GE Power India Q4 FY24 earnings call

Wed 22 May 2024GVPIL

In brief

GE Power India Q4 FY24 revenue up 13.6% YoY to ₹391 cr; PBT swings to ₹23 cr profit on ₹70 cr one-time claim recoveries.

Management's tone
Cautious
What was said
Leaned negative
Guidance
None given
Analyst pushback
Medium
Stock, next session
+18.98% (Nifty 50 +0.31%)
  • Q4 FY24 revenue grew 13.6% YoY to INR 391 cr; PBT swung to INR 23 cr profit from INR 128 cr loss, lifted by INR 70 cr one-time claim/insurance recoveries.
  • Net worth fell to INR 57 cr at March 2024 from INR 226 cr a year earlier; company fully dependent on promoter for funded and non-funded working capital limits.
  • FY24 orders declined 19% YoY to INR 1,319 cr; backlog at March 2024 stood at INR 3,309 cr with roughly half slow-moving.
  • Core thermal services grew 40% in FY24 on technology advantage; reporting will move to the categories of services, FGD on EP, Durgapur and selective Hydro.
  • Trade receivables stood at INR 1,699 cr with INR 1,170 cr retention money expected to be realized over 2-3 years as project milestones complete.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q4 FY24

This quarterA year agoLast quarterMargin
Revenue₹391 cr+13.4%−14.3%
EBITDA (excl. other income)₹-35.6 cr——-9.1% (-34.6% a year ago)
Net profit₹0 cr——0% (0% a year ago)
EPS (₹)₹3.86—+6333.3%

From the company's filed results for the quarter ended 31 Mar 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

Where management's figures differ from the filing

  • EBITDA excluding other income: said PBT INR 23 cr in Q4 with INR 70 cr one-time claim/insurance recoveries; framed as profit swing; filed ₹-35.59 cr (margin -9.1%). Filed EBITDA excludes the INR 79 cr other income; management framed the quarter around PBT boosted by one-time recoveries rather than underlying EBITDA.
  • Other income: said ~75% insurance claims; one-time positive impact of INR 70 cr on Q4 profit; filed ₹79.13 cr. Gap of ~INR 9 cr between the INR 70 cr one-time impact cited and the INR 79 cr total other income filed; balance attributed to provision write-backs.

What moved the numbers, as management explained it

  • One-time positive impact of INR 70 cr from insurance/claim recoveries swung Q4 PBT from INR 128 cr loss to INR 23 cr profit. (one-off)
  • Strong thermal core services volume (40% YoY growth) and backlog execution drove Q4 revenue up 13.6% YoY to INR 391 cr.
  • Cost escalation from project delays, execution challenges and Durgapur under-recovery of INR 12-14 cr kept underlying margins negative.
  • FY24 revenue declined 9.5% YoY to INR 1,625 cr on lower order intake in Hydro and FGD plus Saundatti suspension.
  • Provision write-backs (delayed export incentives) and customer claims contributed to the INR 79 cr other income. (one-off)

The numbers management led with

  • Backlog: INR3,309 cr as of March 2024 (vs INR3,615 cr Mar-23, INR3,437 cr Dec-23)
  • Net worth erosion: Net worth declined to INR57 cr (Mar-24) from INR226 cr (Mar-23)
  • Core services growth: Core services revenue grew ~40% in FY24
  • Insurance/claim recovery in Q4: ~INR70 cr of one-time positive impact from insurance and customer claim recoveries
  • Jaypee FGD order: INR775 cr for Bina + Nigrie plants on EP basis — to be booked in Q1 FY25

The business

By business

Thermal Services (core services and upgrades)

Core services grew 40% in FY24 on technology advantage; upgrades returned after 3-4 year lull with DeNOx wins at Hindustan Zinc and Maithon Power.

Core services growth 40% YoY · Annual core services market ~INR 5,000 cr

Outlook: Sustained double-digit quarter-on-quarter growth; selective participation in government upgrade tenders where risk-reward supports margins.

FGD (brownfield EP basis)

About 17 GW ordered in last year; company moving from EPC to EP basis. Won Jaypee Bina-Nigrie order worth ~INR 775 cr booked in Q4.

17 GW ordered last year · ~96 GW remaining · Jaypee order ~INR 775 cr

Outlook: Pick-up expected at 20-25 GW/year over 4-5 years; subject to possible deadline extensions and customer decisions.

Durgapur factory (pressure vessels, cryogenic, services)

Capacity ~240,000 hours with current load 80,000-100,000 hours; under-recovery of INR 12-14 cr. Targeting industrial and services orders to lift utilization.

Capacity ~240,000 hours · Current load 80,000-100,000 hours · Under-recovery INR 12-14 cr

Outlook: Target to lift load to 150,000-200,000 hours through pressure vessels, cryogenic and industrial services.

Hydro (services and selective PSP)

Saundatti project of INR 850 cr under suspension; backlog dominated by long-gestation projects; focusing selectively on cash-accretive PSP.

Saundatti project INR 850 cr (suspended) · ~50% of backlog from Hydro

Outlook: Selective participation in margin-accretive PSP only, awaiting regulatory and permitting approvals.

Balance sheet, capex and funding

  • Net worth fell to INR 57 cr (Mar 2024) from INR 226 cr (Mar 2023); stressed for three consecutive years of losses.
  • Company totally dependent on promoter for funded and non-funded working capital limits; attracting bank limits without promoter support is challenging.
  • Trade receivables INR 1,699 cr with INR 1,170 cr retention; expected realization 2-3 years.
  • Saundatti Hydro project INR 850 cr under suspension; discussions ongoing with customer for restart.
  • Order backlog INR 3,309 cr at March 2024; ~70% projects (Hydro+FGD) and ~15-20% services; about half slow-moving.
  • FY24 loss before tax INR 177 cr vs INR 324 cr in FY23; reduction aided by one-time claim/insurance recoveries.

The industry, as management sees it

Indian power sector remains structurally strong — peak demand grew 7% to 240 GW, IEA forecasts 6.5% annual electricity demand growth through CY26, and coal production is up double-digits — but thermal ordering (especially FGD and Hydro PSP) is regulatory-driven and proceeding in a staggered, slower-than-expected fashion, with potential further deadline extensions adding uncertainty.

Risks management named

  • Working capital fully dependent on promoter — no bank support without parent guarantee
  • Parent (GE) has exited new coal globally — coal-fired BTG re-entry requires new promoter
  • ~50% of backlog is slow-moving, spanning decade-plus gestation (Hydro)
  • Durgapur factory under-recovery of INR12-14 cr/yr at current ~80-100k hours utilisation
  • Operating well below breakeven revenue of INR2,000-2,500 cr
  • Saundatti Hydro project (INR850 cr) under suspension pending commercial resolution
  • FGD regulatory uncertainty — further deadline extensions possible

Q&A

Q&A was dominated by three threads: (a) the company's structural constraints — net worth erosion, promoter dependence, and inability to re-enter new coal without a new parent; (b) the timing and quantum of FGD ordering, where management admitted ordering would be staggered and avoided giving specific market-share numbers; and (c) the credibility of the strategy pivot to services and Durgapur utilisation. Pushback was strongest from Sushil Finance on parent support and Alchemy Capital on FGD realisations and market share — both produced partial/candid responses rather than crisp answers. No analyst was given a forward revenue or margin number.

Not answered directly

  • Durgapur revenue potential if fully utilised
  • Durgapur employee count
  • Specific FGD market share guidance for FY25
  • Timing of depromoterisation process

Asked for a number, answered without one

  • FGD market share: Management declined a specific number; said it depends on mix of state vs IPP, EPC vs EP and customer-by-customer selection; cited low double-digit share qualitatively in past.
  • Durgapur factory revenue at full utilization: Management declined; said it is company policy not to give future revenue projections; focused instead on the 150,000-200,000 hours capacity utilization objective.

Every question, with its answer

  1. 1. Coal-fired BTG re-entry

    Madanagopal, Sundaram Alternates

    Question. Coal-based BTG market is picking up with ~10 GW likely to be ordered this year; Alstom/GE used to participate. Are we planning to re-enter given the strong pipeline?

    Answer, Prashant Jain, Managing Director. Re-entry into new coal requires parent company guarantees and working-capital lines. The promoter has exited new coal globally; GEPIL's balance sheet by itself cannot support this market. Participation is contingent on a new promoter / depromoterisation process.

    Follow-up. When can FGD ordering improve — FY25, FY26? Risk of further delay?

    Answer. Vinit Pant: ~17 GW ordered last year vs ~20 GW the year before. Going forward ordering will be staggered (~20-25 GW/yr) over the next 4-5 years rather than a step-up. Prashant Jain added: government may extend deadlines further; uncertainty persists around customer propensity to invest.

    Partly answered.

  2. 2. Hydro PSP pipeline

    Madanagopal, Sundaram Alternates

    Question. Any large Hydro PSP orders likely this year? Who are competitors besides BHEL and GE?

    Answer, Prashant Jain, Managing Director. Prashant Jain was candid: very bullish 2 years ago, but Hydro order conversion has been disappointing — Saundatti order (~1.5 yrs ago) is in suspension. Three categories of projects explained: Hydro (decade-plus gestation), EPC FGD (being derisked to EP), and industrial/services (fastest cash conversion). Kalpesh Shah added that permitting/regulatory approvals still delay conversion of pipeline into orders.

    Partly answered.

  3. 3. FGD ordering timeline and Jaypee win

    Ahmed Madha, Unifi Capital

    Question. What's happening on FGD — what's the delay and when will ordering restart?

    Answer, Prashant Jain, Managing Director. Prashant Jain and Vinit Pant clarified ordering has not stopped (~17 GW last year, ~20 GW prior). Of total 211 GW pipeline, ~128 GW has been ordered and ~96 GW remains. Expect ~20-25 GW ordered every year going forward, staggered. Confirmed booking of INR775 cr Jaypee (Bina + Nigrie) order on EP basis this quarter — will be booked in Q1 FY25.

    Follow-up. Of 211 GW to be installed by 2026, ~110 GW already awarded — which players and what share can we capture?

    Answer. Vinit Pant: major FGD players are BHEL, L&T, MHPS. Avoided giving a specific market-share number; said going forward focus is on EP deals with state utilities and private customers — cash-accretive only. Market size for remaining ~96 GW estimated at INR60,000 cr.

    Not answered directly.

  4. 4. Services market and Durgapur factory

    Bharat Sheth, Quest Investment

    Question. Colour on nature of services, competitive landscape and total available market — for services and industrial. Can GEPIL participate in the 10 GW coal-based ordering?

    Answer, Prashant Jain, Managing Director. Services split into core services (parts/spares — converts to cash in ~6 months) and upgrades (R&M, retrofit, DeNOx). Vinit Pant pegged annual core services + upgrades market at ~INR5,000 cr. Prashant said GE is a technology leader, not cost leader; GE's own OEM fleet is only ~6% of market — participates in other 50% (BHEL/Chinese fleet) by solving technical problems; targeting low-double-digit to high-single-digit share. On upgrades, government has outlined 60 GW upgrade programme, expecting ~20 GW materialisation. Durgapur factory underutilised (capacity 800k hours now 240k hours; current load 80-100k hours). On new coal, GE does not do EPC; would need new promoter plus an EPC partner.

  5. 5. Durgapur factory utilisation

    Ramakrishnan V, Individual Investor

    Question. Why measure Durgapur capacity in hours not turnover? If fully utilised, what revenue is possible? How many employees?

    Answer, Prashant Jain, Managing Director. Capacity measured in hours because the issue is underutilisation, not revenue forecasting (company policy not to give future projections). Load was <10k hours 2 years ago; services work brought ~100k hours. Yogesh Gupta quantified Durgapur under-recovery at INR12-14 cr currently. Prashant declined to give employee count or revenue potential, reiterating the chase is for capacity utilisation to ~150-200k hours, not turnover.

    Not answered directly.

  6. 6. Trade receivables and retention

    Dalip Jain, ICICI Bank

    Question. Trade receivables of INR1,699 cr — how much is retention money and over what timeline?

    Answer, Yogesh Gupta, Whole Time Director & CFO. Retention money is ~INR1,170 cr, linked to project milestones; expected to be recovered over ~2-3 years as milestones are achieved.

  7. 7. Parent support and multi-year underperformance

    Lavish, Sushil Finance

    Question. Power sector is positive — why isn't parent infusing money? It has been 16 quarters of weak performance. What's the outlook?

    Answer, Prashant Jain, Managing Director. Prashant laid out four drivers of underperformance: (1) project delays post-COVID; (2) Solapur and Sipat fires together costing ~INR150 cr; (3) COVID-era lull in thermal ordering; (4) FGD deadline extensions and slow Hydro conversion. Strategy to fix: derisk EPC vs EP, grow services (40% growth achieved), and grow industrial/private business.

    Partly answered.

  8. 8. FGD market share and breakeven revenue

    Himani Shah, Alchemy Capital

    Question. BHEL claims 30% FGD market share; you have mentioned 10% earlier — how is the competitive landscape? Are bid realisations improving?

    Answer, Prashant Jain, Managing Director. Acknowledged realisations have gone up and government has noted it, but market is regulated (tariff approval, developer balance sheet). Cannot give market-share guidance for current year — depends on mix of state vs IPP vs EPC vs EP. Central segment largely done; left is state (largely EPC — selective participation) and IPP (opportunity-by-opportunity). Also disclosed breakeven revenue at INR2,000-2,500 cr vs current run-rate far below — turnaround will take several quarters.

    Follow-up. If realisations are improving, why can't margins be maintained given costs are already in place?

    Answer. Prashant Jain: company is operating below breakeven because backlog is at the tail end with high site activity for retention collection — large structure but no breakeven revenue. Even an order booked today takes 12-18 months for revenue — sustainable quarterly margin is several quarters away.

    Partly answered.

  9. 9. Depromoterisation and slow-moving backlog

    VP Rajesh, Banyan Capital Advisors

    Question. Does depromoterisation impact the current order book? How much of backlog is slow-moving?

    Answer, Prashant Jain, Managing Director. No impact on current backlog — committed to execute. Yogesh Gupta: ~70% of backlog is FGD + Hydro projects, ~15-20% services. Saundatti Hydro project (~INR850 cr) is under suspension; rest on track. Prashant summed up: ~50% slow-moving, the remainder (services/upgrades) typically converts within 18 months.

  10. 10. Other income breakup and backlog mix

    Premal Shah, Individual Investor

    Question. INR79 cr of other income in Q4 — breakup? What % of current order book is services and how much executes this year?

    Answer, Prashant Jain, Managing Director. Prashant: ~75% from insurance claims, balance from customer claims (extension of time, conservation). Yogesh added some provision write-backs on delayed export incentives. On backlog mix, ~70% project / 30% services; services convert in 15-18 months.

What was said

Topic by topic, in the order it was spoken

Global economic backdrop · Prashant Jain (MD)

  • Global growth slowing to 2.4% in 2024 per World Bank — third consecutive year of deceleration
  • Trade growth in 2023 slowest outside recessions in 5 decades
  • India singled out as bright spot — infrastructure investment, easing monetary policy, stable political transition supportive of growth

Indian power sector outlook · Prashant Jain (MD)

  • Energy demand grew 7% YoY for a second consecutive quarter, peak demand touched 240 GW
  • Overall power generation ~1,700 BU in FY24, with ~76% from thermal
  • IEA projects 6.5% annual electricity demand growth in India between CY24-26 — fastest among major economies
  • Coal production CAGR of 8% over 4 years; FY24 output ~997 MMT (+11.65%); coal imports up 7.2% to 244 MMT

FGD regulatory and ordering backdrop · Prashant Jain (MD)

  • FGD implementation deadline approaching but order flow slower than anticipated over last 2 quarters
  • Time required for system erection means meeting deadline looks challenging
  • Market still expects potential further 2-3 year extension based on industry reports
  • Remaining 96 GW to be ordered over the next several years in staggered fashion (~20-25 GW/yr)

Strategic focus areas after balance sheet deterioration · Prashant Jain (MD)

  • Balance sheet stressed due to project cost updates, Sipat-Solapur fire incidents and lower prior order intake
  • Net worth down to INR57 cr from INR226 cr; company totally dependent on promoter for working-capital limits
  • Cannot pursue new coal-fired thermal without new promoter backing — promoter has globally exited new coal
  • Strategic focus narrowed to: core services + upgrades, brownfield FGD on EP basis, Durgapur factory utilisation (pressure vessels/cryogenic), selective cash-accretive Hydro PSP
  • Reporting will shift from EPC vs non-EPC to these four strategic area buckets from Q1 FY25

Q4 and FY24 results summary · Prashant Jain (MD) and Yogesh Gupta (CFO)

  • FY24 orders INR1,319 cr (-19% YoY); Q4 FY24 orders INR262 cr (+15% YoY)
  • FY24 revenue INR1,625 cr (-9.5%); Q4 revenue INR391 cr (+13.6% QoQ comparison, -ve vs Q3)
  • Backlog declined from INR3,615 cr (Mar-23) → INR3,309 cr (Mar-24)
  • Q4 PBT INR23 cr vs loss of INR128 cr in Q4 FY23; FY24 loss INR177 cr vs INR324 cr — narrower loss aided by ~INR70 cr one-time claim/insurance recovery
  • Core services revenue grew 40% in FY24 with double-digit QoQ growth for several quarters
  • Major upgrades booked including DeNOx at Hindustan Zinc and Maithon Power

In their words

The net worth of the company has come down to almost INR57 crores as of March 2024 from INR226 crores in March 2023, and the company has been making losses for 3 consecutive years. Thus, the balance sheet of the company is stressed.
Prashant Jain (Managing Director, GE Power India)
The company is totally dependent on working capital funded and nonfunded limits on the promoter. Attracting working capital from banks without promoter support is challenging for GEPIL.
Prashant Jain (Managing Director, GE Power India)
The breakeven revenue for the today's structure of the company is in the range of INR2,000 crores to INR2,500 crores, and we are far below that at this point in time… for us getting sustainable quarter-on-quarter margin will take several quarters.
Prashant Jain (Managing Director, GE Power India)

To check next time

What management committed to on this call, or the dates they gave.

  • Conversion of Jaypee FGD order (INR 775 cr, 2 GW) to revenue — typically 12-18 months for peak revenue.
  • Status of Saundatti Hydro project (INR 850 cr) restart discussions with customer.
  • Trade receivables collection progress; INR 1,170 cr retention money expected over 2-3 years.
  • Durgapur factory load progress toward the 150,000-200,000 hours utilization target.
  • FGD regulatory developments — whether government extends deadlines and consequent order flow.
  • Cash collections and claim settlements — stated focus areas for the company.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Wed 22 May 2024₹399.40+18.98%+0.31%
5 sessions Tue 28 May 2024₹328.05−2.28%+1.59%
20 sessions Wed 19 Jun 2024₹392.00+16.77%+4.38%

From the close of Tue 21 May 2024, ₹335.70: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

GE Power India's other calls

  • Q2 FY27Mon 16 Nov 2026Tone: Mixed
  • Q1 FY27Fri 10 Jul 2026Tone: Confident
  • Q1 FY27Mon 6 Jul 2026Tone: Confident
  • Q4 FY26Tue 12 May 2026Tone: Confident
  • Q3 FY26Tue 17 Feb 2026Tone: Confident
  • Q2 FY26Fri 14 Nov 2025Tone: Confident
  • Q4 FY25Fri 30 May 2025Tone: Optimistic
  • Q3 FY25Thu 13 Feb 2025Tone: Mixed
  • Q1 FY25Mon 12 Aug 2024Tone: Confident
  • Q1 FY25Tue 30 Jul 2024Tone: Defensive
  • Q1 FY25Thu 18 Jul 2024Tone: Mixed