 bps EBITDA margin expansion to 16.4%.
  • Cost: Operating leverage from scaled-up manufacturing footprint and cost discipline; full automation at Matar limited proportionate employee cost growth.
  • Capital structure: Matar capex funded from IPO proceeds, so no incremental interest cost was loaded into the new unit, supporting margin and interest coverage.

The numbers management led with

  • FY26 target capacity: 4,00,500 metric tons per annum
  • Asia's largest galvanizing plant capacity: 90,000 metric tons per annum
  • External order book: Rs 800+ crores
  • Total order book (internal + external): Crossing Rs 2,000 crores including KP Group internal

Guidance

Guidance on this call

WhatForWhat management said
FY26 YoY growth (CMD committed)FY26Committed 60%-70% YoY growth for FY26 by CMD
PAT margin rangeFY26We will be looking to maintain those margins at a level of, PAT at a range of 9%-10%
EBITDA margin bandFY26There will be a slight change in the margin, 100 basis points here and there, but we will try to maintain it
FY26 total installed capacityFY26Total capacity in FY26 to be 4,00,500 metric tons per annum
Matar 1,68,000 MT go-liveFY261,68,000 metric ton capacity is under production and set to go-live in this financial year, FY 26
Asia's largest galvanizing plant commissioningFY26Asia's largest galvanizing plant, which is capacity 90,000 metric tons per annum is under construction and expected to be operational in this financial year
FY26 starting capacity utilizationFY26we will start with at least 50% utilization immediately
Long-run capacity utilization targetFY26-FY30at least 4-5 years, you will see the kind of 80%-90% utilization

The business

By business

Solar Module Mounting Structure (MMS)

Fixed and tracker structures; technology partner with GameChange Solar and NexTracker (US); 5 GW Magni coating partner facility planned at Matar.

~30% of order book mix

Outlook: Continued traction expected in solar mounting structure, supported by policy tailwinds and increased tender activity.

Substation Equipment Structure

Pooling and substation structures for renewable and infrastructure segments.

~20% of order book mix

Transmission Line Towers

Lattice type towers up to 400 KV supplied currently; transmission monopole type test underway, commercial launch soon.

~20% of order book mix · Up to 400 KV currently supplied

Pre-Engineered Building (PEB)

New product line using robotic welding, CNC cutting and in-house CPL line; first order delivered, 2-3 more under negotiation.

Outlook: Management sees 'huge potential market' for PEB and multi-storey PEB conversion.

Heavy Engineering (railway, highway, defense)

Steel girder, FOB, ROB and steel shelter products; vendor approval applications filed with RDSO, Power Grid, DRDO and Mazagaon Dock.

Outlook: Defense sector entry targeted by end FY26 or early FY27.

Galvanizing (captive)

Asia's largest 90,000 MT galvanizing kettle under construction at Matar; captive use with possible external tie-up if spare capacity.

90,000 MT under construction · Total FY26 capacity 4,00,500 MT

Outlook: Set to be operational in FY26.

Balance sheet, capex and funding

  • FY25 capex of ₹185 cr, primarily for Matar plant commissioning and Kural unit capacity augmentation.
  • Capex funded through internal accruals and external financing; interest coverage kept in line with management's target.
  • Cash conversion cycle improved from 139 days to ~86 days.
  • Receivable days at 142 (vs 135 prior) despite a ~100% increase in topline.
  • No further capex planned until the current capex cycle is complete; future capex will be evaluated after.

The industry, as management sees it

Management is bullish on the renewable energy vertical, citing policy tailwinds and increased tender activity in solar mounting structures and wind towers. They also flagged strong potential in PEB, heavy engineering for railway/highway, and the green hydrogen and offshore wind adjacencies.

Risks management named

  • Capacity currently utilized at only ~50%; full ramp-up will take 4-5 years
  • Cash conversion cycle at 86 days (improved from 139) but receivables at 142 days
  • Royalty of 2% of topline payable to promoter Dr. Faruk Patel; SEBI-permitted cap
  • No near-term further CAPEX planned until current Rs 185 cr FY25 capex is absorbed

Q&A

Q&A was dominated by clarifying questions on capacity utilization, order book composition and revenue guidance, with relatively light pushback. Two analysts flagged related-party concerns — the 2% promoter royalty and Rs 2.6 cr property advance to Dr. Faruk Patel — drawing extended justifications from CFO Salim Yahoo. Management deflected on volume disclosure and average realization, citing product customization. Largest surprise was the explicit confirmation of 60-70% growth guidance attributed to CMD Dr. Faruk Patel.

Not answered directly

  • Volume / tonnage disclosure
  • Average realization per ton
  • Adani/Saudi group tie-up discussions
  • Internal KP Group PO disclosure breakdown

Asked for a number, answered without one

  • Production / sales volumes: Management declined, saying products are customised and not standardised, so volume comparison would be misleading.
  • EBITDA per ton: Management said margins should be tracked; customisation drives per-ton differences and margins are already better than peers.
  • Peak revenue potential at 4,00,000 MT: Management declined to quantify, said it depends on product mix and that capacity is 'quite good enough' to deliver strong growth.
  • Employee cost growth as Matar scales: Management said no direct proportionate ramp-up due to full automation; only qualitative 'increase' indicated.

What was said

Topic by topic, in the order it was spoken

Company Overview & Sector Presence · Muinulhaque Kadva (Whole-Time Director)

  • KP Green Engineering operates across renewable energy, power and transmission, telecom, railway, chemical, highway and infrastructure sectors
  • Current product line spans Solar MMS (fixed and tracker), Windmill Lattice Tower, Transmission Line Tower, Substation Equipment, Solar Rooftop, Crash Barrier, Cable Tray and Pre-Engineered Buildings
  • New product additions: Pre-Engineered Building, heavy engineering for railway/highway (FOB, ROB, Steel Girder), Transmission Monopole, High Mast, Lighting Mast, Torque Tube Mill for Solar Tracker
  • Technology partner to GameChange Solar and NexTracker (largest US solar tracker companies) and to Sanvion for Windmill Lattice Towers

Capacity Expansion Roadmap · Muinulhaque Kadva (Whole-Time Director)

  • Matar plant 36,000 MT per annum now operational; total current operational capacity 1,42,500 MT per annum
  • Additional 1,68,000 MT per annum capacity under trial production, expected live in FY26
  • Asia's largest galvanizing plant at 90,000 MT per annum under construction, expected operational in FY26
  • Total FY26 capacity to reach 4,00,500 MT per annum

Geographic & Product Expansion · Muinulhaque Kadva (Whole-Time Director)

  • Current presence in Gujarat, Rajasthan, Madhya Pradesh, Maharashtra; South India expansion planned
  • Exports to USA initiated; Middle East and Africa being explored
  • In-house engineering team exploring green hydrogen storage, electrolyzers and offshore wind tubular towers
  • Backward integration planned: rolling mill, tube mill, slitter line, CTL line for margin and delivery control

FY25 Financial Performance · Salim Yahoo (Group CFO)

  • Total income Rs 702 cr vs Rs 352 cr prior year, +99% YoY
  • EBITDA Rs 115 cr vs Rs 54 cr; EBITDA margin expanded 110bps from 15.3% to 16.4%
  • PAT Rs 73.5 cr vs Rs 35.1 cr, +109%; EPS Rs 14.7 vs Rs 9.6
  • Margin improvement driven by scaled-up manufacturing footprint and mix shift to Lattice Wind Towers and Pre-Engineered Buildings

Capex & Balance Sheet · Salim Yahoo (Group CFO)

  • FY25 capex of Rs 185 cr primarily for Matar plant commissioning and Kural unit augmentation
  • Funded through internal accruals plus external financing; cost of capital kept in line with target interest coverage
  • Matar 36,000 MT ramped up; 1,68,000 MT trial runs initiated; 90,000 MT galvanizing kettle in final construction phase
  • Target full 2,94,000 MT new facility capacity as scheduled

Forward Strategy & Renewable Energy Outlook · Salim Yahoo (Group CFO)

  • Focus on converting robust order book into revenue and leveraging automation for further margin improvement
  • Continued traction expected in renewable energy vertical — solar mounting structure and wind tower — supported by policy tailwinds and increased tender activity
  • Positioned as one-stop solution for green renewable energy infrastructure
  • First annual earnings call post March 2024 SME IPO

In their words

We are having a very strong margin compared to other players in the industry. We will be looking to maintain those margins at a level of, PAT at a range of 9%-10%.
Salim Yahoo (Group CFO, KP Green Engineering)
KPI has got 1.5 GW of its own IPP plant and the other KP Energy also has got 2.26 GW... altogether you can say that we at present have internal plus external would cross 2000.
Salim Yahoo (Group CFO, KP Green Engineering)
Last time also we have given 60%-70% growth and we have grown 100%. So what we have given is the base, how much we can achieve, and it is the minimum I can say and maximum is something which you will see as we go forward into the year.
Salim Yahoo (Group CFO, KP Green Engineering)

To check next time

What management committed to on this call, or the dates they gave.

  • Execution of ₹800 cr order book - 'majority covered by September' per CFO; check Q1 FY26 call.
  • Matar 1,68,000 MT trial production go-live in FY26; check ramp-up and order conversion.
  • Asia's largest 90,000 MT galvanizing plant operational in FY26; commissioning timeline.
  • Green hydrogen 1 MW demo model announcement targeted by September/October, per Group CEO.
  • Defense sector vendor approvals (RDSO, Power Grid, DRDO, Mazagaon Dock); first orders targeted end FY26/early FY27.
  • Internal KP Group purchase order updates on BSE/NSE going forward, per CFO commitment.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Tue 20 May 2025₹536.75−3.22%−1.05%
5 sessions Mon 26 May 2025₹517.15−6.75%+0.22%
20 sessions Mon 16 Jun 2025₹531.10−4.24%0.00%

From the close of Mon 19 May 2025, ₹554.60: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

KP Green Engineering's other calls

  • Q2 FY27Fri 13 Nov 2026Tone: Mixed
  • Q4 FY26Wed 13 May 2026Tone: Confident
  • Q2 FY26Fri 14 Nov 2025Tone: Confident