Jindal Drilling Ind. Q1 FY26 earnings call

Fri 1 Aug 2025JINDRILL

In brief

Jindal Drilling Q1 FY26: revenue ₹254 cr, EBITDA ₹107 cr; guides FY26/FY27 EBITDA to ₹360-380 cr each.

Management's tone
Confident
What was said
Leaned positive
Guidance
Guidance held
Analyst pushback
Low
Stock, next session
−4.23% (Nifty 50 −0.82%)
  • Standalone Q1 FY26 EBITDA ₹107 cr, up 23% QoQ from ₹87 cr, on full-quarter contribution of acquired rig Jindal Pioneer.
  • Guides FY26 revenue above ₹925 cr and FY27 revenue near ₹900 cr; FY26 and FY27 EBITDA both guided to ₹360-380 cr.
  • Net cash position ₹112 cr as of 30 June 2025 (liquidity ₹233 cr minus debt ₹121 cr) despite the Pioneer acquisition.
  • Jindal Explorer dehired in May 2025, under refurbishment, to be redeployed in October 2025 for its next ONGC contract.
  • International rig day rates quoted at $80,000-90,000; reasserts the prior $35,000/day Jindal Explorer rate as a one-off competitor mis-bid.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q1 FY26

This quarterA year agoLast quarterMargin
Revenue₹254 cr+48.6%+3.7%
EBITDA (excl. other income)₹107 cr+177.1%+22.8%42% (22.5% a year ago)
Net profit₹0 cr——0% (0% a year ago)
EPS (₹)₹22.81+50.7%−7.7%

From the company's filed results for the quarter ended 30 Jun 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Full-quarter operation of newly acquired rig Jindal Pioneer lifted standalone EBITDA to ₹107 cr from ₹87 cr in Q4 FY25.
  • Other income declined due to forex fluctuation, keeping total revenue flat QoQ despite operational revenue rising from ₹245 cr to ₹254 cr.
  • Jindal Explorer dehired in May 2025 and under refurbishment, so its contribution will fall away in Q2-Q3 FY26 ahead of redeployment in October 2025.
  • Finance cost fell to just ₹2.5 cr in June 2025 as debt was paid down, and net cash position was held at ₹112 cr.

The numbers management led with

  • Jindal Pioneer acquisition price: USD 75 million (rig built in 2015)
  • International rig day rates: USD 80,000 to USD 90,000 per day
  • Net cash position: INR 112 crores as of 30 June 2025 (total liquidity INR 233 crores; gross debt INR 121 crores)
  • Fleet size: 6 rigs - 4 with ONGC, 1 overseas, 1 under refurbishment

Guidance

Guidance on this call

WhatForWhat management saidFiled
FY26 consolidated revenueFY26FY26 revenue in excess of INR925 cr.₹997 cr, within the range
FY26 consolidated EBITDAFY26FY26 EBITDA between INR360 cr and INR380 cr.₹345 cr, below the range
FY27 consolidated revenueFY27FY27 revenue almost INR900 cr (conservative, Pioneer at $40,000/day).—
FY27 consolidated EBITDAFY27FY27 EBITDA again INR360-380 cr (conservative, Pioneer at $40,000/day).—
Quarterly depreciation run-rateFY26Depreciation of INR38 cr per quarter is a fair figure for the rest of FY26.—
Jindal Pioneer assumed day rate (sensitivity) (Offshore Drilling)FY27Projections assume Jindal Pioneer at $40,000/day, flagged as a conservative base case.—

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

What changed since the Wed 28 May 2025 call

WhatOn the Wed 28 May 2025 callOn this call
Jindal Pioneer status (achieved)Acquired on 5 March 2025, one rig under refurbishmentFull-quarter operation contributed to Q1 FY26; profit-making centre, expected to dehire September 2025 for refurbishment
FY26 revenue visibility (raised)Conservative FY26 revenue visibility of INR898 cr, expected to positively surpriseGuided FY26 revenue in excess of INR925 cr
EBITDA guidance (new)No explicit EBITDA guidance given; FY25 EBITDA ₹237 crFY26 EBITDA guided to ₹360-380 cr; FY27 EBITDA ₹360-380 cr at conservative $40,000/day Pioneer rate
Net cash position (cut)Net cash INR131 cr as of Mar-25Net cash INR112 cr as of 30 June 2025 after Pioneer acquisition
Jindal Explorer (achieved)Subject to low $35,000/day ONGC tender; flagged as one-off mis-bidDehired May 2025, under refurbishment, to redeploy October 2025; rate again called a one-off
FY27 revenue/mix (restated)Expected FY27-FY29 revenue in line with FY25/FY26FY27 revenue ~₹900 cr with Pioneer at conservative $40,000/day; if rate higher, FY27 above FY26
Order book figure (not repeated)Order book INR1,791 cr stated on Q4 FY25 callNot mentioned on this call; order book slides referenced but no number quoted
Diversification beyond ONGC (restated)Diversify into Mexico, Middle East and other geographies; related servicesSaid currently not looking at Aramco; only ONGC and overseas operators being spoken to; diversification 'thoughts' but no concrete plan

Guided on earlier calls, and what was filed

WhatForGuidedFiled
FY26 blended EBITDA marginFY26at least 35% (on the Q4 FY25 call)34.6%, below the range

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Offshore Drilling (rig services)

Fleet of 6 rigs; 4 operating with ONGC, 1 overseas, 1 (Jindal Explorer) under refurbishment after May 2025 dehiring; Pioneer acquired in March 2025 contributed a full quarter.

Revenue from operations ₹254 cr (vs ₹245 cr QoQ) · EBITDA ₹107 cr (standalone, +23% QoQ) · PAT ₹55 cr (standalone, +5% QoQ) · EPS ₹19 (standalone, vs ₹18) · 6 rigs in fleet, 4 operating with ONGC

Outlook: FY26 revenue above ₹925 cr, EBITDA ₹360-380 cr; FY27 revenue ~₹900 cr, EBITDA ₹360-380 cr assuming Pioneer at $40,000/day

Mud logging and directional drilling services

Adjacent oilfield services offered alongside the jack-up rig fleet; no separate numbers given this quarter.

Balance sheet, capex and funding

  • Net cash ₹112 cr as of 30 June 2025: total liquidity ₹233 cr minus debt ₹121 cr.; the net cash position is INR112 crores. The way we arrived at that figure is by deducting INR121 crores from the total liquidity of INR233 crores
  • Finance cost just ₹2.5 cr in June 2025; debt-averse stance maintained, cash kept for refurbishment.; our finance cost has continued to decline, and it is only INR2.5 crores in June 2025
  • Depreciation run-rate guided at ~₹38 cr per quarter for the rest of FY26.; INR38 crores is a fair figure for the rest of this financial year
  • Refurbishment expenditure to be funded from operational surplus; cash not to be parked in equity mutual funds.; We will not invest operational surpluses in equity mutual funds

The industry, as management sees it

Management sees the Indian offshore drilling market as 'quite bullish' over the medium term, driven by the government's push to lift domestic oil production. The recent two-year period has been sluggish due to delayed ONGC tenders and ONGC's BP partnership work, which is expected to conclude by mid-2026, after which ONGC should issue a more aggressive drilling plan.

Risks management named

  • Jindal Pioneer to be dehired in September 2025; no income contribution in Q3/Q4 FY26
  • ONGC tenders have been delayed or cancelled in recent cycles
  • One ONGC contract was won at a discredited USD 40,000/day by an over-eager competitor
  • Aramco market avoided due to tender volatility and history of cancelling rates

Q&A

Q&A was dominated by Faisal Hawa (H.G Hawa and Co.) who probed profitability mechanics, capex, dividend, and ONGC outlook across roughly ten sub-questions. Management was direct and specific on FY26/FY27 projections, repeatedly anchoring on the conservative USD 40,000/day Pioneer assumption. The only soft patches were the dividend/liquidity question (Raghav Jindal said 'I really can't comment') and rig valuation specifics (no formal valuation exercise). Pushback intensity was low - more a clarifying session than a hard grilling.

Not answered directly

  • Dividend payout and stock liquidity
  • Specific rig market valuations
  • Backup plan client names for Jindal Pioneer

Asked for a number, answered without one

  • Market value of rigs: Declined to give a figure, saying no formal valuation exercise has been undertaken; market value depends on crude price and rig availability.
  • Aramco participation: Said open tenders and participation possible but not actively looking at Aramco due to volatility and short contracts; will bid if a rig is available.
  • Equity/liquidity improvements: MD declined to comment on stock liquidity; cash to be retained for refurbishment spend and will not be parked in equity mutual funds.

Every question, with its answer

  1. 1. Rig valuation vs book

    Apoorv Bandi, White Stone Financial Advisors Private Limited

    Question. Rig book value is INR795 cr; what is the market value and is it higher or lower than book?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations & Finance. Market value fluctuates with rig availability and crude prices. Recent comparable is Jindal Pioneer acquired at USD 75 mn (2015-built). For older rigs like Jindal Supreme and Discovery, market value is generally higher than book due to depreciation and shared tender participation with new rigs, but a specific valuation exercise has not been undertaken.

    Follow-up. When are you planning the next acquisition and how is the company headed for new growth?

    Answer. Raghav Jindal: Plans are tied to ONGC tenders, which have been sluggish recently. If new tenders come up, will look at additional rigs beyond current fleet; Jindal Pioneer will be bid in the next ONGC contract. Nothing beyond rigs under consideration for now.

    Partly answered.

  2. 2. International rates, ONGC one-off, consolidation

    Faisal Hawa, H.G Hawa and Co.

    Question. Three questions: current per-day hiring rate in international market; is the prior comment that the USD 40,000/day ONGC contract was a one-off and that better rates are expected still valid; and is management consolidating rigs from sister concerns onto one balance sheet?

    Answer, Raghav Jindal, Managing Director. International rig rates currently between USD 80,000 and USD 90,000 per day. The USD 40,000/day ONGC contract was a one-off - a competitor bid low because they had 3 idle rigs and wanted to deploy one; the statement that rates should normalize holds. No active consolidation plan but would eventually prefer all rigs on one balance sheet with no timeline.

    Follow-up. Most rig owners globally are not making simple interest on current rig values - what could change? Will owners sell or will rates rise further to justify capital?

    Answer. New rig today costs over USD 250 mn; only newer-generation rigs hold real value. If there's no contract, rigs are selling for USD 60-70 mn; with demand, offers of USD 130 mn have been seen. Hard to estimate market value - depends on supply/demand at the time.

  3. 3. FY26/FY27 projections

    Faisal Hawa, H.G Hawa and Co.

    Question. What does profitability look like over the coming year and what capex is expected in FY26?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations & Finance. FY25 revenue was INR884 cr and EBITDA INR237 cr. FY26 revenue expected over INR925 cr and EBITDA between INR360-380 cr. FY27 revenue ~INR900 cr and EBITDA INR360-380 cr, even with two rigs getting dehired in FY27. All projections assume Jindal Pioneer redeployed at USD 40,000/day - explicitly stated as conservative; actual rate expected to be much higher.

    Follow-up. Is it fair to assume depreciation will be higher and interest outgo near zero, so cash PAT will mirror EBITDA?

    Answer. Yes. Finance cost was only INR2.5 cr in June 2025 and continues to decline as gross debt is paid. Depreciation will increase when more rigs are acquired, not before.

  4. 4. Conservatism of EBITDA guidance

    Faisal Hawa, H.G Hawa and Co.

    Question. Q1 operating profit was INR107 cr - is the INR380 cr full-year guidance a little conservative?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations & Finance. Estimates are reasonable because Jindal Pioneer is profit-making but expected to be dehired in September 2025 for refurbishment. No income from Pioneer expected in Q3 and Q4 FY26, which is why the full-year number is held at INR360-380 cr.

    Follow-up. Will JDIL play contrarian and acquire rigs opportunistically given strong debt availability?

    Answer. Yes - if ONGC contracts are available and we have more rigs to provide, we will look at acquiring them. Either bareboat charter or outright purchase, with purchase being more feasible.

  5. 5. Dividend, stock liquidity, mutual fund deployment

    Faisal Hawa, H.G Hawa and Co.

    Question. Any plans to improve stock liquidity given low equity and dividend payout? And can the company commit to not putting liquid funds into equity mutual funds?

    Answer, Raghav Jindal, Managing Director. On dividend and liquidity, Raghav said: 'I really can't comment on that.' Kaushal added that JDIL will not invest operational surpluses in equity mutual funds; surplus is being retained for refurbishment expenditure as rigs get dehired and amortized over contract duration.

    Not answered directly.

  6. 6. ONGC capex outlook, discovery impact, Aramco access

    Faisal Hawa, H.G Hawa and Co.

    Question. What are ONGC's capex projections and can new oil discoveries in various regions drive rig deployment? Any connections with Aramco?

    Answer, Raghav Jindal, Managing Director. ONGC has another tender expected by September 2025; specifics beyond that are limited. ONGC has been working with BP for the last 1.5 years (another 6 months to go); they will come out with a more aggressive drilling plan post-BP work. India is looking to improve oil production, which will benefit operators. Aramco tenders are open and JDIL can participate, but management is not actively looking at Aramco as of now.

    Partly answered.

  7. 7. Pioneer backup plan and Aramco rationale

    Adarsh Hinduja, Unknown

    Question. If the ONGC tender for Jindal Pioneer doesn't go through, do you have a backup plan? And why not work with Aramco?

    Answer, Raghav Jindal, Managing Director. Already speaking with some international companies and Indian operators - yes, backup plan exists. Aramco is quite uncertain: they dehired about 20 rigs in previous years, tenders are volatile and they can cancel or amend rates, contracts are not usually long-term. Prefer ONGC for stability, but won't shy away from Aramco bids if rig is available.

  8. 8. Depreciation, interest, FY26 revenue drivers

    Apoorv Bandi, White Stone Financial Advisors Private Limited

    Question. Is INR38 cr per quarter a fair depreciation run rate for FY26? Will interest cost stay similar? And is the FY26 revenue increase entirely from old rigs (Jindal Supreme) given no Pioneer income in Q3/Q4?

    Answer, Kaushal Bengani, Deputy General Manager, Investor Relations & Finance. INR38 cr is a fair depreciation figure for the rest of FY26. Interest cost will be lower as rates fell in the June quarter and debt is gradually reducing; net cash position will improve further. Revenue increase in FY26 is mainly because Jindal Supreme, which operated for less than 6 months last year, will operate for 12 months this year.

    Follow-up. In FY27, with Pioneer contributing, why is revenue still guided at ~INR900 cr? Has Pioneer revenue not been added?

    Answer. Already stated - we have taken a very conservative rate for Pioneer.

  9. 9. ONGC bidding discipline and Pioneer placement

    Maitri, Sapphire Capital

    Question. Last time Jindal Explorer was taken at a low per-day contract and now you're bidding again - what confidence do you have that another competitor won't bid as low? Why not take Pioneer for an international contract rather than ONGC?

    Answer, Raghav Jindal, Managing Director. I believe they must have learned their lesson. They left USD 20,000-30,000 on the table - the difference between L1 and L2. Hope they have the brains not to bid that low again. On Pioneer placement, JDIL is open - looking at international operators and other Indian operators. Won't impact international market prices either way.

  10. 10. Current international rig pricing

    Maitri, Sapphire Capital

    Question. Any international rig contracted recently and what prices are prevailing in the market?

    Answer, Raghav Jindal, Managing Director. ONGC was our last contract. Internationally, recent transactions have been around USD 80,000 to USD 90,000 per day.

  11. 11. Long-term strategy and capital allocation

    Jitendra Hiru Panjabi, EM Investco Capital Advisors Private Limited

    Question. Beyond the next 12-18 months, how do you think about the business, capital allocation, and adding new capacity or diversification?

    Answer, Raghav Jindal, Managing Director. ONGC had an interim 2-year period of sluggish demand; the ministry wants India to produce more oil. We see this market quite bullish going forward with rig counts to go up. Will invest in more rigs when the opportunity is right and tenders are available. Diversification is being thought about but nothing concrete to share.

    Follow-up. What is the net cash position today and how is it being kept?

    Answer. Cash is invested in liquid mutual funds. As of June 30, 2025, net cash position is INR112 cr (INR233 cr total liquidity minus INR121 cr gross debt).

  12. 12. Geopolitical exposure

    Jitendra Hiru Panjabi, EM Investco Capital Advisors Private Limited

    Question. Are there any second-order implications on JDIL from the recent US actions on Russian-linked companies?

    Answer, Raghav Jindal, Managing Director. I don't see any reason for ONGC or any other company to do badly or better. India is only looking at improving oil production in the coming future and that will only benefit us with operations in India.

What was said

Topic by topic, in the order it was spoken

Q1 FY26 Financial Performance · Kaushal Bengani (DGM, Investor Relations & Finance)

  • Total revenue similar QoQ at INR254 cr operations; flat headline due to forex drag in other income
  • EBITDA grew 23% QoQ from INR87 cr to INR107 cr
  • PAT up 5% QoQ from INR53 cr to INR55 cr; EPS INR18 to INR19
  • Standalone figures cited; consolidated PAT and EPS even stronger
  • Improvement was in line with prior call guidance

Fleet & Operational Footprint · Kaushal Bengani (DGM, Investor Relations & Finance)

  • 6 rigs in fleet: 4 currently operating with ONGC, 1 overseas, 1 in refurbishment
  • Jindal Explorer dehired May 2025; refurbishment underway for next ONGC contract; redeployment targeted October 2025
  • Jindal Pioneer newly acquired (USD 75 mn, 2015-built rig) contributing in Q1 FY26
  • Additional services: mud logging and directional drilling
  • 35+ years of offshore drilling experience; strong safety and operational track record

Capital Structure & Acquisition Context · Kaushal Bengani (DGM, Investor Relations & Finance)

  • Net cash position unchanged despite Jindal Pioneer acquisition - signals strong operational cash generation
  • Order book bifurcated rig-wise and year-wise for amortization visibility
  • Shareholding structure slide presented

In their words

I want to stress this repeatedly that these are conservative projections based on a assumption that Jindal Pioneer would be deployed on the next contract at USD 40,000 per day. I am not saying that Jindal Pioneer will get deployed at that rate. We expect the rates to be much higher.
Kaushal Bengani (DGM, Investor Relations & Finance, Jindal Drilling & Industries)
Aramco is quite uncertain. Like you must have heard that they dehired about 20 rigs in the previous years. So the tender is very volatile as they can cancel or amend the rates at any time. And it's usually not a very long-term period contract, though the rates are higher. So we prefer stability. That's why we were with ONGC.
Raghav Jindal (Managing Director, Jindal Drilling & Industries)
We see this market quite bullish in the coming times and the rig counts to go up.
Raghav Jindal (Managing Director, Jindal Drilling & Industries)

To check next time

What management committed to on this call, or the dates they gave.

  • Outcome of ONGC tender expected by September 2025 and the day-rate Pioneer secures.; We know that they have another tender coming out by September
  • Whether Jindal Pioneer is deployed, dehired in September 2025 or sent for refurbishment.; it is expected to be dehired in September of this year. And then it will go into refurbishment
  • Redployment of Jindal Explorer in October 2025 with ONGC at a higher day rate.; It will be redeployed in October 2025
  • Track the zero Pioneer revenue contribution expected in Q3 and Q4 FY26.; for the third and fourth quarters of this financial year, we do not expect any income from Jindal Pioneer
  • Whether finance cost continues to decline below the ₹2.5 cr/June 2025 level as debt is paid down.; finance cost has continued to decline, and it is only INR2.5 crores in June 2025

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Fri 1 Aug 2025₹619.20−4.23%−0.82%
5 sessions Thu 7 Aug 2025₹594.60−8.03%−0.70%
20 sessions Mon 1 Sept 2025₹613.45−5.12%−0.58%

From the close of Thu 31 Jul 2025, ₹646.55: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Jindal Drilling Ind.'s other calls

  • Q2 FY27Mon 16 Nov 2026Tone: Confident
  • Q1 FY27Mon 10 Aug 2026Tone: Mixed
  • Q3 FY26Fri 30 Jan 2026Tone: Mixed
  • Q2 FY26Thu 6 Nov 2025Tone: Mixed
  • Q4 FY25Wed 28 May 2025Tone: Confident
  • Q3 FY25Wed 29 Jan 2025Tone: Confident
  • Q2 FY25Wed 30 Oct 2024Tone: Confident
  • Q1 FY25Wed 31 Jul 2024Tone: Mixed
  • Q4 FY24Thu 23 May 2024Tone: Confident