Shriram Properties Q3 FY25 earnings call
In brief
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- Guidance cut
- Analyst pushback
- Low
- Stock, next session
- −1.46% (Nifty 50 −0.12%)
- Q3 sales 1.26 m sq ft / INR670 cr (+22%/+18% QoQ); Q4 handover target set at 1,500 units to unlock deferred revenue
- Two own projects (Pristine, Park 63) with ~INR500 cr revenue recognition now nearly resolved on OC/CC front
- FY25 sales volume/value guidance trimmed to 4.6-4.8 m sq ft and INR2,400-2,700 cr vs earlier INR2,750-3,000 cr
- Pipeline target doubled to 30-35 m sq ft over 12-24 months; medium-term 3x revenue by FY28 reaffirmed
- Net debt at INR400 cr; zero-debt aspiration deprioritized to fund INR2,000 cr pipeline expansion
An AI read of the company's transcript · the filing
The numbers
The quarter, Q3 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹121 cr | −45.2% | −13.8% | |
| EBITDA (excl. other income) | ₹-14.8 cr | — | — | -12.2% (8.7% a year ago) |
| Net profit | ₹13 cr | −29.8% | — | 10.7% (8.4% a year ago) |
| EPS (₹) | ₹0.76 | −29.6% | — |
From the company's filed results for the quarter ended 31 Dec 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
The numbers management led with
- Q3 sales volume: 1.26 m sq ft (+22% QoQ, +14% YoY)
- Q3 new development rights acquired: 3 projects, 1.1 m sq ft, GDV INR850-1,000 cr
- Deferred revenue (Pristine + Park 63): ~INR500 cr pending OC, expected to recognize in Q4
- Ongoing project pipeline: 21 m sq ft, 80% sold; GDV INR9,000-10,000 cr (Shriram-share ~INR6,500 cr)
Guidance
Guidance on this call
| What | For | What management said | On the Q2 FY25 call |
|---|---|---|---|
| FY25 sales volume | FY25 | Trimmed to 4.6-4.8 m sq ft (vs earlier higher target) | ~5+ msf of sales in H2 FY25 to recover deferred Q2 volumes |
| FY25 sales value (presales) | FY25 | INR2,400-2,700 cr (vs earlier INR2,750-3,000 cr) | — |
| Q4 FY25 handover units | Q4 FY25 | 1,500 units target vs 1,300 last year | — |
| EBITDA margin | Annual/medium-term | 22-25% (excluding other income) | Mid-20s% EBITDA margin band retained for FY25, consistent with historical 20–24% range |
| PBT margin | Annual/medium-term | 9-11% | 9–10% PBT margin band retained, give or take half a percent |
| PAT margin | Annual/medium-term | 8-10% (including other operating revenue) | — |
| Revenue growth | Near-term annual | 20%+ annual top-line growth | — |
| Medium-term revenue | FY28 | ~3x revenue by FY28 vs INR1,000 cr FY25 base | — |
| Pipeline target | Next 12-24 months | 30-35 m sq ft upcoming pipeline over 12-24 months (vs 17 m sq ft currently) | — |
| FY26 BD additions | FY26 | 8-10 m sq ft pipeline addition in FY26 (vs 3-4 m sq ft in FY25) | — |
Said on the Q2 FY25 call, not repeated on this one (7)
- Revenue recognition: Full-year FY25 revenue recognition target maintained at over INR1,200 cr
- PAT: Full-year FY25 PAT guidance retained at ~INR100 cr (combination of H2 handovers and Chennai land monetisation gain)
- Sales value: INR2,700+ cr of sales value targeted in H2 FY25
- Handovers: 3,300–3,500 handovers targeted in H2 FY25; 3,000–3,300 for full year FY25
- Portfolio realisation growth: 6–8% realisation growth for the year vs 4–5% market-level
- Net debt: Target zero net debt in 18–24 months; peak gross debt INR600–700 cr
- Project pipeline addition: 15–18 msf of new pipeline to be assembled to support three-year sales doubling
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Deferred revenue recognition | Q3 FY25 | at least ₹150 cr (on the Q2 FY25 call) | ₹121 cr, below the range |
| FY25 sales value growth | FY25 | at least 27% (on the Q4 FY24 call) | -69.7%, below the range |
| FY25 PAT margin | FY25 | 9–10% (on the Q4 FY24 call) | 9.4%, within the range |
| Sales value | FY25 | at least ₹2,700 cr (on the Q2 FY25 call) | ₹823 cr, below the range |
| Revenue recognition | FY25 | at least ₹1,200 cr (on the Q2 FY25 call) | ₹823 cr, below the range |
| PAT | FY25 | ₹100 cr (on the Q2 FY25 call) | ₹77 cr, below the figure guided |
| Full-year revenue | FY25 | ₹1,100 cr (on the Q2 FY25 call) | ₹823 cr, below the figure guided |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
The industry, as management sees it
Management sees a robust demand environment with customer activity reviving post festive season (October-November 2024); no demand slowdown observed. However, administrative/approval processes have suppressed launches and supply industry-wide, creating a temporary volume constraint rather than a fundamental issue. With approvals now streamlining and potential rate cuts supporting affordability, management expects renewed launch momentum across peers in coming quarters.
Risks management named
- Kolkata launch (Symphony) contingent on KMDA final approval - could slip beyond Q4 FY25
- Q3 handover mix was 90%+ JV/DM, limiting revenue recognition; needs own-project recovery
- Net debt target of zero balances against INR2,000 cr land commitment for 15-17 m sq ft pipeline expansion
- Royalty/land dispute resolution in Bengal pending, with INR12 cr provision in 9M FY25
Q&A
Q&A was light on pushback and largely exploratory/clarifying in nature. Vidhi Shah (C.R. Kothari) drove the most rigorous probing on PAT margin composition, EBITDA calculation methodology, and handover backlog versus Q4 targets, surfacing some genuine deflection on FY26-specific guidance. Parikshit Kandpal (HDFC Securities) covered the breadth of the call — BD pipeline, RERA status, land monetization, and diversification — with management providing specific numbers but appearing non-committal on the zero-debt aspiration. Topics that drew partial or deflected answers: FY26 revenue/PAT guidance (deferred to Board approval), Q4 handover deliverability against 1,500 target (qualified with spillage acknowledgment), and the precise mix of other income vs other operating revenue in margin calculations.
Not answered directly
- FY26 specific revenue and PAT guidance (deferred to Board plan approval)
- Precise handover count for Q4 (qualified with spillage risk to Q1/Q2 FY26)
- Promoter open-market purchase plans (no definitive plans)
Every question, with its answer
1. Deferred revenue, margin composition, FY25/26 guidance, 3x revenue aspiration
Vidhi Shah, C.R. Kothari & Sons
Question. Previously, deferred revenue of INR150 cr was guided for Q3 but actual was INR120 cr. Why? And is the EBITDA margin guidance of 20-30% and PAT margin of 10% inclusive or exclusive of other income? Also, can you give PAT guidance for FY25 and FY26, and handover guidance for next year? And is the 3x revenue vs current INR1,000 cr?
Answer, Gopalakrishnan J, Chief Executive Officer. The deferred INR500 cr is the combined Q2+Q3 deferral across Pristine and Park 63, not just Q3. With OC visibility now in place, most of this should be recognized in Q4. On margins, we have consistently guided EBITDA at 22-25%, not 20-30%. We include other operating revenues (sale of development rights, pass-through charges, handover fees, premiums) but exclude other income (interest income, gains). EBITDA without other income was 21% in Q3, 24% with other operating revenues. Staying away from specific FY26 guidance — annual plans need Board approval. FY25 revenue will see meaningful growth vs last year's INR860-987 cr; PBT margin 9-11% and PAT margin 8-10% maintained. Medium-term aspiration of ~3x revenue by FY28 is vs the INR1,000 cr FY25 base, underpinned by ~INR5,000-6,000 cr GDV Shriram-share from ongoing projects.
Not answered directly.
2. Institutional outreach, promoter support, index inclusion
Pankaj Garg, Individual Investor
Question. Is the company proactively reaching out to mutual funds/FIIs, and are promoters planning open-market purchases to support share price and create shareholder wealth? Also, is there anything being done to get added to index funds for passive flow?
Answer, Gopalakrishnan J, Chief Executive Officer. Yes, working with advisors and SGA on institutional marketing. Periodic conversations with mutual fund managers ongoing. Made meaningful progress with family offices and HNIs; mutual fund efforts showing initial results, set to gain momentum. On promoter purchases, no definitive plans currently. On index inclusion, we are smaller than the eligibility threshold at this stage — we look forward to that day very soon.
Partly answered.
3. Other income explanation and medium-term profit confidence
Shalini Desai, Elevate Capital
Question. Other income has risen for Q3 and 9 months — please explain. And what gives confidence on the 4x profit aspiration?
Answer, Gopalakrishnan J, Chief Executive Officer. Other income rose to INR7.5 cr from INR4.4 cr QoQ due to additional interest income. Other operating revenues include divestment/sale of development rights including mall land (with capital gain) and other project rights transfers — all routine. On 4x profit: ongoing projects 21 m sq ft with Shriram-share GDV ~INR6,500 cr to be completed over 1-3 years; at 9-10% margin profile, this gives the trajectory. 80% of projects sold and on/ahead of RERA timelines provides visibility.
4. BD pipeline, land monetization, Q4 launches, FY25 guidance, zero-debt strategy
Parikshit Kandpal, HDFC Securities
Question. On BD, you added INR1,000 cr this quarter — what is 9-month BD and Q4 expectation? Will INR93 cr land sale cash flow reflect in Q4 and capital gain be in Q3 or Q4? Q4 launches GDV and RERA status update? Have you applied for RERA in Bangalore? FY25 presales guidance now? Any plans to diversify beyond southern markets? Kolkata land bank monetization update and zero-debt target timeline?
Answer, Gopalakrishnan J, Chief Executive Officer. Year started with target of 3-4 m sq ft BD; slightly below at 9 months but will exceed by year-end. FY26 target reset to 8-10 m sq ft. Land sale cash flow: small part in Q3, majority in Q4. Capital gain ~INR5 cr recognized in Q3. Pune launching this quarter with new government in place; Bangalore at pre-RERA stage. Kolkata awaiting couple of final clearances. FY25 sales volume 4.6-4.8 m sq ft, value INR2,400-2,700 cr. Focus stays on Bangalore, Chennai, Pune and existing Kolkata — no new market expansion until targets reached. CMD Murali added that the company is working to stabilize Pune as a credible player first. Kolkata monetization hopeful but most likely next fiscal — path clear but external dependencies remain. Zero-debt is not the priority; net debt (INR400 cr) is. Land proceeds may be used for growth (INR2,000 cr commitment for 15-17 m sq ft pipeline) rather than debt repayment.
Not answered directly.
5. JV vs own handover mix
Rishikesh, RoboCapital
Question. Of the 1,758 units handed over in 9M, how many were via JV? And how many units in Q4?
Answer, Gopalakrishnan J, Chief Executive Officer. Majority (~783) were in JV and DM as per Slide 20. Q4 targeting ~1,500 units; mostly own projects with one joint venture.
6. PAT margin composition, Q4 handover deliverability, spillage risk
Vidhi Shah, C.R. Kothari & Sons
Question. Without other income, PAT would be negative. Does the INR6,000 cr GDV realization include other income? How many handovers since December 2024? Confidence on the remaining 1,250 target? Will there be spillage to Q1?
Answer, Gopalakrishnan J, Chief Executive Officer. Other operating revenue is part of operations per accounting standards — cannot be excluded. Only other income (interest, gains of INR7-8 cr) should be excluded. The 8-10% PAT margin guidance includes other operating revenues and excludes only other income. About 250 handovers since December. Last year did 1,300 in Q4 with mid-February OC timing; 1,500 is achievable. Handovers are not linearly distributed — they depend on OC arrival, now imminent for Pristine and Park 63. Some spillage expected: Q4 inventory is 2,500 units but only 1,500 targeted; rest will spillover to Q1/Q2 next year.
Partly answered.
What was said
Topic by topic, in the order it was spoken
Company Overview and Quarter Context · Gopalakrishnan J (CEO)
- 25th year of operations; strong operating platform and balance sheet
- Medium-term aspiration framework rolled out; targeting 3 years forward delivery
- Q3 described as mixed: muted start, strong second half across sales, execution and collections
- External factors (approvals, OCs) continued from Q2 but visibility now improving
Q3 Operational Performance · Gopalakrishnan J (CEO)
- Sales volumes 1.26 m sq ft (+22% QoQ, +14% YoY); sales value INR670 cr (+18% QoQ, +14% YoY)
- Collections muted at INR346 cr flat QoQ/YoY due to deferred launches and handovers
- Handovers 636 units in Q3 (+8% QoQ); 1,758 units in 9M FY25
- New launches Serenity (Bangalore), Swargam (Chennai), Symphony (Kolkata) contributed meaningfully
External Approval and OC Challenges · Gopalakrishnan J (CEO)
- Pune project delayed ~3 quarters due to central/state elections and regulatory authority appointments
- Bangalore project now at pre-RERA stage; expect RERA in coming month
- Completion Certificate / Occupancy Certificate / Release Order issues now nearly resolved in Chennai and Bangalore
- No demand slowdown observed; customer activity revived post festive season (October-November 2024)
Q4 Launch Pipeline · Gopalakrishnan J (CEO)
- 2 definite launches planned — Pune and Bangalore; Kolkata contingent on KMDA approval
- Kolkata Symphony plan approval received; final KMDA clearance awaited
- Rest of planned launches pushed to Q1-Q2 FY26
- 2 launches adequate for meaningful YoY growth in current year
Business Development and Pipeline · Gopalakrishnan J (CEO)
- Added 3 new projects in Q3: Yelahanka, Electronic City (Bangalore) and Koyambedu (Chennai)
- Combined development potential 1.1 m sq ft; GDV INR850-1,000 cr
- Current ongoing pipeline 21 m sq ft (80% sold); to-be-launched pipeline 17 m sq ft (GDV ~INR10,000 cr)
- Aspiration to double pipeline from 17 m sq ft to 30-35 m sq ft over 12-24 months
- 17-18 projects at advanced evaluation stage in BD pipeline
Pricing and Market Trends · Gopalakrishnan J (CEO)
- Portfolio price hikes moderated to ~5% in FY25 (vs 20% between FY23-FY24)
- Average realization for mid-market products ~INR6,700/sq ft; mid-market is ~70% of portfolio
- Plot prices moved up INR500/sq ft YoY
- Industry-wide launch subdued due to administrative/approval processes; supply shrinkage noted
Q3 Financial Performance · Gopalakrishnan J (CEO)
- Revenue INR180 cr in Q3 (QoQ growth but YoY decline due to handover/registration constraints)
- Gross profit INR89 cr; gross margin ~31%; EBITDA INR43.9 cr (+14% YoY); EBITDA margin ~24%
- PBT ~INR15 cr vs INR9 cr YoY; PAT INR13 cr vs INR18.5 cr YoY (impacted by prior year tax write-back)
- Other expenses elevated ~INR3-5 cr QoQ due to launch expenses on 3 new launches
- Finance costs lower YoY on 9M basis due to debt repayment; royalty provision INR4 cr in Q3 (INR12 cr in 9M)
Deferred Projects Status Update · Gopalakrishnan J (CEO)
- Pristine Estate (Bangalore): Penal demand challenged; favorable court verdict obtained; bill approved in assembly awaiting gazette notification
- Park 63 (Chennai): Papers have moved; registration preparations underway
- Combined deferred revenue potential ~INR500 cr; majority expected to recognize in Q4
- Customer line-up and sale deed preparation progressing for both projects
Cash Flow and Debt Profile · Gopalakrishnan J (CEO)
- Q3 operating cash flow INR60 cr; 9M FY25 INR157 cr
- Free cash flow negative INR14 cr in Q3 due to ~INR73 cr loan repayments and ~INR40 cr new project investments
- Mall land monetization generated INR93 cr cash flow; capital gain ~INR5 cr recognized in Q3
- Gross debt INR470 cr (vs INR631 cr earlier); net debt INR400 cr (vs INR440 cr)
- Cash and equivalents rebuilt to INR143 cr post land monetization
- Cost of debt remained under control
Updated FY25 Guidance · Gopalakrishnan J (CEO)
- FY25 sales volume trimmed to 4.6-4.8 m sq ft (from earlier higher target)
- FY25 sales value trimmed to INR2,400-2,700 cr (from earlier INR2,750-3,000 cr)
- Q4 handover target 1,500 units vs 1,300 last year
- 2,500 units available for Q4 handover from current inventory
- EBITDA margin guidance maintained at 22-25%; PBT 9-11%; PAT 8-10%
Medium-Term Pipeline and Aspirations · Gopalakrishnan J (CEO)
- Ongoing project pipeline 21 m sq ft (80% sold), GDV INR9,000-10,000 cr; Shriram-share GDV ~INR6,500 cr
- Majority of ongoing projects on or ahead of RERA timelines
- Medium-term aspiration: ~3x revenue recognition by FY28
- Handovers of 3-5 m sq ft annually expected to support 20%+ top-line growth
- Need to nearly double upcoming pipeline from 17 m sq ft to 30-35 m sq ft in 12-24 months
Promoter Group Restructuring · Gopalakrishnan J (CEO)
- HoldCo-level shareholding change between Shriram Group and Mr. Murali; SEBI approval secured
- First tranche completed December 2024; remaining transactions to complete by December 2025
- Mr. Murali's HoldCo stake rose to 54.8% (from 26-27%); effective SPL ownership now 15.2%
- Promoter holding in SPL unchanged at 28%; no equity overhang expected
- Brand continuity confirmed; royalty payments end after FY25; new logo/identity retained
In their words
The quarter gone by has left with a mixed emotion for us, strong in some aspects, not so strong and a satisfactory moment in some aspects.
But I want to assure you that this is not a demand slowdown. We are seeing a robust demand.
These 2 projects alone held revenue recognition potential of about INR500 crores, most of it should come through in Q4.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Wed 12 Feb 2025 | ₹79.46 | −1.46% | −0.12% |
| 5 sessions Tue 18 Feb 2025 | ₹69.83 | −13.41% | −0.55% |
| 20 sessions Wed 12 Mar 2025 | ₹67.69 | −16.06% | −2.61% |
From the close of Tue 11 Feb 2025, ₹80.64: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Shriram Properties's other calls
- Q2 FY27Fri 20 Nov 2026Not read
- H1 FY27Fri 13 Nov 2026Not read
- Q1 FY27Thu 13 Aug 2026Tone: Confident
- Q4 FY26Mon 25 May 2026Tone: Cautious
- Q3 FY26Sat 14 Feb 2026Tone: Confident
- Q2 FY26Wed 12 Nov 2025Tone: Mixed
- Q1 FY26Tue 12 Aug 2025Tone: Confident
- Q4 FY25Tue 27 May 2025Tone: Confident
- Q2 FY25Thu 14 Nov 2024Tone: Confident
- Q1 FY25Wed 14 Aug 2024Tone: Mixed
- Q4 FY24Thu 30 May 2024Tone: Confident