Genus Power Infrastru Q2 FY26 earnings call

Fri 7 Nov 2025GENUSPOWER

In brief

Genus Q2 FY26 revenue up 136% YoY to Rs. 1,149 cr; FY26 guidance raised to Rs. 4,500 cr at 20% EBITDA margin

Management's tone
Confident
What was said
Leaned positive
Guidance
Guidance raised
Analyst pushback
Low
Stock, next session
−0.27% (Nifty 50 −0.07%)
  • Q2 FY26 standalone revenue up 136% YoY to Rs. 1,149 cr; EBITDA at Rs. 244 cr with margin up 456 bps to 21.3%; PAT from continuing ops rose 162% to Rs. 148 cr.
  • FY26 guidance revised up: revenue Rs. 4,500 cr (from Rs. 4,000 cr) and EBITDA margin 20% (from 18%); new FY27 guidance Rs. 5,500-6,000 cr at 20% EBITDA margin.
  • Order book at Rs. 28,758 cr (net of taxes) for 3.6 cr meters; 13 of 24 AMISP projects (2.10 cr meters) have OGL; remaining 11 expected by Dec 2025-Jan 2026.
  • Cash-flow positive now expected in FY27 versus FY26 earlier; working capital cycle targets 160-170 days by end-2027 with 40-50 day reduction every 6 months.
  • Gross debt at Rs. 1,744 cr (Sep 30, 2025), expected to peak at Rs. 2,000-2,100 cr and start reducing from middle of FY28; cash and equivalents ~Rs. 600 cr; net debt Rs. 1,150 cr.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY26

This quarterA year agoLast quarterMargin
Revenue₹1,149 cr+136.0%+21.9%
EBITDA (excl. other income)₹234 cr+187.8%+17.3%20.4% (16.7% a year ago)
Net profit₹0 cr——0% (0% a year ago)
EPS (₹)₹5.17+72.3%+4.0%

From the company's filed results for the quarter ended 30 Sept 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

Where management's figures differ from the filing

  • Q2 FY26 EBITDA: said Rs. 244 cr, margin 21.3%; filed Rs. 233.92 cr, margin 20.4% (excl. other income). Management figure of Rs. 244 cr matches filed EBITDA plus other income of Rs. 10.84 cr; ~4.3% gap, above 3% threshold, definitional.

What moved the numbers, as management explained it

  • Q2 revenue +136% YoY: AMISP projects transitioning to operational phases drove sharp growth; large projects now in execution phase.
  • EBITDA margin +456 bps YoY to 21.3%: operating leverage, cost control, and execution efficiency; better absorption of fixed costs.
  • PAT +162% to Rs. 148 cr despite higher finance expenses: improved operating performance and better absorption of fixed costs.
  • Working capital cycle improvement: debtor days reduced 61 to 126 by Sep 2025 (from 187 at Mar 2025); inventory held high due to new project ramp-up at multiple sites.

The numbers management led with

  • Order book: Rs. 28,758 crores (net of taxes) for ~3.6 crore meters
  • Meters installed to date: 80 lakh installed, 42 lakh SAT done, 40 lakh at OGL out of 3.62 cr order book
  • Market share: ~25% in awarded AMISP smart meter tenders
  • JV Platform stake: 26% in JV Platform with GIC; Rs. 318 cr already invested, Rs. 700–800 cr more over FY26–FY28; total ceiling Rs. 1,000–1,100 cr

Guidance

Guidance on this call

WhatForWhat management saidFiled
FY26 revenueFY26FY26 revenue Rs. 4,500 crores (revised up from Rs. 4,000 crores)₹4,751 cr, above the figure guided
FY26 EBITDA marginFY26FY26 EBITDA margin 20% (revised up from 18%)19.2%, below the figure guided
FY27 revenueFY27FY27 revenue Rs. 5,500-6,000 crores—
FY27 EBITDA marginFY27FY27 EBITDA margin 20%—
FY26 meter installations (Smart metering)FY26Target 80+ lakh meter installations in FY26 (earlier band 80-90 lakh)—
Peak gross debtFY28Expected peak gross debt Rs. 2,000-2,100 crores, to start reducing from middle of FY28—
JV Platform with GIC total investment cap (Joint venture)FY28Total investment in JV Platform capped at Rs. 1,000-1,100 crores over FY26-FY28—
Working capital cycle targetFY28Working capital cycle to reach 160-170 days by end of 2027, via 40-50 day reduction every 6 months—
Kotputli injection molding plant - phase 1FY26Phase-1 40 machines at new Kotputli injection molding plant to be operational by end-FY26—

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

What changed since the Mon 11 Aug 2025 call

WhatOn the Mon 11 Aug 2025 callOn this call
FY26 revenue guidance (raised)FY26 revenue guidance of >Rs. 4,000 cr maintainedFY26 revenue revised to Rs. 4,500 cr
FY26 EBITDA margin guidance (raised)18% EBITDA margin maintained20% EBITDA margin
FY27 revenue and margin guidance (new)Not separately quantified; 1.1-1.2 cr meter installations indicatedFY27 revenue Rs. 5,500-6,000 cr with 20% EBITDA margin
Operating cash-flow positive timing (delayed)Cash-flow positivity targeted in FY26 itselfMay take more time; cash-flow positive in FY27
JV Platform with GIC total investment (cut)Around Rs. 1,600-1,700 cr envisagedTotal cap of Rs. 1,000-1,100 cr expected; won't exceed that
Peak gross debt level (new)Not quantifiedPeak expected at Rs. 2,000-2,100 cr; to start reducing from middle of FY28
Order book value (restated)~Rs. 29,300 crRs. 28,758 cr (net of taxes) for 3.6 cr meters

Guided on earlier calls, and what was filed

WhatForGuidedFiled
FY25 total revenueFY25₹2,500 cr (on the Q4 FY24 call)₹2,442 cr, below the figure guided
FY25 EBITDA marginFY2515–16% (on the Q4 FY24 call)17.8%, above the range
Stated revenue targetFY25₹2,500 cr (on the Q1 FY25 call)₹2,442 cr, below the figure guided
Expected EBITDA marginsFY2515–16% (on the Q1 FY25 call)17.8%, above the range
FY25 revenue guidanceFY25₹2,500 cr (on the Q3 FY25 call)₹2,442 cr, below the figure guided
Average EBITDA marginFY2515–16% (on the Q3 FY25 call)17.8%, above the range
Next financial year revenue growthFY2630–35% (on the Q3 FY25 call)94.5%, above the range
Next-year revenue increaseFY2630–40% (on the Q3 FY25 call)94.5%, above the range
FY26 EBITDA marginFY2615–16% (on the Q3 FY25 call)19.2%, above the range
FY26 top lineFY26₹4,000 cr (on the Q4 FY25 call)₹4,751 cr, above the figure guided
FY26 EBITDA marginFY2618% (on the Q4 FY25 call)19.2%, above the figure guided
FY26 revenueFY26at least ₹4,000 cr (on the Q1 FY26 call)₹4,751 cr, within the range
FY26 EBITDA marginFY26at least 18% (on the Q1 FY26 call)19.2%, within the range

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Smart metering (AMISP and direct utility supply)

Q2 revenue up 136% YoY at Rs. 1,149 cr, driven by AMISP projects transitioning to operational phases. 24 projects live, 13 OGL on 2.10 cr meters. H1 manufactured 90 lakh meters, with ~50% to JV Platform with GIC and ~50% to government/private utilities.

Q2 FY26 revenue Rs. 1,149 cr (+136% YoY) · Q2 FY26 EBITDA Rs. 244 cr, margin 21.3% · Q2 FY26 PAT from continuing operations Rs. 148 cr (+162% YoY) · H1 FY26 revenue Rs. 2,091 cr (+132% YoY) · H1 FY26 EBITDA Rs. 444 cr, margin 21.2% · Order book Rs. 28,758 cr for 3.6 cr meters · 13 of 24 AMISP projects OGL on 2.10 cr meters · H1 FY26 installations 36 lakh meters · H1 FY26 manufacturing 90 lakh meters at ~50,000/day

Outlook: FY26 revenue Rs. 4,500 cr at 20% EBITDA; FY27 Rs. 5,500-6,000 cr at 20% EBITDA; 11 remaining AMISP projects to achieve OGL by Dec 2025-Jan 2026; FY26 installation target 80+ lakh meters.

Balance sheet, capex and funding

  • Gross debt Rs. 1,744 cr as on Sep 30, 2025, up ~Rs. 400 cr from Mar 31, 2025; increase primarily from short-term loans; expected to peak at Rs. 2,000-2,100 cr and start reducing from middle of FY28.
  • Cash and cash equivalents ~Rs. 600 cr (in fixed deposits); net debt Rs. 1,150 cr.
  • Working capital: debtor days 126 (Sep 2025) versus 187 (Mar 2025); management targets 40-50 day reduction every 6 months, reaching 160-170 days by end-2027.
  • JV Platform with GIC: Rs. 318 cr invested as on Sep 30, 2025; expects additional Rs. 700-800 cr over FY26-FY28, total cap Rs. 1,000-1,100 cr (down from earlier Rs. 1,600-1,700 cr).
  • New injection molding plant at Kotputli, Rajasthan: phase-1 40 machines to be operational by end-FY26, for in-house plastic moulded meter components.
  • H1 FY26 capex not separately disclosed; expansionary capex indicated by new injection molding plant and JV investments.

The industry, as management sees it

RDSS is the dominant near-term driver: ~25 cr meters sanctioned so far, with another 6–6.5 cr meters expected to be tendered in 12–18 months and large states (Karnataka, Telangana) yet to join, potentially pushing total to 30–31 cr. Adjacent verticals — gas (12–14 cr units over 5–6 years, likely to pivot to prepaid) and water meters (potentially larger than electricity over 4–6 years) — are emerging opportunities where Genus plans to participate.

Risks management named

  • Cash flow positive may slip to FY27 versus earlier FY26 expectation due to elevated project-level inventory
  • Gross debt at Rs. 1,744 cr with peak borrowing expected at Rs. 2,000–2,100 cr; short-term loans have driven the increase
  • Tender evaluation timelines for Tamil Nadu, Delhi and Punjab are outside management's control and could take 30–90 days
  • Latching relays and certain components still imported from China; no in-house relay manufacturing planned
  • Local field-level execution issues in states like Maharashtra can cause intermittent slowdowns

Q&A

Q&A was friendly and low-pressure, with 10 analysts probing execution, market share, working capital, and forward growth vectors (gas/water/exports). Management gave direct answers on most operational metrics — installation, OGL status, JV investment revision — and was transparent on the slippage of cash flow positivity to FY27. The only soft deflections were on third-party meter margins (not shared) and order flow quantum (asked to refer to opening remarks). No aggressive pushback; one broker (Kaviraj Securities) hosted with a single analyst on the panel as well.

Not answered directly

  • Third-party meter margin differential — management declined to share the number
  • Order flow quantum from upcoming tenders — asked analyst to refer to opening remarks

Asked for a number, answered without one

  • Margin differential between meters supplied to third parties vs JV Platform: Management declined to share, saying "That number, we don't share."
  • Target order inflow value from live Tamil Nadu, Delhi and Punjab tenders: Redirected to opening remarks; no quantified inflow value provided.
  • Timing for finalisation of live tenders: "It is very, very difficult to say... it may take 30 days, it may take 90 days, very difficult to put any number onto it." Management later said hopeful of finalisation in this financial year.

Every question, with its answer

  1. 1. Installation volume

    Divyansh Thakur, Finterest Capital

    Question. How many meters have been installed in Q2 FY26 and how are we planning to reach the 80–90 lakh installation guidance?

    Answer, Jitendra Agarwal, Joint Managing Director. Q2 FY26 installation was ~19 lakh meters. In H1, ~36 lakh meters have been installed. Management is confident of meeting the +80 lakh installation guidance for FY26 since November–March is historically the best installation period.

  2. 2. OGL status and capacity

    Bhavin Chheda, Enam Holdings

    Question. How many meters are at OGL and are we now receiving monthly revenue? Also, what was Q2 manufacturing volume and how is per-day capacity ramping?

    Answer, Jitendra Agarwal, Joint Managing Director. Out of 3.62 cr meter order book, 80 lakh installed, 42 lakh SAT done, 40 lakh at OGL; monthly revenue starts 45 days after OGL. Q2 manufacturing ~50 lakh meters (~50,000/day, ~15 lakh/month). Current capacity sufficient; can add shifts if needed. Volume guidance raised to 80 lakh for FY26 (from 75 lakh) and next year expected above 1 cr.

    Follow-up. Per-day capacity ramp outlook?

    Answer. Current capacity is comfortable; if more is needed, additional shifts can be added. No capacity constraint at this stage.

  3. 3. Indigenisation and components

    Eshwar Arumugam, iThought PMS

    Question. What degree of indigenisation do we have in smart meters, given competitors like HPL Electric are partnering with Chinese firms and Permanent Magnets is setting up relay capacity?

    Answer, Jitendra Agarwal, Joint Managing Director. Smart meters fall under Category 1 of Make-in-India; >60% value addition required in India. Genus is comfortably in this category as the largest meter manufacturer. On latching relays specifically: Genus does not manufacture them, buys from suppliers (both Indian and Chinese), and does not plan to manufacture them in future. Declined to comment on competitors' partnerships.

    Follow-up. Are latching relays being imported from China?

    Answer. Yes, partly from China but also from multiple Indian manufacturers. No plans for in-house relay manufacturing.

  4. 4. Guidance reiteration

    Darshil Jhaveri, Crown Capital

    Question. Could you reiterate the revenue and margin guidance? And what is the expected order flow value from upcoming tenders this year/next?

    Answer, Kailash Agarwal, Vice Chairman. FY26 revenue Rs. 4,500 cr, FY27 Rs. 5,500–6,000 cr; EBITDA margin 20% for both years. On order flow quantum from upcoming tenders, Kailash Agarwal directed analyst to the opening remarks where market size numbers had already been given.

    Follow-up. Order inflow expectation from new tenders?

    Answer. Deflected — asked analyst to refer to opening remarks where full market detail was provided.

    Not answered directly.

  5. 5. Tender status and margin guidance

    Mahesh Patil, ICICI Securities

    Question. Status of the open tenders (Tamil Nadu, Delhi, Punjab totalling ~4 cr meters), especially Tamil Nadu. Given H1 EBITDA margin was >21%, will FY26 cross 21–22%? And what is the margin differential for third-party-supplied meters?

    Answer, Jitendra Agarwal, Joint Managing Director. Tamil Nadu (6 projects), Delhi (2), Punjab (5) total 13 projects/~4 cr meters; Genus has quoted all 13. Tamil Nadu and Delhi are under technical evaluation; Punjab bid (26 lakh) submitted. On margin: management wants to be conservative at 20% guidance even though H1 is at 21% — driven by operational efficiencies. Margin split for third-party meters is not shared.

    Follow-up. Margin differential for third-party meters?

    Answer. That number, we don't share.

    Not answered directly.

  6. 6. Export, gas/water, tender timeline, competitor

    Mahek Talati, Agility Advisors

    Question. Views on export market and gas/water smart meter opportunity? Status of pending 3.6 cr meter tenders and expected timeline? Views on competitor Kimbal Technologies?

    Answer, Jitendra Agarwal, Joint Managing Director. Export market: Genus is strategically working in select markets; meaningful revenue expected in 2–3 years (currently small). Gas meters: 12–14 cr units opportunity in 5–6 years; may go prepaid or RDSS route. Water meters: very large opportunity, potentially as large or larger than electricity in 4–6 years. Pending 3.6 cr tenders (Tamil Nadu, Delhi, Punjab) under technical evaluation; will be decided this financial year. On Kimbal: declined to comment on competitors.

    Follow-up. Tender finalisation timeline?

    Answer. Hard to put a number; technical evaluation may take 30–90 days. Kailash Agarwal: should be finalised within this financial year.

  7. 7. Installation geography, Maharashtra, outreach, software

    Pranjal Mukhija, Growthsphere Ventures LLP

    Question. From which states will the 80 lakh installation target be met? Do we have meaningful share in Maharashtra? Any slowdown due to Maharashtra municipal elections? Update on consumer outreach and software/HES/SDM plans?

    Answer, Jitendra Agarwal, Joint Managing Director. All 24 projects running; 80 lakh target from all states per order book mix. Maharashtra is a smaller share of total; only intermittent field-level slowdowns, not a major issue. Consumer outreach is joint with utilities via BTL/media/local metrics — most consumer resistance has neutralised; app downloads rising. Software: focusing on own HES and SDM; software cell is a sizeable opportunity for future monetisation.

    Follow-up. Medium of consumer outreach?

    Answer. Utility-specific — BTL, media, local metrics; varies by state.

  8. 8. Market share and post-RDSS revenue

    Darsh Solanki, Axis Securities

    Question. Of the 15–16 cr balance meter opportunity, what market share are we targeting? And once the RDSS scheme finishes, will revenue shift to exports and water meters?

    Answer, Jitendra Agarwal, Joint Managing Director. Current market share ~25%; management will try to maintain or improve. Participate in every tender. Kailash Agarwal: clear path of 5 years for RDSS electricity meters; thereafter replacement (10–12 year meter life), new connections, O&M of 30 cr installed meters, plus exports, water and gas will drive revenue post-2031/32.

  9. 9. Plant visit request

    Pranjal Mukhija, Growthsphere Ventures LLP

    Question. Request to organise a plant visit to the Haridwar facility.

    Answer, Kailash Agarwal, Vice Chairman. Kailash Agarwal asked analyst to connect with SGA (Investor Relations) to arrange the visit.

  10. 10. Cash flow timing and payment mechanics

    Santanu Chatterjee, Mount Intra Finance Private Limited

    Question. On cash flow guidance — earlier you said FY26 cash flow positive; is that still on or pushed to FY27? Also, after OGL, are payments received from an Escrow/DDF account or directly from state electricity boards?

    Answer, Kailash Agarwal, Vice Chairman. Cash flow positive may slip to FY27 (not FY26) because of working capital needs for the 24 projects; every site needs inventory. Jitendra Agarwal: payments flow through a DDF (Designated Dedicated Fund) account which is separate.

  11. 11. JV Platform investment revision

    Chandresh Malpani, Niveshaay

    Question. Earlier the JV Platform investment was guided at Rs. 1,600–1,700 cr; now you mention Rs. 1,100 cr. What changed? Does it affect stake or exclusivity?

    Answer, Kailash Agarwal, Vice Chairman. Maximum committed investment was Rs. 1,600 cr but due to better cash flows and execution at the JV, the actual ceiling will not exceed Rs. 1,100 cr. Has no impact on stake (26%) or exclusivity — purely a requirement-based revision.

What was said

Topic by topic, in the order it was spoken

Q2 and H1 FY26 Financial Performance · Kailash Agarwal (Vice Chairman)

  • Q2 FY26 standalone revenue Rs. 1,149 cr vs Rs. 487 cr in Q2 FY25, growth of ~136% YoY, driven by AMISP project transition to operational phase
  • Q2 FY26 EBITDA more than tripled YoY to Rs. 244 cr; EBITDA margin improved 456 bps to 21.3% on operating leverage and cost control
  • Q2 FY26 PAT from continuing operations at Rs. 148 cr (+162% YoY); PAT margin 12.9% reflecting better fixed-cost absorption despite higher finance costs
  • H1 FY26 revenue Rs. 2,091 cr (+132% YoY); H1 EBITDA over 3x at Rs. 444 cr with 21.2% margin; H1 PAT Rs. 277 cr (+185% YoY)

Market Size and RDSS Pipeline · Kailash Agarwal (Vice Chairman)

  • Total RDSS meter requirement is ~25 cr meters; 15 cr already awarded, 10 cr pending across Gujarat, Kerala, MP, Punjab, TN, WB, Haryana and Delhi
  • Three live tenders currently: Tamil Nadu (3.05 cr), Delhi BSES (50 lakh), Punjab (26 lakh); balance 6–6.5 cr meters expected in next 12–18 months
  • States like Karnataka and Telangana yet to come under RDSS — incremental opportunity could push total addressable to 30–31 cr meters
  • Only 4.5 cr smart meters installed in India to date out of 15 cr awarded; less than 50% of expected 30–31 cr meters have been finalised

Working Capital, Debt and Cash Position · Kailash Agarwal (Vice Chairman)

  • Debtor days reduced from 187 (Mar 25) to 126 (Sep 25) — a 61-day improvement; inventory days still elevated as new projects ramp
  • Working capital cycle expected to reduce by 40–50 days every 6 months, targeting 160–170 days by end-2027
  • Gross debt at Rs. 1,744 cr as of Sep 25 (up ~Rs. 400 cr from Mar 25), primarily short-term loans; expected peak borrowing Rs. 2,000–2,100 cr
  • Cash and equivalents ~Rs. 600 cr; net debt ~Rs. 1,150 cr; debt expected to start reducing from middle of FY28

JV Platform with GIC and Capex · Kailash Agarwal (Vice Chairman)

  • Rs. 318 cr already invested in JV Platform (26% stake); another Rs. 700–800 cr planned over FY26–FY28
  • Total investment ceiling revised down to Rs. 1,000–1,100 cr from earlier Rs. 1,600–1,700 cr projection — stake and exclusivity unchanged
  • New injection molding plant at Kotputli, Rajasthan; first phase 40 machines to be operational by end of FY26, supplements meter capacity

Revised FY26 and FY27 Guidance · Kailash Agarwal (Vice Chairman)

  • FY26 revenue guidance raised to Rs. 4,500 cr (from Rs. 4,000 cr); EBITDA margin guided at 20% (from 18%)
  • FY27 revenue pre-guided at Rs. 5,500–6,000 cr at 20% EBITDA margin
  • Meter installation volume guidance raised to 80 lakh+ for FY26 (from 75 lakh earlier); next year expected to cross 1 cr

Operations and Order Book Snapshot · Kailash Agarwal (Vice Chairman)

  • H1 FY26 manufacturing ~90 lakh meters; ~50% supplied to government/private utilities and other AMISPs, balance to GIC JV Platform
  • Order book of Rs. 28,758 cr (net of taxes) for ~3.6 cr meters across utilities, AMISPs and JV Platform
  • Additional Rs. 127 cr of non-smart meter orders received in H1 FY26 for ~9 lakh regular meters
  • Out of 24 AMISP projects, 13 (2.10 cr meters) have OGL; remaining 11 expected by Dec 25–Jan 26

In their words

The company estimates revenue of INR 4,500 crores for Financial Year 2026 and INR 5,500-6,000 crores for Financial Year 2027 with an EBITDA margin of 20%.
Kailash Agarwal (Vice Chairman, Genus Power)
By the end of 2027, we are very hopeful that our working capital cycle from here also will go to 160-170 days, which we have earlier told to the investors.
Kailash Agarwal (Vice Chairman, Genus Power)
Water meters we see as a very, very large opportunity as big as or even bigger than electricity meters... Four years to six years down the line, we see water meter business to be as large or even larger than electricity meter business.
Jitendra Agarwal (Joint Managing Director, Genus Power)

To check next time

What management committed to on this call, or the dates they gave.

  • Progress on 80+ lakh meter installation target for FY26 (36 lakh installed in H1)
  • Outcome of Tamil Nadu 3.05 cr meter tender (under technical evaluation, targeted this financial year)
  • Next 40-50 day working capital cycle reduction by March 2026
  • Status of 11 remaining AMISP projects achieving OGL by Dec 2025-Jan 2026
  • Cash-flow positive trajectory (now targeted in FY27)
  • Gross debt progression towards peak Rs. 2,000-2,100 cr; short-term loan composition

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Fri 7 Nov 2025₹353.50−0.27%−0.07%
5 sessions Thu 13 Nov 2025₹329.95−6.91%+1.45%
20 sessions Thu 4 Dec 2025₹305.15−13.91%+2.05%

From the close of Thu 6 Nov 2025, ₹354.45: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Genus Power Infrastru's other calls