Vodafone Idea Q2 FY25 earnings call
In brief
Vodafone Idea plans ₹80 billion of H2 FY25 capex, targeting 4G population coverage of 1.2 billion by September 2025.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- −0.27% (Nifty 50 −0.11%)
- Q2 FY25 revenue was ₹109.3 billion, up 4% QoQ, and customer revenue rose 5.6% after July 4 price increases.
- Reported EBITDA including Ind AS 116 was ₹45.5 billion at a 41.6% margin; excluding it, EBITDA was ₹23.2 billion at a 21.3% margin.
- Q2 FY25 capex was ₹13.6 billion and nearly 42,000 4G sites were added; ₹300 billion supplier deals support the planned ₹80 billion H2 FY25 capex.
- Customer ARPU excluding M2M rose 7.8% QoQ, but subscribers fell by 5.1 million amid port-outs and seasonal weakness.
- PAT loss was ₹71.8 billion; net finance costs were ₹63.1 billion, with the prior quarter benefiting from several reversals.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹10,932 cr | +2.0% | +4.0% | |
| EBITDA (excl. other income) | ₹4,550 cr | +6.2% | +8.2% | 41.6% (40% a year ago) |
| Net profit | ₹0 cr | — | — | 0% (0% a year ago) |
| EPS (₹) | ₹-1.03 | — | — |
From the company's filed results for the quarter ended 30 Sept 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Revenue growth: said 4% QoQ; filed +2.0% YoY. Management stated sequential growth, while the filed figure shows year-on-year growth, so the percentages are not directly comparable.
What moved the numbers, as management explained it
- Customer revenue grew 5.6% QoQ after the July 4 tariff increase; customer ARPU excluding M2M rose 7.8% QoQ and exit ARPU growth exceeded 10%.
- A 5.1 million subscriber loss, including port-outs to a non-hiking operator and additional BSNL movement amid seasonal weakness, kept revenue growth below ARPU growth.
- Enterprise postpaid, M2M and some government revenue saw no tariff increase, helping explain why a roughly 16% blended price rise yielded 7.8% customer ARPU ex-M2M growth.
- Net finance costs were ₹63.1 billion; the prior quarter benefited from reversals tied to the revenue-share licence fee, a Supreme Court judgment and vendor settlements, while forex MTM also affected Q2.
- Reported depreciation and amortisation of ₹54 billion and net finance costs of ₹63.1 billion accompanied a ₹71.8 billion PAT loss.
- Reported EBITDA including Ind AS 116 was ₹45.5 billion at a 41.6% margin, versus ₹23.2 billion at a 21.3% margin excluding Ind AS 116. (accounting)
The numbers management led with
- H2FY25 planned capex: Rs 80 billion
- Three-year capex plan: Rs 500-550 billion
- Nokia/Ericsson/Samsung equipment deal: Rs 300 billion (~USD 3.6 billion) over three years
- 4G population coverage: 1.05 billion (from 1.03 billion over 6 months); target 1.1bn by March 2025 and 1.2bn by September 2025
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Transformative three-year capex plan | — | The transformative three-year capex plan is ₹500 billion to ₹550 billion. |
| Capex spends | H2 FY25 | Capex spends are expected at ₹80 billion in H2 FY25. |
| Network equipment supply deals (Network investment and 4G/5G) | — | Network equipment supply deals worth about ₹300 billion with Nokia, Ericsson and Samsung over three years. |
| 4G population coverage (Network investment and 4G/5G) | Q4 FY25 | Target 4G population coverage of 1.1 billion by March 2025. |
| 4G population coverage (Network investment and 4G/5G) | Q2 FY26 | Target 4G population coverage of 1.2 billion by September 2025. |
| 5G rollout in key geographies (Network investment and 4G/5G) | Q4 FY25 | Rollout of 5G in key geographies will start in Q4 FY25. |
| Subscriber trajectory (Consumer and mobility) | FY25 | Management expects the subscriber trajectory to have turned around by the end of FY25. |
| Full impact of the tariff increase on ARPU and revenue | — | The full impact of the tariff increase on ARPU and revenue is expected over a couple of quarters. |
| Tariff increases | — | Further tariff increases are expected, with no date or magnitude specified. |
| Debt funding | — | Debt funding is expected to close once clarity emerges on the AGR matter. |
| Conversion to equity | — | Government dues are expected to convert to equity post-moratorium to the extent of any payment shortfall. |
| Vi One expansion (Digital services) | — | Vi One is expected to expand to other important markets. |
What changed since the Mon 23 Sept 2024 call
| What | On the Mon 23 Sept 2024 call | On this call |
|---|---|---|
| Three-year capex plan (held) | 3-year capex plan of ₹50,000-55,000 cr across FY25-FY27 | Transformative three-year capex plan of Rs. 500 to 550 billion |
| 4G population coverage (held) | Scale from 1.03 bn to 1.2 bn in 12-15 months | Target 1.1 billion by March 2025 and 1.2 billion by September 2025 |
| Network equipment deployment (achieved) | ₹30,000 cr equipment order with Nokia, Ericsson and Samsung closed over 3 years; rollouts accelerate from Q3 FY25 | Deployment started in October 2024 after about ₹300 billion of three-year supplier deals |
| Bank funding (delayed) | ₹25,000 cr bank funding plus ₹10,000 cr LC targeted to close in 7-8 weeks | Bank discussions continue; management gave no timeline |
| 5G rollout (restated) | Launch in all 17 priority circles where 5G spectrum has been acquired within the three-year plan | Rollout in key geographies to start in Q4 FY25 |
| Government dues equity conversion (restated) | ~₹290 bn of deferred installments assumed to convert to equity in H2 FY26 and FY27 | Conversion expected post-moratorium only to the extent of any payment shortfall |
| Physical site target (not repeated) | Physical site count to rise from 183,000 to 215,000-220,000 over three years | Not mentioned |
| Next tariff hike (restated) | Similar magnitude to July 2024 hike, ~15 months after previous hike | Further tariff rationalization required, but no date or magnitude |
The business
By business
Network investment and 4G/5G
Management accelerated 4G expansion, added nearly 42,000 sites, increased data capacity 14% and population coverage to 1.05 billion, and began the network rollout after supplier deals.
Q2 FY25 capex ₹13.6 billion · 4G sites added almost 42,000 · 4G data capacity increase approximately 14% · 4G population coverage 1.05 billion · Equipment supply deals about ₹300 billion · Equipment supply deal period 3 years · 4G data speed improvement up to 18%
Outlook: Spend ₹80 billion in H2 FY25, reach 1.1 billion 4G population coverage by March 2025 and 1.2 billion by September 2025, and start 5G in key geographies in Q4 FY25.
Consumer and mobility
July tariff increases lifted customer ARPU and revenue, but a 5.1 million subscriber loss and BSNL port-outs pressured volumes; postpaid customers rose QoQ and YoY, led partly by M2M.
Customer ARPU ex-M2M +7.8% QoQ · Exit ARPU increase north of 10% · Subscriber loss 5.1 million · Blended price increase about 16%
Outlook: Management expects the full tariff benefit over a couple of quarters and expects a subscriber-trajectory turnaround by FY25-end, without an exact recovery date.
Business services and enterprise
Vi Business expanded beyond connectivity into hybrid SD-WAN, SIP, IoT, IIoT and cloud, with PayU, Genesys and Infinity Labs partnerships and enterprise IoT migration.
Around 20 IoT partner certificates issued
Outlook: Management said it would continue broadening enterprise solutions through SD-WAN, IoT, cloud and partner collaborations; no financial outlook was given.
Digital services and partnerships
Vi App, Vi Movies & TV and Vi One combined mobility, content, broadband and OTT offerings; Vi One launched in three circles and across Kerala.
Vi App offers over 100 games · Vi App offers over 350 TV channels · Vi One launch in 3 circles
Outlook: Management said Vi One would expand to other important markets and that digital partnerships would support stickiness and incremental monetisation.
Balance sheet, capex and funding
- Bank debt was ₹32.7 billion, down ₹45.8 billion YoY from ₹78.3 billion.
- Cash and bank balances were ₹136.2 billion, described as more than sufficient for H2 FY25 capex.
- Capex was ₹13.6 billion in Q2 FY25, and management planned ₹80 billion for H2 FY25.
- Deferred spectrum obligations were ₹1,419.4 billion; the AGR liability was ₹703.2 billion.
- The company raised ₹240 billion of equity during 2024; bank debt-funding talks continued without a closing timeline.
- Bank guarantees due over one year were about ₹24,000 crore; management did not factor their provision into its plan.
The industry, as management sees it
Industry needs further tariff rationalization skewed toward higher-consumption tiers to recover cost of capital on large 5G/data investments; broadband tele-density below 65% offers significant headroom; structural correction on heavy data user pricing is required across the industry rather than at the entry level.
Risks management named
- Subscriber base contraction of 5.1mn with port-outs skewed to one non-hiking operator (BSNL)
- AGR liability of Rs 703.2bn unresolved; government conversion of dues to equity flagged as likely if cash shortfall persists post-morono
- Deferred spectrum obligations of Rs 1,419.4bn plus AGR create Rs 2.12 trillion overhang on balance sheet
- Bank guarantee requirement of ~Rs 24,000 crores remains a structural block on fresh debt funding
- Industry tariff structure remains distorted; heavy data users not paying proportionate to network usage
Q&A
Q&A was dominated by analyst scrutiny of (a) debt funding timeline and its linkage to bank guarantee waiver and AGR relief — where management gave no committed timeline, and (b) tariff hike ARPU realisation, where management walked through the math between a ~16% blended price increase and the 7.8% QoQ ARPU uplift. The biggest deflection cluster was around government engagement specifics and Plan B. Management was most concrete on capex execution, network coverage targets and the dues-to-equity conversion disclosure, but visibly uncertain on debt closure and AGR relief.
Not answered directly
- Specific timeline for debt funding closure
- Government's view on AGR relief / merits of curative petition
- Next industry tariff hike timing
- Plan B if government does not relent on AGR
- Big tech traffic share quantum and government stance
Asked for a number, answered without one
- Subscriber recovery timeline: Management said an exact timeline was not possible, but expressed a 'gut feel' that the subscriber trajectory would turn around by FY25-end.
- Debt-funding timeline: Management gave no timeline and said bank discussions were waiting for clarity on the AGR outcome.
- Large traffic generators: Management declined to quantify traffic, called the data confidential and said the government's view had to come from the government.
- Next tariff increase: Management said tariff increases were required and would happen, but offered no date or magnitude.
- FY25 ARPU realisation: Management said 3%-3.5% of the blended increase would not be realised and that downgrades, renewals and churn left the final uplift uncertain.
- Bank-guarantee commission cost: Management called the commission nominal but gave no percentage or rupee amount; guarantees themselves were about ₹24,000 crore.
Every question, with its answer
1. Subscriber losses and capex turnaround
Sanjesh Jain, ICICI Securities
Question. Tariff hike delivered 7.6% ARPU growth QoQ on the customer side but subscribers continue to decline. With the Rs 80bn H2FY25 capex plan, by when do you expect to stop customer losses and trend into positive territory?
Answer, Akshaya Moondra, CEO. Capex quick-win is just the start; larger investments based on new supplies will follow. Subscriber turnaround timing is hard to predict but my gut feel is that by the end of this financial year we should have turned around the trajectory. With investments now on the ground plus larger H2 spend, leverage benefits should accrue, although some subscriber loss may persist in the interim.
Follow-up. We added 42,000 4G towers including 900 MHz expansion yet lost 4G customers. Is this SIM consolidation or movement to BSNL — how do you see it?
Answer. Three factors: (1) subscriber contraction post price increase; (2) significant and unusual flow to BSNL this quarter (reversing from August onwards); (3) seasonal softness. SIM consolidation residual is small; BSNL impact is the main driver and is reversing. Expect trend reversal over time.
Partly answered.
2. Data usage drop
Sanjesh Jain, ICICI Securities
Question. Peers have not seen a material difference in data usage pattern, but for Vi the data usage per subscriber has fallen. Why despite network expansion?
Answer, Akshaya Moondra, CEO. Data usage has declined across the industry this quarter. Vi's decline is more pronounced because 5G consumption is rising on competitors — free 5G data allowance drives much higher usage, and 5G streaming naturally consumes more for the same activity. That is the main reason for the differential.
3. Bank guarantee waiver and AGR resolution
Sanjesh Jain, ICICI Securities
Question. On bank guarantee waiver, AGR resolution and amounts coming up for repayment in CY25 — where are you with the government on each of these?
Answer, Akshaya Moondra, CEO. Repayment pathway is already covered by the reforms package — conversion is built in if there is a shortfall. The curative petition was dismissed on a technicality without merits being heard; the merits are sound and we are engaged with the government to provide support given the judicial route is closed. Government remains committed to a three-private-player structure.
Partly answered.
4. ARPU realisation and tariff structure
Vivekanand Subbaraman, Ambit Private Limited
Question. How critical is the BG waiver or legislative AGR relief to raising debt funding? How long before you can tap debt? Also: do you stand by the prior 11-14% ARPU uplift guidance from the July tariff hike, factoring BSNL port-outs, and how should we think about higher tariff hikes for heavy data users?
Answer, Akshaya Moondra, CEO. On tariffs: blended weighted average price increase was ~16% (prepaid + postpaid). Customer ARPU grew 7.8% QoQ, exit ARPU north of 10% vs June quarter. The gap between 16% and the realised uplift is explained by (a) segments with no price hike (enterprise, M2M, some government), (b) customers staying on old price points, and (c) postpaid and long-validity pack renewals still flowing through. Directionally the response implies ~3-3.5% will never realise from the 16% headline.
Follow-up. Does 16% blended mean by end FY25 ARPU will be 16% higher vs June 24?
Answer. Out of the 16%, ~3-3.5% will not be realised at all (no-tariff-increase segments). Downgrades that have not returned will be a positive reversal; churn renewals a further negative drag. So the steady-state uplift is below 16%, closer to a 12-13% theoretical ceiling.
Partly answered.
5. Next tariff hike timing and structure
Vivekanand Subbaraman, Ambit Private Limited
Question. How do you read the current tariff environment and when can we expect the next hike? Will the industry correct pricing so heavy data users pay more?
Answer, Akshaya Moondra, CEO. No direct timeline for the next hike. At entry-level prices (now Rs 190-200 floor) there is limited room; structurally, increases have to come at higher consumption tiers — July 2024 hike already saw ~10% at entry vs up to ~20% at the top. As 5G consumption rises and gets metered, that itself will open higher-ARPU monetisation. This is a structural correction that requires the industry to act in concert.
Not answered directly.
6. Debt fundraising, BG waiver and AGR linkage
Vivekanand Subbaraman, Ambit Private Limited
Question. On debt fundraising — how linked is it to BG waivers and AGR legislative action?
Answer, Akshaya Moondra, CEO. BG waiver request: government has waived guarantees for future auctions and returned earlier guarantees — Vi is asking for the same logic to apply retrospectively. Banks will not willingly provide a BG facility for spectrum that already has a payment schedule, especially when debt funding (which improves operations and cash generation) is the more productive use. Entire industry is aligned on BG waiver. On debt: Vi and promoters are engaged with banks but lenders are in wait-and-watch mode pending government direction on AGR; clarity will help move things together. AGR relief was NOT part of the TEV business plan submitted to banks.
Follow-up. Any Plan B if government does not relent on AGR?
Answer. Not commenting on Plan B. Engagement is ongoing; position is that this needs to be addressed on fairness grounds given the merits of the curative petition were never heard. Conversion mechanism is already in the reforms package.
Partly answered.
7. Bank funding timeline
Saurabh Handa, Citigroup
Question. Given AGR dues start only around March 2026 and spectrum payments are spaced, is the bank funding process likely to be protracted? If the TEV already gave clean chit even without AGR relief, why is funding delayed? Also some FIs have publicly declined to lend — is government action needed?
Answer, Akshaya Moondra, CEO. No specific timeline. Post curative dismissal the narrative has shifted — observers conflate government AGR stance with bank willingness, which is not the same. Engagements with government and banks are simultaneous and will move together. Vi is well-funded for the next 1-1.5 years of capex but wants to close these matters urgently; the issue is clarity rather than a discrete trigger event.
Follow-up. On the dues-to-equity disclosure added to notes to accounts — was this an auditor requirement?
Answer. Disclosure was made because the moratorium expires in the next 12 months — prudent given Vi's current cash generation. On conversion: the Cabinet has already approved the framework, so no fresh Cabinet approval should be needed; only internal departmental approvals. Conversion will happen to the extent of shortfall between what Vi can pay and what is due.
Partly answered.
8. Bank guarantee quantum and cost
Gaurav Malhotra, Axis Capital
Question. Is debt raise connected to the bank guarantee issue, and how material is the BG cost? What is the BG quantum?
Answer, Akshaya Moondra, CEO. BG quantum disclosed in financials is ~Rs 24,000 crores over a one-year horizon. Commission cost is nominal but banks will not willingly provide BGs since they expose balance sheet without improving operations — debt funding is what banks prefer. BG provisioning is not part of Vi's business plan; only debt funding is.
Follow-up. Where are you on resolving the BG issue?
Answer. It is with the government — Vi has made all required representations and is awaiting a final call.
Not answered directly.
9. Big tech funding of telecom capex
Vivekanand Subbaraman, Ambit Private Limited
Question. On the COAI/industry proposal for big tech / digital gateways to share network capex burden — how is government thinking and what is the traffic polarity from the top two/three digital ecosystems?
Answer, Akshaya Moondra, CEO. Cannot speak for government. Will not give traffic share data but YouTube is the largest data consumer, followed by other OTTs. Networks can handle the traffic; the issue is returns. Differential tariffs by service are not permitted under current rules, but if big traffic generators could contribute to investment without raising tariffs for essential services that would help. This is a global, multi-layered engagement — no short-term resolution expected.
Follow-up. Are all industry participants aligned on this thinking?
Answer. Total alignment — it originated as a COAI representation; the larger the traffic, the larger the impact.
Partly answered.
What was said
Topic by topic, in the order it was spoken
Indian Telecom Market Context · Akshaya Moondra (CEO)
- Wireless broadband subscriber base grew ~8% (66 million adds) between August 2023 and August 2024
- Overall broadband tele-density still below 65% — large headroom remains
- Industry at a juncture: large capex needed for 5G/data, but tariffs must remain affordable
- Further tariff rationalization needed for industry to recover cost of capital; 'customers using more should pay more'
Capex & Network Investment · Akshaya Moondra (CEO)
- Q2FY25 capex of Rs 13.6 billion; H2FY25 plan of Rs 80 billion
- Quick-win capex complete, lifting 4G data capacity ~14% and 4G population coverage from 1.03bn to 1.05bn (+22 million over 6 months)
- Added ~42,000 4G sites — largest ever single-quarter addition
- Deployed 4G on sub-GHz 900 band across ~20,500 sites and ~21,200 sites on 1800/2100 MHz bands; data speeds up as much as 18%
- Opensignal rated Vi Best 4G network across all six experience categories nationally
- Concluded Rs 300 billion / USD 3.6 billion deals with Nokia, Ericsson and Samsung for three-year equipment supply
Market Initiatives & Tariff Hike · Akshaya Moondra (CEO)
- Customer ARPU ex-M2M grew 7.8% QoQ; exit ARPU north of 10% vs June quarter
- No tariff hike in Enterprise postpaid or M2M segments this quarter
- Lost 5.1 million subscribers with port-outs concentrated to one operator (BSNL) that did not hike
- Postpaid customer base grew QoQ and YoY; retail postpaid growing steadily over last year
- Prepaid 'Hero Unlimited' plans with Night Free Data and Weekend Data Roll Over; Vi Guarantee program with 130GB additional data
- RED X Plan at Rs 1,201/month with bundled OTT (Netflix, Prime, Hotstar, Sony Liv, Sun NXT, EaseMyTrip, airport lounge, 7-day IR pack, SwiggyOne)
Brand & Marketing · Akshaya Moondra (CEO)
- Vi brand won multiple awards including London International, Asia Pacific, SAMMIE, Cannes Lion, Spikes Asia and D&AD
- Dabbawalas, Be Someone's We and Postpaid Choose Your Benefits campaigns recognised at ET Brand Equity Shark, DG+, e4m and AFAQS BrandStoryz awards
- Won Best Social Media Brand – Telecom at SAMMIE 2024
Business Services & Enterprise · Akshaya Moondra (CEO)
- Transforming from Telco to Techco via hybrid SD-WAN, SIP, IoT/IIoT, cloud and CCaaS offerings
- Partnerships signed with PayU India (MSME digital payments), Genesys (contact centre CCaaS) and Infinity Labs (Make-in-India SD-WAN with AI security)
- All Enterprise IoT customers migrated to IoT Smart Central CMP platform; IoT lab issued ~20 partner certificates
Digital Ecosystem & Partnerships · Akshaya Moondra (CEO)
- Vi App offers 100+ games, eSports, utility bill pay, shopping, OTT subscriptions and 350+ TV channels
- Vi Movies & TV relaunched as a connected TV destination bundling Disney+ Hotstar, SonyLiv, Zee5, SunNxt with data allowance
- Vi One converged broadband+mobility+OTT plan live in Mumbai, Gujarat, Maharashtra and Kerala (via Asianet partnership)
Debt Funding & AGR Update · Akshaya Moondra (CEO)
- Cash and bank balance of Rs 136.2 billion more than sufficient for Rs 80 billion H2 capex plan
- FPO and preferential issue to one promoter group completed; further debt funding being tied up with lenders (CEO and promoters personally engaged)
- Supreme Court dismissed AGR curative petition on technical grounds; merits never argued; engaged with government to find solution
- Government remains supportive of 3-private-player structure
India Mobile Congress 2024 Showcase · Akshaya Moondra (CEO)
- Theme 'Future is Live' showcased Industry 4.0 solutions integrating 5G, IoT, AI and ML via a Smart Mine demo
- Displayed MSME 'Ready for Next' initiative, AI-powered hybrid SD-WAN, CPaaS and CCaaS solutions
- Vi Games eSports tournament 'Vi Game to Fame' held; immersive 360-degree dome and live remote music collaboration demos
Financial Highlights · Murthy GVAS (CFO)
- Q2 revenue Rs 109.3 billion, up 4% QoQ; customer revenue up 5.6% QoQ on July 4 price increase
- EBITDA ex-Ind AS 116 of Rs 23.2 billion (+10.5% QoQ); margin improved to 21.3% — highest since merger
- Reported EBITDA incl. Ind AS 116 of Rs 45.5 billion, margin 41.6% (+8.2% QoQ)
- D&A Rs 54 billion (ex-Ind AS 116 Rs 39.4 billion); net finance cost Rs 63.1 billion (ex-Ind AS 116 Rs 51.1 billion) — elevated due to forex MTM and reversal effects in prior quarter
- PAT loss of Rs 71.8 billion
- Bank debt Rs 32.7 billion vs Rs 78.3 billion at Q2FY24 (Rs 45.8 billion YoY reduction)
In their words
We are seeking a certain facility from the banks, and if we are going to seek the bank guarantee facility, it will reduce our ability to get debt funding. So, it is very clear that bank guarantee is something which the banks themselves will not be very willing to offer.
My gut feel would be that by the end of this financial year, we should have turned around the trajectory. But this is just an expectation. I don't think it is possible to give you an exact timeline on when this could turn around.
Bank guarantees will not have that result. So, in the first place, the bank guarantees that are being talked about, that is, not possible to get.
To check next time
What management committed to on this call, or the dates they gave.
- Execution against ₹80 billion H2 FY25 capex, including equipment deployment started in October 2024.
- Progress from 1.05 billion toward 1.1 billion 4G population coverage by March 2025.
- Whether subscriber losses narrow after the 5.1 million Q2 decline and management's FY25-end turnaround expectation.
- Customer ARPU and revenue as the remaining July tariff benefit flows through over the next couple of quarters.
- 5G launch timing in key geographies ahead of the stated Q4 FY25 start.
- Progress on AGR dialogue and bank-funding closure following the curative-petition dismissal.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Thu 14 Nov 2024 | ₹7.34 | −0.27% | −0.11% |
| 5 sessions Fri 22 Nov 2024 | ₹6.67 | −9.38% | +1.48% |
| 20 sessions Fri 13 Dec 2024 | ₹7.99 | +8.56% | +5.13% |
From the close of Wed 13 Nov 2024, ₹7.36: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Vodafone Idea's other calls
- H1 FY27Fri 13 Nov 2026Not read
- Q1 FY27Tue 11 Aug 2026Tone: Confident
- Q4 FY26Mon 18 May 2026Tone: Confident
- Q2 FY26Tue 11 Nov 2025Tone: Mixed
- Q1 FY26Mon 18 Aug 2025Tone: Mixed
- Q4 FY25Mon 2 Jun 2025Tone: Mixed
- Q3 FY25Wed 12 Feb 2025Tone: Confident
- Q1 FY25Mon 23 Sept 2024Tone: Mixed
- Q1 FY25Tue 13 Aug 2024Tone: Confident
- Q4 FY24Fri 17 May 2024Tone: Confident