PFC incorporates Khushkhera Transmission SPV for 400 KV Rajasthan project
PFC · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 0.2 pts more than Nifty 100 and 0.1 pts more than its Financial Institution peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
PFC Consulting, a wholly owned PFC subsidiary, has incorporated Khushkhera Transmission Limited as a wholly owned SPV for the 400 KV GSS Bhojrajka-Khushkhera project and associated transmission system. The SPV will prepare surveys, initiate land acquisition and seek forest clearance if required. It will be transferred to the successful bidder selected through competitive bidding.
Neutral for now. The SPV is only preparing the project, and no direct earnings impact or transaction consideration has been disclosed.