Vodafone Idea Q4 FY24 earnings call
In brief
Vodafone Idea raised Rs. 180 bn via largest-ever India FPO; plans Rs. 500-550 bn 3-year capex; Q4 Pre-IndAS EBITDA highest post-merger.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- +0.76% (Nifty 50 +0.28%)
- Equity of ~Rs. 215 billion raised in last 3 months via Rs. 180 bn FPO, Rs. 14.4 bn ATC OCD conversion and Rs. 20.75 bn ABG preferential issue.
- Pre-IndAS EBITDA of Rs. 21.8 billion in Q4 FY24, highest quarterly EBITDA post-merger; margin improved to 20.6% on +5.4% YoY.
- Capex plan of Rs. 500-550 billion over next 3 years for 4G coverage expansion in 17 priority circles, 5G launch and capacity.
- 4G subscriber base grew to 126.3 million; Q4 FY24 ARPU Rs. 146 marks 11th consecutive quarter of growth and 8.4% 2-year industry-leading CAGR.
- Bank debt reduced by Rs. 70.9 billion YoY to Rs. 40.4 billion at March 31, 2024; consortium debt raise of Rs. 250 bn plus Rs. 100 bn non-fund in discussions.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY24
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹10,574 cr | +0.4% | −0.9% | |
| EBITDA (excl. other income) | ₹4,303 cr | +2.7% | −15.7% | 40.7% (39.8% a year ago) |
| Net profit | ₹0 cr | — | — | 0% (0% a year ago) |
| EPS (₹) | ₹-1.57 | — | — |
From the company's filed results for the quarter ended 31 Mar 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- ARPU grew for 11 consecutive quarters to Rs. 146 in Q4 FY24 (2-year CAGR 8.4%, industry-leading); QoQ average daily revenue +0.5%.
- 4G subscriber base expanded to 126.3 million (vs 122.6 million at Mar 2023); 11th successive quarter of growth despite limited capex.
- Reported EBITDA Rs. 43.4 bn includes IndAS 116 impact; Pre-IndAS EBITDA at Rs. 21.8 bn (margin 20.6%, +5.4% YoY) excludes it - reader must use Pre-IndAS for like-for-like. (accounting)
- Capex limited to Rs. 5.5 bn in Q4 and Rs. 18.5 bn for FY24 due to past liquidity constraints, capping subscriber/revenue growth and forcing continued subscriber losses. (one-off)
- 3G spectrum refarmed to 4G in 6 circles (Maharashtra, Gujarat, Andhra Pradesh, Mumbai, Kolkata, Kerala); supports effective capex utilization and customer experience.
The numbers management led with
- Equity raised via FPO: Rs. 180 billion (largest FPO in India; subscribed ~7 times)
- Total equity raised in last 3 months: Rs. 215 billion (FPO + ATC OCD conversion + ABG preferential)
- Planned bank debt raise: Rs. 250 billion funded + Rs. 100 billion non-fund facilities
- 3-year capex guidance: Rs. 500-550 billion over FY25-FY27
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Capex over next 3 years | FY25-FY27 | capex over next 3 years which is expected to be in range of Rs. 500 to 550 billion |
| Network capacity | FY26 | as we go from March '24 to March '26, the capacity increases about 2X |
| 5G rollout start (Mobile Services) | Q3 FY25 | we should be able to start rolling out 5G on a from about 6 months from now |
| 4G capacity completion (Mobile Services) | Q3 FY25 | we should be done addressing the capacity in 6 to 7 months' time |
| 4G coverage completion (Mobile Services) | Q2 FY26 | complete the large part of the coverage to be competitive in 12 to 15 months |
The business
By business
Mobile Services (Wireless)
Q4 revenue Rs. 106.1 bn with QoQ average daily revenue +0.5%; Pre-IndAS EBITDA Rs. 21.8 bn (highest post-merger); margin 20.6%; ARPU Rs. 146 for 11th straight quarter; 4G base 126.3 million.
Revenue Rs. 106.1 bn · Pre-IndAS EBITDA Rs. 21.8 bn · EBITDA margin 20.6% · Reported EBITDA Rs. 43.4 bn · ARPU Rs. 146 · 4G subscribers 126.3 million · Total subscribers 212.6 million
Outlook: Capex Rs. 500-550 bn over next 3 years; 4G coverage expansion in 17 priority circles; 5G rollout in ~6 months; capacity targeted to double by March 2026.
Business Services (Enterprise)
Vi Business continuing Telco-to-TechCo transformation; Rich Business Messaging adopted by 50+ brands on Android; first Indian telecom to achieve SOC2 Type II attestation; won 7 CIO Choice recognitions.
50+ brands adopted RBM · 7 CIO Choice recognitions · First Indian telecom with SOC2 Type II attestation
Digital / Vi App
Vi App evolved into multi-utility platform: Vi Games with CloudPlay, Vi Movies & TV for connected TV, OTT bundles with Amazon Prime/Hotstar/SonyLiv/SunNxt; 60% of service requests now digital vs 40% a year ago.
60% digital service requests vs 40% a year ago · 400 LIVE TV channels on Vi App
Balance sheet, capex and funding
- Bank/FI debt Rs. 40.4 bn at March 31, 2024; OCDs Rs. 1.6 bn; cash and bank balance Rs. 1.7 bn.
- Bank debt reduced by Rs. 70.9 bn YoY; total bank exposure down ~Rs. 347 bn since Sep 2021 telecom reforms package.
- Q4 FY24 capex Rs. 5.5 bn; FY24 capex Rs. 18.5 bn; planned capex Rs. 500-550 bn over next 3 years for 4G coverage and 5G.
- Government deferred payment obligations Rs. 2,034.3 bn: spectrum Rs. 1,331.1 bn (payable till FY42) and AGR Rs. 703.2 bn (payable till FY31).
- Equity raise ~Rs. 215 bn: Rs. 180 bn FPO, Rs. 14.4 bn ATC OCD conversion, Rs. 20.75 bn ABG preferential issue expected to close in May 2024.
- In discussions with bank consortium for Rs. 250 bn debt and Rs. 100 bn non-fund based facilities; no timeline provided.
The industry, as management sees it
Management believes the Indian telecom industry is gradually moving from a market-share-driven posture to a price-discipline posture - reflected in reduced competitive aggression last quarter and the broader consensus among operators that 'pay more for using more' pricing needs to be reintroduced on higher-usage plans. Management sees scope for industry-wide ARPU uplift driven by tariff hikes on higher-usage tiers (rather than entry-level) and by operators pruning gratuitous data allowances, although rotational churn remains elevated industry-wide at ~4.3%.
Risks management named
- Government deferred payment obligations of Rs. 2,034.3 bn (spectrum + AGR) due starting FY26 after moratorium ends
- Continuing loss of data subscribers because of 4G coverage gap; only gross adds share is healthy
- Industry-wide churn still elevated at ~4.3% with rotational churn discipline lacking
- AGR curative petition sub judice; timeline and outcome not committable
- Bank debt raise timeline not yet finalised; dependent on equity raise completion which is now done
Q&A
Q&A was dominated by three threads: (1) capex execution and how quickly Vi can close the 4G coverage gap with Airtel, where Moondra was specific on 12-15 month coverage timeline but evasive on site counts and the coverage/capacity split; (2) the AGR curative petition, where Moondra gave rough arithmetic (~Rs. 6,000 cr base correction => ~Rs. 24,000 cr total at Oct '19, ~36% with interest to March '24, plus penalty waiver prayer) but firmly declined to comment on timing; and (3) industry pricing paradigm, where Moondra pushed back gently on Vivekanand's framing that Jio/Airtel may be diverging from 'pay more for using more' - arguing consumption itself is partly a function of irrational cheapness. Pushback intensity was normal scrutiny - one follow-up each on coverage gap and AGR, otherwise Q&A was collegial with management delivering direct answers.
Not answered directly
- Site count needed in 17 priority circles
- AGR curative petition timeline
- Capacity vs coverage split within Rs 500-550 bn capex
- Bank debt raise timeline
Asked for a number, answered without one
- FY25 capex split from 3-year plan: Outlined four categories (4G coverage, 4G capacity, 5G, enterprise) but did not specify FY25 amount.
- Tower/site numbers needed to match peers: Declined: 'I will not be able to give that figure to you right now'; said plans are factored into the capex guidance.
- AGR dues final amount under curative petition: Gave rough sense (base ~Rs. 6,000 cr, total ~Rs. 24,000 cr as of Oct'19 plus accrued interest to ~36%) but declined precise final number.
- Timeline for curative petition outcome: Akshaya: 'this is a matter at the court. I can't give any comment on the timeline.'
- Capacity investment as % of total capex and 4G/5G split: Akshaya: 'I will not be able to give you more detail than that'; said largest part is 5G and 4G portion skewed to coverage.
- Timeline for bank debt raise: Akshaya: 'I will not be able to give you a timeline but...we will be able to close the discussions with the banks in good time.'
Every question, with its answer
1. Capex plan and FY25 pacing
Kunal Vora, BNP Paribas
Question. Could you share details on the Rs. 50,000-55,000 crore capex plan - how much will be deployed in FY25 and what are the main investment areas? And how much of the coverage gap with Airtel (currently ~1.84 lakh sites vs Airtel's 3.3 lakh) do you look to bridge in the next 2-3 years?
Answer, Akshaya Moondra, CEO. Capex will fall into four buckets: 4G coverage expansion (with sub-GHz/L900 infill), 4G capacity growth, 5G rollout starting afresh, and enterprise business. Topmost priority is 4G coverage - that's the reason we keep losing subscribers - and that capex will be accelerated. Capacity decongestion in a few areas also top priority. 5G rollout will start ~6 months from now in main cities with high 5G device concentration; 5G investment will be iterative. The gap with Airtel reflects both coverage and traffic - on traffic-difference areas we don't need to match site count. We will focus on expanding 4G coverage in the 17 priority circles to be competitive; in the 5 non-priority circles investment priority will differ from matching the competition.
Partly answered.
2. AGR curative petition self-assessment
Kunal Vora, BNP Paribas
Question. On AGR dues (~Rs 70,000 crore on books), what is your self-assessment of where the number could land if your curative petition succeeds? Any sense of timeline?
Answer, Akshaya Moondra, CEO. We have filed the curative petition. On merits I won't comment, but I can indicate what we have asked for. We have asked for correction on the base amount of roughly Rs. 6,000 crore. The AGR demand is built up of base + interest + penalty + interest on penalty. Our rough sense is the base is ~25% of the total - so 4x. Applying that to Rs. 6,000 cr base correction gives ~Rs. 24,000 cr total as of ~Oct 2019. With accrued interest at ~8% p.a., by March 2024 the total sought correction would be ~36% larger. Additionally, the curative petition prays for waiver of penalty because the last Tribunal judgment went largely in favour of industry. On timing - matter is sub judice at the court, can't comment.
Follow-up. Anything on timeline, when do you expect or is it difficult to see that?
Answer. No, this is a matter at the court. I can't give any comment on the timeline.
Partly answered.
3. Tower rollout count and timeline
Sanjesh Jain, ICICI Securities
Question. What kind of tower rollout do you think you'll need in the 17 focus circles to match peer coverage? How much time will it take to bridge the gap - 6 months or 18 months from CAPEX start?
Answer, Akshaya Moondra, CEO. We have the workings but won't share the site number now - the projections to be competitive in 17 circles are baked into the Rs. 50-55K capex guidance. Capacity addition/decongestion can start in a couple of months (much is license upgrades at existing sites stalled by liquidity) and finish quickly. Coverage rollout will start in 3-4 months and the bulk of competitive coverage should complete in 12-15 months.
Not answered directly.
4. CAPEX success metrics and backhaul
Sanjesh Jain, ICICI Securities
Question. What initial parameters will you track to assess whether CAPEX is being executed effectively and translating into commercial success? And how does backhaul fit into the capex plan?
Answer, Akshaya Moondra, CEO. First metric we need to achieve: stop losing subscribers and start growing. Industry is growing at a certain rate; we haven't participated because of under-investment. With investments back and competitive coverage, we should be able to participate in our fair share of industry growth - that is the measure of success. On backhaul - it's very much part of the plan, common to all three buckets (4G coverage, 4G capacity, 5G) - 5G will need the most. Just didn't call it out as it's infrastructure enabling all categories.
5. 4G vs 5G capacity strategy
Sanjesh Jain, ICICI Securities
Question. You say 4G capacity is a priority but also that you can swap 4G capacity for 5G capacity - isn't this contradictory? How do you differentiate future 4G vs 5G capacity build?
Answer, Akshaya Moondra, CEO. We'll decide per location whether to roll out 5G - in those locations 5G will provide most capacity. But we'll also watch 5G device penetration and 4G traffic growth. Where we project 4G traffic can be absorbed by 5G deployment, no 4G capacity addition needed. In other areas, both 4G and 5G will be required. It's iterative - generally 5G roughly doubles capacity at a location, so you don't need more capacity immediately. 4G capacity growth is low lead-time and can be done very quickly.
Partly answered.
6. Data subscriber losses
Sanjesh Jain, ICICI Securities
Question. You are still losing data customers this quarter - shouldn't fixing the data-customer loss be the first and earliest priority?
Answer, Akshaya Moondra, CEO. We have to fix subscriber loss across categories - confident we can as we go along. As investments flow, customer experience improves and 4G geography expands. Current new-customer additions will increase, and importantly we'll retain more subscribers than we lose today because of 4G coverage gaps. Our gross-add share is already higher than our customer market share - this will grow with expanded geography. So positive on adds + control on churn from 4G coverage = participate in industry growth.
7. Tariff hikes, interim initiatives, FTTH strategy
Sachin Salgaonkar, Bank of America
Question. First - what's your view on the market's ability to absorb a meaningful tariff hike? Second - beyond coverage (which will take 6-9 months), are there other initiatives like revamped distribution you can deploy in the interim to slow subscriber loss? Third - any strategy for fixed broadband bundling and is anything earmarked from the capex?
Answer, Akshaya Moondra, CEO. Tariff hike: any hike would only consolidate dual-SIMs/multiple SIMs, not eliminate users. Telecom spend isn't discretionary - nobody spends less than today. Impact of consolidation has progressively reduced over past hikes. The price correction should focus more on 'pay more for using more' than entry levels. On interim initiatives: capacity upgrades can begin in ~2 months and finish in 6-7 months - experience improvement will be rapid. Coverage takes longer; our share of gross adds already exceeds our customer market share. The churn/loss of subscribers is largely because of 4G coverage, not distribution. On bundling/fiber: bundling has existed 3-4 years without significant customer impact. We have content (Vi Movies & TV) and mobility, but no plans to invest in fiber-to-home. Limited play via YOU Broadband (Vi One in 12 cities) and partnerships with other ISPs. Fiber will be limited; not material to customer preference.
8. ARPU mix, churn discipline, usage-based pricing
Vivekanand Subbaraman, Ambit Private Limited
Question. What is the ARPU differential between feature-phone and smartphone base given the minimum ARPU uplift? And is the industry doing anything to curb rotational churn (you are at 4.3% monthly)? Also, Jio users consume ~29 GB vs Vi/Airtel - who will bell the cat on moving industry to usage-linked pricing?
Answer, Akshaya Moondra, CEO. On ARPU: different definitions exist. Pre entry-level pricing, delta was ~1:4 in 16 circles; now with entry-level ULV, delta is ~1:3 (approximate, with different cuts). On churn: industry churn is elevated, agreed - reduction in aggression seen last quarter. If all players exercise discipline and make offers less aggressive, it will self-correct. On usage-linked pricing: Jio data figure includes fixed broadband, so not comparable. Even then, a lot of consumption is avoidable if pricing is right. We don't need a drastic shift - users will self-manage from 25 GB to 15-20 GB if price signals it. The right long-term structure is 'use more, pay more' - no other industry or global market has slabs this steep with per-unit cost falling so rapidly.
9. Capex capacity vs coverage split
Vivekanand Subbaraman, Ambit Private Limited
Question. On capacity scaling to ~2X in 3 years - how does it break down between 3G refarming, 5G rollout, and additional 4G carriers? How much of the Rs. 50,000+ cr capex is capacity vs coverage?
Answer, Akshaya Moondra, CEO. The largest part of this capex guidance is 5G. Between coverage and capacity on 4G, it's somewhat skewed in favour of coverage rather than capacity - that's the only broad guidance. The split between 5G rollout, 4G extra layers and expanding 4G is very different per circle because spectrum portfolio differs by circle - no single answer applies.
Not answered directly.
10. 5G NSA vs SA roadmap
Vivekanand Subbaraman, Ambit Private Limited
Question. Your 5G thought process is NSA. Airtel uses NSA with mid-band for uplink. Is your strategy similar?
Answer, Akshaya Moondra, CEO. Rolling out 5G NSA as of now - that's the given. If merit emerges to go SA, we can - main incremental investment is fresh core; radio capex for NSA is reusable for SA, but coverage layer will need to be re-decided. Currently we are NSA because 5G monetisation is not yet happening and SA investment is much higher than NSA - doesn't seem justified right now. SA is more relevant for enterprise applications; consumer relevance is limited. We'll see how market evolves.
11. Debt raise timeline and government liability funding
Vibhor Singhal, Nuvama Equities
Question. By when do you think you can close the Rs. 25,000 cr debt and Rs. 10,000 cr non-fund facility raise? And given government liabilities come due after moratorium ends September next year, how do you plan to fund them - debt, equity base, conversion, internal accruals?
Answer, Akshaya Moondra, CEO. Overall facility available is ~Rs. 55,000 cr (Rs. 20K equity done + Rs. 25K funded debt + Rs. 10K non-funded). Plan is to use it with some fungibility but conceptually for 3-year capex. Internal cash generation will be largely for clearing existing debt and some vendor dues. On government liabilities post-moratorium: based on our outlook, in FY26 and FY27 we will probably look at conversion of convertible instalments per the reforms package. That's the current view.
Follow-up. And the remaining non-convertible portion - you think internal accruals will be good enough by then?
Answer. Yes, based on our estimation it will be good to be met out of cash generation from operations.
Partly answered.
12. Bank debt raise timeline
Vibhor Singhal, Nuvama Equities
Question. Any timeline for the debt raise or non-fund limit increase?
Answer, Akshaya Moondra, CEO. We've been engaged with banks for a long time - their ask was that equity raise complete first, and we've done that. Engagement restarted with banks. I can't give a specific timeline but all I can say is we have some capital available and we'll close the bank discussions in good time. Till the time we need those facilities, they will be available.
Not answered directly.
What was said
Topic by topic, in the order it was spoken
Equity Fundraise Milestone · Akshaya Moondra (CEO)
- Rs. 180 billion FPO completed - India's largest-ever FPO, subscribed ~7 times
- ATC converted Rs. 14.4 bn OCDs into equity, clearing operational dues
- ABG promoter group entity contributing Rs. 20.75 bn via preferential at Rs. 14.87/share; expected to close in May 2024
- Total promoter infusion ~Rs. 70 bn between March 2022 and May 2024 (preferential + FPO)
- Aggregate equity raised in last 3 months ~Rs. 215 bn; bank debt of Rs. 250 bn + Rs. 100 bn non-fund facilities in discussions
- Bank exposure reduced by ~Rs. 347 bn since Telecom reforms package in September 2021
Capex Plan & Focused Investment Strategy · Akshaya Moondra (CEO)
- 3-year capex guided at Rs. 500-550 bn; funded primarily by new equity + debt
- Capex directed to 4 categories: 4G coverage expansion (sub-GHz/L900 infill), 4G capacity, 5G rollout, enterprise business
- Targeted at 17 priority circles that contribute >98% of Vi revenue and ~92% of industry revenue
- 5G rollout allows substitution for some 4G capacity needs, making capex more efficient
Network: 4G, 3G Refarming and 5G · Akshaya Moondra (CEO)
- 3G completely shut down in 6 circles: Maharashtra, Gujarat, Andhra Pradesh, Mumbai, Kolkata, Kerala
- 5G minimum rollout obligations completed in 4 circles: Maharashtra, Delhi, Tamil Nadu, Punjab; completion certificates applied for in Bihar and Mumbai
- 5G technology partner finalisation under discussion; advanced trials of Open RAN and vRAN
- Capacity projected to grow ~2X between March 2024 and March 2026 per investor presentation
Brand 'Vi' and Marketing Initiatives · Akshaya Moondra (CEO)
- Continued 'Be Someone's We' brand campaign across TV, digital and on-ground
- 'Choose Your Benefit' on Vi Max postpaid expanded with Swiggy One; Vi 20 FANfest for cricket engagement
- Most comprehensive IR packs among Indian operators - unlimited across 29 countries covering ~70% of IR traffic; portfolio expanded to 27 new countries
- Won 'The One Show Award' for Vi Human Network Testing Network campaign with Mumbai Dabbawalas
ARPU and Pricing Posture · Akshaya Moondra (CEO)
- Q4 FY24 ARPU Rs. 146 vs Rs. 145 QoQ despite one fewer day
- 11 consecutive quarters of ARPU growth; 2-year ARPU CAGR of 8.4% is highest in industry
- Management views tariff rationalisation on higher-usage plans and 'pay more for using more' pricing as critical for industry ROI
Enterprise / Business Services · Akshaya Moondra (CEO)
- Telco-to-TechCo transformation continuing; leveraging Vodafone group's global enterprise expertise
- Rich Business Messaging (RBM) scaled to 50+ brands; available exclusively via Vi Business on Android
- First Indian telecom operator to achieve SOC2 Type II attestation for data security
- Won 7 CIO Choice recognitions for IoT, Cloud Telephony, SD-WAN, RBM, mobile/intl carrier services
- Won Asian Telecom Awards 2024 for Vi Business Sanchaar Shakti IoT logistic platform
Digital Roadmap: Vi App Ecosystem · Akshaya Moondra (CEO)
- Vi App repositioned as multi-utility app - 400+ live TV channels + VoD; Vi Games including hyper-casual + eSports + CloudPlay
- Utility bill payment integrated; Vi Shop marketplace launched with leading partners across categories
- Vi Movies & TV relaunched with apps across Android, iOS, Google TV, Samsung, Firestick (LG coming)
- OTT bundling with Amazon Prime, Disney+ Hotstar, SonyLiv, SunNxt; more partnerships coming
Operational KPIs and Awards · Akshaya Moondra (CEO)
- 4G subscriber base 126.3 mn as on 31-Mar-2024 vs 122.6 mn a year ago (11th consecutive quarter of growth)
- Overall subscriber base 212.6 mn
- Revenue Q4 FY24 Rs. 106.1 bn; QoQ average daily revenue growth 0.5%
- Pre-IndAS116 EBITDA Q4 FY24 Rs. 21.8 bn - highest quarterly EBITDA post-merger
- 60% of customer service requests now raised digitally vs 40% a year ago
- Ranked Best Company to Work For in India - rank 15 overall, rank 1 in telecom (Business Today)
Financial Performance Detail · Murthy GVAS (CFO)
- Q4 FY24 pre-IndAS116 EBITDA Rs. 21.8 bn (+5.4% YoY); margin 20.6%; reported EBITDA Rs. 43.4 bn vs Rs. 42.1 bn Q4 FY23
- FY24 revenue Rs. 426.5 bn vs Rs. 421.8 bn FY23; pre-IndAS116 EBITDA Rs. 84 bn vs Rs. 83 bn
- Q4 D&A Rs. 57.5 bn (Rs. 42.6 bn ex-IndAS116); Q4 net finance costs Rs. 62.5 bn (Rs. 53.5 bn ex-IndAS116)
- Q4 capex Rs. 5.5 bn / FY24 capex Rs. 18.5 bn; sharp ramp to Rs. 500-550 bn guided over next 3 years
- Bank + FI debt Rs. 40.4 bn + OCDs Rs. 1.6 bn at 31-Mar-2024; bank debt down Rs. 70.9 bn YoY (vs Rs. 111.3 bn Q4 FY23)
- Cash & bank balance Rs. 1.7 bn at 31-Mar-2024
- Deferred spectrum obligations Rs. 1,331.1 bn (payable till FY42); AGR liability Rs. 703.2 bn (payable till FY31); total Rs. 2,034.3 bn vs Rs. 1,888.6 bn at 31-Mar-2023
In their words
This moment in some way marks the beginning of Vi 2.0 and from here on VIL will stage a smart turnaround to effectively participate in the industry growth opportunities.
We have marked an important milestone in the journey of Vodafone Idea Limited by raising Rs. 180 billion through FPO route which has been the largest in the country. The overwhelming success of our FPO is testimony to the confidence and trust that has been reposed in us by each and every one of our investors who have rallied behind us in large numbers leading to our issue being subscribed almost 7 times.
Tariff rationalization on the higher usage plans and moving to a pricing structure of paying more for using more remains critical to ensure that the operators make reasonable returns on their large network and spectrum investments.
To check next time
What management committed to on this call, or the dates they gave.
- Closure of Rs. 20.75 bn ABG promoter preferential equity issue expected in May 2024.
- Progress on Rs. 250 bn bank debt raise and Rs. 100 bn non-fund facilities with bank consortium.
- Start of 4G capacity decongestion additions within 2-3 months of call (July-August 2024).
- Commencement of 4G coverage expansion rollout within 3-4 months (August-September 2024).
- 5G rollout start ~6 months from call (around November 2024); 5G NSA technology finalization with partners.
- Subscriber base trajectory and ARPU movement beyond Rs. 146; track shift from continued losses to gross add participation.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Fri 17 May 2024 | ₹13.25 | +0.76% | +0.28% |
| 5 sessions Thu 23 May 2024 | ₹14.05 | +6.84% | +2.52% |
| 20 sessions Thu 13 Jun 2024 | ₹16.07 | +22.21% | +4.44% |
From the close of Thu 16 May 2024, ₹13.15: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Vodafone Idea's other calls
- H1 FY27Fri 13 Nov 2026Not read
- Q1 FY27Tue 11 Aug 2026Tone: Confident
- Q4 FY26Mon 18 May 2026Tone: Confident
- Q2 FY26Tue 11 Nov 2025Tone: Mixed
- Q1 FY26Mon 18 Aug 2025Tone: Mixed
- Q4 FY25Mon 2 Jun 2025Tone: Mixed
- Q3 FY25Wed 12 Feb 2025Tone: Confident
- Q2 FY25Thu 14 Nov 2024Tone: Mixed
- Q1 FY25Mon 23 Sept 2024Tone: Mixed
- Q1 FY25Tue 13 Aug 2024Tone: Confident