KSB Q1 FY25 earnings call
In brief
Customer project delays held back KSB’s H1 growth; management targets 13-14% EBITDA margins and ₹150 crore solar sales by year-end.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −2.44% (Nifty 50 −1.17%)
- H1 growth of about 10% lagged orders because customer payment issues and project delays held up deliveries, which management expects to recover in H2.
- Order in hand excluding nuclear stood at ₹11,948 million at June 2024, which management described as robust and steady.
- Management set a 13-14% sustainable EBITDA margin range for the next one to two years, while cautioning that quarterly mix changes results.
- Solar turnover reached almost ₹80 crore this year, and management targeted ₹150 crore by year-end after supplying 1,600 systems.
- Nuclear bookings were almost ₹1,300 crore, with deliveries planned through 2027 and first sales revenue expected in H1 FY26.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q1 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹646 cr | +9.3% | +18.7% | |
| EBITDA (excl. other income) | ₹90.6 cr | +6.3% | +48.8% | 14% (14.4% a year ago) |
| Net profit | ₹0 cr | — | — | 0% (0% a year ago) |
| EPS (₹) | ₹3.91 | −78.3% | −69.5% |
From the company's filed results for the quarter ended 30 Jun 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- About 10% H1 growth lagged order intake because some project deliveries were blocked by customer payment constraints or project delays; management expected H2 recovery.
- Quarterly EBITDA margins varied with the mix of project, standard and aftermarket business, so management cautioned against evaluating one quarter in isolation.
- New-product and new-business market-development costs remained in current results; management said these investments support future growth but weigh on near-term margins.
- Solar margins were lower than product-business margins because more than 50% was bought out and own value addition was 25-30%; scale and localisation were expected to improve them.
- Distillery and vegetable-oil orders grew strongly, and valves posted the highest quarterly sales and H1 order intake, supporting H1 performance.
- Nuclear revenue had not begun because the first 100%-in-India pump faced customer site, test-rig and new-test delays; revenue was pushed to H1 FY26.
The numbers management led with
- Order intake (ex-nuclear): ₹11,948 million YTD June 2024
- Solar revenue achievement: ₹80 crores booked in H1 FY25 vs target ₹150 crores by FY25 year-end; aspiration ₹500 crores over 2-3 years
- Nuclear order book: ₹1,300 crores including recent Kudankulam order, deliverable FY26 to FY28
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Sustainable EBITDA margin | FY26-FY27 | Management targeted a stable 13%, 14% EBITDA margin for the next one to two years. |
| Solar turnover | FY25 | Management hoped to achieve ₹150 crore of solar turnover by the end of FY25. |
| Nuclear sales revenue | H1 FY26 | Nuclear testing was expected to conclude by FY25-end, with sales revenue expected in H1 FY26. |
| Nuclear order booking | FY25 | Management said the nuclear order would not be booked this year. |
| Nuclear deliveries | FY26-FY28 | Management expected nuclear deliveries to continue through calendar 2027. |
| Solar turnover aspiration | FY26-FY28 | Management affirmed a ₹500 crore solar turnover aspiration over the next two to three years. |
| Export ratio (Exports) | — | Management hoped to maintain the export ratio at 15%. |
| BPCL business target (BPCL acquisition) | FY25 | Management set a ₹25 crore target for the BPCL business in FY25. |
| Fire-fighting business | FY25 | Management wanted to double the ₹25 crore H1 fire-fighting business. |
| SupremeServ share | — | Management said 15-20% was achievable and expressed confidence in the 20-25% ambition. |
| Valves margin | — | Management said the valves margin at 12%-13% was sustainable. |
| Continued growth | — | Management aimed to continue the growth achieved over the last seven or eight years in coming years. |
| Captive solar project commissioning | Q2 FY25 | Management expected testing and commissioning to conclude by mid-August 2024. |
| In-house controllers and accessories (Solar) | FY26 | Management expected in-house controllers and accessories in the early part of next year. |
| Solar prototype testing | FY25 | Management expected solar prototype testing to be completed this year. |
The business
By business
Energy and nuclear
Nuclear was the main growth focus: bookings were almost ₹1,300 crore, with deliveries running through 2027. Coal thermal opportunity was mainly FGD and auxiliary pumps.
Nuclear order booking: almost ₹1,300 crores
Outlook: The first nuclear pump testing was expected to finish by FY25-end, with sales revenue in H1 FY26 and Kudankulam revenue also expected next year.
Industrial project business
H1 growth of about 10% lagged order intake because some project orders could not be delivered due to customer-side payment constraints or project delays.
H1 growth: about 10%
Outlook: Management expects delayed project deliveries to recover in H2 and said capacity is sufficient for this year and next year.
Standard pumps, irrigation and solar
Standard pumps drove H1 performance and solar, recorded under standard pumps, reached almost ₹80 crore of turnover with 1,600 systems supplied.
Solar sales turnover: almost ₹80 crores · Solar systems supplied: 1,600 · Standard pumps order share: 42% to 52%
Outlook: Management targeted ₹150 crore of solar turnover by FY25-end and expected controllers and accessories to be released in early FY26.
Wastewater
Management called wastewater a high-potential segment, citing rising customer investment and products for sewage, effluent, drainage and dewatering.
Effluent treated in India: 10%
Outlook: Wastewater was described as a good-growth sector, alongside building services and water.
SupremeServ and BPCL
Aftermarket strategy covered spares, repairs, remote pump monitoring and BPCL localisation. BPCL's 3,000-4,000 pump install base yielded a first reciprocating-pump order.
BPCL install base: 3,000, 4,000 pumps · Group-level service share: 32%
Outlook: Management said 15-20% was achievable for SupremeServ and was not worried about the 20-25% ambition; BPCL's FY25 target was ₹25 crore.
Valves
Valves recorded the highest quarterly sales and highest H1 order intake; supply-chain and internal-efficiency gains supported a sustainable margin level.
Prior-year turnover: ₹350 crores · Current margin: 12%-13% · Domestic GGC market share: 8% to 10% · Ball-valve business: around ₹70 crores
Outlook: Management expects valve growth to continue, with gradual capacity expansion and a larger market-share opportunity.
Exports
Exports were described as an ongoing opportunity supported by group references and a new segment-based organisation; Poland contributed an almost €4 million valve order.
YTD export performance: around 11% · Target export ratio: 15% · Poland valve order: almost €4 million
Outlook: Management hoped to maintain a 15% export ratio while developing borehole, API and vertical-turbine products for overseas markets.
Fire-fighting and rail pumps
Fire-fighting generated ₹25 crore in H1, with FM and UL product development underway. Rail pumps gained a long-term Siemens contract and follow-on ABB orders.
Fire-fighting business in H1: ₹25 crores
Outlook: Management wanted to double fire-fighting business and expand the full UL and FM range; railway order values were withheld as confidential.
Balance sheet, capex and funding
- Net financial position improved from ₹2,746 million to ₹3,152 million as of YTD June 2024.
- Inventory reduced to ₹5,636 million at end-June 2024 as management focused on working-capital control.
- Receivables stood at ₹4,896 million at end-June 2024.
- Solar working capital was constrained by 50% bought-out PV panels, seven-day price validity and two-week supplier payment terms.
- Capacity spending continued on Shirwal land, additional Sinnar shed space, new machinery and replacement of older machines; no amount was disclosed.
The industry, as management sees it
Management frames the broader sector as multi-decadal — Solar via government Kusum Yojana traction, wastewater given only ~10% of India's effluent is treated, Nuclear with SMRs and private-sector entry alongside NPCIL fast-tracking EPCs to scale capacity, and Valves with sustained demand given the small elite-player base. Indian pump customers are shifting from price-sensitivity toward life-cycle cost, energy conservation and sustainability, which should gradually lift quality players like KSB over fragmented regional suppliers.
Risks management named
- Nuclear first-pump delivery at NPCIL has slipped to H1 FY26 from earlier FY25 schedule; extension under mutual discussion with NPCIL
- Working-capital intensity of Solar EPC plus PV panel price validity of only 7 days creates cash strain
- New-product development costs (mechanical seal, Solar integration, reciprocating pumps at BPCL) compress near-term margins
- Thermal-power opportunity capped because BHEL is the dominant EPC and manufactures own pumps
- Export bidding tied to KSB parent's territory-allocation grid; limited direct export rights (Bangladesh, Nepal, Bhutan)
Q&A
Q&A was led by Rajeev Jain (CEO) over a 90-minute+ session. The dominant themes were (a) nuclear — repeated probing on first-pump delay, contractual liability, SMR optionality, Kudankulam fast-track, future private-sector entry and timeline for booking the ₹1,300 cr backlog, (b) growth and margin sustainability — Kunal's pushback on whether SupremeServ / aftermarket growth could lift margins above the 13-14% band was firmly held back, and (c) new-business ramp-ups — solar revenue trajectory, BPCL / reciprocating pumps, railways with Siemens and ABB, fire-fighting FM/UL approvals and mechanical seals. The strongest deflection was on the Siemens / ABB order-book size and per-train-set pump value (declined as price-sensitive / potentially UPSI). Other softer deflections were on Valves captive split and the ₹3,000 cr nuclear opportunity figure (reserved).
Not answered directly
- Siemens and ABB locomotive order-book size and per-train-set pump value
- Quantum of long-term order-book impact from private-sector entry in nuclear
- Specific captive vs external split numbers for the Valves division
Asked for a number, answered without one
- Nuclear opportunity size: Management said it could increase but reserved comment until other segment opportunities were developed; nuclear remained a large opportunity.
- Siemens and ABB railway order value: Management declined to disclose a value, citing competitive sensitivity and the possibility that the information was UPSI.
- Railway pump value per train set: Management called the pricing confidential and only offered 2-3% as a typical pumps share of refinery or similar project value.
- Green hydrogen opportunity size: Management said the pumps are small, volume could be larger, and the business depends on Indian capex, installation and localisation; no rupee size was given.
- Service opportunity per pump value: Management said the math is difficult because customers resist service fees; recovery varies from two-three years in FGD to five-six years for water or chemical pumps and 10-12 years for some energy pumps.
- Thermal power pipeline: Management said BHEL's in-house pumps leave mainly FGD and small auxiliary-pump opportunities and gave no quantum.
Every question, with its answer
1. Growth constraint H1 FY25
Kunal, B&K Securities
Question. H1 growth has been about 10%, on the lower side. Is this capacity-constrained or due to external / domestic weakness?
Answer, Rajeev Jain, Managing Director, KSB Limited. Mainly due to project orders which could not be delivered because of constraints at the customer end — payments or project delays. We expect this to be recovered in the second half.
Follow-up. Order inflow has been strong, almost equivalent to last year. Is mid-teens growth feasible for the next few years? Is capacity a constraint for this year and next?
Answer. Yes, order booking is strong and we are targeting to continue the growth we have achieved in the last 7-8 years. Capacity is not a constraint — additional land bought in Shirwal last year, two spaces still available in Sinnar, building the last shed there. Capacity is a continuous process of investment in space and machinery: replacing old machines with multi-axis 3/4/5-axis machines for productivity and efficiency.
2. EBITDA margin sustainability
Kunal, B&K Securities
Question. Margin recovered to 14% this quarter after 11% the prior two quarters. What was driving the lower margins and is the gross margin of 43.5% sustainable? Is the low-margin project drag behind us?
Answer, Rajeev Jain, Managing Director, KSB Limited. Quarter-to-quarter evaluation does not give a true picture — the business depends a lot on product mix, project / standard / aftermarket share. Year-on-year EBITDA has been very consistent at 13-14% and that is the long-term sustainable target. New-product development and market-development costs get built into the present results; investments in new products are necessary for future growth.
3. Margin upside from SupremeServ
Kunal, B&K Securities
Question. Historically the target was to lift SupremeServ to 20-25% and nuclear / FGD aftermarket is high-margin. Once those levers play, can the 13-14% margin band be lifted further?
Answer, Rajeev Jain, Managing Director, KSB Limited. I don't think so. SupremeServ is increasing but standard and project business is also increasing. FGD itself is not a high-margin business. Project business in oil & gas and energy is very competitive. Development costs in Solar, mechanical seals and other new businesses partly offset the SupremeServ uplift. Nuclear will carry first-pump development costs for 1-2 years. Net-net, 13-14% EBITDA is a fair near-term (1-2 years) stability target.
4. Nuclear order booking timing
Kunal, B&K Securities
Question. Last time we were supposed to book about ₹100 cr from nuclear power this year. Are we on track or is there further delay?
Answer, Rajeev Jain, Managing Director, KSB Limited. The first pumps are taking time because of multiple factors not entirely in our hands — site readiness at Gorakhpur (Haryana) delayed, customer-side test rig not ready, and new tests being added because this is the first 100%-Made-in-India nuclear pump. Even non-contractual tests are being honoured. Order is progressing well with no hold-up; we expect all this to clear by this year-end and the sales revenue should come in H1 of next year, not this year.
Follow-up. So the booking slips to H1 next year, not this year?
Answer. Confirmed: not this year.
5. Bullish sectors — solar, wastewater, building services
Unidentified Analyst, Unknown
Question. Which 2-3 sectors are you most bullish on, especially given Kusum Yojana traction in solar?
Answer, Rajeev Jain, Managing Director, KSB Limited. Solar — entered a bit late but good progress this year with sales turnover of almost ₹80 cr as integrator, targeting ₹150 cr by year-end. Already supplied 1,600 systems, which qualifies us to bid on our own in upcoming tenders in Assam, Maharashtra, Punjab. Working on local value addition including in-house controllers — prototype testing this year, release by year-end. Wastewater and sewage treatment is another strong segment — only ~10% of India's effluent is treated today. Building services / infrastructure development is the third. Distillery has slowed but continues; pulp and paper is focused; energy, oil and gas, industry remain core.
6. Solar segment margins
Unidentified Analyst, Unknown
Question. Given the late entry in Solar and competition, will margins be lower in Solar over the next 1-1.5 years?
Answer, Rajeev Jain, Managing Director, KSB Limited. Solar margins are lower than product business, since 50%+ is bought-out and own value-add is only 25-30%. But with volume, supply chain can be improved. Goal is to improve margins via better supply chain and increased localisation — margins should not decline and are aimed to improve.
7. Nuclear contractual liability
Sagar, PhillipCapital
Question. Follow-up on nuclear — are there any contractual liabilities that could come to KSB because of the supply delay?
Answer, Rajeev Jain, Managing Director, KSB Limited. Contractual delivery was April-May this year. In discussion with NPCIL for extension due to the reasons mentioned, and that will be done mutually. Risk is always there but I would term it as low risk, not high.
8. SMR opportunity
Sagar, PhillipCapital
Question. On SMRs — the budget spoke about SMRs. What are your thoughts? Can it be a very big opportunity?
Answer, Rajeev Jain, Managing Director, KSB Limited. Yes, big opportunity for KSB. The group is well ahead and on the brink of booking a good SMR order for supply to the US. SMR technology for pumps is available with the group; we in India will have access once it is developed here. These pumps are totally different from the existing nuclear pumps for NPCIL heavy water reactors. Domestic competitor status is not fully clear to me; internationally others may have it.
Partly answered.
9. Green hydrogen revenue
Sagar, PhillipCapital
Question. Last time you mentioned green hydrogen pumps. Are we expecting revenue booking this year, and how big can the opportunity be — given India's 5 mn-ton target?
Answer, Rajeev Jain, Managing Director, KSB Limited. Revenue booking has started but is low — small orders in the range of ₹50 lakh to ₹1 cr. These are pumps from our existing range with special treatment / quality requirements per group standards, supplied to Indian and international customers. No new product development per se; small special variants like magnetically driven pumps and Bloc-type versions are under development. Pump opportunity will grow as the industry ramps up — pumps used are small (low individual value) but volume is large, so business size depends on how fast CapEx is implemented in India.
10. Exports and new segments
Sagar, PhillipCapital
Question. Export outlook — order execution challenges and new launches? Second, progress on new businesses like railways and fire-fighting pumps?
Answer, Rajeev Jain, Managing Director, KSB Limited. Export is a continuous opportunity — new initiative to sell submersible borehole pumps in Africa; energy project wins in Greece and the USA via the group; recent €4 mn valve order from Poland (partially booked last year). Quality, surface finish, packing and delivery requirements in export markets are tougher than domestic. On new segments — Pune plant is now FM-qualified as assembler for fire-fighting, FM/UL products under prototype development, ₹25 cr fire-fighting business already in H1 with intent to double. Navy / defence got pumps-for-submarines orders; LSA hygiene non-metallic pumps also being sold.
Follow-up. Has the railway pump business started?
Answer. Big success. Breakthrough long-term contract with Siemens; following Siemens' example, ABB has also placed orders. Step-by-step we should be a key supplier to international locomotive players in India — progress good, growth tied to customer growth.
11. Product gaps in exports
Sagar, PhillipCapital
Question. In exports, are there product gaps you would like to fill over the next year?
Answer, Rajeev Jain, Managing Director, KSB Limited. API product range is being continuously developed — whatever is pending will be developed. Product development is continuous given the breadth of KSB's basket; vertical turbine pumps are now on the development list.
12. Thermal power opportunity
Nirav, ASK Investment Managers
Question. Any insights on the pipeline for coal-fired thermal power? Can KSB get orders from Adani Group or is it limited to BHEL?
Answer, Rajeev Jain, Managing Director, KSB Limited. Recently there has been a coal-fired boom but unfortunately for us BHEL is the only successful EPC — GE, Toshiba, Doosan, L&T and other private EPCs have not been successful. BHEL makes their own pumps. So opportunity for us is mainly FGD pumps (we are main supplier to BHEL) and small auxiliary pumps. BTG scope goes to BHEL, who supplies the pumps; Adani would not buy pumps directly.
13. Nuclear order book delivery timeline
Mohit Surana, Unknown
Question. Nuclear power order book was last mentioned at ~₹1,000 cr; the first pumps delivered are delayed. What about the balance ₹900 cr and the timeline to book and deliver?
Answer, Rajeev Jain, Managing Director, KSB Limited. Total nuclear order booking is more than ₹1,000 cr — almost ₹1,300 cr including a Kudankulam order booked recently. Deliveries spread over '25 to '27. Next year should see good nuclear revenue if all goes to plan, especially the fast-tracked Kudankulam. Beyond '27 the pipeline is robust for 7-10 years. Importantly, only the first-time pump takes long for provenness; once established, subsequent pumps don't need repeated testing.
Follow-up. Will a new nuclear plant repeat this 2-year testing cycle?
Answer. No. Only the first time it takes that long to establish provenness. Once proven, no need to repeat that test.
14. Valves margin sustainability
Mohit Surana, Unknown
Question. Valves margin has expanded — is this a sustainable level or can it improve further?
Answer, Rajeev Jain, Managing Director, KSB Limited. We have reached a very good level in valves — historically up and down, even in red earlier; now at 12-13% double-digit EBITDA. Sustainable because supply-chain, internal-process, layout, digitisation (S/4HANA, warehouse digitisation), old-machine replacement (3-4 manpower reduced to 1) improvements are ongoing. Margin should be sustainable.
Follow-up. Any sense on the order-book size potential from Siemens and ABB — 8-10 year contracts including servicing?
Answer. I will not be able to give any value on that. It may be a UPSI or it may be helpful to my competitors also.
Not answered directly.
15. Kudankulam award dynamics
Vipin Goel, Mirabilis Advisors
Question. On the Kudankulam award won recently — is it different from the NPCIL fleet-mode reactors (Russian counterparty, fast-track nomenclature)? Has the strategy or opportunity size changed?
Answer, Rajeev Jain, Managing Director, KSB Limited. Kudankulam is completely different from the NPCIL heavy-water reactors — different specs, different customer, different pumps. The difference is it is fast-track and on a real push to finish, giving hope of revenue next year. Since it is a first-time customer for us, we are going through familiarisation; urgency on both sides is helping. Smaller 250 MW and other plants could also be introduced as fill-gap capacity — nuclear is a big opportunity across existing projects, SMRs and smaller plants.
Follow-up. Does the ₹3,000 cr nuclear opportunity figure change? And does private entry (as NITI Aayog ex-CEO has suggested) change moving parts?
Answer. Could be, but reserving comment till segment opportunities mature. Private sector will help; other EPCs are being successful in bidding (e.g., Kaiga). NPCIL is moving from in-house execution to lump-sum EPC contracts to speed up. We are preparing — invested in capacity, new machines, space, sheds and recruiting people with domain competency.
Partly answered.
16. Solar segment accounting
Vipin Goel, Mirabilis Advisors
Question. Do we record solar under standard pumps or engineered pumps? Is that why H1 was relatively better?
Answer, Rajeev Jain, Managing Director, KSB Limited. Standard pumps. Yes, that's a reason H1 has been relatively better in standard pumps.
17. Chinese competition
Digant Haria, GreenEdge Wealth
Question. Since 2019 Chinese competition has not been a problem — do you see Chinese activity coming back in India in pockets of pumps?
Answer, Rajeev Jain, Managing Director, KSB Limited. Not really.
18. BPCL acquisition progress
Digant Haria, GreenEdge Wealth
Question. On the BPCL acquisition (now ~1.5 years in) — how many designs have been localised, and how much of the 4,000 installations have been reached for spare-parts sales?
Answer, Rajeev Jain, Managing Director, KSB Limited. Very bullish on BPCL acquisition — install base of 3,000-4,000 pumps, seven containers of drawings received which are being converted from 2D to electronic, 3D models and patterns. Becoming the proprietary supplier in PSUs is the real win. FY25 target set at ₹25 cr, on track in H1; first reciprocating pump order received (a product KSB never made before). Long-term profitable business, with future scope for pumps not in KSB's range.
19. Valves captive vs external and foundry supply
Digant Haria, GreenEdge Wealth
Question. On valves — what is captive vs external split? Is the external market a big opportunity? And is the foundry availability issue from last year resolved?
Answer, Rajeev Jain, Managing Director, KSB Limited. Captive (KSB-on-KSB) is very small relative to total — we try to fit our valves on KSB pumps whenever possible, but the quantities are minor. External market is huge — last year's valve turnover was ₹350 cr on a plant that had historically done ₹100-150 cr with a much smaller branded basket. Few quality players mean high share-gain potential. Foundry availability issue was temporary; we are making the supply chain robust by developing two vendors / two patterns to avoid recurrence.
20. Export relationship with parent KSB
Unidentified Analyst, Unknown
Question. On exports — how does the relationship with the parent work? Are we allowed to bid directly? Are we directly allowed to bid in SAARC?
Answer, Rajeev Jain, Managing Director, KSB Limited. Decision on participation is with the parent via a central supply-chain grid that allocates which countries each KSB entity can export to. Where the parent / other entities cannot compete competitively, they add our name and refer the enquiry. Direct export territory for India is Bangladesh, Nepal and Bhutan; Sri Lanka is Singapore territory and Myanmar is also Singapore territory.
21. BB3/BB5/CHTRa tech transfer
Unidentified Analyst, Unknown
Question. Update on BB3, BB5 and CHTRa technology transfers from parent — how has the offtake been in global markets? Any further transfers expected?
Answer, Rajeev Jain, Managing Director, KSB Limited. BB3 has been quite successful — good orders from Taiwan and other export countries; references being developed which will allow Indian-market participation. Parent will absolutely support any tech-transfer request given the manufacturing-cost advantage of India for global supply.
22. Siemens/ABB pumps and FGD ordering outlook
Unidentified Analyst, Unknown
Question. Siemens and ABB pumps — for local needs or global needs? And what about FGD ordering outlook — how many pumps yet to be tendered?
Answer, Rajeev Jain, Managing Director, KSB Limited. Siemens and ABB pumps are mainly for local domestic market (where the big growth is) but once proven, they may also be used in exports. ABB is also into the same locomotive market. On FGD — maybe 70% of ordering for existing plants is already done; the remainder is over 2-3 years from state governments. Future growth depends on how fast new coal power plants come up — greenfield FGD is a longer-cycle opportunity.
23. River linking, flood control and nuclear competition
Unidentified Analyst, Unknown
Question. Opportunity for river-linking and flood control? And are we seeing competition in the nuclear business?
Answer, Rajeev Jain, Managing Director, KSB Limited. On flood control — studying the possibility of a rental-pump business (truck-mounted, self-contained systems) for mobile flood response. Already have Amacan-type submersibles supplied to Kolkata Municipal Corporation and are bidding for municipal corporations in the Eastern zone. On nuclear competition — competition is always there, in every business — and is healthy; nothing strange.
Partly answered.
24. Sensor-based remote service monitoring
Unidentified Analyst, Unknown
Question. On the service business — do we have the capability for remote monitoring of project-business pumps? Can we track data over time and help customers improve performance? And is this applicable to competitor pumps too?
Answer, Rajeev Jain, Managing Director, KSB Limited. Yes — sensors mounted on big pumps (vibration, temperature) transmit data back to Pune where a 24/7 team of engineers (across time zones — three engineers, two per shift) monitors performance and raises alerts on deterioration (spare-part replacement, overhauling). Capability applies equally to other companies' pumps since devices and parameters are the same. Some international customers are already being monitored this way, with diagnosis solutions also provided.
25. Valves market size and share
Unidentified Analyst, Unknown
Question. On valves — how big is the segment, what is our market share, which sectors contribute, and what is a single train-set's pump value in the railway opportunity?
Answer, Rajeev Jain, Managing Director, KSB Limited. Valve market is huge — estimated at ₹20,000 cr plus. KSB is focused on Gate / Globe / Check domestically where share is 8-10% for those product categories. Recently entered ball valves (~₹70 cr business currently) by partial assembly / labelling. Growth plan is gradual and capacity-aligned. On railway train-set pump value — cannot give specifics on the Siemens/ABB contract (price information is confidential), but pumps are typically 2-3% of project value across refineries / projects.
Not answered directly.
26. SupremeServ / aftermarket math 15-25%
Unidentified Analyst, Unknown
Question. On service opportunity — if ₹100 is the cost of a pump, what is the service opportunity over its life? Across how many years? And what's the math behind taking service income from 15% to 25%?
Answer, Rajeev Jain, Managing Director, KSB Limited. Hard to give a single number — Indian customers don't want to pay separately for service; combine it with spares. In harsh applications (abrasive / corrosive, like FGD), pump value can be recovered in 2-3 years via spares. In water / chemical pumps, 5-6 years. Energy / boiler-feed pumps run for years (NTPC 600 MW pump ran for 10-12 years before spare opportunity arose — large windfall). Math for 15-25% SupremeServ growth: (1) take business from small players running on pirated spares via faster delivery, (2) replace competitors' pumps during service, (3) growth in mechanical seals (15-20 cr today but huge market — first item to wear out), (4) BPCL's highly engineered BP&CL pumps giving proprietary access, (5) warehouse-driven ₹100 cr standard business cutting 14-16 week delivery to ex-stock. Group-level SupremeServ is already 32%; 15-20% at KSB level isn't a risk.
27. Pumps vs valves market sizing and consolidation
Unidentified Analyst, Unknown
Question. How related is the valves market (₹20,000 cr) to the pump market? And is the pump market consolidating from Coimbatore / Rajkot fragmentation?
Answer, Rajeev Jain, Managing Director, KSB Limited. Valve market is much bigger than the pump market (pumps estimated at ₹15,000-16,000 cr); one pump has many valves around it but valves include very standard / throwaway categories. Market may not structurally consolidate — quality levels will improve as energy-conservation and sustainability awareness lift customers toward life-cycle cost thinking. The elite group of pump suppliers is already forming; price sensitivity remains high in India.
28. Solar ₹500 cr aspiration and working capital
Unidentified Analyst, Unknown
Question. Aspiration on Solar pumps — can this scale to ₹500 cr over 2-3 years? What are working-capital challenges?
Answer, Rajeev Jain, Managing Director, KSB Limited. ₹500 cr — no doubt. Working capital is a real challenge — PV panel prices valid for only 7 days and payment terms only 2 weeks, plus government documentation and formalities. Efficiency [Hindi phrase] and internal process improvement are the levers; we are trying to manage via in-house / local manufacturing of the non-PV components.
29. Energy pumps supply + O&M combined orders
Unidentified Analyst, Unknown
Question. On energy pumps — does the client give combined orders for supply and O&M (relevant to SupremeServ)? Is this trend increasing?
Answer, Rajeev Jain, Managing Director, KSB Limited. Sometimes — yes. For replacement jobs at existing power plants, clients often ask for a lump-sum turnkey job. For new pumps at sites with their own teams, only an expert supervisor is needed from KSB for guidance. So combined O&M orders happen in replacement contexts more than in new-supply contexts.
What was said
Topic by topic, in the order it was spoken
Welcome, Organogram and Group Structure · Mahesh Bhave (CFO)
- Cautionary statement on forward-looking statements delivered as standard disclaimer.
- Organogram introduced: MD Rajeev Jain, CFO & DTC Head Mahesh Bhave, plus HR (M Patil), Sales & Marketing (P Kumar), Nuclear (N Patil), Valves Coimbatore (Raja), Quality (Philip), PMPS (Seshadri), CS (Kavathekar), Standard Agri/Solar/Foundry (S Bapat), SupremeServ (R Kulkarni) and Contracts (M Pattewar).
- Group structure: KSB Limited plus associate MIL Controls (Kochi, valves), associate KSB Tech (engineering/IT services) and Bangladesh liaison office.
KSB India Locations and Plant Overview · Mahesh Bhave (CFO)
- Footprint: 6 manufacturing plants, 6 service stations, 350+ service centres / dealer network, 22 warehouses, 4 zonal offices, 14 branches, 1,100+ dealers.
- Plants: EPD Shirwal (new admin building inaugurated); IP&P Pimpri Pune; SupremeServ Chinchwad Pune; Central warehouse Chinchwad; Standard pump division Sinnar (Nashik); Valves Coimbatore; MIL Controls Kochi; KSB Tech Pune design centre.
- Jaipur sales office recently renovated as part of zonal expansion.
Application Coverage Across Energy, Industrial, Irrigation, Wastewater, Construction · Mahesh Bhave (CFO)
- Energy: high-pressure multistage pumps, FGD pumps, GGC and ball valves for power plants — applications include FGD and hydrocarbon services.
- Industrial: end-suction, process, non-clog, API 610 multistage pumps, plus GGC and ball valves for oil & gas, sugar, paper & pulp, thermic fluid and hydrocarbon services.
- Irrigation: submersible pumpsets, openwell monobloc, mini-monobloc, dewatering, solar products, GGC and ball valves for irrigation, farmhouses, drinking water.
- Wastewater, Construction, and SupremeServ aftermarket (services, spares, modification, replacement pumps) round out the application map.
Q2 FY25 Highlights and Top Customers · Mahesh Bhave (CFO)
- Highlights: strong growth in distillery and vegetable oil; Valves division highest-ever Q2 sales and H1 order intake; TSG Regulation Audit by CESI for China export market cleared without major observation.
- E2E workshop / web shop expanding to MEGA and MEGACHEM spares; approval of KSB mechanical seal by major customer.
- Top 10 customers: Thermax, PSU HPCL, BPCL, dealers Rushabh / Pooja / Patil; new solar customers Dakshin Gujarat and Maharashtra Energy; IGSEC and Toyo Engineering from the private sector.
- Order mix shift: standard pumps grew from 42% to 52%; engineered-pumps share lowered; valves steady; export ratio 11% YTD vs 15% target.
Financial Position and ESG / Idea Management · Mahesh Bhave (CFO)
- Revenue from operations ₹11,902 mn (YTD June); PBT ₹1,483 mn (H1); net cash position improved from ₹2,746 mn to ₹3,152 mn.
- Inventory controlled to ₹5,636 mn; receivables at ₹4,896 mn.
- ESG step-change: 50% reduction in KSB India Scope 1 emissions and 29% reduction in Scope 2 emissions in H1 2024.
- Idea Management: 927 ideas / ₹4 mn savings / ~416 employees contributed; training and distribution events held across plants.
Group Captive Solar Project, Events, and Nuclear ISO 19443 Success · Mahesh Bhave (CFO)
- Group captive solar: construction completed; work completion reports received from relevant authorities; pre-commissioning tests for transmission line, pooling substation and remote-end GSS Bay ongoing, expected to conclude mid-August 2024.
- All India Dealer Conference 2024 in Kochi, Kerala attended by Chairman Mr. Swarup; Valves Dealer Meet in Chennai and West Zone Sales Meet also held.
- Exhibitions: KSB Agri Intex Expo Coimbatore; Chemtech Expo Mumbai — showcased latest pump technologies; visited by KSB North America President Luis to explore cross-region collaboration.
- KSB Shirwal Energy Pump Division received ISO 19443:2008 certification — first company in Indian pump industry to obtain this nuclear-safety accreditation covering development, production, marketing and servicing of pumps for ITNS (Important to Nuclear Safety) classified product systems.
In their words
Nuclear is a big opportunity in general, I would say. It's only thing whether how fast we can implement it. That is the only question which comes to it.
I don't think margins would go down [in Solar]. In fact, we are aiming to make it better with having the supplies done, having the experience gained, and doing more of localisation or in house manufacturing.
We are very bullish on [BPCL] acquisition. Because they have a good install base 3,000, 4,000 pumps... we got seven containers of drawings... and we got our first order for reciprocating pump. Can you believe it? That we never have made reciprocating pump in our [history], and the customer gave the confidence, and we are building a completely new reciprocating pump.
To check next time
What management committed to on this call, or the dates they gave.
- Whether customer-delayed project orders convert into H2 deliveries and revenue.
- Whether EBITDA margin stays within the 13-14% range as mix and development costs change.
- Solar turnover progress toward ₹150 crore by FY25-end and controller localisation in early FY26.
- Completion of nuclear testing by FY25-end ahead of first revenue in H1 FY26.
- Fire-fighting revenue after ₹25 crore in H1 and progress toward doubling it.
- Commissioning of the captive solar transmission line and substation by mid-August 2024.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Fri 2 Aug 2024 | ₹947.60 | −2.44% | −1.17% |
| 5 sessions Thu 8 Aug 2024 | ₹923.30 | −4.94% | −3.57% |
| 20 sessions Fri 30 Aug 2024 | ₹928.50 | −4.40% | +0.90% |
From the close of Thu 1 Aug 2024, ₹971.25: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.