KSB Q1 FY26 earnings call

Fri 22 Aug 2025KSB

In brief

KSB's H1 CY25 profit grew to ₹1,607 mn from ₹1,483 mn; order book at ₹2,697 cr; nuclear ₹1,313 cr, two pumps await test bed.

Management's tone
Confident
What was said
Leaned positive
Guidance
None given
Analyst pushback
Medium
Stock, next session
+1.85% (Nifty 50 −0.85%)
  • H1 CY25 profit rose to ₹1,607 mn from ₹1,483 mn YoY, with order book at ₹2,697 cr including nuclear ₹1,313 cr.
  • Nuclear order book ₹1,313 cr anchored by Kaiga 5&6, Kudankulam light water order, and an export Critical Safety Class 2 order via principals.
  • Solar YTD June ₹125.1 cr orders, ₹134.3 cr sales; 10,613 systems installed; pricing down ~10% in Maharashtra.
  • Net financial position ₹316 cr cash at June 2025; nuclear cycle cash positive; no borrowings planned for solar.
  • Non-nuclear non-solar growth ~15% led by building services, water/wastewater, supercritical revival, firefighting and marine qualifications.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q1 FY26

This quarterA year agoLast quarterMargin
Revenue₹667 cr+3.2%+12.0%
EBITDA (excl. other income)₹91.4 cr+0.9%+35.0%13.7% (14% a year ago)
Net profit₹70.4 cr—+36.4%10.6% (0% a year ago)
EPS (₹)₹4.04+3.3%+36.0%

From the company's filed results for the quarter ended 30 Jun 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Non-nuclear, non-solar order intake growth ~15% YoY led by building services, water/wastewater, supercritical revival, firefighting/marine qualifications, mechanical seals localization, mining via Vambori foundry.
  • Solar H1 revenue lift with ₹134.3 cr YTD June sales and 10,613 PM Kusum systems installed across Maharashtra, Gujarat, Rajasthan, Haryana.
  • FGD segment vanished due to government regulation, a one-off distortion; partly offset by L&T supercritical order loaded into Shirwal plant. (one-off)
  • Solar pricing down ~10% in Maharashtra from ₹2,05,000 per 3HP system as tenders progressed from Phase 1 to current; pressure seen across most states.
  • Nuclear revenue not yet invoiced in H1; first two 700 MW pumps await 500-1,000 hour endurance testing at Tarapur test bed; invoicing subject to test bed readiness.

The numbers management led with

  • H1 CY25 order intake: Rs 17,381 million
  • Total order book as of 30 June 2025: Rs 26,969 million (Rs 13,836 mn non-nuclear + Rs 13,131 mn nuclear)
  • Nuclear order book: Rs 1,313 crores
  • Export share of revenue: ~15% (absolute may cross Rs 400–450 cr vs ~Rs 350 cr historical)
  • Annual capex on capacity and machine upgrades: ~Rs 120–130+ crores per year

Guidance

Guidance on this call

WhatForWhat management saidFiled
Annual capex for upgradesFY26₹120 crores, ₹130 crores or maybe more now is being invested every year to ensure that we upgrade and upscale our people—
Nuclear order book conversion (Nuclear business)FY26-FY28₹1,300 crores [nuclear orders], which definitely will convert into sales in the next two, three years—
Export revenue potentialFY26We may cross ₹400 crores, ₹450 crores₹2,702 cr, above the range
Two nuclear pumps to invoice (Nuclear business)FY26we are expecting, to start invoicing two pumps this year—
Nuclear pump invoicing run-rate (Nuclear business)FY27every year, four to five pumps we would, we are in a good position to do that—
Residential pumps revenue doublingFY26-FY28we want to double it in the next three years [residential pumps]—
Solar working capital cycle (Solar business)FY26we expect it to come down below 120 days once we complete our portion—

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Overall / Consolidated

H1 CY25 profit ₹1,607 mn vs ₹1,483 mn; order book ₹2,697 cr at June 2025; H1 order intake ₹1,738 cr; net worth ₹1,474 cr; cash ₹316 cr.

Net worth ₹14,737 mn · Cash ₹316 cr · Total order book ₹26,969 mn · H1 order intake ₹17,381 mn · Workforce 2,170 · ROCE 23.42% CY24 · Dividend 200%

Outlook: All-round growth; order intake better than last year; FY remains better than LY.

Nuclear business

Order book ₹1,313 cr; Kaiga 5&6, Kudankulam light water breakthrough, first export safety class 2 order to Europe via principals; ISO 19443 certified; Shirwal plant 3 Star MBK.

Nuclear order book ₹13,131 mn · Per 2-unit opportunity ₹500-600 cr · First pump 500-1,000 hours test pending · Shirwal 80% green energy

Outlook: Two pumps to invoice CY 2025 subject to test bed; 4-5 pumps per year thereafter; 10x700 MW tenders in next few quarters; BSRs long-term.

Solar business

YTD June ₹125.1 cr orders, ₹134.3 cr sales; 13,227 cumulative systems ordered, 10,613 installed; pan-India 32 installers; own PMSM motor and controller; 5-year warranty.

YTD June orders ₹125.1 cr · YTD June sales ₹134.3 cr · Cumulative orders 13,227 systems · Installed 10,613 systems · 2023 orders ₹89.3 cr · 2024 orders ₹198.9 cr

Outlook: More aggressive participation in more states; Component C (replacement) entry; pricing pressure persists; funded from internal accruals only.

Standard pumps (non-nuclear, non-solar)

Non-nuclear, non-solar growth ~15% YoY; building services, water/wastewater, supercritical power revival, distillery/sugar drive growth; new verticals firefighting, marine, mechanical seals, mining.

Non-nuclear, non-solar growth ~15% · Domestic pumps growth 12-14%

Outlook: Exports may cross ₹400-450 cr with U.S., Saudi gas projects; product additions across verticals; mining local sourcing via Vambori foundry.

Balance sheet, capex and funding

  • Cash position ₹316 cr at June 2025, maintained consistently.
  • Net worth ₹1,474 cr (₹14,737 mn) at June 2025.
  • Solar funded from internal accruals; no external borrowings planned.
  • Nuclear contracts milestone-paid; cycle cash positive.
  • Capex ~₹120-130 cr per year on machine replacements and capacity upgrades.
  • Solar working capital cycle targeted to drop below 120 days from current.

The industry, as management sees it

India nuclear power targeting 100 GW by 2047 (vs 8.6 GW current); 10 reactors sanctioned and 8 under construction; private sector entry via Bharat Small Reactors pending legislative amendments. PM Kusum Component B has >50% scope still to be installed; Component C (replacement of electric/diesel pumps) is the next leg. Supercritical power plant business is reviving after the FGD segment 'vanished overnight' due to government regulation. Pumped storage is an emerging PSU-driven opportunity.

Risks management named

  • Solar net working capital currently >120 days; targeted to fall below as documentation/collection processes mature
  • First nuclear pump invoicing in CY25 conditional on Tarapur test bed completion (power connection, piping pending)
  • A competitor holds a development order for primary coolant pumps; qualification cycle is long but competitive supply is rising
  • Solar tender pricing down ~10% in Maharashtra (3HP system from ~₹2.05L) — pressure persists across states
  • FGD segment 'vanished overnight' due to government regulation — offset by L&T supercritical orders

Q&A

Discussion was dominated by nuclear (revenue trajectory, export order, test bed timing, competition, BP&CL) and solar (working capital, scaling path, pricing). Analysts pushed hardest on solar NWC >120 days and the competitor with a nuclear development order; management acknowledged both openly but did not change posture. The L&T supercritical order and Shirwal's 3-Star MBK rating were used to anchor the bullish non-nuclear narrative. Nidhi Shah and Shiv Chanani drove the most detailed exchanges on export strategy and parent-entity dynamics.

Not answered directly

  • Specific 3-year revenue contribution percentage from nuclear + solar (refused to commit to 20%+)
  • Value of the European nuclear export order (NDA cited)
  • Quarter of first nuclear pump invoicing — Q3 vs Q4 (test bed dependency)
  • Pump storage opportunity sizing (called it 'sketchy information' at this stage)

Asked for a number, answered without one

  • Solar+nuclear share in 3 years: Said better share of total revenue; declined to give percentage; nuclear ₹1,300 cr order book converts in 2-3 years; solar growing fast.
  • Nuclear opportunity in rupee terms: Said two units together are ₹500-600 cr; declined to size full nuclear pipeline in rupees.
  • Solar business scale target: Said aiming for much better share, more aggressive participation in more states, but gave no rupee or % target.
  • Residential business as % of total: Said ~8-10% of business today; wants to double in 3 years but declined to give a % target.
  • Export revenue target: Said not impossible; exports will constantly grow; we may cross ₹400-450 crores from ~₹350 cr earlier.

Every question, with its answer

  1. 1. Nuclear and solar revenue contribution

    Mahesh, LIC Mutual Fund

    Question. What was the contribution from nuclear and solar to revenue last year? Three years down the line what contribution can come from these two segments? Can you quantify the nuclear pump opportunity in rupee terms?

    Answer, Rajeev Jain / Nitin Patil, Managing Director / VP Nuclear. Solar revenue last year was ~₹190 crores; nuclear invoicing has not started yet — first 2 pumps expected to invoice this year subject to Tarapur test bed readiness (500-hour endurance testing still to complete). MD: both segments will have a 'better share' of total revenue, but refused to commit to a specific percentage. He cited the ₹1,300 cr nuclear order book as a 2–3 year conversion pipeline. Nitin Patil: a typical 2-unit nuclear package is worth ~₹500–600 crores.

    Not answered directly.

  2. 2. Working capital and non-solar growth

    Ashish, Sundaram Mutual Fund

    Question. Will nuclear and solar growth impact working capital? Is solar NWC currently >120 days? On growth perspective, ex-solar growth seems to be coming down — is there a concern around non-solar business? Any increased competition in nuclear?

    Answer, Rajeev Jain / Nitin Patil, Managing Director / VP Nuclear. Nuclear: milestone-based payments; KSB is cash positive in the cycle and expects the same going forward. Solar: working capital was alarming at entry; processes are maturing and should be 'much better' in a couple of months. NWC is currently >120 days but should come down; central bodies like MNRE pushing states to expedite. MD: non-nuclear growth has been ~15% in the first 6–7 months — water/wastewater, Building Services, distillery/sugar, plus L&T supercritical and export to US/Saudi despite tariffs. Nitin: one competitor has a development order for primary coolant pumps, but qualification cycle is long; KSB expects to retain major share.

    Follow-up. On solar NWC being more than 120 days — how comfortable is the company? And on non-solar growth concerns, is the slowdown being seen across segments?

    Answer. MD acknowledged today's NWC is >120 days but framed it as Maharashtra-specific and improving; not all states are similar. On competition, MD: 'as the whole market grows and the nuclear market is huge, there will always be a need for bigger supply chain... KSB is in a very comfortable position in terms of experience, knowledge, provenness.'

  3. 3. Nuclear exports, CY26 outlook, oil & gas drivers

    Nidhi Shah, ICICI Securities

    Question. What is the value of the nuclear export order booked this year? Scope for more export orders? How does export bidding work — through principals or independently? When can we expect the 2 nuclear pumps to book revenue (Q3 or Q4)? What does CY26 look like for nuclear? And the oil & gas export traction in US/Middle East — key drivers and 2-3 year outlook?

    Answer, Nitin Patil / Rajeev Jain, VP Nuclear / Managing Director. Export order value not disclosed due to NDA with end customer; project has more tags to come. Export bidding is via principals, not independently; focus remains India. First 2 pumps invoice this year, subject to test bed preparedness — can't confirm Q3 vs Q4. CY26: once first pump clears 500-hr test (NPCIL has option for additional 500 hr = 1,000 hr total), 4–5 pumps/year is achievable; 4–5 of the 8 pumps on hand are nearly complete. Oil & gas: growth driven by competitive Indian manufacturing, parent support, KSB's local entities in Saudi/Middle East for local value addition; tariff impact on US business so far nil. MD: KSB globally is shifting from Germany-only supply to local content in Middle East; India is part of that adaptation.

    Follow-up. Does KSB Global expect to increase manufacturing within Middle East, or will most products still come from India for the next 2–3 years?

    Answer. MD: KSB global works on strategy per market requirements. Earlier it was supply from Germany/India complete; now shifting to more local content. KSB India is building local organisations abroad to keep business within the KSB Group.

    Not answered directly.

  4. 4. Order intake drivers, new products, nuclear competition

    Kunal Sheth, B&K Securities

    Question. How much of the order inflow growth is market growth vs KSB initiative? Any major new product additions in non-nuclear/non-solar that can drive growth? On nuclear competition — what is the typical cycle time from development order to commercial order? Can a competitor commercially qualify next year?

    Answer, Rajeev Jain / Nitin Patil, Managing Director / VP Nuclear. MD: market growing 8–9%, KSB non-nuclear/non-solar growing 12–14%. New product drivers: firefighting (UL&FM certification work), Navy/marine (qualified via Spain license), mechanical seals (90% localised, ~9,000 units/year), BP&CL (first supplies to GAIL Pata), vertical turbine pumps for water/river-connect projects, mining (white iron localised at Wambori), Estigia vertical sump pump. On nuclear competition cycle: 'qualification process is long and lengthy. It's not easy to make the first pump completely indigenous' — won't comment on competitor's timeline; KSB itself required significant time despite having the technology.

  5. 5. Base business execution, solar scaling, nuclear delivery

    Dhavan Shah, AlfAccurate Advisors

    Question. Base business ex-solar seems to have stable growth despite rising order book — when to expect execution, is H2 a bumper? Solar: how can it scale from ₹200 cr to ₹1,000 cr; are margins in line with listed pure-play solar pump peers (around 20%)? Nuclear: is site progress on track to deliver 2 pumps this year?

    Answer, Rajeev Jain / Sunil Bapat / Nitin Patil, Managing Director / VP Solar / VP Nuclear. MD: H2 expected to be good; base business + non-solar growth supportive. Sunil Bapat: Component B >50% still to be installed; Component C is the big opportunity (replacement of electric/diesel pumps). Pricing down ~10% in Maharashtra (3HP system from ~₹2.05L); participating independently now (earlier via consortium). MD: solar approach is cautious — funding via internal accruals, no borrowings for working capital; 'aiming much better share' but not aggressively enough to need external debt. Nitin: not the site, it's the test bed at Tarapur; teething troubles remain with power connection and piping, but pump is installed for testing. Delivery conditional on test field completion.

    Not answered directly.

  6. 6. Resources, MBK certification, parent view, exports, BP&CL learnings

    Shiv Chanani, Baroda BNP Paribas Mutual Fund

    Question. Resource/capacity needs for the next 3-5 years opportunity? What does the 3-Star MBK certification mean for Shirwal? Has the parent company's view of the Indian entity changed over the last 5-7 years? Can exports meaningfully grow beyond 15% — ₹1,000 cr in 5 years? Learnings from the BP&CL acquisition and appetite for more inorganic growth?

    Answer, Rajeev Jain / Nitin Patil, Managing Director / VP Nuclear. MD: biggest challenge is skilled manpower, not visible outside. Nuclear org already 100+ people before any revenue. Attrition is single-digit (9–10%) vs industry >15%. Sinnar fourth shed ready this year; Shirwal extra plot ready by March; machine upgrade ongoing. Capex ₹120–130+ cr/yr. Nitin: 3-Star MBK is a 'personal satisfaction' but also opens up group-company sourcing; Frankenthal is not yet 3-Star. MD: parent always saw India as a key hub; difference today is less justification needed for product licenses, faster India product development (mining pump in 6 months), and more work offloaded to KSB Tech. On exports: should look at absolute number, not just 15% — 'may cross ₹400–450 cr' vs ~₹350 cr historical; ₹1,000 cr 'not impossible' but timing uncertain. BP&CL learnings: financially already recovered acquisition cost in 2–3 years; challenge is old paper drawings with no proper records; would repeat such M&A.

  7. 7. NPCIL tender timeline, residential pumps, nuclear payment status

    Mohit Surana, Monarch Networth Capital

    Question. When will NPCIL tender the 10 pre-project activity reactors — given we have only 5-7 years? Traction from the residential pump TV commercials last quarter — how is growth shaping up? Are the 2 nuclear pumps already delivered to NPCIL with payments received? Are milestone advances being received on the next 2 pumps being manufactured?

    Answer, Rajeev Jain / Nitin Patil, Managing Director / VP Nuclear. Nitin: tendering for 10 reactors is already a bit delayed — should happen in next few months or quarters. MD: satisfied with TV commercial push; residential/agriculture declined slightly (solar shift, slowdown) but domestic pumps grew 12–14%. Started with East zone, now expanded to North; South in different languages. Residential pumps are 8–10% of business today; aim to double ₹200–250 cr base in 3 years. Nitin: pumps not delivered — sent to test bed at Tarapur; will then go to Gorakhpur Haryana site. KSB cash positive in nuclear business. Milestone payments are staggered and cover documentation/raw material; well covered.

  8. 8. Pumped storage, utility pump winning factors, dealer criteria

    Unidentified Analyst, Unknown

    Question. Do we see opportunity in the pumped storage space? In utility pumps, what is the winning factor among large players? What is the criteria for appointing a dealer and has it evolved?

    Answer, Rajeev Jain, Managing Director. MD: pumped storage is a real opportunity (HPCs and PSUs announcing projects; Greenko, Reds active). KSB has ~50–60% of the required pump product range; 'started exploring, initial visits done'. Utility/water pumps: efficiency is the biggest factor today (85%+ expected); KSB upgrading legacy products. Comprehensive range from small to mixed-flow pumps critical. Dealer criteria: financial strength, pump business mindset, service capability, stocking of spares. Annual evaluation — even top dealers must grow delta over prior year agreement.

What was said

Topic by topic, in the order it was spoken

Company Overview and Group Structure · Mahesh Bhave (CFO)

  • Asia West Region comprises 4 entities: KSB Ltd (est. 1960), MIL Control (valves, Kerala), KSB Tech (captive tech centre since 2005), and Bangladesh liaison office
  • Six manufacturing plants — Pimpri (flagship IPD + corporate), Shirwal (energy pumps), Sinnar (water pumps), Wambori (foundry), Coimbatore (valves), Chinchwad (SupremeServ); plus MIL Kerala
  • Distribution footprint: 6 service stations, 350+ service centres, 22 warehouses, 4 zonal offices, 14 branches, 800+ authorised dealers
  • Board led by Chairman Gaurav Swarup; MD Rajeev Jain; parent KSB SE & Co. KGaA (Germany) is the ultimate parent

Financial Performance and Order Book · Mahesh Bhave (CFO)

  • H1 CY25 PAT ₹1,607 mn vs ₹1,483 mn prior year; FY-level CAGRs: revenue 16%, PAT 20%, EBITDA 18%
  • Net worth ₹14,737 mn (June 2025); ROCE 23.42% (CY2024 close); dividend 200%; net financial position ₹316 cr (cash positive)
  • H1 CY25 order intake ₹17,381 mn; total order book ₹26,969 mn (₹13,836 mn non-nuclear + ₹13,131 mn nuclear) as of 30 June 2025
  • Exports maintained at ~15% of revenue; top customers include L&T (recent), Thermax, ISGEC, Megha plus dealer additions including valves

Nuclear Business Deep Dive · Nitin Patil (VP Nuclear, Pimpri and Shirwal)

  • Shirwal: 100,000+ sqm, IGBC Platinum, rooftop 1 MW solar + open access group solar = ~80% green energy; 3-Star MBK rating (one of only 3 globally, alongside Pegnitz and Luxembourg)
  • ISO 19443 nuclear safety certification held by KSB India — only pump company with it; BP&CL acquisition (2022) added reciprocating pumps to nuclear portfolio
  • Order book ₹1,313 cr includes Kaiga 5&6, Kudankulam (light water breakthrough), and a Critical Safety Class 2 export order for a European plant via principal
  • India nuclear roadmap: 8 reactors under construction (6.6 GW), 10 more sanctioned, 22,480 MW target, 100 GW by 2047; ₹20,000 cr SMR allocation, 5 indigenous SMRs by 2033; BSRs need Atomic Energy / Liability Act amendments
  • 10x700 MW opportunity: ~40 main coolant pumps + 350+ primary island pumps; Bharat Small Reactors add 4 main coolant + 34 critical primary island pumps per unit

Solar Business Update · Sunil Bapat (VP Sinnar, Solar, Foundry)

  • Late entrant 2021 (non-SECI), PM Kusum empanelment 2023, first order late 2023 (UP, ₹89.3 cr intake); CY2024 intake ₹1,989 mn across Maharashtra, Gujarat, Rajasthan, Haryana
  • YTD June CY25: ₹125.1 cr order intake, ₹134.3 cr sales; cumulative 13,227 systems ordered, 10,613 installed in field
  • Backward integration: own PMSM motor launched, own controller in progress; delivery cycle improved to 4–5 weeks to sites
  • Distribution: 32 Pan-India installers (17–18 in Maharashtra), 132 authorised service centres for 5-year warranty; own project monitoring software launched
  • Outlook: >50% of Component B still to be installed; Component C (replacement of electric/diesel pumps) is the next big leg

ESG and CSR · Mahesh Bhave (CFO)

  • Renewable electricity share at 68% in Q2 CY25 — sharp step up vs prior periods; Shirwal already at 80% green energy
  • Y4D Foundation partnership for tribal women skill development and employability
  • PCMC CSR award 2024 (education and skill development) for Don Bosco ITI project — 40 students trained in vocational skills

In their words

This year has been a much better great year for us compared to the last year in terms of order intake. Last year order intake was not so good, but the sales was quite good because of a good orders on book situation. But this year, I'm much more happy, satisfied that the business is flowing in for all quarters.
Rajeev Jain (Managing Director, KSB Limited)
FGD business goes, something else comes. Nuclear business will continue to come, but it will go in its space. There we don't have the pressure. There we feel that, slow and steady wins the race, but on the day-to-day business, with the exports, we are getting now acceptance with the Supercritical for Shirwal plant.
Rajeev Jain (Managing Director, KSB Limited)
We are the only pump company now having the ISO 19443 certification, which is important to nuclear safety certification. I think other than us, only one other company has that, other company non-pump company.
Nitin Patil (Vice President, Nuclear Business, KSB Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • Nuclear test bed readiness at Tarapur and first two 700 MW pump invoicing timing in CY 2025.
  • Tender progress on 10x700 MW nuclear reactors - timing of order flows.
  • Solar order intake from Haryana, Rajasthan, MP, Telangana under PM Kusum Component B and C.
  • Solar working capital cycle normalization - target below 120 days.
  • L&T supercritical order execution and Shirwal plant utilization.
  • Domestic residential pumps TV campaign expansion to South and West zones.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Fri 22 Aug 2025₹810.10+1.85%−0.85%
5 sessions Fri 29 Aug 2025₹825.90+3.83%−2.62%
20 sessions Fri 19 Sept 2025₹864.45+8.68%+0.97%

From the close of Thu 21 Aug 2025, ₹795.40: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

KSB's other calls

  • Q2 FY27Tue 17 Nov 2026Tone: Mixed
  • Q3 FY26Tue 17 Mar 2026Tone: Confident
  • Q2 FY26Mon 17 Nov 2025Tone: Confident
  • Q3 FY25Fri 28 Feb 2025Tone: Confident
  • Q2 FY25Thu 14 Nov 2024Tone: Confident
  • Q1 FY25Fri 2 Aug 2024Tone: Confident