Telge Projects Q4 FY26 earnings call

Tue 19 May 2026

In brief

FY26 revenue rises 57% to Rs. 40.2 cr post-IPO, guides 60-70% CAGR for FY27 with sustained Q4 margins

Management's tone
Confident
What was said
Leaned positive
Guidance
Guidance raised
Analyst pushback
Medium
Stock, next session
−3.09% (Nifty 50 −0.14%)
  • FY26 revenue rose ~57% YoY to Rs. 40.2 cr from Rs. 25.6 cr in FY25; FY26 EBITDA Rs. 9.55 cr at 24% margin, PAT Rs. 5.9 cr at 15% margin.
  • Q4 FY26 revenue Rs. 14.4 cr (+13.7% YoY, ~58% QoQ); Q4 EBITDA Rs. 5 cr at 35% margin, PAT Rs. 3.3 cr at 23% margin.
  • Edward Farr Architects (US) acquired on March 3, 2026 at 2.5x EBITDA; CY25 revenue ~Rs. 14 cr with 10-12% PAT margin; adds architecture and interior capability.
  • Active order book stands at ~Rs. 25 cr plus ~Rs. 6 cr bidding pipeline; ~80% from the US; Edward Farr contributes ~Rs. 10 cr.
  • Guides 60-70% CAGR revenue growth for FY27 and beyond, sustaining Q4-level EBITDA (~35%) and PAT (20-23%) margins.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q4 FY26

This quarterA year agoLast quarterMargin
Revenue₹14.4 cr—+58.4%
EPS (₹)₹3.36—+300.0%

From the company's filed results for the quarter ended 31 Mar 2026 (consolidated), not from the call.

What moved the numbers, as management explained it

  • Edward Farr contributed ~Rs. 1.5 cr to Q4 revenue and ~Rs. 40 lakhs to PAT, but only one month (from March 3, 2026) was consolidated in Q4 FY26 — full-year consolidation begins FY27. (one-off)
  • Billing rate target raised to $45-60/hr from previous $25-35/hr, enabled by US local team through acquired companies; cited as lever for sustaining Q4 EBITDA margin of 35%.
  • Active order book expanded to Rs. 25 cr plus Rs. 6 cr bidding pipeline, with ~Rs. 4-5 cr added monthly through FY26; ~80% US-based.
  • Employee cost rose to ~45% of FY26 revenue vs ~35% prior year, with ~70 staff added (total headcount 200-250, of which 25 in US) for future pipeline support.
  • Geographic mix: US contributes ~80% of order book; presence across US, UK, Europe and Australia cited to balance regional seasonality (Q2 typically slower).

The numbers management led with

  • Order book: Rs 25 crore (current active orders); Rs 6 crore pipeline in bidding/RFQ stage

Guidance

Guidance on this call

WhatForWhat management said
Consolidated revenue CAGRFY2760-70% CAGR revenue growth in FY27 and beyond
EBITDA margin maintenance at Q4 levelFY27Sustain Q4 EBITDA margin of ~35% in FY27; not planning to go below
PAT margin maintenance at Q4 levelFY27Sustain Q4 PAT margin of 20-23% in FY27
Project ticket size—Targeting project ticket size of Rs. 8-10 cr (up from Rs. 2-3 cr previously)
Billing rate per hour—Targeting $45-60/hr billing rate (up from $25-35/hr previously)

What changed since the Tue 18 Nov 2025 call

WhatOn the Tue 18 Nov 2025 callOn this call
FY27 revenue growth target (cut)FY27 YoY growth target of 70-80%60-70% CAGR revenue growth in FY27 and beyond
FY27 EBITDA margin guidance (raised)30-35% EBITDA margin expected in FY27Sustain Q4 EBITDA margin of ~35% in FY27; not planning to go below
Edward Farr Architects acquisition (achieved)Two US acquisitions in active evaluation (architecture + structural design); one targeted to close in FY26Edward Farr Architects acquired March 3, 2026 at 2.5x EBITDA; adds architecture/interior capability
Order book disclosure (restated)Order book Rs. 10.4 cr confirmed + Rs. 8-10 cr high-probability + Rs. 15-18 cr RFQsActive order book Rs. 25 cr + Rs. 6 cr bidding pipeline
IPO completion (achieved)Successful IPO journey this year (implied upcoming completion)One of the biggest milestones this year was our successful completion of our IPO
Disclosure cadence (achieved)Transitioning to quarterly unaudited results from current half-yearly cycleQuarterly unaudited results now in place; quarterly earnings call held for Q4 FY26
Nashik delivery centre (achieved)Nashik delivery centre to start before end-FY26Nashik office became operational effectively this year and supports future scalability
US acquisition scope (restated)Architecture + structural design/stamping targeted; one to close in FY26Architecture added via Edward Farr; now exploring MEP (mechanical, electrical, plumbing) and design services

The business

By business

Structural engineering and BIM services

Core services across structural engineering, BIM, steel/SDS2 and precast detailing; FY26 consolidated revenue ~Rs. 40.2 cr; 96 clients total (~20 added in Q4); total headcount 200-250 (25 in US).

FY26 revenue ~Rs. 40.2 cr · FY26 EBITDA Rs. 9.55 cr (24% margin) · FY26 PAT Rs. 5.9 cr (15% margin) · Q4 revenue Rs. 14.4 cr · Q4 EBITDA Rs. 5 cr (35% margin) · Q4 PAT Rs. 3.3 cr (23% margin) · Active order book Rs. 25 cr · Bidding pipeline Rs. 6 cr · ~80% of order book from US · 96 total clients, ~20 added in Q4

Outlook: 60-70% CAGR revenue growth in FY27; sustain Q4 EBITDA ~35% and PAT 20-23% margins; target project ticket size Rs. 8-10 cr vs Rs. 2-3 cr earlier.

Architectural services (Edward Farr Architects)

US architecture firm acquired March 3, 2026 at 2.5x EBITDA; adds architectural and interior design; only one month consolidated in Q4 FY26.

CY25 revenue ~Rs. 14 cr · PAT margin 10-12% · Q4 FY26 revenue contribution ~Rs. 1.5 cr · Q4 FY26 PAT contribution ~Rs. 40 lakhs · Order book contribution ~Rs. 10 cr · Acquisition multiple 2.5x EBITDA

Outlook: Cross-selling Telge services to Edward Farr client base to expand ticket size; full-year consolidation begins FY27; no specific revenue target stated.

Balance sheet, capex and funding

  • No debt planned for next two years; management will use alternative funding structures (not equity dilution this year) per acquisition opportunity.
  • Cash position described as 'healthy' post-IPO; precise cash figure not disclosed.
  • IPO proceeds: Rs. 7 crores utilised; Rs. 5 crores reallocated from office purchase to acquisition funding ('deviation in the object issue').
  • FY26-end receivable days expanded to 108 (from 73), with major portion from related party; reduced to ~60 days DSO after April-May collection.
  • Capex: no specific figure stated; office purchase deferred and Rs. 5 cr repurposed for acquisitions.
  • Acquisition funding: Rs. 5 cr provision held from IPO proceeds; balance may come from alternative arrangements, not debt or equity in the near term.

The industry, as management sees it

Global AEC and BIM industry continues to create exciting opportunities — clients in the US, Europe, and Australia are increasingly seeking optimization, faster execution, and digital engineering capabilities. This shift is creating long-term opportunity for engineering companies that combine domain expertise with scalable delivery from India.

Risks management named

  • EBITDA margin sustainability questioned vs. peers at 20–22% — management defends via rate hike and AI efficiency
  • Receivables DSO widened to 108 days from 73 days — CFO says collections accelerated in April-May to restore 60-day DSO
  • AI/automation commoditizing low-end BIM modelling work — management sees AI as a tool for workflow optimization, not a threat
  • Geopolitical risk from Iran-US tensions on US infrastructure — management reports no impact so far

Q&A

The Q&A session was dominated by three broad themes: (1) the plausibility of 60–70% CAGR guidance given the current Rs 25 crore order book — management justified this through monthly order additions (~Rs 4–5 crore/month), ticket-size expansion from Rs 2–3 crore to Rs 8–10 crore, and a Rs 6 crore pipeline converting within weeks; (2) margin sustainability at 35% EBITDA vs. industry peers at 20–22% — management responded with US rate hike strategy ($45–60/hr vs $25–35/hr) and rural cost expansion; and (3) receivables and working capital concerns following DSO expansion to 108 days — CFO quickly intervened to reassure that collections were accelerated in April-May, restoring 60-day DSO. Analysts also probed the inorganic vs. organic growth split and the AI automation threat. No major topic was deflected; management answered most questions directly.

Asked for a number, answered without one

  • Acquisition pipeline specifics: We are absolutely looking forward to have more and better and bigger acquisitions going forward. Nothing is identified as such. We are still looking out for it.
  • Current monthly revenue run rate: I cannot disclose the exact numbers right now.
  • Debt outlook for next two years: We have not planned anything like that. There are many other options available... debt is something that we are not actively looking forward to.
  • Receivables expansion drivers (73 to 108 days): Our timeline for the recovery of the payments is anytime between 30 to 45 days. So, major category falls under that... major portion is with to the related party only.

Every question, with its answer

  1. 1. Revenue growth and margin guidance

    Amit Mehendale, Robo Capital

    Question. What is the outlook for revenue growth for FY27 and FY28, and can you guide on EBITDA margins going forward?

    Answer, Shraddha Telge, Chairman, MD and CEO. In the medium term, we are confident to achieve 60% to 70% CAGR growth in the upcoming financial year (FY26-27) and relatively the next years as well. On EBITDA and PAT, as Q4 results are now open, we are trying to have the same numbers in the upcoming years.

    Follow-up. Can you talk about go-to-market strategy, customer acquisition, sales pipeline funnel visibility?

    Answer. Current order book is Rs 25 crore with pipeline of Rs 6 crore in RFQ stage, expected to convert in 2 weeks to 1 month. Edward Farr Architects will enable cross-sell to their customer base and vice versa, increasing project ticket size. Capacity expanded to take on more and larger projects, targeting not only fabricators but also general contractors, design-build companies and developers.

  2. 2. Order book vs growth guidance

    Amit Mehendale, Robo Capital

    Question. With 60% CAGR we will hit Rs 60 crore then Rs 90–100 crore — but current order book is only Rs 25 crore. What gives confidence in such high growth?

    Answer, Shraddha Telge, Chairman, MD and CEO. Order book keeps building throughout the year. We added almost Rs 4–5 crore per month in the last year and expect this to continue. US local team is helping us get better rates from customers; execution from India combined with local US support enables larger projects. Previously ticket size was Rs 2–3 crore; now targeting Rs 8–10 crore projects.

  3. 3. Organic vs inorganic growth

    Taher Hydrabadwala, Grobizfund

    Question. H2 growth appears largely acquisition-driven (inorganic). Has organic growth slowed, and is there a limit to reliance on acquisitions?

    Answer, Shraddha Telge / Vinayak Mane, Chairman, MD and CEO / CFO. Edward Farr acquisition happened on 3rd March — only one month added to FY26 numbers. Major growth is organic. The three US acquisitions (Midwest, Draftco, Edward Farr) operate with sales/customer relations handled by acquired companies while execution is done by Telge Projects (parent). Everything is merged and working as one company — cannot bifurcate subsidiaries from organic performance.

    Follow-up. What are the revenue and PAT margins of Edward Farr, and what is their client profile?

    Answer. Edward Farr Architects achieved Rs 14 crore turnover in calendar year 2025 with PAT margins of 10–12%. Only one month of consolidation added Rs 1.5 crore to top line and Rs 40 lakh to PAT in FY26.

  4. 4. Receivables and working capital

    Taher Hydrabadwala, Grobizfund

    Question. Receivable days expanded from 73 to 108 days. Is this specific to any geography or client? Any concentration risk?

    Answer, Vinayak Mane. Normal payment timeline is 30–45 days. The major portion of receivables is from a related party; collections have been accelerated in April and May. Currently maintaining 60-day DSO on receivables.

  5. 5. Acquisition valuation

    Vansh Saini, Street Smart Investment

    Question. What acquisition multiple was paid for Edward Farr Architects?

    Answer, Vijay Katke, Consultant. Paid at 2.5x EBITDA multiple.

    Follow-up. What is the employee attrition rate for FY26?

    Answer. Attrition is very low, around 10% in India operations. Subsidiaries have zero attrition — all employees of acquired companies are retained. The 10% figure is only for India operations.

  6. 6. Sustainability of cost arbitrage and AI impact

    Vansh Saini, Street Smart Investment

    Question. India's key advantage in BIM is cost arbitrage. How sustainable is this over 5–10 years, and does AI-driven automation risk commoditizing low-end modelling work and impacting pricing power?

    Answer, Shraddha Telge, Chairman, MD and CEO. We consider AI a tool for optimization — avoiding repetitive tasks. We are expanding geographically (Latur, Nashik) for better resource access. US companies provide local presence for better rates. Over 2–3 years, growth will be driven by integration of overseas and local locations, expanding supply chain, and moving from structural services to complete project coverage (architecture, interior, structural design, BIM coordination) under one roof.

    Partly answered.

  7. 7. Growth guidance scope

    Deepak Poddar, Sapphire Capital

    Question. The 60–70% CAGR guidance — does this include inorganic revenue contribution from subsidiaries?

    Answer, Shraddha Telge, Chairman, MD and CEO. Existing subsidiaries will be part of organic growth going forward. Inorganic growth means new acquisitions only. Any new acquisition would be incremental to the 60–70% CAGR target.

    Follow-up. Are any new acquisitions planned for this year?

    Answer. We are looking for more acquisitions, nothing identified yet. Open to adding MEP (mechanical, electrical, plumbing) services to our portfolio as soon as a good opportunity arises. With Edward Farr, architectural detailing capability is now built.

  8. 8. Margin sustainability

    Deepak Poddar, Sapphire Capital

    Question. On margins — what base are you comparing to for the 'maintain Q4 performance' guidance?

    Answer, Shraddha Telge, Chairman, MD and CEO. For FY27, we are trying to continue with Q4 performance — PAT 20–23% and EBITDA approximately 35%. Not planning to go below those levels.

    Follow-up. Is there any seasonality in the business?

    Answer. Q4 is always the best quarter due to better decision-making in the regions we operate. Q3 is good, Q2 tends to be slow. Diversification across different countries and regions helps balance the teams and offset seasonality.

  9. 9. Order book composition

    Kapil Adwani, Aarth Growth Fund

    Question. How much of the Rs 25 crore order book is from the new acquisition (Edward Farr)? And what portion is from the US?

    Answer, Shraddha Telge / Vinayak Mane, Chairman, MD and CEO / CFO. Rs 25 crore is combination of existing business and new acquisition. Approximately Rs 10 crore is from the architectural business (Edward Farr). Around 80% of the order book is from the US region.

    Follow-up. Any challenges or delays in US orders due to Iran-US tensions?

    Answer. No impact on business so far. We operate in a different sector with diversification — different sides of US, different services (fabricators, developers). We are also focused on Australia and Europe as backup if anything goes unplanned.

  10. 10. Headcount and employee cost

    Kapil Adwani, Aarth Growth Fund

    Question. Employee cost increased ~100% this year. How many employees hired in FY26 and what is current total headcount?

    Answer, Shraddha Telge, Chairman, MD and CEO. Total headcount is currently 200–250. Approximately 70 people were added in FY26 internally. Hiring was done to build a strong pipeline — we kept some employees on bench to support future growth. In the US, approximately 25 people; rest in India across Latur, Nashik, and Pune.

  11. 11. EBITDA margin sustainability

    Amit Mehendale, Robo Capital

    Question. Competitors like Mold-tek have EBITDA margins around 20–22%. What gives confidence that Telge can sustain 30–35% EBITDA margins — is it higher US pricing or does scaling eventually pull margins down?

    Answer, Shraddha Telge, Chairman, MD and CEO. Two key differentiators: (1) Local US team is enabling us to target $45–60/hr rates vs previous $25–35/hr. (2) Expanding into rural regions (Nashik, Latur) and AI integration to get more output from fewer resources. Both factors will help maintain better margins going forward.

    Follow-up. What AI tools are you using for BIM?

    Answer. Using Claude (Anthropic) and customized automation. Software like Tekla Structures, SDS2, and Revit Structures are also introducing AI integration — we customize these to customer needs to reduce task completion time.

  12. 12. Revenue visibility and project duration

    Amit Mehendale, Robo Capital

    Question. What is the nature of recurring revenue — is it project-based (12–18 months then stops) or longer-term retainer?

    Answer, Shraddha Telge, Chairman, MD and CEO. Project lifecycle varies: some finish in one month, some run for a couple of years. As we target larger ticket sizes of Rs 8–10 crore, those projects will last longer and multiple such projects will provide better month-on-month revenue stability.

    Follow-up. Any outlook on debt levels for the next two years, especially for future acquisitions?

    Answer. No debt plans for future. Will use different arrangements suitable to each acquisition opportunity — not actively looking at debt. Not planning equity dilution this year at least.

  13. 13. IPO proceeds utilization

    Taher Hydrabadwala, Grobizfund

    Question. IPO fund utilization — Rs 7 crore used, rest unused. What is the acquisition pipeline for FY27?

    Answer, Vinayak Mane, CFO. Few opportunities identified and under evaluation; no conclusion reached yet. Provision of Rs 5 crore made for acquisitions from IPO proceeds (after deviation for office premises purchase).

    Partly answered.

  14. 14. Employee cost trajectory

    Kaustubh Babrekar, Individual Investor

    Question. Employee cost as % of revenue is ~45% vs ~35% last year. Will this sustain or increase with growth?

    Answer, Shraddha Telge, Chairman, MD and CEO. High employee cost was purposeful — we saw strong pipeline and hired leadership team (business development heads, department heads, regional heads) and expanded Nashik team with experienced people to support US team. This year we are not adding leadership; only execution team will expand. Growth in employee cost will not be as high as last year.

    Follow-up. Earlier concall mentioned Rs 4.5 crore per month revenue run rate from January. Are you at the same run rate?

    Answer. Targeting better revenue going forward but cannot disclose exact numbers. Reiterated confidence in 60–70% CAGR in medium term.

  15. 15. New client additions

    Kaustubh Babrekar, Individual Investor

    Question. How many new clients were added this year / this quarter?

    Answer, Vinayak Mane, CFO. Total customer count for FY26 was 96. Approximately 20 new clients were added in Q4, all from the US.

What was said

Topic by topic, in the order it was spoken

FY26 Financial Performance · Shraddha Telge (Chairman, MD and CEO)

  • FY26 revenue from operations: Rs 40.2 crore vs Rs 25.6 crore in FY25 (+57% YoY)
  • EBITDA: Rs 9.55 crore with 24% margins; PAT: Rs 5.9 crore with 15% margins
  • Q4 standalone: Rs 14.4 crore revenue (+13.7% YoY, +58% QoQ); EBITDA Rs 5 crore (35%); PAT Rs 3.3 crore (23%)
  • Current active order book: approximately Rs 25 crore across structural and architectural segments
  • Recurring revenue: 60–70% from existing clients

Strategic Milestones — IPO and Acquisitions · Shraddha Telge (Chairman, MD and CEO)

  • IPO completed successfully — strengthens governance, transparency, and business credibility
  • Edward Farr Architects (US) acquired to expand into architectural and planning, enabling participation across full AEC lifecycle
  • Three US acquisitions now operating as integrated unit: Midwest, Draftco, Edward Farr Architects
  • Acquisition multiple for Edward Farr: 2.5x EBITDA; Edward Farr revenue Rs 14 crore (CY2025), PAT margins 10–12%
  • Future acquisition focus: MEP (mechanical, electrical, plumbing) design services

Operational Expansion · Shraddha Telge (Chairman, MD and CEO)

  • Nashik office became operational this year; Latur and Pune offices also active
  • SDS2 team expanded significantly, improving steel detailing and connection design capabilities
  • US local team of ~25 people enables better customer rates and larger project acquisition
  • Total headcount: 200–250; added ~70 employees in FY26; attrition ~10% in India, zero in subsidiaries
  • Targeting project ticket sizes of Rs 8–10 crore (vs current Rs 2–3 crore) via US local team support

Technology and AI Integration · Shraddha Telge (Chairman, MD and CEO)

  • AI-enabled BIM dashboards, automation tools, and internal R&D initiatives underway
  • Using Claude by Anthropic and customizing Tekla Structures, SDS2, Revit for AI integration
  • Goal: reduce repetitive tasks, improve productivity, build proprietary IP and operating leverage
  • Currently billing $25–35/hr; targeting $45–60/hr through US local presence
  • Technology as a differentiator, not just a support function

Market Expansion and Demand Outlook · Shraddha Telge (Chairman, MD and CEO)

  • Global AEC/BIM industry creating long-term opportunity; clients seeking optimization, faster execution, digital capabilities
  • ~80% of order book from US; expanding into UK, Europe, Australia; evaluating Canada, NZ, Southeast Asia
  • 20 new clients added in Q4; total customer count 96 in FY26, all from US
  • Targeting not just fabricators but also general contractors, design-build companies, and developers
  • Pipeline of Rs 6 crore in RFQ stage, expected to convert within 2 weeks to 1 month

Forward Guidance and Outlook · Shraddha Telge (Chairman, MD and CEO)

  • Medium-term revenue growth: 60–70% CAGR for FY27 and beyond
  • Target EBITDA margins: ~35% (Q4 FY26 run-rate); PAT margins: 20–23%
  • Order additions of Rs 4–5 crore per month; order book expected to grow every month
  • Q4 tends to be strongest quarter; Q2 slowest; geographic diversification partially offsets seasonality
  • No equity dilution or debt planned for acquisitions this year; alternative funding structures being evaluated

In their words

We have a local team sitting in the US, which is helping us have better rates from our customers. Previously our highest ticket size was Rs 2–3 crore, and now we are targeting Rs 8–10 crore projects.
Shraddha Telge (Chairman, MD and CEO, Telge Projects)
In account receivables, the major portion is with the related party only, and we have accelerated collection in the month of April and May itself. So we are maintaining 60 days DSO on receivable side.
Vinayak Mane (CFO, Telge Projects)
Our existing subsidiaries will be a part of our organic growth only. Inorganic growth going forward will be the new acquisitions that we will look out for.
Shraddha Telge (Chairman, MD and CEO, Telge Projects)

To check next time

What management committed to on this call, or the dates they gave.

  • Full-quarter Edward Farr consolidation impact on revenue and margins (only one month in Q4 FY26).
  • Order book progression beyond Rs. 25 cr, given FY26 run rate of Rs. 4-5 cr added monthly.
  • New US acquisition announcement (MEP/design services identified as next gap).
  • Sustainability of Q4 margins (~35% EBITDA, 20-23% PAT) per FY27 guidance.
  • IPO fund utilisation: Rs. 5 cr provision deployed on acquisitions.
  • Nashik office ramp-up contribution to execution capacity and employee cost absorption.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Tue 19 May 2026₹102.00−3.09%−0.14%
5 sessions Mon 25 May 2026₹102.05−3.04%+1.61%
20 sessions Tue 16 Jun 2026₹110.00+4.51%+1.43%

From the close of Mon 18 May 2026, ₹105.25: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Telge Projects's other calls

  • Q2 FY27Mon 16 Nov 2026Tone: Mixed
  • Q2 FY26Tue 18 Nov 2025Tone: Confident