Maharashtra Seamless posted FY24 records - EBITDA ₹1,223 cr, PAT ₹975 cr, EPS ₹73; Q4 was weak on a delayed order, since received.

Management's tone
Confident
What was said
Mixed
Guidance
Guidance held
Analyst pushback
Medium
Stock, next session
−6.85% (Nifty 50 +0.31%)
  • FY24 EBITDA up 18% to ₹1,223 cr, PAT up 23% to ₹975 cr, EPS up 23% to ₹73, all company records; revenue declined 4%.
  • Treasury stood at ₹1,859 cr on 31-Mar-24, almost doubled YoY, even after debt prepayment and dividends.
  • Dividend for FY24 doubled to ₹10/share (vs ₹5 for FY23), quadrupling the payout over two years.
  • No ICDs to unrelated parties or corporate guarantees outstanding on 31-Mar-24; guarantee discharge achieved six months ahead of Sept-24 timeline.
  • Order book ₹1,753 cr, 60% from ONGC and Oil India; ₹674 cr ONGC order received in April 2024 for delivery over 44 weeks.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q4 FY24

This quarterA year agoLast quarterMargin
Revenue₹1,215 cr−25.6%−15.1%
EBITDA (excl. other income)₹270 cr−16.0%−26.2%22.2% (19.7% a year ago)
Net profit₹218 cr−41.0%—18% (22.7% a year ago)
EPS (₹)₹16.30−70.5%−20.8%

From the company's filed results for the quarter ended 31 Mar 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

Where management's figures differ from the filing

  • Q4 revenue: said ₹1,259 cr; filed ₹1,214.90 cr. No reason given on the call for the 3.6% gap, which is above the 3% materiality threshold.
  • Q4 EPS: said ₹17 per share; filed ₹16.30. No reason given on the call for the 4.3% gap, which is above the 3% materiality threshold.

What moved the numbers, as management explained it

  • Q4 production, revenue and profit fell vs Q3 because a large order expected in Q4 FY24 was delayed and received in the second week of Q1 FY25, reducing tonnage manufactured.
  • Q3 Seamless EBITDA/ton of ₹30,475 was an exception driven by raw material prices falling between tender submission and award, which lifted margins; Q4 normalised to ₹21,619/ton, dragging the FY24 average. (one-off)
  • FY24 EBITDA still grew 18% on a 4% revenue decline through cost control despite volatile macros and inflationary pressures.
  • ERW Q4 EBITDA/ton jumped 85% QoQ as mix shifted toward higher-margin oil-sector orders versus water-sector orders.
  • Depreciation charge declined as certain assets became fully depreciated, lowering the reported expense line. (accounting)

The numbers management led with

  • Treasury / liquid investments: INR 1,859 crores as on 31 March 2024; nearly doubled YoY
  • Order book: INR 1,753 crores as of mid-May 2024; 60% from ONGC and Oil India
  • ONGC order: INR 674 crores received in second week of April 2024 with 44-week staggered delivery
  • Telangana capex: INR 184 crores for finishing line; FY25 capex ~INR 200 crores for modelling

Guidance

Guidance on this call

WhatForWhat management said
Telangana finishing line capex (Seamless)FY25Telangana finishing line capex of ₹184 cr, all to be spent in FY25.
Telangana unit revenue potential (Seamless)—Telangana unit revenue can rise to ₹1,600-1,700 cr per annum once the finishing line is installed.
Capex modeling guideFY25Model ₹200 cr capex for now; will update if changes.
EBITDA per ton floor (Seamless)—Margins generally expected to remain above ₹15,000 per ton.
Telangana finishing line completion (Seamless)FY25Telangana finishing line capex has commenced and is expected to complete within FY25.
Volume growth from Telangana (Seamless)FY26Volume growth is expected to take place in FY26.
FY24 dividend per shareFY24Dividend of ₹10 per share announced for FY24, subject to shareholder approval, vs ₹5 in FY23.

The business

By business

Seamless

Q4 EBITDA/ton ₹21,619 (down from Q3's exceptional ₹30,475 as the raw material timing benefit unwound); FY24 average ₹25,793. Segment delivered 76% of Q4 and 84% of FY24 EBITDA mix.

Q4 EBITDA/ton ₹21,619 · FY24 avg EBITDA/ton ₹25,793 · Q4 EBITDA mix 76% · FY24 EBITDA mix 84%

Outlook: Capex ₹852 cr over FY24-FY26; Telangana finishing line ₹184 cr to be completed in FY25, hot mill upgrade thereafter; volume growth expected in FY26.

ERW

Q4 EBITDA/ton ₹11,803 (up 85% QoQ) as oil-sector orders outweighed water-sector; FY24 average ₹7,315. Segment is a blend of oil and water sector orders.

Q4 EBITDA/ton ₹11,803 · FY24 avg EBITDA/ton ₹7,315 · Q4 EBITDA/ton +85% QoQ

Outlook: ERW EBITDA/ton generally expected between ₹6,000-11,000 per ton depending on oil vs water sector mix.

Balance sheet, capex and funding

  • Treasury ₹1,859 cr as on 31-Mar-24, almost doubled YoY, even after debt prepayment and dividend payouts.
  • No ICDs to unrelated parties and no corporate guarantees outstanding as on 31-Mar-24.
  • Planned capex ₹852 cr for FY24-FY26; FY24 spend was minor (land acquisition at Telangana + machinery identification, payments not yet due).
  • Telangana finishing line capex ₹184 cr; all to be spent in FY25 with completion in FY25.
  • Back-to-back raw material booking with orders locks margins and insulates working capital from raw material price moves.
  • No debt required to fund capex or working capital; treasury fully covers planned spend.

The industry, as management sees it

Capital goods, infrastructure and oil & gas continue to see strong medium-term demand globally, directly driving seamless pipes demand. Global market estimated at ~10 million tons with large undocumented Chinese capacity. Indian manufacturers including MSL are among the lowest-cost producers due to cheap labour and equipment acquired at non-full-price, but Chinese dumping remains a concern in segments not covered by anti-dumping duty.

Risks management named

  • Q1 FY25 preventive maintenance shutdown will reduce production by ~15,000 tons
  • Q4 timing mismatch with delayed ONGC order caused lower revenue and profit
  • Export market not yet revived — exports were only 5–6% of FY24 dispatches
  • Chinese dumping exists in seamless pipe segments not covered by anti-dumping duties
  • Telangana unit revenue uplift to INR 1,600–1,700 cr dependent on selling price and demand stability

Q&A

Discussion was dominated by questions on EBITDA per ton volatility (Q3 vs Q4), export revival, capex pacing for the Telangana finishing line, and deployment of the INR 1,859 cr treasury. Management pushed back on giving specific per-ton guidance, citing the 3–4 month short-cycle order book, and declined to share product-wise EBITDA per ton or realizations. Pushback was strongest on why per-ton margin guidance appeared to step down and on the timing of export revival, with management repeatedly redirecting to the INR 15,000 floor and to maximising profit per ton rather than chasing volume.

Not answered directly

  • EBITDA per ton guidance by product
  • Realization figures for Seamless and ERW
  • Export revival timing
  • Specific geographies for inorganic acquisition

Asked for a number, answered without one

  • EBITDA/ton for high-value orders: We cannot disclose that figure. However, margins for high-value orders by definition, would be more than the mean margin.
  • EBITDA/ton target for FY25 and FY26: It is difficult... margins are generally expected to remain above INR 15,000 per ton.
  • Product-wise EBITDA/ton ranking: I cannot do that. We have disclosed more than what our competitors do. I think you should refer to our presentation.
  • Realization for Seamless and ERW: We do not share realization figures.
  • US/Canada seamless pipe market size: I don't have the market size. I think you have access to more databases than I do.

Every question, with its answer

  1. 1. EBITDA per ton guidance

    Tushar Raghatate, KamayaKya Wealth Management

    Question. What is the EBITDA per ton for the higher-value orders, and what is the EBITDA per ton guidance for FY25/FY26 given Q3 was INR 30,475/ton vs Q4's INR 21,619/ton?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Per-ton figure for high-value orders not disclosed; by definition margins on those are above the mean. Order book at INR 1,750-odd crores represents only four months of execution, so per-ton guidance for FY25/FY26 is not possible. However, margins are generally expected to remain above INR 15,000 per ton.

    Follow-up. When can we expect the hot mill upgrade (41% of total capex outlay) and Telangana finishing facility to commercialize? And is INR 800 crores of revenue potential possibly utilized?

    Answer. Telangana finishing line will be completed first within this financial year; hot mill upgrade will follow. Confirmed INR 800 crores of revenue potential from Telangana currently utilized.

    Partly answered.

  2. 2. Capex breakup, exports, capital allocation, margin guidance

    Aryan Sharma, B&K Securities

    Question. Breakup of INR 852 crores capex for FY24–FY26 — how much in FY24, FY25, FY26? What is the export mix in the INR 700 crores order? Why have exports come down and when do they recover? Capital allocation policy for new treasury — any inorganic opportunities being evaluated? Why is future EBITDA per kg guided lower at INR 18–20 vs FY24's INR 24?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. FY24 capex limited to land acquisition and machinery identification; payments not due yet. Telangana INR 184 crores, with FY25 capex of ~INR 200 cr for modelling. Exports were 5–6% of FY24 dispatches and have not revived; domestic demand absorbed the gap. Treasury being used judiciously via dividends, capex and overseas inorganic opportunities only. The Q3 INR 30,000/ton margin was an exception; going forward the floor is INR 15,000/ton but specific numbers not commentable given short-cycle order book.

    Partly answered.

  3. 3. Demand outlook, order book, depreciation

    Dhananjai Bagrodia, ASK Investments

    Question. How is end demand market playing out post elections? By segment, which is seeing growth? Is the order book executable in less than a year? Why is depreciation going down — is it on WDV?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. No impact of elections; ONGC INR 674 cr order received post-election. Order book of INR 1,750 cr comfortable; execution in 3–4 months. Depreciation reduced because certain assets have been fully depreciated and the charge fully expensed out.

  4. 4. Maintenance shutdown, ONGC order, capex ramp

    Riya, Aequitas

    Question. How long is the maintenance shutdown next year and when? What are the volumes for the large ONGC order that shifted to FY25? When will capex come online and how long to ramp up the finishing line? Will FY25 have no addition from capex?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Shutdown most likely in last week of May or first week of June for one month. Large ONGC order of INR 674 cr received in second week of April with 44-week staggered delivery. Telangana finishing line capex has started, expected to complete within FY25; volume growth in FY26. FY25 will have no addition from Telangana finishing line.

  5. 5. Raw material prices, export markets, shutdown

    Nikhil Agrawal, VT Capital

    Question. Billet prices are at a 1-year high — how will it impact Q1/Q2 margins? What is the price trend in round steel billets? Are we looking to supply to countries other than US/Canada given mixed rig count trends? How long is the maintenance shutdown?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Round steel billets (used by MSL) have not moved up significantly; square billets are different. Order book has back-to-back raw material booking so margins are locked. Will only export to markets other than US/Canada if margins hold — objective is to maximise profit per ton, not maintain presence. Maintenance shutdown is one month.

  6. 6. Telangana peak revenue, hydrogen market

    Simarjeet, Almondz Financial Services

    Question. What is the peak revenue expected from Telangana unit once fully positioned in FY26/FY27? Will it be margin accretive? Any plans for hydrogen pipes?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Telangana currently generates INR 800–900 crores of revenue at 50% capacity due to finishing bottleneck. Post finishing line installation, revenue can go to INR 1,600–1,700 crores annually, subject to selling price and demand. Hydrogen pipes have been discussed internally but it is too early for a definitive comment.

    Partly answered.

  7. 7. Product-wise EBITDA per ton

    Prolin Nandu, Edelweiss Alternative Asset Advisors

    Question. What is the EBITDA per ton range for different pipe types (subsea, drilling, CNG)? How much can mix change lift EBITDA per ton in FY25/FY26? Will EBITDA per ton change significantly once most capex is done? Can you at least rank the categories?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Cannot give product-wise EBITDA per ton or ranking. Once all capex is done, there will be higher profit and higher value addition products manufactured — that is the purpose of capex. Investors were referred to the presentation.

    Not answered directly.

  8. 8. Industry capex, dumping, treasury deployment, inorganic plans

    Pradeep Rawat, Yogya Capital

    Question. Do you see any new capex being announced in the seamless tube market? Will ISMT turnaround and United Seamless ramp-up cause oversupply? Any dumping in seamless pipe product lines? If anti-dumping duties are lifted, are Indian producers competitive against China? What is the plan for the rest of the INR 1,800-1,900 cr treasury beyond INR 800 cr capex? Any inorganic opportunities and which geographies?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. One competitor has announced capex, but impact on tonnage not known. No, ISMT and United Seamless ramp-ups will not cause oversupply. Dumping exists in segments not covered by anti-dumping duty. India is one of the lowest-cost manufacturers; MSL was earlier too because of cheap labour and plant/equipment at non-full-price. Treasury conserved for judicious use; quadrupled dividend in two years; will communicate on inorganic moves in due course.

    Follow-up. If you spot an inorganic opportunity, where are you planning to spend — organic front, broad sense?

    Answer. Announced capex, doubled dividend twice, and would invest in core business only — specifics to be communicated when materialised.

    Partly answered.

  9. 9. Subsea sour service pipes, market share

    Chetan Doshi, Tulsi Capital

    Question. What quantity/value of subsea sour service seamless pipes has been dispatched, when, and is the customer satisfied? Is the order an import substitute? What future do you see for this segment? Has a repeat order been placed? Is there any competition in India for this product? Any specific capex for this product line?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Quantity and amount not disclosed. Customer satisfied and giving regular orders — repeat order confirmed. There is competition but MSL already has majority. This is an import-substitution product. No specific plant required; existing facilities can manufacture it; capex plans cover all value-addition products.

    Partly answered.

  10. 10. Realization, M&A geography

    Rakesh Roy, Boring AMC

    Question. What is the realization for Seamless and ERW for this quarter and last quarter same period last year? Any broad idea on nearby realization? Which geography are you looking at for acquisition?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Realization figures not shared. Earlier explored one Indian competitor (United Seamless), now open to any geography — equipment can be dismantled overseas, packed, shipped to India and assembled.

    Not answered directly.

  11. 11. EBITDA per ton decline, ERW margin, coking coal

    Aashav Patel, Molecule Ventures

    Question. Seamless EBITDA per ton dropped from ~INR 30,000 to INR 22,000 — was it due to raw material cost push or realization softening? Given coking coal correction (above 325 to 235), can we see margin improvement? Why did ERW EBITDA per ton rise 85% QoQ?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Q3 had timing mismatch between tender submission and order award during which raw material prices fell — that drove the higher Q3 margin. Q4 corrected to INR 21,000/ton. Expect margins above INR 15,000/ton; cannot give specifics due to 3–4 month order book. ERW segment is a blend of oil sector (higher margin) and water sector; quarterly blend drives the reported number. ERW margins guided at INR 6,000–11,000/ton range.

  12. 12. Shutdown impact, dispatches, ONGC order execution

    Saket Kapoor, Kapoor & Co

    Question. Is Mr. Jindal on the call? Preventive shutdown impact on full-year volume — can the loss be negated? What % of tonnage loss should we model? How are dispatches 45 days into the quarter vs March exit run rate? Given ONGC order is 44-week (11 months), how does it square with 4-month order book guidance?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. Mr. Jindal not on call. Preventive shutdown one month in May/June, production loss ~15,000 tons in Q1 FY25. If Telangana finishing line completes within FY25, the loss can be negated by year-end. Order book of four months assumes steady prorata execution — ONGC order split between Q4 FY24 (which did not happen) and FY25; entire order received in FY25 with 44-week execution decided by ONGC.

    Follow-up. Will the INR 674 cr order execute in four months or percolate to the full year?

    Answer. Order will execute in 44 weeks; ONGC decides the execution schedule. Expected earlier in FY24 but did not happen.

    Partly answered.

  13. 13. Global market size, exports, competition

    Radha, B&K Securities

    Question. What is the market size for seamless pipes in US/Canada, global market size and China's share? Who are key competitors in US/Canada exports? Does Europe have anti-dumping duty on China — are we exporting to Europe? Why better margins in US vs Europe? When do we see export market revival?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations and Finance. US/Canada market size very big due to drilling; global seamless pipe market ~10 million tons; China share not data-backed but large capacities. International competitors: ArcelorMittal, JFE, Tenaris, TMK, Jindal Saw, Vallourec. Europe duty on China exists; MSL exports very small quantity there. US margins better because customers willing to pay higher prices. Key markets remain US/Canada; export revival hoped for as early as possible but not seen in FY24.

    Partly answered.

What was said

Topic by topic, in the order it was spoken

FY24 Financial Performance Overview · Kaushal Bengani (DGM, IR & Finance)

  • FY24 revenue declined 4%, but EBITDA rose 18% to INR 1,223 cr, PAT rose 23% to INR 975 cr, EPS rose 23% to INR 73/share
  • Management claims highest ever EBITDA, PAT, EPS and margins in FY24 despite lower production and sales
  • Q4 FY24 revenue INR 1,259 cr, EBITDA INR 276 cr (23% margin), PAT INR 223 cr (18% margin), EPS INR 17
  • Q4 underperformance vs Q3 attributed to timing mismatch — large order expected in Q4 received only in second week of Q1 FY25
  • Q3 FY24 EBITDA per ton of INR 30,475 acknowledged as exceptional, occurring only once or twice historically

Treasury, Liquidity and Capital Allocation · Kaushal Bengani (DGM, IR & Finance)

  • Treasury stands at INR 1,859 cr as of 31 March 2024, nearly doubling over the year even after debt prepayment and dividend payout
  • Liquidity being conserved for judicious use — debt-free for capex and working capital needs
  • Dividend for FY24 doubled to INR 10/share from INR 5/share; total dividend quadrupled over past two years
  • Inorganic opportunities only in core business; explored one Indian competitor earlier (United Seamless), now open to overseas acquisitions
  • Cash could be deployed via capex, dividends and selective inorganic moves; geography not a constraint as equipment can be dismantled and shipped

Corporate Governance Milestones · Kaushal Bengani (DGM, IR & Finance)

  • Zero ICDs to unrelated parties and zero corporate guarantees outstanding as on 31 March 2024
  • Corporate guarantee discharge achieved six months ahead of September 2024 commitment to shareholders
  • Resolution of ICDs and corporate guarantees described as fully and completely done
  • Included in NSE indices NIFTY500, NIFTY Small Cap 250 and NIFTY MidSmall Cap 400 from 28 March 2024
  • FII + DII holdings rose to 16% as of 31 March 2024 from 7% at the start of the year

Order Book and Demand Outlook · Kaushal Bengani (DGM, IR & Finance)

  • Order book at INR 1,753 cr, of which 60% from ONGC and Oil India
  • ONGC order of INR 674 cr received in second week of April 2024 with 44-week staggered delivery
  • Order book represents three to four months of execution — company maintains short-cycle discipline
  • Capital goods and oil & gas continue to witness strong demand for the medium term
  • Drill pipes dispatched in Q4 FY24 and continued into Q1 FY25

Segment EBITDA and Operational Metrics · Kaushal Bengani (DGM, IR & Finance)

  • Q4 Seamless EBITDA per ton INR 21,619; FY24 average INR 25,793
  • Q4 ERW EBITDA per ton INR 11,803; FY24 average INR 7,315
  • EBITDA mix: Seamless contributed 76% in Q4 and 84% in FY24
  • Drill pipe domestic market size ~10,000 mt; subsea sour service seamless pipes ~35,000 mt
  • Management claims majority market share in drill pipes and subsea sour service; both are import-substitution products

Capex Plan and Telangana Expansion · Kaushal Bengani (DGM, IR & Finance)

  • Telangana finishing line capex of INR 184 cr has commenced; expected to complete within FY25
  • Hot mill upgrade to follow once Telangana finishing line is operational
  • FY24 capex spend limited to land acquisition; machinery orders placed but payments not yet due
  • FY25 capex guidance of ~INR 200 cr indicated for modelling purposes
  • No debt required for capex or working capital given treasury size

Shareholding Structure · Kaushal Bengani (DGM, IR & Finance)

  • Promoter holding increased to 68% in Q4 FY24 via creeping acquisition
  • Number of FII and mutual fund schemes holding the stock increased
  • Quarterly disclosures on shareholding provided in presentation Slide 19
  • No specific commentary on promoter intent beyond creeping acquisition disclosure

In their words

Our objective is not maintaining presence in various markets. Our objective is to maximize profit per ton.
Kaushal Bengani (DGM, IR & Finance, Maharashtra Seamless)
We are a company that has been a market leader for the past 35 years. And one quarterly result, which is lower compared to the previous quarter should not discourage shareholders.
Kaushal Bengani (DGM, IR & Finance, Maharashtra Seamless)
There are no ICDs to unrelated parties or corporate guarantees outstanding as on 31st March '24. We have come a long way from the time when this used to be the main cause of concern, and that has now been fully and completely resolved.
Kaushal Bengani (DGM, IR & Finance, Maharashtra Seamless)

To check next time

What management committed to on this call, or the dates they gave.

  • Telangana finishing line completion in FY25 and the start of volume growth from Telangana flagged for FY26.
  • Execution of the ₹674 cr ONGC order over 44 weeks, with a portion expected in Q1 FY25 and the balance later.
  • Impact of the one-month preventive maintenance shutdown in late May/early June 2024 (~15,000 ton production loss in Q1 FY25).
  • Trajectory of EBITDA/ton above the ₹15,000/ton floor and any ERW mix shift between oil and water sector.
  • Hot mill upgrade decision once the Telangana finishing line is commissioned.
  • Order book replenishment and capital allocation on the ₹1,859 cr treasury.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Wed 22 May 2024₹753.50−6.85%+0.31%
5 sessions Tue 28 May 2024₹724.25−10.47%+1.59%
20 sessions Wed 19 Jun 2024₹676.20−16.41%+4.38%

From the close of Tue 21 May 2024, ₹808.95: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Maharashtra Seamless's other calls

  • Q2 FY27Sat 14 Nov 2026Tone: Mixed
  • Q1 FY27Sat 8 Aug 2026Tone: Confident
  • Q3 FY26Thu 29 Jan 2026Tone: Defensive
  • Q2 FY26Wed 5 Nov 2025Tone: Defensive
  • Q1 FY26Thu 31 Jul 2025Tone: Defensive
  • Q4 FY25Tue 27 May 2025Tone: Cautious
  • Q3 FY25Tue 28 Jan 2025Tone: Confident
  • Q2 FY25Tue 29 Oct 2024Tone: Confident
  • Q1 FY25Tue 30 Jul 2024Tone: Mixed