GE Power India Q2 FY26 earnings call

Fri 14 Nov 2025GVPIL

In brief

Q2 FY26: revenue ₹281 cr (+29% YoY), PBT pre-exceptional ₹33 cr; core orders +45% YoY, FGD terminations cut backlog to ₹1,825 cr.

Management's tone
Confident
What was said
Leaned positive
Guidance
None given
Analyst pushback
Low
Stock, next session
+18.20% (Nifty 50 +0.12%)
  • Q2 FY26 revenue rose to ₹281 cr (vs ₹217 cr Q2 FY25), with PBT before exceptional items of ₹33 cr (vs ₹8 cr PY) on core services growth.
  • Order backlog fell to ₹1,825 cr from ₹2,662 cr (Mar'25) after termination of two FGD EPC contracts with Jaypee Bina and Nigrie valued at ₹775 cr.
  • Core services orders grew 45% YoY to ₹162 cr in Q2; H1 FY26 core order intake rose to ₹343 cr from ₹235 cr.
  • BHEL settlement of ₹340 cr to be received in phases over next 2-3 quarters; first ₹50 cr tranche received in October with ₹23 cr ECL reversal booked.
  • Durgapur undertaking demerged to JSW Energy effective July 1, 2025 at 10:139 share ratio; stand-alone net worth rose to ₹298 cr (vs ₹233 cr).

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY26

This quarterA year agoLast quarterMargin
Revenue₹281 cr+29.0%−2.2%
EBITDA (excl. other income)₹28 cr——10% (-2.3% a year ago)
Net profit₹0 cr——0% (0% a year ago)
EPS (₹)₹4.81−51.7%−6.8%

From the company's filed results for the quarter ended 30 Sept 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Core services revenue growth and shift in mix (majority of sales now from core services with better gross margins) drove top line up 29% YoY to ₹281 cr.
  • Jaypee FGD settlement led to a one-time P&L charge of ₹27 cr; ₹25 cr settlement amount expected to be received in Oct-Dec quarter on shipment completion. (one-off)
  • BHEL settlement led to a one-time ECL reversal of ₹23 cr booked in other income on first tranche of ₹50 cr received in October 2025. (one-off)
  • Solapur fire insurance claim settled at ₹6.6 cr in current quarter, closing the insurance recovery process for both fire incidents. (one-off)
  • Q2 FY25 base included a ₹243 cr Wanakbori turbine upgrade order, inflating the prior-year order intake comparison (Q2 FY26 ₹240 cr vs Q2 FY25 ₹446 cr).

The numbers management led with

  • Core services orders (Q2 FY26): ₹162 cr in Q2 FY26 vs ₹112 cr in Q2 FY25 — 45% increase
  • Order backlog: ₹1,825 cr as on 30 Sep 2025 vs ₹2,662 cr as on 31 Mar 2025
  • BHEL receivable settled: ₹340 cr settlement; ₹357 cr total receivable; ₹50 cr first tranche received in October

Guidance

Guidance on this call

WhatForWhat management said
Core services order growth—Core is poised to build on its momentum and deliver double-digit year-over-year growth

What changed since the Fri 30 May 2025 call

WhatOn the Fri 30 May 2025 callOn this call
Durgapur operations (restated)Durgapur at 165K of 242K hours (2/3 utilisation); 4th pillar booked INR 18 cr — recovery flagged as multi-quarter, not immediateDemerger to JSW Energy announced effective July 1, 2025 at 10 JSW Energy shares for every 139 GEPIL shares; NCLT approved
Order backlog (cut)backlog up to INR 2,662 cr with 200 bps margin upliftorder backlog of INR 1,825 crores as on September 30, 2025 after termination of 2 FGD EP contracts worth INR 775 cr
BHEL settlement (new)Maintain financial discipline — no debt, preserve cash, focus on working-capital-light projectsSettlement with BHEL of INR 340 cr to be received in phased manner over next 2-3 quarters; first tranche INR 50 cr received in October 2025
FGD EPC strategy (restated)underlying operations posted ~INR 30 cr negative due to FGD EPC provisionsTwo Jaypee FGD contracts (Bina and Nigrie) terminated at INR 775 cr combined; MoEFCC policy limits FGD scope to ~30 GW
Net worth (stand-alone) (raised)net worth rises to INR 233 cr (vs INR 57 cr)stand-alone net worth stands today at INR 298 crores as on September 30, 2025
Geographic footprint (raised)5-country geographic footprint covering 6 GWPenetrated 7 countries covering about 8 GW installed base; first boiler spares orders worth INR 4 cr secured
Quarterly order intake (restated)Order intake nearly doubled YoY to INR 2,183 cr — highest since FY20Q2 order intake INR 240 cr (vs INR 446 cr PY which included INR 243 cr Wanakbori); core orders +45% YoY

The business

By business

Core Services

Core services order intake grew 45% YoY to ₹162 cr in Q2 FY26; now the main driver of revenue, with majority of sales from this segment and better gross margins.

Q2 core orders ₹162 cr (+45% YoY) · H1 FY26 core orders ₹343 cr (vs ₹235 cr PY)

Outlook: Poised to deliver double-digit year-over-year growth

Upgrade Services

Modernization and retrofitting projects; PY Q2 included a ₹243 cr Wanakbori turbine upgrade order which inflated the order intake comparison.

PY Wanakbori upgrade order ₹243 cr

FGD EPC

Two Jaypee FGD contracts (Bina and Nigrie, ₹775 cr combined) terminated this quarter; MoEFCC notification limits FGD installation to ~30 GW (vs ~70 GW earlier scope).

Terminated FGD contracts ₹775 cr combined

Outlook: Watching new tender momentum; some awarded orders also terminating

Durgapur Operations

Demerger to JSW Energy announced effective July 1, 2025 at 10:139 share ratio; NCLT approved; 5-year supply contract signed for post-closing access to boiler and mill capability.

Durgapur capacity 2.5 lakh hours, 2/3 utilized

Outlook: Transaction closing pending; GEPIL to purchase services from Durgapur via JSW Energy

Exports / Geographic Expansion

Penetrated 7-8 countries (Saudi, Turkey, Austria, Australia, UAE, Malaysia, Indonesia, Morocco) covering ~8 GW installed base; secured first boiler spares orders of ₹4 cr.

Boiler spares exports ₹4 cr · Installed base ~8 GW · Country footprint (7-8)

Outlook: Focus on deeper penetration in existing 7-8 countries rather than adding new markets

Balance sheet, capex and funding

  • Stand-alone net worth ₹298 cr as on September 30, 2025 vs ₹233 cr as on March 31, 2025, on divestments and disciplined cash management.
  • Total receivables ~₹1,000 cr; ₹357 cr from BHEL (35%); first tranche of ₹50 cr received in October 2025; balance to come in next 2-3 quarters.
  • Durgapur undertaking demerger to JSW Energy announced effective July 1, 2025; NCLT approved; transaction closing pending.
  • No specific new debt or capex figure stated on this call; previous call noted no debt and net cash position of ₹433 cr.
  • ECL policy applied to receivables to provide for any default or delay risk; ₹23 cr reversed on BHEL tranche receipt.

The industry, as management sees it

Management views the thermal generation share holding >55% of Indian power output through 2030-2032, with rising PLF supporting servicing demand. Coal demand expected to accelerate 2.5% in 2026 on industrial recovery and moderated renewable penetration. However, the FGD opportunity has been structurally capped by the MoEFCC notification at ~30 GW by Dec 2027/2028, with ~70 GW Category C plants excluded — making the new tender momentum a key watch-item.

Risks management named

  • FGD market opportunity structurally capped by MoEFCC notification (~30 GW by Dec 2027, 70 GW Category C plants excluded)
  • Some awarded orders are seeing termination in the FGD segment
  • Underutilization at the Durgapur facility pre-demerger (~2/3 utilisation of 2.5 lakh hour capacity)
  • Solar and monsoon variability can intermittently suppress peak demand (229 GW vs 277 GW govt forecast for the period)
  • Future ECL reversals on remaining ₹290 cr BHEL receivable not committed beyond policy: on extension no commitment on amount

Q&A

Five questioners covered the call — three of them individual investors (Rahul, Premal Shah) and two professional (Smith Shah from GHP Securities, Lavneesh from BlueOcean Asset Management). The discussion was dominated by clarification on the two settlements (BHEL and Jaypee), the termination of Jaypee FGD contracts, normalised profitability walk, and receivables quality. Management was open on settlement mechanics but visibly closed on forward-looking specifics — declining sub-segment EBITDA margins, future ECL reversal quantum, and any new business verticals. Pushback intensity was low; no analyst pressed more than once on the same point, and the call wrapped without the management being forced into incremental disclosure.

Not answered directly

  • Sub-segment EBITDA margin ranges in core services
  • Future ECL reversal quantum on balance ₹290 cr BHEL receivable
  • New lines of business or industries

Asked for a number, answered without one

  • EBITDA margin in core services: Sorry, we don't provide sub-segment ranges. And it would be difficult especially with the EBITDA, because how we operate is there are a lot of common themes for across core upgrades.
  • Future BHEL ECL reversals on remaining ~₹290 cr: We refrain from giving any futuristic statement... as and when the collections keep coming as per the policy that we have adopted, the current provision in the balance sheet would get reversed.
  • Scalability ceiling of services business: CAGR at least for the period of half yearly has seen a consistent growth... real big focus sharp, very much focus on our services growth of the non-GEPIL fleet; no quantitative ceiling given.

Every question, with its answer

  1. 1. Order intake QoQ

    Rahul, Individual Investor

    Question. The order intake has fallen versus the prior-year quarter (₹240 cr vs ₹446 cr). How does management explain this?

    Answer, Puneet Bhatla, Managing Director. The fall is because the Wanakbori complex turbine upgrade order worth ₹243 cr was booked in the corresponding quarter last year. On an apple-to-apple comparison, order intake from core is ~18% up.

    Follow-up. What is the order backlog currently?

    Answer. Order backlog stands at ₹1,825 cr as on 30 September 2025 — Aashish Ghai.

  2. 2. Gross margin walk

    Rahul, Individual Investor

    Question. Gross margins in the current quarter are ~22% vs ~42% in the corresponding quarter last year. How much of this is due to Jaypee shipment (unrecognised revenue)?

    Answer, Aashish Ghai, Whole Time Director & CFO. Gross margin on COGS/work-in-progress basis is ~33% on ₹281 cr top line, with ~55% coming from higher-margin core services. Yes, there is an INR 27 cr P&L charge from Jaypee in the quarter; settlement signed, supplies to be completed in Oct-Dec quarter, after which any gains will be booked in Q3.

    Follow-up. Confirming: ₹27 cr exceptional Jaypee charge and ₹23 cr BHEL provision reversal — correct?

    Answer. Yes, both understandings are correct.

  3. 3. Jaypee termination value

    Rahul, Individual Investor

    Question. What is the value of the Jaypee order that is likely to be booked in the current quarter?

    Answer, Aashish Ghai, Whole Time Director & CFO. The contracts being terminated are Jaypee Bina and Jaypee Nigrie, combined ₹775 cr — booked in the prior year and terminated in the current quarter. Settlement consideration to GEPIL is INR 25 cr (subject to completion of material shipments and customer acceptance).

    Follow-up. Any new lines of business the company is looking at entering?

    Answer. Not at this point. Focus is on penetrating the 7 export countries already entered and growing domestic and export core services; no plans to find new industries.

  4. 4. BHEL settlement structure

    Premal Shah, Individual Investor

    Question. What is the nature of the BHEL settlement? Why is BHEL paying ₹340 cr to GEPIL?

    Answer, Aashish Ghai, Whole Time Director & CFO. BHEL is an old vendor partner; GEPIL had ₹357 cr of receivables from BHEL. Settlement is joint with offshore Vernova entities — technical gaps were identified and a joint settlement was agreed. GE Power India receives what is owed (~₹340 cr) in a phased manner over the next 2-3 quarters; first tranche of ₹50 cr received in October.

    Follow-up. What fulfilments has GE agreed to under the deal?

    Answer. Technical field service contracts to be fulfilled; closed on 'as-is where-is' basis for most contracts; GE will continue to support PG tests via technical field advisors — obligation agreed to support customers.

  5. 5. ECL reversal outlook

    Premal Shah, Individual Investor

    Question. Against the ₹50 cr first tranche, INR 23.8 cr was reversed from other expenses per ECL policy. What reversal is expected against the balance ₹340 cr?

    Answer, Aashish Ghai, Whole Time Director & CFO. We refrain from giving any futuristic statement. As collections come in per policy, the current provision in the balance sheet would get reversed — but no number can be given now.

    Follow-up. What is the approximate cost GE Power has incurred on the Jaypee FGD project and what return will it get from JP?

    Answer. Almost breakeven — maybe INR 2-4 cr impact; ₹27 cr P&L charge already taken; ₹25 cr expected from Jaypee settlement; net amicable outcome. Vendor settlements still in progress.

    Partly answered.

  6. 6. Scalability of services post-divestments

    Premal Shah, Individual Investor

    Question. With Hydro, Gas and Durgapur gone, manufacturing activity will be negligible. Who handles the upgrades? Are you outsourcing? How scalable is it?

    Answer, Aashish Ghai, Whole Time Director & CFO. Core services is not just manpower — it's spare parts supply, in-house repair capabilities (with strong technical field advisors), and overhauling/maintenance. Average project lead time ~12 months, low-risk, cash and margin accretive. Upgrades done via 5-year contract with Sanand factory (Vernova group) and 5-year contract with JSW Energy for Durgapur post-demerger. OEM technology available via Vernova factories in Europe/US. Puneet added that thermal generation remains >55% of electricity through 2030-2032 and rising PLF supports servicing demand.

  7. 7. Boiler manufacturing capability

    Rahul, Individual Investor

    Question. Follow-up: Will GEPIL be building boilers or only repair work? If yes, where?

    Answer, Aashish Ghai, Whole Time Director & CFO. Boilers remain in the portfolio for core services — spares, repairs, pressure parts, NOx abatement upgrades. Access to Durgapur factory via JSW Energy 5-year deal; global supply chain mostly within India but some outside also. Boiler is not out of focus.

    Follow-up. Repair and upgradation orders outside India this quarter — was INR 4 cr. Do you feel confident this can be ramped up?

    Answer. Yes.

  8. 8. Core order execution timeline

    Smith Shah, GHP Securities

    Question. Once you get core services orders, over what lifetime period are they executable?

    Answer, Aashish Ghai, Whole Time Director & CFO. Average lead time within 12 months; the complete project is done within that period.

    Follow-up. What is the ballpark EBITDA margin range in core services?

    Answer. We do not provide sub-segment ranges; common themes across core, upgrades and supporting products make segmental reporting difficult; cannot give that.

    Not answered directly.

  9. 9. Normalized profit walk

    Abhishek Jain, Invest Well

    Question. What is the normalized profit after excluding Jaypee and BHEL settlements for Q2 and H1?

    Answer, Aashish Ghai, Whole Time Director & CFO. For the quarter: ₹27 cr charge from Jaypee and ₹23 cr release from BHEL largely neutralize — residual charge ~₹4 cr. For H1, also include Q1 INR 20 cr provision write-back in other income and INR 18 cr fire insurance claims so far. If only settlements are considered, the assessment is right that they neutralize.

    Follow-up. Was there a settlement with NTPC?

    Answer. No settlement with NTPC; no disputes with NTPC. Both Solapur fire incidents' insurance claims are now fully closed. The ₹340 cr reported relates only to GE Power, not group entities.

    Partly answered.

  10. 10. Receivables quality

    Lavneesh, BlueOcean Asset Management

    Question. On the ₹1,000 cr receivables — how good are they? Any concerns?

    Answer, Aashish Ghai, Whole Time Director & CFO. Expected credit loss policy is applied consistently and any default/delay risk is suitably provided for. Of ₹1,000 cr receivables, 35% (~₹357 cr) is from BHEL — now with signed agreement. Balance from retentions on FGD EP contracts and normal receivables. INR 1,000 cr is solid; auditor reviews apply.

    Follow-up. Collection timeline for the balance receivables?

    Answer. Yes, there is a timeline; running receivables collected in due course; retentions linked to execution milestones — 18 active sites, 50+ milestones, timeline tied to milestone completion.

  11. 11. Future ECL reversal guidance

    Lavneesh, BlueOcean Asset Management

    Question. On the BHEL agreement — INR 50 cr received and ₹23 cr reversed. For the remaining ₹290 cr likely to be received, will there be any such reversal?

    Answer, Aashish Ghai, Whole Time Director & CFO. Yes, accounting per ECL policy — provisions reversed when collected. We won't provide details of future reversals; as per agreed payment schedule, money will come over the next few quarters and accounting done per policy.

    Not answered directly.

What was said

Topic by topic, in the order it was spoken

India Power Sector Context · Puneet Bhatla (MD)

  • India power consumption rose 3.2% YoY to ~146 BU; H1 FY26 growth ~4% aligned with IEA full-year projections.
  • Peak demand 229 GW in Sep 2025 (vs 230 GW YoY) dampened by 15% above-normal monsoon; May 2025 peak hit 250 GW vs govt forecast 277 GW.
  • Coal demand in India (world's #2 consumer) +5.5% in 2024 to record ~40 MT; coal-fired generation up 5%.
  • 2026 outlook: coal demand expected to accelerate 2.5% on industrial recovery and moderated renewable penetration.
  • MoEFCC limited FGD installation to ~30 GW of thermal plants by Dec 2027/2028 progressively; ~70 GW Category C plants excluded from scope.
  • Management watching new tender momentum in FGD segment carefully; some awarded orders seeing termination simultaneously.

Business Performance & Strategic Settlements · Puneet Bhatla (MD)

  • Core order intake up from ₹235 cr (H1 FY25) to ₹343 cr (H1 FY26); overall services sales up 23%.
  • Settlement with BHEL on outstanding receivables unlocks cash inflow with defined payment timelines.
  • Dispute with JP Venture Power Limited also settled amicably; impact roughly neutral on P&L.
  • Penetrated 7 countries (Saudi, Turkey, Austria, Australia, UAE, Malaysia, Indonesia, Morocco) accessing ~8 GW installed base; INR 4 cr boiler spares shipped.
  • Won ₹47 cr NOx abatement & performance improvement order from Adani Mahan for 600 MW units in H1 FY26.
  • Strategic intent: serve non-GEPIL thermal installed base plus pursue profitable, fast-turnaround, cash-accretive orders.

Durgapur Demerger to JSW Energy · Puneet Bhatla (MD)

  • Announced demerger of Durgapur undertaking to JSW Energy effective 1 July 2025; ratio 10 JSW Energy shares per 139 GEPIL shares.
  • Durgapur capacity 2.5 lakh hours but only 2/3 utilised in prior year due to underutilisation of services business.
  • Durgapur contribution to GEPIL top line not significant; facility dragged on bottom line due to township/run-factory overheads.
  • Post-demerger, GEPIL can purchase services from the Durgapur facility via 5-year supply agreement with JSW Energy.
  • Standalone net worth ₹298 cr as on 30 Sep 2025 vs ₹233 cr as on 31 Mar 2025 — reflection of disciplined cash management.

Commercial Updates – Orders & Backlog · Aashish Ghai (CFO)

  • Q2 FY26 orders ₹240 cr vs ₹446 cr in Sep 2024 quarter (base included ₹243 cr Wanakbori turbine upgrade).
  • Core orders ₹162 cr in Sep 2025 quarter vs ₹112 cr in Sep 2024 quarter — 45% increase.
  • Core poised for double-digit YoY growth; pivot to margin and cash accretive services business validated.
  • Order backlog ₹1,825 cr as on 30 Sep 2025 vs ₹2,662 cr as on 31 Mar 2025; reduction driven by termination of 2 Jaypee FGD EP contracts (₹775 cr combined).

Financial Performance & Strategic Steps · Aashish Ghai (CFO)

  • Q2 FY26 revenue ₹281 cr vs ₹217 cr in Sep 2024 quarter; majority of sales now from core services.
  • PBT before exceptional items ₹33 cr vs ₹8 cr in Sep 2024 quarter — clean turnaround.
  • Received final Solapur fire insurance settlement of ₹6.6 cr during current quarter; both Solapur fire claims now fully closed.
  • Critical steps in quarter: BHEL settlement, Jaypee settlement, Durgapur demerger with JSW Energy — reduce financial exposure and optimise costs.
  • Despite FGD policy constraint, company maintained solid operating footing; strong core orders and healthy backlog position it well for FY26.

In their words

Year '25 has been a bold decisive year for the steps which we have taken to create the lasting value for our shareholders, including the strategic sale of Hydro and the Gas businesses in the previous quarters.
Puneet Bhatla (Managing Director, GE Power India)
This is a long-term journey, and we are advancing with disciplined execution one quarter at a time.
Aashish Ghai (Whole Time Director & CFO, GE Power India)
So, it is going to be almost breakeven. We might have an impact maybe in the range of INR 2 crores to INR 4 crores overall... I would say, again, a good win, an amicable settlement that we have entered into.
Aashish Ghai (Whole Time Director & CFO, GE Power India)

To check next time

What management committed to on this call, or the dates they gave.

  • BHEL settlement collections and ECL reversals on remaining ~₹290 cr receivable over the next 2-3 quarters
  • Jaypee settlement completion and receipt of ₹25 cr in Oct-Dec 2025 quarter on shipment fulfilment
  • Durgapur demerger transaction closing with JSW Energy post-NCLT approval
  • FGD policy developments and new tender activity with MoEFCC scope now limited to ~30 GW
  • Core services order intake continuation of 45% YoY growth momentum
  • Geographic expansion — further boiler spares orders and deeper penetration of existing 7-8 countries

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Fri 14 Nov 2025₹354.95+18.20%+0.12%
5 sessions Thu 20 Nov 2025₹361.00+20.21%+1.21%
20 sessions Thu 11 Dec 2025₹311.70+3.80%+0.07%

From the close of Thu 13 Nov 2025, ₹300.30: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

GE Power India's other calls

  • Q2 FY27Mon 16 Nov 2026Tone: Mixed
  • Q1 FY27Fri 10 Jul 2026Tone: Confident
  • Q1 FY27Mon 6 Jul 2026Tone: Confident
  • Q4 FY26Tue 12 May 2026Tone: Confident
  • Q3 FY26Tue 17 Feb 2026Tone: Confident
  • Q4 FY25Fri 30 May 2025Tone: Optimistic
  • Q3 FY25Thu 13 Feb 2025Tone: Mixed
  • Q1 FY25Mon 12 Aug 2024Tone: Confident
  • Q1 FY25Tue 30 Jul 2024Tone: Defensive
  • Q1 FY25Thu 18 Jul 2024Tone: Mixed
  • Q4 FY24Wed 22 May 2024Tone: Cautious