- +20.00% (Nifty 50 +0.37%)
- Q3 FY25 order intake at record ₹11,594 cr (up 838% YoY) led by Khavda-Nagpur HVDC consortium win with BHEL
- Order backlog hits all-time high of ₹18,994 cr; company became debt-free as of Dec 31, 2024
- Operational EBITDA margin at 10.1%, double-digits achieved earlier than guided; FY25 guidance maintained
- QIP enabling resolution of up to ₹4,200 cr approved; ₹2,000 cr capex over 4-5 years already announced
- Service business unit (5th BU) launching April 1, 2025 to monetise ₹80,000+ cr installed base; exports >40% of orders ex-HVDC
An AI read of the company's transcript · the filing
The numbers
The quarter, Q3 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,620 cr | +27.2% | +4.3% | |
| EBITDA (excl. other income) | ₹167 cr | +145.5% | +52.1% | 10.3% (5.3% a year ago) |
| Net profit | ₹137 cr | +498.1% | +162.7% | 8.5% (1.8% a year ago) |
| EPS (₹) | ₹32.41 | +498.0% | +162.6% |
From the company's filed results for the quarter ended 31 Dec 2024 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
The numbers management led with
- Quarterly order intake: ₹11,594.3 cr (Q3 FY25, +838% YoY)
- Order backlog: ₹18,994.4 cr (highest ever, as of Dec 31, 2024)
- QIP enabling resolution size: Up to ₹4,200 cr (Board approval dated 18 Jan 2025)
- India capex commitment: ₹2,000 cr over 4-5 years for capacity expansion
Guidance
Guidance on this call
| What | For | What management said | On the Q2 FY25 call |
|---|---|---|---|
| Operational EBITDA margin | FY25 | Double-digit margin guidance for FY25 maintained; already achieved 10.1% in Q3 FY25 (held) | Double-digit margin trajectory maintained for end-FY25 with no change in plan |
| HVDC Khavda-Nagpur execution timeline | FY26-FY29 | Bipole-I: 48 months contractual; Bipole-II: 54 months contractual | — |
| HVDC revenue booking pattern | FY26-FY28 | Revenue booking low in Year 1, bulk in Years 2 and 3 of contract | — |
| India capex commitment | Next 4-5 years | ₹2,000 cr investment over the next 4-5 years for capacity expansion, transformer upgrades, traction and HVDC capacity | — |
| Fund raise size | Unspecified | Enabling resolution to raise up to ₹4,200 cr — timing and structure not specified | — |
| Service business unit | FY26 | Fifth business unit to commence 1 April 2025 targeting ₹80,000+ cr installed base | — |
Said on the Q2 FY25 call, not repeated on this one (4)
- Order backlog coverage: Backlog of Rs 8,910 cr provides approximately 26 months of revenue visibility
- HVDC order conversion: At least one, if not two, of the remaining HVDC tenders expected to be finalised in this financial year
- IT cost run-rate: IT cost to hover around 2.7-3% range going forward; last leg of ABB TSA agreement to end by December 2024
- Related-party order flow: Of approved ~Rs 1,200 cr from parent-related entities, ~Rs 300+ cr has flowed in till 30 Sep 2024; expected to cross threshold by year-end
The business
The industry, as management sees it
Management remains constructive on India's energy transition despite a downward revision in FY25 GDP growth to 6.4%. Backlog visibility is anchored by ~₹18 lakh cr in renewable generation investment, ₹9.16 lakh cr in transmission outlay under the National Electricity Plan (35% capacity increase by 2032), a $6-7 bn data centre market by 2027, and ongoing railway modernisation. HVDC in particular is described as a multi-decadal opportunity with the country now needing 'two projects per year' versus the historical one in four-to-five years.
Risks management named
- Slight delay in awarding of certain transmission projects, though described as not major
- Renewables segment showed 68% YoY decline this quarter — flagged as seasonal
- QIP sizing of ₹4,200 cr flagged as larger than near-term visible CapEx
- Revenue from current HVDC order back-ended — low in Year 1, bulk in Years 2-3
Q&A
Q&A was dominated by HVDC-related questions — almost every analyst probed on Khavda-Nagpur order sizing, indigenous manufacturing, the HVDC pipeline (Bhadla, Khavda-Olpad, Pang-Kaithal, Leh-Ladakh), VSC vs LCC positioning and the long-term opportunity. The second-most-discussed topic was the ₹4,200 cr QIP enabling resolution, where management fielded pointed questions on OFS versus fresh issue, deployment plan and sizing relative to ₹2,000 cr capex — declining to clarify. Pushback was strongest on QIP structure (Parikshit Kandpal) and on HVDC order size (Subhadip Mitra). Margin guidance was reaffirmed by the CFO but no forward trajectory was offered.
Not answered directly
- HVDC order exact sizing in order book
- QIP structure — fresh issue versus OFS and instrument type
- Battery energy storage update
- Data centre revenue contribution guidance
- Forward margin trajectory beyond FY25 double-digit commitment
Every question, with its answer
1. HVDC order sizing, pipeline & QIP fund usage
Subhadip Mitra, Nuvama
Question. Congrats on double-digit margins ahead of guidance. Could you outline the size of the Khavda-Nagpur HVDC order in your order book? Is the booked amount after excluding BHEL's portion? And is most of this indigenously manufactured with lower import content? Also, would the upcoming Bhadla, Khavda-Olpad and Pang-Kaithal HVDC tenders get ordered out over the next 12 months, and are you participating in all three? Finally, on the QIP — what would the funds be used for?
Answer, N Venu, MD & CEO. On HVDC order size — we do not give exact numbers, as we have said earlier. The BHEL portion is not booked in our books; only our share is. Yes, the project is indigenously manufactured with lower import content. On upcoming HVDC tenders — we will participate in as many as possible; assessment is one of the two remaining tenders (Bhadla or Khavda-Olpad/Pang-Kaithal) could finalise in the next six months, and one in the last quarter of next fiscal year, but it depends on customer finalisation. On QIP — enabling resolution; ₹2,000 cr was already announced in October 2024 for capacity expansion (transformer, traction, HVDC, network control), plus working capital, strategic initiatives, M&A and possible debt pre-payment. We will update on timing when decided.
Not answered directly.
2. QIP size, structure and HVDC execution
Parikshit Kandpal, HDFC Securities
Question. On HVDC, is this executed entirely by the Indian entity or in partnership with the parent? What is the import content? On the ₹4,200 cr QIP — this looks very large versus ₹2,000 cr CapEx and given order book run-rate could imply ~₹20,000 cr revenue potential; does this include any capacity allocation for global export markets? And is this an entirely fresh issue with no OFS component?
Answer, N Venu, MD & CEO. HVDC is executed entirely by the Indian entity. Import content is limited to semiconductors and CRGO steel for transformers; 80-90% is locally manufactured. On QIP — Board approved raising up to ₹4,200 cr on 18 January; this is an enabling resolution for capital structure flexibility, covering HVDC, transformer, high-voltage expansions, working capital, M&A and potential debt pre-payment. We will not comment on OFS versus fresh issue at this stage — it is only an enabling resolution.
Not answered directly.
3. Domestic order momentum & HVDC revenue ramp
Mohit Kumar, ICICI Securities
Question. The order inflow appears driven by exports and HVDC — how do you characterise domestic orders excluding HVDC? Given large transmission activity, is the YTD FY25 weakness in domestic awards just a delay that will pick up? And what is the timeline for HVDC Khavda-Nagpur execution — is revenue booking back-ended?
Answer, N Venu, MD & CEO. Excluding HVDC, base order growth was double-digit YoY, fuelled by both exports and domestic — particularly data centres and industries. On domestic delays — slight delays are expected but not major; pipeline is robust and customers are finalising orders. HVDC execution timeline: contractually 48 months for Bipole-I and 54 months for Bipole-II. Revenue booking is low in the first 12 months, with the bulk coming in Years 2 and 3.
4. HVDC technology positioning & long-term market opportunity
Mohan Krishnaswami, Individual investor
Question. On HVDC technology — one of your leading competitors publicly claims VSC is superior to LCC, yet most Indian bids are LCC-based. But the Adani VSC order went to Hitachi. What is the preferred basis in India and why? Separately, India has only ~33,000 MW of HVDC versus China's 300,000 MW and power demand heading to 400,000 MW — where do you see India's HVDC capacity heading over the next five-to-six years?
Answer, N Venu, MD & CEO. On technology — Hitachi invented HVDC 70 years ago; we run 150 GW globally across both VSC and LCC. In India, for 6,000 MW transfers in one link, LCC is more cost-effective; VSC has technological limits above 3,000 MW. But we offer both and leave it to the customer. The Mumbai project was VSC. On growth potential — I have been saying for 2-3 years that India needs one HVDC project per year versus the historical one in four-to-five years; today the need is two projects per year. The opportunity is multi-decadal and we are investing accordingly in factories, capacity and people.
5. Competitive positioning in HVDC
Vinod Chari, Phillip Capital
Question. You reportedly have ~50% HVDC market share in India and globally — what differentiates Hitachi against ABB/Siemens/GE Vernova? Is it localisation? And on the National Electricity Plan, intra-state is a big component — do you see DC technology making inroads there?
Answer, N Venu, MD & CEO. We do not talk about competition, we talk about ourselves — invented the technology 70 years ago, continuous investment in footprint reduction, losses, localisation, local competency and execution capability are the clear differentiators. On intra-state DC — every technology makes sense depending on distance, grid strength and ROI; even at lower distances and 1,000 MW, DC is being used globally for its inherent benefits.
Partly answered.
6. Industry investment split & HVDC execution timeline
Ruchita Parik, I-Wealth LLP
Question. Of the ₹9 lakh cr transmission investment outlined in NEP, how much is substation versus line — and within substations, what's the split across 765kV/400kV/220kV? Also, when do we see execution of the Khavda-Nagpur HVDC project?
Answer, N Venu, MD & CEO. On industry split — we do not have off-hand figures; the NEP-24 plan has the complete breakdown. The ₹9.16 lakh cr covers transmission including HVDC, 765kV and 400kV — ISDS comes in there. On HVDC execution — already reiterated: 48 months for Bipole-I and 54 months for Bipole-II, with revenue slow in Year 1 and bulk in Years 2 and 3.
Not answered directly.
7. Data centre outlook, energy storage & Leh-Ladakh HVDC
Vimox Shah, GoyamLabdhi Fintech
Question. What is the expected future revenue contribution from data centres? Any update on the battery storage opportunity you mentioned last time? And what is the current status of the Leh-Ladakh HVDC project and expected timeline?
Answer, N Venu, MD & CEO. Data centre contribution — we do not give forward-looking statements, but data centres are a key growth segment driven by data/privacy laws and AI-ready facilities; a ChatGPT query needs 8-10x the energy of a Google search, so the market is in upswing. Battery/energy storage — assessing technologies and localisation options, nothing concrete to share yet. Leh-Ladakh HVDC — customer is working on it; from our standpoint, end of next financial year (FY26).
Partly answered.
8. HVDC services/commissioning share
Yash Mehta, Aart Ventures
Question. How much of the HVDC order will be services / commissioning?
Answer, N Venu, MD & CEO. We don't give exact figures but it will be roughly a ballpark of around 10%.
Partly answered.
9. Capacity reserve agreement & program-based model
Sagar Gandhi, Invesco Mutual Fund
Question. Yesterday's press release mentioned a first-of-its-kind year-long capacity reserve agreement with a customer in the decarbonisation space for renewable studies. Could you explain this in more detail? Is this a global or Indian customer? And is the reserved capacity manufacturing or employee/engineering?
Answer, Manashwi Banerjee and N Venu, Head of Communications and MD & CEO. Manashwi explained it is a year-long contract where resources are allocated to conduct various renewable studies; the customer name will not be shared. Venu added this signals a shift from project-based to program-based engagement — engineering once and replicating across multiple projects — to derive cycle, efficiency and cost benefits. Confirmed the customer is Indian. Clarified the reserve is engineering/study capacity, not manufacturing.
10. FY25 margin guidance
Prathamesh Rane, Antique Stock Broking
Question. Are you maintaining the double-digit margin guidance for FY25?
Answer, Ajay Singh, CFO. Yes — we have been speaking on the same lines; we have already touched the guidance level in Q3 and we continue with the same intention.
11. HVDC classification and order growth basis
Parikshit Kandpal, HDFC Securities
Question. Follow-up — when you said ex-HVDC order inflow growth is double-digit, that's YoY, right? On the HVDC order, if 10% is services/installation, then 90% is product supply? This will be classified under 'project' this year, not 'products' — why? Does it have an EPC component?
Answer, N Venu, MD & CEO. On YoY — yes, YoY. On classification — products means we supply and obligation ends; here we supply but also integrate, so it is a project. No, it does not include civil/EPC work.
12. Order book execution timeline & margin trajectory
Varun Basrur, Julius Baer
Question. Excluding HVDC, what is the execution/delivery timeline for the order book? Is it two-three years or longer? And given the operating leverage you have, directionally — where do you see margins trending — high double-digit, high teens or mid-teens?
Answer, N Venu and Ajay Singh, MD & CEO and CFO. Venu — excluding HVDC, order book execution is at least close to two years; HVDC itself is 48-54 months back-loaded. Ajay Singh — we do not give forward-looking margin guidance; we remain committed to what we have been guiding and go step by step. Venu added — all efforts are to enhance every KPI, subject to market conditions.
Not answered directly.
What was said
Topic by topic, in the order it was spoken
Safety, HSE and ESG Progress · N Venu (MD & CEO)
- Conducted 500+ on-site safety inspections; achieved 99.49% on-time closure of high-risk hazardous situations
- Annual HSE Week in November reinforced life-saving rules and incident reporting across offices, factories and project sites
- Mental health, stress management, ergonomics and first-aid training rolled out across sites
- Installed 930 kW rooftop solar at Maneja (Gujarat) and switched canteen to piped natural gas; retrofit emission control on Mysore diesel generator
- Water meters and rainwater recharge wells at Peenya and Maneja; 15% STP treated water reused at Maneja for gardening
- Awarded Green Leader certification in L&T's Responsible Supply Chain Assessment
Q3 FY25 Financial Performance · N Venu (MD & CEO) and Ajay Singh (CFO)
- Highest-ever quarterly order intake of ₹11,594.3 cr, up 838% YoY, led by the Khavda-Nagpur HVDC order
- Revenue at ₹1,672 cr, up 31% YoY on favourable execution mix and operational efficiencies
- PBT up 4x YoY to ₹184 cr; PAT up ~5x YoY to ₹138.2 cr — both boosted by notional forex gains on export deliveries
- Operational EBITDA at ₹168.9 cr, translating to a 10.1% margin (double-digit achieved earlier than guided)
- Order backlog hit record ₹18,994.4 cr providing revenue visibility for several quarters
- Material cost 59.2%, personnel 8.4%, other expenses 19.3%, depreciation 1.4% — finance costs down on lower average debt; PBT margin 11%, PAT margin 8.2%
- Company became debt-free as of December 31, 2024 on strong collections and HVDC advance
Industry and Demand Backdrop · N Venu (MD & CEO)
- GDP growth revised down to 6.4% for FY25 but India on track to become the third-largest economy by 2030-31
- Renewable generation sector projected to attract ~₹18.8 lakh cr of investment
- National Electricity Plan targets 35% increase in transmission capacity by 2032, with ~₹9.16 lakh cr investment
- India data centre market expected to touch $6-7 bn by 2027, growing at 12-14% CAGR
- Railway modernisation on track with 76% of FY25 capex budget already utilised
Project Commissions and Brand Initiatives · N Venu (MD & CEO)
- Commissioned 400kV, 375MW substation in Jaisalmer and 600MW substations at Fatehgarh-Bhimsar and Baiya (Rajasthan) for renewable integration
- Hosted 'Energy and Digital World 75' in October with 2,500+ attendees — announced ₹2,000 cr India investment commitment
- Participated in CII Karnataka ESG Summit and Tamil Nadu IT/ITeS focus group discussions on energy transition
- Convened Power System Communication User Forum 2024 and HVDC/STATCOM training at Peenya and Maneja; technical seminar for Bhutan Power Corporation
- Transformer BU rolled out 1,000th locomotive transformer (of 1,600-unit order from 2017) at Savli facility
Khavda-Nagpur HVDC Order Detail · N Venu (MD & CEO)
- PGCIL awarded consortium order to Hitachi Energy India and BHEL for 800kV ±800kV, 6,000MW bi-pole bi-directional HVDC link
- Link transmits renewable energy from Khavda (Gujarat) to Nagpur (Maharashtra) over 1,200 km
- Project feeds into India's 500 GW renewable evacuation and inter-state transmission system build-out
- Scope includes converter transformers, AC/DC control and protection, gas-insulated HV switchgear, thyristor valves, 765kV/400kV substation and auxiliaries
- Executed entirely by the Indian entity; 80-90% local manufacturing, with import content limited to semiconductors and CRGO steel
Service Business Unit Launch · N Venu (MD & CEO)
- Fifth business unit to commence 1 April 2025 (FY26) focused on services and digital
- Aim to tap installed base of approximately ₹80,000+ cr across all four existing business units
- Move from project-based to program-based engagement — replicating engineering across multiple customer sites
- Capacity reserve agreement with Indian decarbonisation customer: year-long renewable study programme already signed
Order Mix and Export Momentum · N Venu (MD & CEO)
- Transmission orders grew both with and without HVDC; industries up ~60% YoY; data centres up 6x on low base
- Renewables segment declined 68% YoY — flagged as seasonal, with strong expected rebound
- Segment mix led by projects (HVDC); without HVDC, products led; utilities dominated both with and without HVDC
- Services contributed 11% of total orders excluding HVDC; exports grew to over 40% of total orders excluding HVDC
- Key export wins: 330kV/430kV breakers for Central West Orana (Croatia); AIS for PLN Indonesia; AIS equipment for Sangachal (Azerbaijan); 800kV CT for Hydro-Quebec (Canada)
Forward Strategy and Closing · N Venu (MD & CEO) and Ajay Singh (CFO)
- Maintain leadership in utilities and HVDC while scaling data centre and industrial segments
- Push exports and digital contribution; leverage record backlog for revenue and profitability accretion
- Sustain double-digit operational EBITDA margin guidance for FY25; first-time achievement in Q3 itself
- No let-up on safety culture; continued upskilling, reskilling for future energy requirements
In their words
Concerted focus on collections have borne fruit, which in addition to the advance from HVDC project has led to a solid cash position and the Company becoming debt-free as of December 31, 2024.
Today the need of the hour is not one [HVDC project], but two projects per year. So, it is completely evolving. We need more and more HVDC links to ensure that anywhere you produce the green energy, you can transmit to the load center very seamlessly, at the same time ensuring that the grid is robust, flexible, and secure.
We have already touched the guidance level that we are talking. So, still we guided the same intention.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Thu 30 Jan 2025 | ₹12,277.50 | +20.00% | +0.37% |
| 5 sessions Tue 4 Feb 2025 | ₹12,029.35 | +17.57% | +2.49% |
| 20 sessions Tue 25 Feb 2025 | ₹11,797.90 | +15.31% | −2.66% |
From the close of Wed 29 Jan 2025, ₹10,231.25: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Hitachi Energy India's other calls
- Q2 FY27Wed 18 Nov 2026Not read
- Q2 FY27Thu 12 Nov 2026Tone: Confident
- Q4 FY26Tue 26 May 2026Tone: Confident
- Q3 FY26Thu 5 Feb 2026Tone: Confident
- Q2 FY26Fri 7 Nov 2025Tone: Confident
- Q1 FY26Wed 30 Jul 2025Tone: Confident
- Q4 FY25Thu 15 May 2025Tone: Confident
- Q2 FY25Tue 29 Oct 2024Tone: Confident
- Q1 FY25Thu 25 Jul 2024Tone: Mixed
- Q4 FY24Wed 22 May 2024Tone: Confident