KNR Constru Q4 FY26 earnings call
In brief
KNR Q4 FY26 consolidated PAT ₹106 cr on ₹696 cr revenue; FY27 order inflow target ₹8,000-10,000 cr.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- +1.78% (Nifty 50 −0.70%)
- Q4 FY26 consolidated revenue ₹696 cr, EBITDA ₹169 cr (24.3% margin) and PAT ₹106 cr.
- FY27 order inflow target set at ₹8,000-10,000 cr across NHAI, irrigation, mining and state government work.
- Total order book at ₹11,903 cr including 2 new HAM wins worth ₹3,897 cr BCC; to be executed in 3-3.5 years.
- Consolidated debt rose to ₹2,438 cr (vs ₹1,847 cr); net debt/equity at 0.49x; working capital days improved to 78 from 93.
- FY27 EBITDA margin guided at 10-11% on recent low-margin wins; aggressive bidding cited as the reason.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹696 cr | −28.7% | −6.4% | |
| EBITDA (excl. other income) | ₹169 cr | +76.4% | +1.5% | 24.3% (9.8% a year ago) |
| Net profit | ₹106 cr | −23.7% | +3.3% | 15.3% (14.3% a year ago) |
| EPS (₹) | ₹3.78 | −23.6% | +3.3% |
From the company's filed results for the quarter ended 31 Mar 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Q4 standalone EBITDA at 5.3% reflects lower revenue base (₹535 cr) and overheads maintained at prior-year staffing and equipment levels.
- Standalone Q4 included claims recognition of ₹162 cr offset by ~₹130 cr cost, netting ~₹27 cr in income from operations. (accounting)
- Telangana Kaleshwaram Package 4 receivable of ~₹670 cr remained stuck, dragging working capital; outstanding at consolidated level ~₹1,400-1,450 cr.
- Aggressive bidding on lean NHAI pipeline pulled blended EBITDA margin guidance to 10-11% vs historical 15-20% on HAM and irrigation.
- Mining order still pre-revenue (Banhardih Gram Sabha pending), so no contribution to Q4 numbers despite 30% of order book.
- FY26 consolidated EBITDA margin of 26.4% supported by HAM SPV revenue recognition, not expected to repeat at this level.
The numbers management led with
- Order book including new HAMs: INR11,903 crore as of 31 March 2026 (₹8,672 cr excluding HAMs)
- Order inflow target FY27: INR8,000-10,000 crore
- Telangana receivables outstanding: INR1,400-1,450 crore including unbilled (Kaleshwaram Package 4 alone ₹670 cr)
- EBITDA margin guidance: 10-11% on order book (vs 15-20% historical)
- FY28 revenue target: INR3,000 crore+ (vs ~₹2,200-2,300 cr in FY27)
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 order inflow | FY27 | Order inflow target of approximately ₹8,000-10,000 cr in FY27 across NHAI, irrigation, mining and state government work. |
| Overall EBITDA margin | FY27 | Overall EBITDA margin guided at around 10-11% given recent aggressive bidding. |
| FY27 revenue | FY27 | ED said will try to touch around ₹2,000 cr plus in FY27, dependent on new project award timing. |
| FY28 revenue | FY28 | Management targeting around ₹3,000 cr plus in FY28. |
| Mining revenue | FY28 | Expected mining revenue of ₹300-400 cr per annum once operational, from FY28. |
| Two new HAMs combined execution (Roads (HAM)) | FY28 | Combined execution target of ₹1,000-1,200 cr from the two new HAMs in FY28. |
| New HAM execution margin (Roads (HAM)) | FY27 | Mahabubnagar-Gudebellur HAM EBITDA execution margin aimed at 11-12% level. |
| FY27 capex | FY27 | FY27 capex target of ₹200-250 cr, including mining and ECR Chennai elevated corridor requirements. |
| Pipeline execution | FY27 | Target of ₹350-400 cr pipeline work execution in FY27. |
| Irrigation execution | FY27 | Package 3 irrigation execution of ₹200-250 cr targeted in FY27, subject to land handover. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| FY25 EBITDA margin | FY25 | 15–16% (on the Q4 FY24 call) | 31.2%, above the range |
| Standalone turnover | FY25 | ₹3,500–3,600 cr (on the Q2 FY25 call) | ₹4,753 cr, above the range |
| Standalone EBITDA margin guidance | FY25 | 13–14% (on the Q2 FY25 call) | 31.2%, above the range |
| Revenue target | FY26 | ₹4,500 cr (on the Q2 FY25 call) | ₹2,698 cr, below the figure guided |
| H2 FY26 standalone revenue | H2 FY26 | ₹800–900 cr (on the Q2 FY26 call) | ₹1,439 cr, above the range |
| FY26 EBITDA margin | FY26 | 13–14% (on the Q2 FY26 call) | 26.4%, above the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Roads (HAM + EPC)
Order book 49% of total; new HAM wins include ECR Chennai (₹2,163 cr) and Mahabubnagar (₹1,734 cr). HAM was 42% of Q4 revenue and road EPC 33%.
Order book share 49% · Q4 revenue share HAM 42% · Q4 revenue share road EPC 33% · ECR Chennai bid cost ₹2,163 cr · Mahabubnagar project value ₹1,734 cr
Outlook: Target ₹8,000-10,000 cr order inflow in FY27 including NHAI HAM and Hyderabad RRR; FY28 HAM execution ₹1,000-1,200 cr.
Irrigation
14% of order book; Kaleshwaram Package 4 receivable (~₹670 cr) stuck with Telangana; Q4 share 8% of revenue.
Order book share 14% · Q4 revenue share 8% · FY26 execution ~₹340 cr · Package 4 receivable ~₹670 cr
Outlook: FY27 Package 3 execution ~₹200-250 cr subject to land handover; expect ₹670 cr receivable resolution in 2-3 months.
Mining
30% of order book; Banhardih F1 forest clearance received; Gram Sabha pending. No mining revenue yet.
Order book share 30% · Banhardih land 850 ha · FY26 execution 0
Outlook: Expect 7-8 months to start; FY28 turnover ₹300-400 cr, peaking at ₹1,000 cr in year 5.
Pipeline
7% of order book; FY26 execution ₹270 cr; unbilled ~₹700-800 cr.
Order book share 7% · FY26 execution ~₹270 cr · Q4 revenue share 13-14%
Outlook: FY27 target ₹350-400 cr execution.
Railway
Diversification push; 6-7 tenders submitted, recent ₹800 cr bid for Shimoga–Lumpur.
Bids submitted ~₹700-800 cr
Outlook: Targeting high-speed rail JV; outcomes awaited.
Solar and Data Centre
Exploratory; exploring solar on existing land bank and Agentic AI + data centre near Hyderabad smart city.
Outlook: Plan to grow data centre business; solar EPC in 500+ MW scale only.
Balance sheet, capex and funding
- Consolidated debt ₹2,438 cr as of 31-Mar-2026 vs ₹1,847 cr as of 31-Mar-2025.
- Net debt/equity on consolidated basis at 0.49x (vs 0.41x prior year).
- Working capital days improved to 78 from 93 days as of March 2025.
- FY27 capex target ~₹200-250 cr, including mining and elevated corridor (ECR Chennai) requirements.
- Q4/FY26 capex minimal at ~₹4 cr; existing capex sufficient for current order book.
- Telangana government outstanding (including unbilled) ~₹1,400-1,450 cr; ₹670 cr stuck in Kaleshwaram Package 4.
The industry, as management sees it
Management sees FY27 as a 'more balanced' year for road sector after a 2-year slowdown. NHAI awarding is expected to recover from 3,100 km FY26 low; MoRTH construction of 9,000-9,500 km targeted. Sector diversifying beyond roads into mining, irrigation, ropeways, metro, urban mobility, rail. Long-term policy support and private participation remain intact.
Risks management named
- Telangana government receivables of ~₹1,450 cr pending including Kaleshwaram Package 4
- Aggressive bidding for orders has compressed EBITDA margins to 10-11%
- Mining project (Banhardih) delayed indefinitely pending Gram Sabha clearance
- Fixed overhead structure with lower turnover compressing margins
- Land acquisition delays on Mysore-Kushalnagara HAM projects affecting final completion
- Net debt/equity rose to 0.49x from 0.41x with consolidated debt up to ₹2,438 cr
Q&A
Q&A was dominated by three concerns: (1) the magnitude of the EBITDA margin reset to 10-11% from 15-20% historically, where management was unusually candid ('shameful to say'); (2) the stuck Telangana receivables of ~₹1,450 cr, with management hopeful but vague on timing; and (3) the order inflow pipeline for the ₹8,000-10,000 cr FY27 target. Pushback was moderate - analysts probed margin assumptions and asked for segment-wise breakdowns. Management answered most questions directly, only deferring on MoRTH awarding data.
Not answered directly
- MoRTH total awarding data for FY26
- Exact HAM execution phasing by quarter
Asked for a number, answered without one
- FY27 revenue guidance: ED said revenue "quite difficult to say" given timing uncertainty on HAM and EPC starts; only mentioned trying to touch "around 2,000 plus."
- MoRTH + NHAI total km awarded in FY26: Management said they only have NHAI data and would revert with MoRTH data.
- Mining capex of ₹350 cr: Said KNR parent will fund through internal accruals, monetization proceeds and higher purchase loan; final structure still being worked out.
- Order book mix of high vs low margin: Only qualitative answer that irrigation (historically 18-20% EBITDA) is not much in the book now; overall margin 10-11%.
Every question, with its answer
1. Order inflow and working capital
Ketan Jain, Avendus Spark
Question. Sir, in totality including MoRTH how many kilometres were awarded in FY26? What was our order inflow in FY26? Any guidance on revenue and order inflow for FY27? Also, working capital has increased - which customer pockets are you seeing payment delays?
Answer, K Jalandhar Reddy, Executive Director. MoRTH data to be shared later. Order inflow FY26 included ECR Chennai flyover (~₹2,150 cr), Gudebellur-Mahabubnagar (₹1,750 cr), GHMC flyovers (~₹1,400-1,500 cr), Chennai ORR (₹800 cr). On FY27, K. Jalandhar Reddy said revenue is 'quite difficult' to guide because HAM projects take 6-7 months to start while EPC can start in 2-3 months; targets ~₹2,000 cr+ for FY27. On working capital, K. Venkata Ram Rao clarified the increase is due to ~₹670 cr stuck in Kaleshwaram Package 4 (Telangana irrigation); other clients are not delaying. Debtor days actually reduced to 78 from 93.
Partly answered.
2. Telangana receivables and order pipeline
Sandeep Agarwal, Naredi Investments
Question. Any update on Telangana dues timeline? What is the FY27 order pipeline beyond the initial ₹3,600 cr? Any major claims pending to be received?
Answer, K Jalandhar Reddy, Executive Director. Telangana: management had meeting with Finance Minister last week; expects resolution in 1-2 months. Confident of getting payments but 'not in this quarter, but next quarter'. Pipeline: another ~₹4,000 cr is in LOA stage; plus ₹4,000-5,000 cr being pursued. Hyderabad RRR and ~66 Hyderabad highways expected. Also exploring railways, mining, flyover, solar. On claims: 'whatever was there, we received in the last quarter itself. Hardly anything pending'.
3. Margin guidance, mining and pipeline
Shravan Shah, Dolat Capital
Question. On the order book of ₹11,900 cr, can you break down segment-wise execution for FY27 and FY28? Should we look at FY28 revenue of at least ₹4,500 cr? On margins, are we at 10% EBITDA overall given HAM at 18-20% earlier? What is the mining capex/revenue outlook and how many bids are in the pipeline?
Answer, K Jalandhar Reddy, Executive Director. K. Jalandhar Reddy said: 'turnover can go, but bottom line will not be to that tune which we were giving in the earlier days because market has entirely changed'. Confirmed EBITDA around 10% level. Said 'very shameful to say' margins are now ~10%. Blamed 2-year NHAI gap forcing aggressive bidding and overheads maintained despite lower turnover. Mahabubnagar-Gudebellur HAM is at 11-12% EBITDA; Chennai a little more comfortable. On mining: Banhardih F1 forest clearance has come; Gram Sabha pending. NTPC not ready with rehabilitation answers; needs 7-8 months to start. Pipeline: ~₹4,000 cr+ in active pipeline (mining ₹3,600 cr bid, Chennai 2 + ORR ~₹850 cr), ₹3,000-4,000 cr submitted but not opened, plus GHMC ₹1,400 cr.
Partly answered.
4. Mining funding and margin mix
Balasubramanian, Arihant Capital
Question. On mining capex of ₹350 cr - is it at standalone level, internal accruals, new debt, or separate SPV? When can we expect mining revenue - Q3 FY27 or FY28? What is the concrete pipeline for railway and metro? Out of ₹11,900 cr order book, how much is high-margin vs low-margin (after 2-3% dilution)?
Answer, K. Venkata Ram Rao, General Manager, Finance and Accounts. K. Venkata Ram Rao confirmed mining capex is in parent company balance sheet because it's an MDO with back-to-back JV partner; KNR will fund via internal accruals, monetization proceeds, and buyer credit. Mining revenue expected from Q4 FY27. On railway: bidded ~₹700-800 cr; market heated. On margin mix: explained irrigation used to give 18-20% EBITDA but irrigation not much in current order book; HAM was 15-16%. Overall margin guided at 10-11% given current composition.
5. Mining revenue ramp and HAM appointment dates
Taha Ansari, Taha Capital Management
Question. If mining is operational by Q4 FY27, what revenue can we expect in FY28? What is the appointment date for the two new HAMs and revenue guidance for FY27/28? With Palamuru irrigation now in focus, can it help recovery of irrigation receivables?
Answer, K. Venkata Ram Rao, General Manager, Finance and Accounts. K. Venkata Ram Rao: mining is open-cast coal extraction with billing based on coal extracted. Project is ~₹3,500 cr for the year; annual turnover ~₹300-400 cr once operational, peaking at ~₹1,000 cr in year 5. On HAMs: ECR Chennai financial closure targeted this month, appointment in 2 months, contribution from Q3-Q4. Telangana HAM has time till September; Q4 contribution. Main contribution in FY28. On Palamuru: Package 4 is priority since Hyderabad water supply depends on it; meeting with irrigation officials; hope to recover money in 2-3 months.
6. Segment execution and capex
Vasudev, Nuvama Wealth
Question. In irrigation and pipeline projects, how much execution in FY26 and plan for FY27? Can you quantify? What was the Q4 capex, FY27 capex target, Q4 revenue split by segment, and outstanding from Telangana government?
Answer, K. Venkata Ram Rao, General Manager, Finance and Accounts. K. Venkata Ram Rao: irrigation ~17% done in FY26; pipeline ~13-14%. Pipeline revenue ₹270 cr in FY26; irrigation ₹340 cr. FY27 target: pipeline ₹350-400 cr; irrigation Package 3 ₹200-250 cr (Package 4 almost done). Telangana outstanding: ~₹1,400-1,450 cr including unbilled. Capex: existing capex sufficient for current order book; FY27 target ₹200-250 cr including ECR Chennai elevated corridor work and mining project start.
Follow-up. What is the bid pipeline for the ₹8,000-10,000 cr FY27 inflow target? Q4 revenue mix breakdown for irrigation (8%), HAM, road EPC, etc? What capex was done in Q4?
Answer. K. Venkat Ram Rao: ~₹4,000 cr pipeline including GHMC and mining projects; targeting NHAI HAM projects in Northeast. Mix: NHAI, mining, roads. Q4 revenue mix: HAM 42%, road EPC 33%, back-to-back EPC 17%, irrigation 8%. Q4 capex almost nil; total year ~₹4 cr.
7. HAM execution and revenue guidance
Vaibhav Shah, JM Financial
Question. You mentioned ADs for 2 new HAMs in Q3 and Q4 - what execution are you targeting from both HAMs in FY28? What is the unbilled portion in irrigation order backlog - is that revenue already recognized? What was irrigation revenue in Q4? Do you expect 10-11% margins in FY28 as well? Revenue target for FY28?
Answer, K. Venkata Ram Rao, General Manager, Finance and Accounts. K. Venkata Ram Rao: HAMs completion target FY28 (September 2028 for one); ~₹1,000-1,200 cr combined execution from both HAMs in FY28. Unbilled irrigation: ~₹800 cr, already recognized. Q4 irrigation: 8%. On margins: confirmed 10-11% overall since bid aggressively over last 3 years when orders were scarce; Mahabubnagar at 13%. FY28 revenue: this year ₹2,000 cr, next year ₹2,200-2,300 cr, targeting ₹3,000 cr+ in FY28.
8. Railway diversification and back-to-back EPC
Bhavin Modi, Anand Rathi
Question. What is unbilled revenue pending from road order book and from pipeline? You mentioned forming a team for railways and bidding done - how do you see railway vs road given margin pressure? Any back-to-back EPC arrangement talks ongoing?
Answer, K Jalandhar Reddy, Executive Director. K. Venkata Ram Rao: unbilled irrigation ~₹800 cr, balance in road ~₹500 cr. K. Jalandhar Reddy on railway: submitted 6-7 tenders; market heated; recently bid for Shimoga project (~₹800 cr) quoting sensibly. Exploring high-speed railways with JV partner. On back-to-back: discussions with Maharashtra project did not yield attractive price; quoted our price. Pune-Nanded highway also pending response. 'Trials are there from all corners with little bit sensible payment backup'.
Partly answered.
9. Land bank, data centres and solar
Faisal Hawa, H.G. Hawa and Company
Question. What is the current value of the land bank accumulated over the years for mining etc? With data centre projects in AP, are we looking to execute them? What are our solar plans to enter in a big way without compromising margins?
Answer, K Jalandhar Reddy, Executive Director. K. Jalandhar Reddy: lands were for quarries; land prices up 3-4x; useful for upcoming projects and solar development; goal to develop these lands with solar or quarries over next 4-5 years. On data centres: exploring in Hyderabad near smart city area with partners; model is Agentic AI + data centre development; MoU circulated. KNR will do EPC; key dependency is land allotment with 100% power and water assurance. On solar: small-scale worst, not touching; targeting above 500 MW scale; exploring Maharashtra and Karnataka land.
10. Claim recognition accounting
Durgesh Shukla, InCred Capital
Question. In results pdf, point 4 mentions company recognized claims of ₹16,297 lakhs from client on settlement. Is this revenue already included in the revenue?
Answer, K Jalandhar Reddy, Executive Director. K. Jalandhar Reddy: yes included. ₹162 cr claims recognized offset by ₹130 cr of cost overruns on certain projects; net ~₹27 cr considered in income from operations. Both figures are included in revenue and cost in P&L.
11. Project execution challenges
Akshat, Individual Investor
Question. Are there any major delays or execution challenges in current projects? What steps are being taken to improve execution and timeline in FY27?
Answer, K Jalandhar Reddy, Executive Director. K. Jalandhar Reddy: Mysore-Kushalnagara had land issues - villagers demanded service roads and village access. NHAI gave police protection 2 weeks back; work restored. Final completion may differ from provisional. Mahabubnagar: Project Director confident of giving entire land within 5 months.
What was said
Topic by topic, in the order it was spoken
Industry Landscape & NHAI Award Trends · K. Venkata Ram Rao (GM Finance)
- NHAI awarded 3,100 km in FY26, down ~22% YoY, well below 7,500 km target on appraisal/land delays
- Execution healthy: NHAI constructed 5,300 km in FY26, surpassing 5,000 km internal target
- Asset monetisation of ~₹28,000 cr via InvIT and TOT transactions, in line with government target
- MoRTH price adjustment cycle shortened from 3 months to 1 month, easing commodity cost pass-through
- FY27 outlook: 9,000-9,500 km expected to be constructed; MoRTH awarding to remain calibrated
HAM Project Portfolio & Equity Position · K. Venkata Ram Rao (GM Finance)
- Physical progress: Ramanattukara-Valanchery 99.4%, Valanchery-Kappirikkad 98.3%, Chittor-Thatchur 97.4%, Magadi-Somwarpet 91.3%, Marripudi-Somvarappadu 77.1%, Mysore-Kushalnagara Pkgs IV/V at 15.5%/12.2%
- ₹734.24 cr of ₹952.17 cr revised equity already invested in HAMs; remaining ₹217.93 cr split ₹170 cr (FY27) and ₹47.93 cr (FY28)
New Order Wins & EPC Awards · K. Venkata Ram Rao (GM Finance)
- Tamil Nadu HAM from TANSHA: Thiruvanmiyur-Uthandi elevated corridor, bid cost ₹2,163 cr, 3-year construction + 5-year operations; KNR Mahabalipuram Infra SPV incorporated
- NHAI HAM: Gudebellur-Mahabubnagar (NH-167 laning), project value ₹1,734 cr, 2-year construction + 15-year operations; KNR Manyamkonda Infra SPV incorporated
- Combined HAM equity requirement ~₹510 cr; two EPCs worth ₹133 cr also won (GHMC flyover ₹50 cr, Hyderabad pipeline ₹83 cr)
Asset Monetisation · K. Venkata Ram Rao (GM Finance)
- KNR Palani Infra Private Limited equity transferred to Indus Infra Trust
- ₹64.40 cr equity/sub-debt investment monetised for ₹205.05 cr consideration
- Additional ₹90 cr cash upstreamed from SPV; KNR expects to close one project by June 2026 and two more by September 2026
Order Book Position & Mix · K. Venkata Ram Rao (GM Finance)
- Total order book ₹8,672 cr; ₹11,903 cr including recently won HAM projects
- Mix: 49% roads, 30% mining, 14% irrigation, 7% pipeline; client mix 61% third-party, 39% captive HAM
- Current order book executable over 3-3.5 years; FY27 order inflow target ₹8,000-10,000 cr
Standalone & Consolidated Financial Performance · K. Venkata Ram Rao (GM Finance)
- Q4 FY26 standalone: revenue ₹535 cr, EBITDA ₹28 cr (5.3% margin), PAT ₹19 cr
- FY26 standalone: revenue ₹2,097 cr, EBITDA ₹178 cr (8.5% margin), PAT ₹116 cr
- Q4 FY26 consolidated: revenue ₹696 cr, EBITDA ₹169 cr (24.3% margin), PAT ₹106 cr
- FY26 consolidated: revenue ₹2,698 cr, EBITDA ₹711 cr (26.4% margin), PAT ₹437 cr
- Working capital improved to 78 days (vs 93 days); net debt/equity 0.49x vs 0.41x; consolidated debt ₹2,438 cr vs ₹1,847 cr
In their words
I think EBITDA, if you talk about EBITDA, I'm very shameful to say that it is around 10 kind of level now we are getting.
Further, this is a different situation we are heading, sir. First time, we are unable to say what we are going to do this year. That's the major thing because we are mainly depending on the works which are coming up.
More or less, we should get this [Telangana payments]. It's not in this quarter. But next quarter, we shall be able to get that what we have.
To check next time
What management committed to on this call, or the dates they gave.
- Telangana Kaleshwaram Package 4 receivable recovery; management expects 2-3 months.
- Banhardih Gram Sabha outcome and mining project start timeline.
- ECR Chennai HAM financial closure in June; appointment date within 2 months.
- Mahabubnagar HAM: NHAI committed to full land handover within 5 months; appointment date in Q4 FY27.
- FY27 order inflow progress against ₹8,000-10,000 cr target; bid pipeline ~₹4,000 cr LOA-pending.
- Working capital days trend and any movement in Package 4 unbilled.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 1 Jun 2026 | ₹128.91 | +1.78% | −0.70% |
| 5 sessions Fri 5 Jun 2026 | ₹130.32 | +2.89% | −0.77% |
| 20 sessions Mon 29 Jun 2026 | ₹133.29 | +5.23% | +1.69% |
From the close of Fri 29 May 2026, ₹126.66: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
KNR Constru's other calls
- Q2 FY27Mon 16 Nov 2026Not read
- Q1 FY27Fri 14 Aug 2026Tone: Mixed
- Q3 FY26Wed 11 Feb 2026Not read
- CallFri 6 Feb 2026Not read
- Q2 FY26Thu 13 Nov 2025Tone: Cautious
- Q1 FY26Tue 12 Aug 2025Tone: Mixed
- Q4 FY25Fri 30 May 2025Tone: Cautious
- Q3 FY25Fri 14 Feb 2025Tone: Mixed
- Q2 FY25Wed 13 Nov 2024Tone: Mixed
- Q1 FY25Fri 16 Aug 2024Tone: Mixed
- Q4 FY24Thu 30 May 2024Tone: Cautious