KP Green Engineering Q2 FY27 earnings call
In brief
Revenue rose 27% to INR679 crore in H1 FY27, PAT fell to INR32 crore on higher depreciation and interest, and order book reached INR1,892 crore.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −20.00% (Nifty 50 +0.58%)
- H1 FY27 total income rose 27% to INR682 crore and operating revenue reached INR679 crore.
- EBITDA rose 17% to INR119 crore at a 17.4% margin, but PAT fell to about INR32 crore as depreciation and interest rose.
- Order book was INR1,892 crore, with about INR770 crore of orders announced including July-October; management targets upwards of INR2,500 crore by next midyear.
- Management targets INR1,700-1,800 crore FY27 turnover and a 5%-7% PAT margin for the next two quarters.
- Management reiterated 25% revenue CAGR for five years, plans about INR300 crore capex over 18 months and expects 70% capacity next year.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹679 cr | +27.6% | — | |
| EBITDA (excl. other income) | ₹116 cr | +18.4% | — | 17.1% (18.4% a year ago) |
| Net profit | ₹34.4 cr | −41.0% | — | 5.1% (11% a year ago) |
| EPS (₹) | ₹6.89 | −40.9% | — |
From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Revenue growth coincided with a lower related-party mix; higher capacity was bringing bigger external orders, including the INR819 crore BSNL order, with about INR600-700 crore executed this year.
- Zinc and gas prices rose on geopolitical developments; IEEMA-linked price variation recovered much of the increase, but galvanizing costing still increased.
- PAT fell despite EBITDA growth because depreciation and interest costs increased with the enlarged fixed-asset base.
- H1 was described as slower because of geopolitical issues and rain, with management expecting higher growth in H2.
- Higher capex, reduced payables, later BSNL payments and retention stretched working capital and pressured operating cash flow.
- PAT declined while cash profit rose 11% to INR75 crore because management's cash-profit measure adds back depreciation and deferred tax. (accounting)
The numbers management led with
- Order book: INR 1,892 crores at September 2026
- Planned capex: About INR 300 crores over the next 18 months
- Promoter funding commitment: About INR 100 crores: INR 25 crores in 30–60 days and INR 75 crores within 18 months
- Total debt and leverage: INR 447 crores of debt versus INR 196 crores a year earlier; debt-to-equity 0.91x versus 0.5x
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Turnover | FY27 | Turnover of about INR1,700 crores to INR1,800 crores this year. |
| PAT margin | H2 FY27 | PAT margin of 5%-7% for the next two quarters; PAT is expected to normalize as installed capacity is used. |
| Order book | H1 FY28 | Order book to move upwards of INR2,500 crores by next midyear. |
| CAGR | FY27-FY31 | 25% CAGR for the next five years; management said it may overachieve the target. |
| H2 revenue | H2 FY27 | H2 revenue around INR1,000 crores to INR1,200 crores. |
| Capex | — | Capex of about INR300 crores over the next 18 months. |
| Debt | — | Management referred to about INR300 crores of debt over the next 18 months. |
| Capacity utilization | FY28 | Capacity utilization of about 70% next year. |
| Galvanizing plant capacity utilization | FY27 | Galvanizing capacity utilization of up to 70% by the end of FY27. |
| Working capital cycle and operating cash flow | H1 FY28 | Working-capital cycle to reduce after March and operating cash flow to turn positive from H1 FY28. |
| Promoter infusion | — | Promoter infusion of about INR100 crores: INR25 crores in 30-60 days and INR75 crores within 18 months. |
| Order-book coverage | — | Always keep 12-15 months of orders in hand for execution and revenue visibility. |
| Onshore-offshore tubular tower capex (Adjacent metal products) | FY28 | Start onshore-offshore tubular-tower capex in FY28. |
| Hot-rolling mill capex (Adjacent metal products) | — | The hot-rolling mill is the next product for capex. |
| Granular guidance | FY28 | Granular FY28 guidance expected around Q4 FY27. |
What changed since the Wed 13 May 2026 call
| What | On the Wed 13 May 2026 call | On this call |
|---|---|---|
| Revenue growth ambition (restated) | CMD set 40-50% YoY growth as a minimum target through FY30. | Management said KP Green is included in a 25% CAGR target for the next five years. |
| FY27 EBITDA margin (not repeated) | EBITDA margin guidance was 16-20% for FY27. | Not mentioned |
| FY28 capacity utilization (raised) | Capacity utilization was expected to reach 60%+ by FY28. | Management expects about 70% capacity utilization next year, meaning FY28. |
| Order book (restated) | Order book was ₹1,831 crore, including the ₹819 crore BSNL order, with execution targeted across FY26-27. | Order book was INR1,892 crore at H1 close, with upwards of INR2,500 crore targeted by next midyear. |
| Adjacent-product expansion (held) | Rolling mill, cables/conductors and other adjacent-product expansion were priorities. | Hot-rolling mill and onshore/offshore tubular-tower capex were retained, with tubular capex planned for FY28. |
| Overseas orders (new) | Not mentioned in the previous-call reference. | LOIs were reported from Africa and Saudi Arabia, with advances still pending. |
The business
By business
Galvanizing
The Matar galvanizing plant was operational, value addition had begun, and utilization rose above 50% from 35%-40% earlier; zinc and gas inflation raised costs despite price-variation recovery.
90,000 tons per annum galvanizing capacity · 35%-40% earlier utilization · Above 50% current utilization · Up to 70% utilization by end-FY27
Outlook: Utilization is expected to reach 70% by the end of FY27, with value addition supporting product margins.
Renewables
Management disclosed no quarterly segment result; it supplies module-mounting structures, tracker-plant structures, torque tubes from its in-house tube mill and wind-turbine lattice towers.
500 gigawatt non-fossil capacity by 2030
Outlook: Management described renewable investment as strong and said it would add capacity to meet demand.
Power transmission
No quarterly segment result was disclosed; management supplies lattice towers and cited India's planned transmission investment as supporting demand.
INR9 lakh crores transmission investment envisaged for 2023-2032
Outlook: Management described transmission investment as strong and said it would add capacity if demand and capabilities support it.
Telecom
The INR819 crore BSNL order covers supply and erection at about 1,280 sites under the 4G saturation project; management said related-party orders were lower as external orders grew.
INR819 crores BSNL order · About 1,280 sites · About 8 lakh towers today · Around 12 lakh towers planned
Outlook: Management said it was reducing related-party-order dependence and pursuing more external orders.
Railways and roads
Management supplies bridges, coverage towers and crash barriers and said it was the first company in India to clear all three NATRAX crash tests at the first attempt.
INR3 lakh crores FY27 railway capital outlay · INR3 lakh crores additional roads outlay
Outlook: Management described both markets as supported by record government spending and strong investment.
Buildings
No quarterly segment result was disclosed; management designs and manufactures pre-engineered buildings in-house for factories, warehouses, cold storage and power plants.
INR21,000 crores market size in 2025 · INR38,900 crores expected market size by 2030
Outlook: Management cited the pre-engineered-building market's expected expansion to about INR38,900 crore by 2030.
Data centers
Management offers pre-engineered buildings and structural steel frames for data centers; no quarterly segment result was disclosed.
About 1.5 gigawatt installed capacity in 2025 · 6.5 gigawatts expected by 2030
Outlook: Management expects data-center capacity in the market to expand from about 1.5 gigawatts in 2025 to 6.5 gigawatts by 2030.
Adjacent metal products
Management plans hot-rolling mills, onshore/offshore tubular towers, container manufacturing, cables and conductors, and aluminium extrusion; tubular-tower land is already purchased.
Outlook: The hot-rolling mill is slated for capex, tubular-tower capex is expected to start in FY28, and new categories are planned over the next 2-3 years.
Balance sheet, capex and funding
- Total debt rose to INR447 crore from INR196 crore; debt-to-equity increased to 0.91x from 0.5x.
- Net worth rose to INR491 crore from INR382 crore, while fixed assets rose to INR695 crore from INR330 crore.
- Management sized capex at about INR300 crore over the next 18 months but could not guide the H2 split; it also referred to seeing INR300 crore of debt.
- The promoter confirmed about INR100 crore: INR25 crore within 30-60 days and INR75 crore over 18 months; management said both debt and equity are required.
- Working capital was stressed by higher capex, lower payables and delayed BSNL receipts/retention; relief was expected after March and positive operating cash flow from H1 FY28.
The industry, as management sees it
Management framed end-market investment as strong: India targets 500 GW of non-fossil capacity by 2030, INR 9 lakh crores of transmission investment through 2032, and data-centre capacity growth from about 1.5 GW to 6.5 GW. It also cited a record INR 3 lakh crore FY27 railway outlay, INR 3 lakh crore of roads investment and pre-engineered-building growth from INR 21,000 crores in 2025 to INR 38,900 crores by 2030.
Risks management named
- Higher depreciation and interest costs are expected to keep PAT margin at 5–7% for the next two quarters.
- Geopolitical increases in zinc and gas prices raised galvanising costs; full raw-material relief is not predictable.
- Working capital is stretched by growth capex, delayed BSNL collections and retention money.
- Expanded capacity is only 40–50% utilised, leaving order-execution and asset-turnover risk.
- Expansion requires both debt and equity, including timely promoter funding alongside internal accruals.
Q&A
Discussion centred on the gap between rapid revenue and order-book growth and weak PAT conversion, with repeated scrutiny of depreciation, interest, zinc and gas costs, and working capital. Management was firm on the FY27 turnover range, order-book execution and 25% CAGR ambition, but cautious on margins and would not quantify H2 capex phasing or provide FY28 detail until Q4; the overseas LOI update was the main positive surprise.
Not answered directly
- FY28 granular financial guidance
- H2 raw-material price trajectory
- Phasing of the INR 300 crores capex between H2 FY27 and later periods
- Disclosure timing and value of overseas LOIs
Asked for a number, answered without one
- FY27 absolute PAT: Management guided PAT margin to 5%-7% for the next two quarters and FY27 turnover to INR1,700-1,800 crore, but gave no absolute PAT.
- FY28 detailed guidance: Management reiterated 25% CAGR for five years and said granular guidance would probably be provided in Q4; no FY28 margin or earnings figure was given.
- H2 capex allocation: Management sized total capex at about INR300 crore over the next 18 months but said the H2 allocation could not be guided.
- H2 raw-material costs: Management named zinc and gas, said prices could not be predicted, and maintained the 5%-7% PAT-margin guide.
- H2 depreciation amount: Management said most H2 depreciation would be on similar lines to H1 but gave no rupee amount.
Every question, with its answer
1. Related-party sales and order book
Hasmukh, Unknown
Question. The KP Group reportedly contributed only about 17% of H1 sales versus 50% last year. Is growth in the KP Group's order book lagging, and what pipeline supports the roughly INR 1,800–1,900 crore order book that was similar at end-March 2026?
Answer, Kapil Kriplani, Group Chief Financial Officer, KP Group. The CFO said the lower related-party contribution was not due to a KP Group slowdown but to higher capacity and a deliberate shift toward larger external orders, including the roughly INR 800 crore BSNL order. He said about INR 800 crore was added to the order book and INR 600–700 crore executed, leaving about 9–10 months of current-revenue coverage. He tentatively guided the order book toward upwards of INR 2,500 crores by next midyear.
2. Working-capital stress
Ashish Jindal, Unknown
Question. Working-capital cash flow had deteriorated against the prior year, largely because trade payables were lower. Could management explain the working-capital cycle and whether cash conversion was expected to improve?
Answer, Kapil Kriplani, Group Chief Financial Officer, KP Group. The CFO attributed the stretched working-capital cycle to the company's growth phase and higher capex. He cited the timing of the BSNL order, under which work is performed before payment arrives, together with retention money, as a cause of higher receivables. He said management would manage the mix of payables and receivables to reduce the cycle after March and expected operating cash flow to become positive from H1 FY28.
Follow-up. Ashish Jindal corrected the question and asked for the execution period of the current order book rather than a future order-book target.
Answer. The CFO said each current order generally takes 12–15 months to execute. The company aimed to maintain 12–15 months of orders in hand, providing visibility over at least the next 12 months.
Partly answered.
3. PAT recovery and capacity utilisation
Aniket Panda, Unknown
Question. Why had PAT declined for the first time in the shareholder's experience, what strategy would restore PAT growth, and why was 4 lakh MTPA of capacity not being fully utilised despite the large installed base?
Answer, Kapil Kriplani, Group Chief Financial Officer, KP Group. The CFO said utilisation was currently only 40–50% as the company built orders and worked through a high-growth phase, while geopolitical issues caused significant raw-material-price volatility. He maintained that the PAT margin remained best-in-class and said it would likely stay in a 5–7% range. Capacity utilisation was expected to reach about 70% next year, with stronger H2 growth, although he declined to give granular guidance. He nevertheless reiterated KP 3.0's 25% CAGR target for the next five years and expressed confidence in achieving it.
4. Galvanising ramp-up and FY27 guidance
Rohan, Unknown
Question. Had the issues at the new galvanising facility been resolved and was it operating efficiently? Given prior guidance of 25–30% full-year growth, what was the shape of H2, and would margins normalise?
Answer, Kapil Kriplani and Muinulhaque Kadva, Group CFO, KP Group and Whole-Time Director, KP Green Engineering Limited. The CFO guided FY27 turnover to about INR 1,700–1,800 crores and kept PAT margin at 5–7%. Muinulhaque Kadva said the galvanising plant was operational and generating value addition, but higher zinc and gas costs had increased overall costing despite price-variation recovery. Utilisation had risen from 35–40% to above 50% and was expected to reach 70% by the end of the year.
Follow-up. With interest plus depreciation around INR 65 crores in H1 and potentially unchanged in H2, why should PAT margin not be materially higher? What granular guidance was available for FY28?
Answer. The CFO reiterated the 5–7% PAT-margin guide for the next two quarters because there had been no clear resolution in zinc, gas and other raw-material costs. He maintained the 25% five-year CAGR ambition but said granular FY28 guidance would probably be provided in Q4.
Not answered directly.
5. H2 revenue and raw-material costs
Saravanan Balasubramaniam, Unknown
Question. Could management confirm approximately INR 1,800 crores of FY27 revenue and INR 1,000–1,200 crores in H2? Was the margin pressure caused by raw-material inflation, and could raw-material costs ease in H2?
Answer, Kapil Kriplani, Group Chief Financial Officer, KP Group. The CFO confirmed the FY27 turnover range of INR 1,700–1,800 crores and indicated that H2 sales would be better. He declined to predict raw-material prices, reiterated the 5–7% PAT-margin guide and explained that higher zinc and gas prices were pressuring galvanising costs.
Follow-up. Saravanan then asked when hot-rolling and tubular-tower products would commence, what capex would be incurred in H2, and whether growth funding would come from internal accruals, debt or a preferential issue.
Answer. Muinulhaque Kadva said the hot-rolling mill would internalise raw-material procurement and support margins, while tubular-tower capex could begin in the next financial year; land for the tubular-tower project had already been purchased. The CFO said both debt and equity would be required, disclosed a promoter commitment of about INR 100 crores, with INR 25 crores due within 30–60 days and the remaining INR 75 crores within 18 months, and did not provide a specific H2 capex amount.
Not answered directly.
6. Depreciation outlook
Jay Shah, Unknown
Question. Depreciation had risen sharply because of the recent capex programme. Would depreciation increase significantly again in H2, or remain broadly similar to H1?
Answer, Kapil Kriplani, Group Chief Financial Officer, KP Group. The CFO said depreciation would mostly remain on similar lines in H2.
Follow-up. Jay asked why unchanged depreciation and interest would not improve H2 margins and then whether H2 capex would rise materially or the funding had already been infused. He repeated the depreciation concern once more before the moderator moved on.
Answer. The CFO called the 5–7% PAT-margin guidance realistic and conservative, saying it could improve if depreciation and interest remained stable, but offered no stronger commitment. He planned about INR 300 crores of capex over the next 18 months, could not guide the H2-versus-later phasing, and reiterated the INR 100 crore promoter infusion. No additional response was given when the depreciation question was repeated before the next question.
Not answered directly.
7. International order pipeline
Aniket Panda, Unknown
Question. The company had previously received an order from a US company. Had it now received infrastructure orders from Saudi Arabia, Africa or other international markets?
Answer, Muinulhaque Kadva, Whole-Time Director. Muinulhaque Kadva confirmed that the company had received letters of intent for Africa and Saudi Arabia but had not received advances, so the orders could not yet be disclosed through the exchange. He said the team had secured two or three such orders and expected formal exchange disclosure soon.
What was said
Topic by topic, in the order it was spoken
H1 FY27 Business Snapshot · Kapil Kriplani (Group CFO)
- Kapil Kriplani said this was his first earnings call and presented the H1 FY27 financial and operating highlights.
- Total income grew 27% to INR 682 crores, EBITDA rose 17% to INR 119 crores and the period-end order book reached INR 1,892 crores.
- The company had total manufacturing capacity of about 4 lakh tonnes.
- The 55-acre Matar facility included a 15-ton single-dip galvanising kettle with 90,000 tonnes per annum of capacity.
- A portfolio of 23 products served renewables, power and transmission, telecom, railways, roads and highways, and building sectors.
End-Market Demand and Order Wins · Kapil Kriplani (Group CFO)
- Management highlighted India's target of 500 GW of non-fossil capacity by 2030 and KP Green's wind-module structures, torque tubes and lattice-tower products.
- The national electricity plan was described as envisaging about INR 9 lakh crores of transmission investment between 2023 and 2032.
- India was said to have about 8 lakh telecom towers, with approximately 12 lakh planned for the 5G rollout.
- The INR 819 crore BSNL order covered supply and erection at about 1,280 sites under the BSNL 4G saturation project.
- Management cited a record INR 3 lakh crore FY27 railway outlay, another INR 3 lakh crore for roads and first-attempt clearance of all three NATRAX crash tests.
- The pre-engineered-building market was expected to grow from INR 21,000 crores in 2025 to INR 38,900 crores by 2030, while data-centre capacity was expected to rise from 1.5 GW to 6.5 GW.
Adjacent Metal Products Roadmap · Kapil Kriplani (Group CFO)
- Management said it planned to expand beyond its existing product lines into adjacent metal products.
- Named adjacencies were a hot-rolling mill, onshore/offshore tubular towers, container manufacturing, cables and conductors, and aluminium extrusion.
Financial Performance and Profitability · Kapil Kriplani (Group CFO)
- Total income for H1 FY27 was INR 682 crores, up 27% from INR 536 crores, while revenue from operations was INR 679 crores.
- EBITDA rose 17% to INR 119 crores from INR 102 crores, with an EBITDA margin of about 17.4%.
- Profit before tax was INR 50 crores and PAT was about INR 32 crores, against the INR 58 crore comparison cited for FY26.
- Lower profit was attributed mainly to higher depreciation and interest costs; management expected these burdens to ease as installed capacity was used.
- Cash profit grew 11% to INR 75 crores and earnings per share for the half-year were INR 6.9.
Balance Sheet Position · Kapil Kriplani (Group CFO)
- Net worth at September 2026 was INR 491 crores, compared with INR 382 crores a year earlier.
- Fixed assets increased to INR 695 crores from INR 330 crores.
- Total debt rose to INR 447 crores from INR 196 crores, while debt-to-equity increased to 0.91x from 0.5x.
Statutory Auditor Transition · Kapil Kriplani (Group CFO)
- Management disclosed a change of statutory auditor to BDO Network.
- The rationale cited BDO's global network, sector experience and robust audit methodology.
- The change was framed as strengthening financial reporting and investor confidence as the company expanded capacity and entered adjacent products.
Execution and Capacity Priorities · Kapil Kriplani (Group CFO)
- Management characterised H1 FY27 as a period of building for the future.
- The added capacity was described as supporting higher future ambitions because of strong demand and capabilities.
- The stated focus was to execute the order book on time, improve asset utilisation and turn growth into stronger profitability.
In their words
I can assure you as a group CFO that we have done our background work, and we are very confident of achieving 25% CAGR year-on-year for next 5 years.
So currently, Rohan bhai, basically, what we can guide you is the similar level of 5% to 7% of PAT.
Our focus is clear: execute the order book on time, improve asset utilization and turn this growth into stronger profitability.
To check next time
What management committed to on this call, or the dates they gave.
- FY27 turnover: delivery against INR1,700-1,800 crore and H2 revenue of INR1,000-1,200 crore.
- PAT margin: whether H2 stays within the guided 5%-7% as zinc and gas costs persist.
- Orders: whether the INR1,892 crore book grows towards INR2,500 crore by H1 FY28 and new external orders are disclosed.
- Galvanizing: progress from above 50% towards 70% utilization by FY27 end; overall capacity towards 70% in FY28.
- Funding: promoter infusion of INR25 crore within 30-60 days, the remaining INR75 crore schedule and the INR300 crore 18-month capex plan.
- Cash and guidance: working-capital relief after March, positive operating cash flow from H1 FY28 and whether granular FY28 guidance arrives in Q4 FY27.
Transcript
Read along with the recording
The whole call, 153 lines from 12 speakers over 34:41. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 16 Nov 2026 | ₹224.40 | −20.00% | +0.58% |
From the close of Fri 13 Nov 2026, ₹280.50: the call began at 18:00 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.