Genus Power Infrastru Q4 FY24 earnings call
In brief
Genus Power reported Q4 PAT up 151% YoY at ₹31.4 cr and guided FY25 revenue to ~₹2,500 cr at 15-16% EBITDA margin.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- −4.99% (Nifty 50 −0.95%)
- Guides FY25 revenue to ~₹2,500 cr and EBITDA margin of 15-16%, with operating leverage from the order book as execution scales.
- Q4 FY24 revenue ₹420.1 cr (+108% YoY) and PAT ₹31.4 cr (+151% YoY) on robust smart metering order execution.
- Total order book ₹21,000 cr (incl. SPVs and GIC platform) with L1 status at ~₹11,000 cr for new orders.
- Q4 finance costs rose sharply due to supplementary bank guarantees required to secure influx of orders; BG exposure already ₹600-700 cr.
- Capacity being raised to ~1.5 cr electronic meters/year with Guwahati plant addition; current run rate 1 million meters/month.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY24
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹420 cr | +107.6% | +62.7% | |
| EBITDA (excl. other income) | ₹54.2 cr | +100.4% | +103.3% | 12.9% (13.4% a year ago) |
| Net profit | ₹24.4 cr | — | — | 5.8% (-5.6% a year ago) |
| EPS (₹) | ₹0.90 | — | — |
From the company's filed results for the quarter ended 31 Mar 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Q4 FY24 EBITDA: said ₹65.4 cr, up 104% YoY; filed ₹54.19 cr, margin 12.9% (excl. other income). Management figure appears to include other income (₹15.64 cr); filed figure is EBITDA excluding other income.
- Q4 FY24 PAT: said ₹31.4 cr, up 151% YoY; filed Net profit to owners ₹24.35 cr, margin 5.8%. Management's PAT is ~29% higher; gap likely reflects non-controlling / minority interest that filed net profit to owners excludes.
What moved the numbers, as management explained it
- Revenue +108% YoY to ₹420.1 cr driven by robust smart metering order execution and ongoing expansion of the smart metering business.
- Employee costs and other expenses rose significantly as the company expanded workforce and systems in anticipation of the large order book.
- Q4 finance costs rose substantially due to supplementary bank guarantees required to ensure the influx of orders; flagged by management as a direct one-off hit on profitability. (one-off)
- EBITDA +104% YoY to ₹65.4 cr; management figure appears to include other income, lifting margin above the filed 12.9% operating EBITDA margin.
- PAT +151% YoY to ₹31.4 cr on operating profit growth, partially offset by the higher financing expenses tied to bank guarantees.
The numbers management led with
- Total order book (incl. SPVs and GIC platform): INR 21,000 crores (net of taxes INR 16,000 crores for 1.82 crore smart prepaid meters secured since July 2023)
- L1 position in tenders: Approximately INR 11,000 crores
- Country-wide FY25 smart meter installation expectation: 60-70 million meters (vs cumulative ~11 million over last 6-7 years)
Guidance
Guidance on this call
| What | For | What management said | Filed |
|---|---|---|---|
| FY25 total revenue | FY25 | Total revenue of about INR2,500 crores in financial year '25 | ₹2,442 cr, below the figure guided |
| FY25 EBITDA margin | FY25 | FY25 EBITDA margin of 15% to 16% | 17.8%, above the range |
| L1 status order book | — | L1 in projects around INR11,000 crores | — |
| FY25 export revenue (Exports) | FY25 | At least INR150 crores of export revenue in FY25 | — |
| Electronic meter capacity (annual) | FY25 | Comfortable level of 1.5 crores electronic meters every year (after Guwahati addition) | — |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Smart metering
Main business driven by ₹21,000 cr order book including SPVs and GIC platform; 24-27 month execution cycle with 6-9 month mobilisation; ~75-80% of platform value flows back to Genus as EPC.
Order book ₹21,000 cr · L1 status ~₹11,000 cr · Q4 revenue ₹420.1 cr · Q4 EBITDA ₹65.4 cr · Q4 PAT ₹31.4 cr
Outlook: FY25 revenue ~₹2,500 cr; EBITDA margin 15-16%; operating leverage expected as order book executes.
Gas meters
Existing gas meter business; pure hardware supplier with no O&M; current run rate 40,000-50,000 units/month; needs new capacity build for smart gas meters.
Production 40,000-50,000/month · Normal gas meter ₹1,200-1,500 · Smart gas meter ₹3,000-3,500
Outlook: Opportunity of 8-10 cr gas meters in next 7-8 years; capacity expansion planned for smart gas meters.
Water meters
Long-term vision area; just entered international water meter market; developing domestic and export capability; no numbers given yet.
Outlook: Domestic water meter segment expected to take a big boom in 2-3 years; long-term international play.
Exports
International marketing investment over last 4-5 years; FY24 exports >₹100 cr; selling custom-built hardware only, no O&M abroad.
FY24 exports ~₹100 cr · FY25E exports ~₹150 cr · Unit price $50 to $500
Outlook: FY25 exports at least ₹150 cr; export hardware margins described as better than domestic.
Balance sheet, capex and funding
- Receivables ~₹580 cr at March-end 2024 (more than Q4 sales), comprising historical utility receivables plus meters installed but not yet integrated/billed.
- Bank guarantee exposure of ₹600-700 cr already submitted to electricity boards; 3-5% performance bank guarantee runs for the full contract period.
- Working capital cycle currently 5-6 months; management expects intensity to ease in the later part of FY25 as the business model scales.
- Q4 finance costs rose substantially owing to supplementary bank guarantees required to secure order influx; no retention element on projects.
The industry, as management sees it
Industry is entering an inflection: ~11 million smart meters have been cumulatively installed over 6-7 years, but management expects 60-70 million to be installed in FY25 alone, with the government's 25 crore target likely achieved within 4-5 years. Major states yet to start — Tamil Nadu, Karnataka, Rajasthan, Haryana, Punjab — represent the next leg of tender flow. Gas and water meter adjacencies (8-10 crore gas units over 7-8 years) will provide a secondary growth runway post the electricity smart meter wave.
Risks management named
- Working capital intensity at 5-6 months of receivables; improvement expected only in H2 FY25
- Higher finance expenses from supplementary bank guarantees required for order inflows
- Initial project expenses (manpower, offices, capability) running at INR 75-80 cr/quarter to persist for 2-3 quarters
- Public agitation in pockets like Gujarat (20-25k meters) — management considers normal
- Concentration risk: ~75-80% of platform order book value depends on Genus executing as EPC contractor
Q&A
The Q&A spanned 12 analysts with broad coverage of order book execution, FY25 guidance, working capital mechanics, and growth optionality in gas, water and exports. Pushback was strongest from Mohit Kumar (ICICI Securities), Darshil Pandya (Finterest) and Akash (Dalal & Broacha) on near-term guidance (margin, tax, finance cost, PAT margin) — most of which was deferred to MD Kailash Agarwal or SGA due to his absence. The notable surprise was the explicit L1 disclosure of ~INR 11,000 cr and the operating-leverage-driven margin expansion commitment for FY25.
Not answered directly
- Effective tax rate guidance
- Debt cost and current debt position
- Finance cost and JV loss trajectory on PAT margins
- Manufacturing locations for gas meters
- Gas meter capex for new capacity
Asked for a number, answered without one
- FY25 tax rate guidance: Deferred; MD said he is not quick on this and will have SGA come back with an answer.
- FY25 debt cost and current debt position: Deferred to Mr. Kailash Agarwal; not addressed on the call.
- FY26/FY27 specific guidance: Said FY26 will be much better than FY25 but declined to spell numbers; may revisit in 3-6 months.
- PAT margin trajectory and JV losses: MD said not equipped to answer; query noted for SGA to reply back.
- Gas meter capex for incremental capacity: Said the industry is not very capex intensive but gave no specific number.
Every question, with its answer
1. Order book status & FY25 guidance
Mohit Kumar, ICICI Securities
Question. What is the go-to-live status of the existing order book? And can you help us with revenue and margin guidance for FY25?
Answer, Jitendra Agarwal, Joint Managing Director. Every project is at a different stage of go-live and we are very much within project timelines; most projects are already on the ground. Management has guided FY25 revenue of approximately INR 2,500 crores and FY25 EBITDA margin of 15% to 16%.
Follow-up. And for the margin guidance, sir?
Answer. 15% to 16% EBITDA.
2. Tender pipeline & L1 conversion
Mohit Kumar, ICICI Securities
Question. What is the size of upcoming tender opportunity? Will GIC restrict Genus from bidding on orders larger than INR 3 billion?
Answer, Jitendra Agarwal, Joint Managing Director. There is no restriction from GIC; INR 3 billion was the minimum criteria, not a ceiling. Many tenders are at different stages and Genus is L1 in projects of around INR 11,000 crores, which should be known within a few months.
Follow-up. Is it possible to quantify the L1 status, sir?
Answer. Currently we have L1 in projects; exact number will be around INR 11,000 crores.
3. Execution & capability build-out
Mohit Kumar, ICICI Securities
Question. What are the execution challenges, and are you hiring to build capability for the large order book?
Answer, Jitendra Agarwal, Joint Managing Director. Smart metering is the core business Genus understands well; scale is larger than past. Significant investment in manpower, field capability and HQ systems over the last 12-24 months is visible in salary expenses. No unrealistic field challenges — acceptance has been strong even in lower-income states like Assam and Bihar.
4. Effective tax rate guidance
Darshil Pandya, Finterest Capital
Question. What is the tax guidance going forward? Last quarter you guided ~25% but the current run rate is higher than 25%.
Answer, Jitendra Agarwal, Joint Managing Director. Deferred. Management noted the question and said SGA will come back with the answer.
Not answered directly.
5. SPV structure rationale
Darshil Pandya, Finterest Capital
Question. What is the rationale behind incorporating so many SPV subsidiaries?
Answer, Jitendra Agarwal, Joint Managing Director. SPV creation is mandated by the standard bidding document — every project requires a separate SPV. Each SPV can only bid for one project. Genus has taken the route of separate SPVs per project right from the bid stage.
6. Debt cost & position
Darshil Pandya, Finterest Capital
Question. What is the debt cost for FY25 and the debt position as of date?
Answer, Jitendra Agarwal, Joint Managing Director. Deferred — Jitendra Agarwal said he would like this question to be answered later by Mr. Kailash Agarwal.
Not answered directly.
7. FY26/FY27 outlook
Darshil Pandya, Finterest Capital
Question. Any guidance for FY26 or FY27?
Answer, Jitendra Agarwal, Joint Managing Director. Very positive on FY25; FY26 will definitely be much better than FY25, but Jitendra declined to spell out numbers now — indicated a guidance may come in 3-6 months.
Partly answered.
8. Industry smart meter installation volumes
Pratik Jain, Solidarity Investment Managers
Question. What is the system-wide installed base of smart meters in India today and what is the realistic installation expectation for next year?
Answer, Jitendra Agarwal, Joint Managing Director. Approximately 11 million smart meters installed over 6-7 years (with pickup mainly in last 2 years). Personally expects 60-70 million smart meters to be installed in this financial year.
9. Government 25 cr target & import dependence
Pratik Jain, Solidarity Investment Managers
Question. Government has a target of 25 crore smart meters — when can this realistically happen? And what % of installed meters are imported from China?
Answer, Jitendra Agarwal, Joint Managing Director. Realistic assumption is the 25 crore target will be achieved in the next 4-5 years. Currently not a single meter is being imported from China; historical share may be 0.05%.
10. Other expense trajectory
Akash Vashishth, Future Generali India Life Insurance
Question. Other expenses have gone up ~INR 30 cr sequentially — what is the trajectory? Will the current ~INR 75-80 cr/quarter run rate persist?
Answer, Jitendra Agarwal, Joint Managing Director. Investment phase continues with manpower, offices and other setup costs; many projects will not start in the next 2-3 quarters. Yes — to a very large extent the current run rate of other expenses will remain.
11. EBITDA margin vs segmental EBIT gap
Akash Vashishth, Future Generali India Life Insurance
Question. Why is consolidated EBITDA margin ~13% vs ~16% EBIT in the metering segment?
Answer, Jitendra Agarwal, Joint Managing Director. There is significant investment happening on the ground for projects alongside the metering business; common allocations will smooth out as projects continuously execute in future.
Not answered directly.
12. State-level rollout pipeline
Akash Vashishth, Future Generali India Life Insurance
Question. Which major states are still expected to place smart meter orders in the near term?
Answer, Jitendra Agarwal, Joint Managing Director. Tamil Nadu, Karnataka, Rajasthan, Haryana and Punjab are the major states that have not started the smart metering journey yet — some have issued tenders or are in the process.
13. Receivables & platform execution
Chandresh Malpani, Niveshaay Investment Advisors
Question. How is execution on the ground given that Genus sells to its platform? Receivables of ~INR 580 cr exceed this quarter's sales.
Answer, Jitendra Agarwal, Joint Managing Director. Receivables include historical direct supplies to electricity boards; all EPC contracts are back-to-back from platform to Genus. Execution involves meter installation, SAP, HES/MDM integration and operation go-live — takes 6-9 months. Outstanding levels are similar to prior years.
14. Net metering opportunity
Chandresh Malpani, Niveshaay Investment Advisors
Question. Net metering is gaining traction — does this open additional opportunity for the industry?
Answer, Jitendra Agarwal, Joint Managing Director. Every smart meter is capable of net metering; some duplication may occur in next 2 years as smart and net meters get installed in parallel. A smart meter can do the job of a net meter but not vice versa.
15. Consumer agitation risk
Chandresh Malpani, Niveshaay Investment Advisors
Question. Some states like Gujarat are seeing protests on smart meter bills — do you see any execution challenge?
Answer, Jitendra Agarwal, Joint Managing Director. Management considers this normal; similar issues arose during electronic meter rollout in 2002-03. No agitation observed in Assam (2 million installed), Bihar (4.5 million), or UP (2.5 million). Just 20-25k meters installed in Gujarat — pocket-level rather than systemic.
16. Order book mix & Genus share
Akash, Dalal & Broacha
Question. Can you breakup the INR 21,000 cr order book between supply, installation and maintenance?
Answer, Jitendra Agarwal, Joint Managing Director. Approximately INR 1,500-2,000 cr is from historical direct utility supply tenders. The remaining ~INR 19,000 cr is platform-based, of which ~75-80% flows back to Genus via EPC. Of that 80%, roughly 50% is supply, 20% installation and 30% O&M (broadly 45-25-30 to 40-30-30 depending on project).
Follow-up. So out of the INR 19,000 crores, 80% will come back to Genus from the platform; around 60% for supply and installation should be bookable in next 2-3 years, right?
Answer. Yes, that's right — 60% of order book value is bookable on supply + installation + integration within the execution window.
17. AMISP pipeline & key customers
Ashwani Sharma, Emkay Global Financial Services
Question. How is the inquiry pipeline on the outer platform?
Answer, Jitendra Agarwal, Joint Managing Director. Very good pipeline from major AMISPs; Genus supplies meters to IntelliSmart and Adani. Current AMISP order book is more than INR 1,000 crores.
Follow-up. Opportunity in smart gas meters? And 4-5 year revenue aspiration?
Answer. Genus already does gas meters (currently conventional). Multiple lines being developed — gas, water, exports. FY24 exports >INR 100 cr, targeting INR 150 cr in FY25. Smart meter replacement cycle will also kick in after 10 years.
18. Working capital & bank guarantee mechanics
Jayesh Shah, OHM Portfolio Equity Research
Question. Walk through the working capital cycle: advances, receivable days, retention elements, and bank guarantees.
Answer, Jitendra Agarwal, Joint Managing Director. Most projects do not carry advance. For platform smart meter business, payment comes within 45 days of operation go-live. Currently a working capital intensive business (~5-6 months) — should improve from H2 FY25. No retention money; only performance bank guarantees equal to 3-5% of order book (currently INR 600-700 cr exposure). PBG runs for the full contract duration (e.g. 10 years).
19. O&M capability & future partnerships
Abhijit Purohit, Kaviraj Securities Pvt Ltd
Question. How will you support O&M and updates of the installed smart meters? Could other platforms like GIC emerge?
Answer, Jitendra Agarwal, Joint Managing Director. Proper O&M team will manage installed meters; Genus already does O&M for 0.5 million meters installed in Rajasthan. On GIC — exclusive tie-up exists; not currently seeing any need for additional partnerships.
20. Installation scalability
Vignesh Iyer, Sequent Investments
Question. What is the practical installation capacity per year? Can it be scaled?
Answer, Jitendra Agarwal, Joint Managing Director. No practical capacity constraint on installation — depends on field workforce and circle coverage; expandable without major capex. Country expected to install 60-70 million meters this year.
Follow-up. Around 60-65% of order value is booked on supply + installation, rest spread as O&M over 6-7 years; execution 24-30 months plus 6-7 years O&M = total 10-year contract. Correct?
Answer. Yes — execution period 24-30 months followed by 6-7 years O&M, total 10-year contract.
21. Exports, O&M margin & manufacturing
Smita Mohta, Kredent InfoEdge
Question. Export revenue mix in 5 years? O&M vs installation margins? Is Genus manufacturing meters or sourcing?
Answer, Jitendra Agarwal, Joint Managing Director. Significant export growth expected but no specific 5-year number. O&M margins are comparatively better than supply/installation. Every smart meter is produced in-house by Genus — not sourced.
Partly answered.
22. Capacity expansion
Darshil Pandya, Finterest Capital
Question. What is current manufacturing capacity and are you expanding?
Answer, Jitendra Agarwal, Joint Managing Director. Currently ~1 million meters/month. Adding capacity at Guwahati plant to reach a comfortable level of 1.5 crore electronic meters per year (~30 million capacity addition).
23. Post-smart-meter TAM & gas/water/exports strategy
Rishabh Gang, Sacheti Family Office
Question. What is the business plan after the smart electricity meter opportunity exhausts? TAM for smart gas, water and export meters? Unit value of gas meters? Margins on exports?
Answer, Jitendra Agarwal, Joint Managing Director. Multiple avenues being developed: 8-10 crore gas meters over next 7-8 years in India; water meter boom expected in 2-3 years; exports as hardware + solution provider ($50-$500 per meter, custom-built). O&M annuity also continues. Gas meter unit value INR 1,200-1,500 (normal), INR 3,000-3,500 (smart). Gas meter life 3-5 years; smart meter life ~10-12 years. Export hardware margins comparatively better than Indian margins (~15%).
24. Finance cost & JV loss trajectory
Akash, Dalal & Broacha
Question. How will finance cost and JV losses impact PAT margins over FY25 and FY26?
Answer, Jitendra Agarwal, Joint Managing Director. Not equipped to answer — management noted the query and said SGA would reply separately.
Not answered directly.
25. Communication technology choice
Chandresh Malpani, Niveshaay Investment Advisors
Question. Will cellular or RF technology dominate in India given density and geography?
Answer, Jitendra Agarwal, Joint Managing Director. Disagrees with the premise — both RF and cellular are successful globally depending on conditions. India will use a hybrid solution based on location-specific factors.
26. Platform equity vs value share
Smita Mohta, Kredent InfoEdge
Question. Why is the JV equity stake reported at only 26% while most of the order book sits with the platform?
Answer, Jitendra Agarwal, Joint Managing Director. 26% is Genus's equity investment in the platform — not the share of order book value. All platform orders route back to Genus as EPC at 75-80% of contract value.
27. Government stance on gas & water meters
Rishabh Gang, Sacheti Family Office
Question. What is the government's stance on gas and water meter rollout? Will installed gas meters be smart or conventional?
Answer, Jitendra Agarwal, Joint Managing Director. Government has a clear mandate that every household gas connection must be via pipeline; expects 8-10 crore gas meters in 7-8 years. Water meters still nascent. India currently installs mostly conventional gas meters, not smart.
What was said
Topic by topic, in the order it was spoken
Order Book Achievements & Visibility · Jitendra Agarwal (JMD)
- Total order book including SPVs and GIC platform has surpassed INR 21,000 cr.
- Since July 2023, secured INR 16,000 cr (net of taxes) in orders for installation of 1.82 cr smart prepaid meters.
- Management characterises client wins as a strong testament to dependability of cutting-edge smart metering solutions.
Order Execution Model & Timeline · Jitendra Agarwal (JMD)
- Typical lead time from order receipt to project start is 6-9 months due to statutory and integration formalities.
- Total execution cycle is 24-27 months, providing multi-year revenue visibility.
- All major orders bid for on a separate SPV basis as mandated by the standard bidding document.
Q4 FY24 Financial Performance · Jitendra Agarwal (JMD)
- Revenue INR 420.1 cr, up 108% YoY from INR 202.3 cr in Q4 FY23 on robust smart meter execution.
- EBITDA INR 65.4 cr, up 104% YoY; PAT INR 31.4 cr, up 151% YoY from INR 12.5 cr.
- Significant rise in employee costs and other expenses from workforce and systems build-out; PAT impacted by financing expenses on supplementary bank guarantees.
FY25 Outlook & Margin Trajectory · Jitendra Agarwal (JMD)
- Significant revenue surge expected from FY25 driven by strong order book performance and steady new order inflow.
- Management guided total FY25 revenue of approximately INR 2,500 cr.
- Operating leverage, realisation of economies of scale and continued cost management expected to materially improve operating margins.
In their words
We expect to record total revenue of about INR2,500 crores in financial year '25. With the operating leverage kicking in, we also expect our operating margin to significantly improve.
Our total order book, including all SPVs and GIC platform has surpassed INR 21,000 crores on date, indicating a promising outlook for future revenue growth.
In this financial year, I personally believe that at least 60 million to 70 million smart meters will be installed.
To check next time
What management committed to on this call, or the dates they gave.
- FY25 revenue execution against the ~₹2,500 cr target
- EBITDA margin progression toward the 15-16% range as operating leverage kicks in
- Conversion of L1 orders worth ~₹11,000 cr into confirmed order book
- Working capital cycle improvement from the current 5-6 months
- Guwahati plant capacity addition toward 1.5 cr electronic meters per year
- Tax rate trajectory clarification (deferred on this call)
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Thu 30 May 2024 | ₹301.85 | −4.99% | −0.95% |
| 5 sessions Wed 5 Jun 2024 | ₹277.35 | −12.70% | −0.37% |
| 20 sessions Thu 27 Jun 2024 | ₹306.50 | −3.53% | +5.90% |
From the close of Wed 29 May 2024, ₹317.70: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Genus Power Infrastru's other calls
- Q2 FY27Thu 19 Nov 2026Tone: Mixed
- Q2 FY27Mon 16 Nov 2026Tone: Mixed
- Q4 FY26Tue 19 May 2026Tone: Confident
- Q3 FY26Wed 18 Feb 2026Not read
- Q3 FY26Wed 11 Feb 2026Not read
- Q2 FY26Fri 7 Nov 2025Tone: Confident
- Q1 FY26Mon 11 Aug 2025Tone: Confident
- Q4 FY25Mon 2 Jun 2025Tone: Confident
- Q3 FY25Fri 14 Feb 2025Tone: Mixed
- Q2 FY25Wed 30 Oct 2024Tone: Confident
- Q1 FY25Wed 31 Jul 2024Tone: Confident