Shriram Properties Q3 FY26 earnings call
In brief
Shriram settles ₹259 cr Kolkata land liability without cash outflow; FY26 revenue band raised to ₹1,300-1,500 cr.
- Management's tone
- Confident
- What was said
- Mixed
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −3.01% (Nifty 50 +0.83%)
- Kolkata ₹259 cr land royalty liability settled with no cash outflow via 42.37-acre conveyance to West Bengal government, ending multi-year dispute.
- FY26 revenue guided to ₹1,300-1,500 cr and earnings to ₹90-100 cr, with management claiming 80-90% confidence in the band.
- Q3 revenue grew 13% YoY to ₹203 cr but reported ₹7 cr loss as Karnataka e-Khata and Kaveri portal issues deferred revenue recognition.
- 9M operating cash flow ₹193 cr (+23% YoY); net debt ₹418 cr with net D/E 0.3x; CRISIL A-minus positive outlook maintained.
- FY26 sales volume target cut to ~4.5 mn sqft (from 5.2-5.5 mn); sales value target ~₹2,600 cr; collections >₹1,700 cr expected.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q3 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹179 cr | +47.6% | −12.9% | |
| EBITDA (excl. other income) | ₹-17 cr | — | — | -9.5% (-12.2% a year ago) |
| Net profit | ₹-6.9 cr | — | — | -3.8% (10.7% a year ago) |
| EPS (₹) | ₹-0.40 | — | — |
From the company's filed results for the quarter ended 31 Dec 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Q3 revenue: said INR203 cr (+13% YoY); management labels as total revenue; filed ₹178.90 cr (+47.6% YoY). Filed is revenue from operations; management's ₹203 cr is total revenue including other operating income; 13.5% gap reflects this definition difference.
- Q3 EBITDA: said INR13.1 cr (operating EBITDA, per CFO); filed ₹-16.99 cr (margin -9.5%). Filed uses non-standard PBT + finance costs + depreciation - other income; management's ₹13.1 cr is operating EBITDA (gross profit minus opex); definition gap.
What moved the numbers, as management explained it
- Karnataka e-Khata and Kaveri 2.0 registration portal disruptions continued to defer revenue recognition across completed Bangalore projects, pushing about INR800 cr of revenue into Q4.
- Q3 revenue base of ₹203 cr (+13% YoY) combined with higher operating expenses from Kolkata launches compressed EBITDA to ₹13.1 cr, lower YoY despite gross profit up 19%.
- Commencement of revenue recognition at Shriram Sunshine in Kolkata (a relatively low-margin project) slightly compressed Q3 gross margin versus prior periods.
- Finance costs down 16% YoY on disciplined capital management and lower average debt, partially offsetting EBITDA softness in 9M numbers.
- 9M gross margin held at ~29% YoY; PAT of ₹22.4 cr is depressed vs full-year ₹90-100 cr guidance because revenue recognition is Q4-heavy for the company.
The numbers management led with
- Kolkata land settlement — liability discharged: INR259 cr royalty/non-compete fee liability fully extinguished with no cash outflow; 42.37 acres conveyed to West Bengal government
- Kolkata site cash flow potential: INR1,500 cr over next 5 years (5-6 mn sqft own development + 90-100 acres monetization)
- Pipeline additions in 9M FY26: 2.8 mn sqft added across 6 projects with GDV of INR2,900 cr; 5 more projects with 6+ mn sqft at advanced stage
- Unlaunched pipeline GDV: 18.5 mn sqft unlaunched pipeline with GDV of INR11,670 cr
Guidance
Guidance on this call
| What | For | What management said | Filed |
|---|---|---|---|
| FY26 total revenue (recognition) | FY26 | Full-year revenues in the range of INR1,300-1,500 crores | ₹1,267 cr, below the range |
| FY26 earnings (PAT) | FY26 | Earnings in the range of INR90-100 crores for the full year | ₹101 cr, above the range |
| FY26 sales value (bookings) | FY26 | Sales value of around INR2,600 crores for FY26 | ₹1,267 cr, below the figure guided |
| FY26 unit handovers | FY26 | Deliver 3,200 to 3,300 homes for the full year as originally envisaged | — |
| Q4 FY26 revenue recognition | Q4 FY26 | Recognize about INR800 crores of revenue in Q4 from 1,900+ unit handovers | ₹641 cr, below the figure guided |
| FY26 sales volume | FY26 | Upwards of 4.5 million square feet of sales for FY26 | — |
| FY26 collections | FY26 | Collections expected to cross INR1,700 crores for FY26 | — |
| FY26 GDV addition (pipeline) | FY26 | Add INR4,500-INR5,000 crores of GDV during FY26 | — |
| Peak net D/E (consolidated) | FY28 | Net D/E may go close to 0.7 short-term toward mission targets | — |
| FY26 deliveries (area) | FY26 | Deliver close to 4 million square feet during FY26 | — |
| Kolkata surplus land monetization timeline | FY26-FY28 | Surplus land monetization targeted over a three-year period | — |
| Kolkata site cumulative cash flow potential | FY26-FY30 | Kolkata site potential to unlock cash flows in excess of INR1,500 crores over next 5 years | — |
| Annual pricing growth | FY26-FY28 | Annual price increase of 5%-6% max 8% over the next couple of years | — |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
What changed since the Tue 12 Aug 2025 call
| What | On the Tue 12 Aug 2025 call | On this call |
|---|---|---|
| FY26 unit handovers (cut) | FY26 handover guidance maintained at 3,300-3,600 units (1,400 Kolkata, 1,800 Bangalore, rest Chennai) | On track to deliver 3,200 to 3,300 homes for the full year as originally envisaged |
| FY26 revenue (recognition) (raised) | Most likely upwards of INR 1,250-1,300 cr for FY26 | Full-year revenues in INR1,300-1,500 crores and earnings in INR90-100 crores |
| FY26 PBT margin aspiration (restated) | 8-11% PBT margin (FY26) | Full-year earnings in INR90-100 crores range (replaces margin with absolute profit) |
| Gross margin aspiration (not repeated) | Aspire to ~30% gross margin on annualised basis (FY26) | Not mentioned |
| Pipeline expansion progress (restated) | 6 projects (~3 mn sqft) nearing closure, 5 more at advanced commercial stage, target to double pipeline in 18-24 months | 6 projects with 2.8 mn sqft (GDV INR2,900 cr) added in 9M; 5 more with 6+ mn sqft at advanced stage |
| Kolkata land royalty liability (new) | — | Settled ₹259 cr liability with no cash outflow via 42.37-acre conveyance to West Bengal government |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Deferred revenue recognition | Q3 FY25 | at least ₹150 cr (on the Q2 FY25 call) | ₹121 cr, below the range |
| FY25 sales value growth | FY25 | at least 27% (on the Q4 FY24 call) | -69.7%, below the range |
| FY25 PAT margin | FY25 | 9–10% (on the Q4 FY24 call) | 9.4%, within the range |
| Sales value | FY25 | at least ₹2,700 cr (on the Q2 FY25 call) | ₹823 cr, below the range |
| Revenue recognition | FY25 | at least ₹1,200 cr (on the Q2 FY25 call) | ₹823 cr, below the range |
| PAT | FY25 | ₹100 cr (on the Q2 FY25 call) | ₹77 cr, below the figure guided |
| Full-year revenue | FY25 | ₹1,100 cr (on the Q2 FY25 call) | ₹823 cr, below the figure guided |
| Revenue growth (range) | FY26 | 25–35% (on the Q4 FY25 call) | 53.9%, above the range |
| EBITDA margin (target) | FY26 | 22–25% (on the Q4 FY25 call) | 6.9%, below the range |
| PAT margin (target) | FY26 | 8–10% (on the Q4 FY25 call) | 8%, within the range |
| FY26 revenue | FY26 | ₹1,250–1,300 cr (on the Q1 FY26 call) | ₹1,267 cr, within the range |
| FY26 EBITDA margin | FY26 | 22–25% (on the Q1 FY26 call) | 6.9%, below the range |
| FY26 PAT margin | FY26 | 8–10% (on the Q1 FY26 call) | 8%, within the range |
| FY26 revenue | FY26 | ₹1,250–1,300 cr (on the Q2 FY26 call) | ₹1,267 cr, within the range |
| Annualised EBITDA margin | FY26 | 25% (on the Q2 FY26 call) | 6.9%, below the figure guided |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
Balance sheet, capex and funding
- Net debt ₹418 cr, net D/E 0.3x; cost of debt 11.1%; CRISIL A-minus positive outlook reaffirmed.
- Closing cash balance ₹217 cr; Q3 collected ₹302 cr and generated ₹117 cr operating cash flow; 9M operating inflow ₹787 cr (+27% YoY).
- 9M operating cash flow ₹193 cr (+23% YoY); repaid ₹67 cr scheduled debt in Q3; invested ₹100+ cr in new business development during the quarter.
- ₹250 cr invested in new project acquisitions over 9M; FY26 target to add ₹4,500-5,000 cr GDV; total not-yet-launched pipeline 18.5 mn sqft (GDV ₹11,670 cr).
- Net debt rose to ₹418 cr from ₹380 cr at Q1 FY26; comfort zone at 0.5 D/E, may go to 0.7 short-term for pipeline build-out toward FY28 mission.
The industry, as management sees it
Management views the residential real estate market as fundamentally strong and dismisses slowdown fears as unfounded. New launches across Bangalore, Chennai, Pune and Kolkata are receiving good traction and sustenance sales are robust; home-loan partners are not seeing demand weakness. Bangalore-specific administrative issues around E-Khata and Kaveri 2.0 registration portal have been the main source of industry-wide revenue deferment, but these are expected to stabilise.
Risks management named
- Karnataka E-Khata and Kaveri 2.0 registration portal instability could continue to defer Bangalore handovers and revenue recognition
- FY26 sales volume target revised down to 4.5 mn sqft (from 5.2-5.5 mn sqft earlier) on launch slippage and approval delays
- Q3 reported INR7 cr loss vs prior-year profit due to lower revenue base and higher operating expenses tied to Kolkata launches
Q&A
Q&A was dominated by Kolkata land monetization (5 of 8 questions probed per-acre realization, surplus acreage, 3-year timeline and value extraction) and E-Khata/registration delays. CEO Gopalakrishnan handled most questions with detailed color, particularly defending the INR1,500 cr 5-year Kolkata cash flow estimate. Notable pushback came from Saumil Shah on guidance conservatism (CEO acknowledged the suggestion) and from Sunil Jatakia on stagnant 9M metrics vs the FY28 mission — the CEO pushed back but deferred the detailed answer to Q4 results. The most useful new disclosure was that the INR259 cr liability write-off may modestly boost reserves, pending auditor treatment.
Not answered directly
- Granular timeline for monetizing 90-100 acres of Kolkata surplus land (CEO offered 'maybe three years' and committed to granular visibility by year-end)
- FY28 medium-term mission (sales value INR5,000 cr, revenue INR2,500-3,000 cr, earnings INR250 cr) — CEO deferred full answer to Q4 results
- Exact quantum of INR259 cr liability write-off flowing to reserves (awaiting statutory auditor treatment)
Asked for a number, answered without one
- Peak absolute debt for 3x revenue / 4x profit mission: Gave net D/E band only (comfort 0.5, may go to 0.7 short-term); declined to give an absolute debt or rupee figure.
- Expected IRR from Kolkata 5-6 mn sqft new development: Said company will not do projects below 25% IRR in general; Kolkata could be 'significantly higher' at current price points; no specific IRR number.
- Per-acre / total realisation for 90-100 acres Kolkata surplus land: Gave market range INR3-5 cr/acre for outright sale, INR6-7 cr/acre for villa own-development; declined to commit on aggregate value, said 'comfortably' above analyst estimate.
Every question, with its answer
1. E-Khata/registration delays
Saumil Shah, Paras Investments
Question. Why are OC and E-Khata delays persisting across multiple quarters? How is Q4 shaping up so far, and are we on track for the INR800 cr revenue recognition?
Answer, Gopalakrishnan J, Executive Director & CEO. It is not a Shriram-specific issue — the entire Bangalore industry has been impacted by Karnataka's E-Khata migration and Kaveri 2.0 registration portal instability. OC issues are fully resolved and all OCs received; 380 units plus 1,490-1,500 in upcoming OCs make up the INR800 cr Q4 revenue potential. Registration momentum in Q4 is far better than Q2 and Q3. Kolkata and Chennai account for ~60% of Q4 handovers, with balance from Bangalore.
Follow-up. Suggestion: why not be more conservative and commit to revenue 6 months later so that you can surprise positively? And on the Kolkata land — how much of the balance area will you develop and monetize, and by when?
Answer. On conservative guidance, we will consider that as a suggestion but the RERA angle on handover timelines also matters. On Kolkata — 10 mn sqft total development, of which 5 mn sqft already in progress. Three-year window for surplus land monetization and 5-6 year window to complete construction and handover. We will try to give granular visibility by year-end.
2. Sales volume guidance revision
Saumil Shah, Paras Investments
Question. Sales volume guidance was 5.2-5.5 mn sqft and is now 4.5 mn sqft — is this a market slowdown?
Answer, Gopalakrishnan J, Executive Director & CEO. No slowdown in market — Bangalore launch 'Songs of the Earth' (Shriram The One Codename) at Anekal is 75% sold in 3.5-4 months at high ticket sizes; Skybloom villas in West Bengal sold out in 3-4 weeks at INR1.5-1.8 cr. Pune project is 40% sold. Markets are absorbing well in all four cities. The constraint is supply (especially in Bangalore) due to external factors, not demand.
3. Kolkata IRR and peak debt
Rohit Kumar, ADM Business Advisory LLP
Question. What is the expected IRR from the 5-6 mn sqft Kolkata development? And what peak debt level is needed to deliver 3x revenue and 4x profit targets?
Answer, Gopalakrishnan J, Executive Director & CEO. Difficult to predict Kolkata IRR right now; in general we will not do projects below 25% IRR, and on existing Kolkata land IRR should be significantly higher. On debt: comfort zone is 0.5x net debt-equity, may intermittently touch 0.7x during peak pipeline build, but very uncomfortable going beyond that on consolidated basis.
4. Kolkata surplus land and pricing
Karan Mehra, Mehta Investment
Question. Post-Kolkata settlement, what is the quantum of surplus land available for monetization and what is the indicative price per acre in Uttarpara?
Answer, Gopalakrishnan J, Executive Director & CEO. Out of 314 acres, 48 acres used for ongoing projects and 42 acres conveyed to government. After roads, greens and water bodies, 90-100 acres of developable land available. Land transactions in Uttarpara range INR3-5 cr per acre currently; own villa development can deliver INR6-7 cr per acre pre-tax contribution. Realization will be a weighted mix across apartments, plots and villas; aggregate cash flow expectation of INR1,500 cr from the site remains unchanged.
Follow-up. Despite E-Khata and portal issues in Bangalore, are you seeing sequential improvement in price realizations in Bangalore and Pune? Is pricing power intact or are you using incentives?
Answer. Pricing power intact — sequential growth of 1-1.5% per quarter on existing projects and 5-8% annual increase likely. Recent Bangalore launch achieved INR7,350-7,400 per sqft, well above underwriting. Post-COVID 15-20% spike is unlikely to repeat but steady 5-8% annual increase is reasonable. No need for incentives.
5. Kolkata land split and monetization
Sunil Jatakia, B-Fly India Opportunity Fund
Question. On the 171-175 acres of land left after government conveyance and ongoing projects, how much goes for infrastructure and balance for monetization? Is the 3-year monetization timeline a firm commitment?
Answer, Gopalakrishnan J, Executive Director & CEO. Infrastructure, water bodies and roads will take 50-75 acres, leaving 90-100 acres of surplus developable land. Three-year monetization is the right understanding; will be a weighted mix — warehousing/data center buyers at INR3-4 cr per acre versus own villa development at INR6-7 cr per acre. NPV-driven decision making; will look at NPV per acre across options.
Follow-up. If you take a blended figure of INR4-5 cr per acre on the 90-100 acres, is INR500-600 cr of value realization reasonable?
Answer. It can be much more — villa project re-rated to INR1.5-1.8 cr ticket size from INR50-60 lakh earlier; whatever numbers you talked about, we should be able to realize comfortably.
6. FY28 medium-term mission
Sunil Jatakia, B-Fly India Opportunity Fund
Question. Numbers are stagnant YoY — sales volume, sales value, collections, handovers all at similar levels to FY25. Where do you stand on the FY28 mission of sales value INR5,000 cr, revenue INR2,500-3,000 cr and earnings INR250 cr?
Answer, Gopalakrishnan J, Executive Director & CEO. Will reserve this answer till Q4 results for more credibility. Not all metrics stagnant — 9M revenue growing 50-55% YoY on income recognition, earnings trajectory from FY22 negative to INR77 cr last year to INR90-100 cr this year. As pricing moves to INR6,000-7,000 cr ticket size, revenue will grow faster than volume and margin profile will improve. Monetization may not fully kick in by FY28 but core operations should still reach the medium-term mission.
Not answered directly.
7. Kolkata monetization and Chennai regulatory
Rajesh Agarwal, Moneyore
Question. Kolkata land: confirming 100 acres of monetization at INR4-5 cr per acre (before tax)? And are we seeing E-Khata-type issues in Chennai also?
Answer, Gopalakrishnan J, Executive Director & CEO. On monetization, the 90-100 acres will be monetized in a 3-year window via a mix of outright sale, JDA and JV; what we call 'monetization' also includes joint development where we are not in operations. On E-Khata — it is purely a Karnataka issue. Chennai, Pune and Kolkata have no such problems; their systems (Patta) had stabilized long ago.
8. Balance sheet treatment of liability write-off
Saumil Shah, Paras Investments
Question. On the INR259 cr liability being knocked off the balance sheet — will this flow into reserves and increase book value, or is it just an accounting entry?
Answer, Gopalakrishnan J, Executive Director & CEO. It is a gross liability and gross asset getting knocked off. There may be some small difference in value that may eventually flow into reserves and surplus, depending on treatment being finalised with statutory auditors. Cannot confirm exact quantum now.
Partly answered.
What was said
Topic by topic, in the order it was spoken
CMD Opening: Kolkata Resolution and Business Stability · M. Murali (CMD)
- Kolkata land dispute resolved amicably; 42.37 acres conveyed to West Bengal government and INR259 cr liability fully discharged with no cash outflow
- Core operations remained healthy despite approval and E-Khata challenges; customer demand encouraging, sustenance portfolio delivering steady traction
- 9M FY26 sales of 2.9 mn sqft at INR1,691 cr; Q4 expected to deliver strong rebound backed by project completions and revenue recognition
Kolkata Land Resolution Mechanics and Monetization Plan · Gopalakrishnan J (CEO)
- INR259 cr disputed royalty/ non-compete fee liability extinguished by 42.37-acre conveyance; government orders received in November 2025, deed registered February 2026
- Out of 314 acres at Kolkata, 48 acres under ongoing projects (5 mn sqft, 80% sold) and balance 200+ acres available for development, of which 90-100 acres identified as surplus for monetization
- Strategic intent to develop 5-6 mn sqft with GDV INR3,000 cr over next 5 years on own and monetize remaining land; site cash flow potential estimated at INR1,500 cr over 5 years
Operating Environment and Industry Outlook · Gopalakrishnan J (CEO)
- All pending OCs received; Bangalore E-Khata and Kaveri 2.0 portal stabilising after protracted disruption; Chennai, Pune and Kolkata operating without friction
- Slowdown fears characterized as unfounded; new launches receiving good traction, sustenance sales strong, home-loan partners not seeing demand weakness
- Bangalore-specific administrative issues impacted handover and revenue recognition but improvement from Q2 to Q4 has been substantial
Q3 Operational Performance and Handover Pipeline · Gopalakrishnan J (CEO)
- Q3 sales INR565 cr on 0.9 mn sqft; collections INR424 cr; 613 units handed over; 380+ units in OC-received projects with INR350 cr revenue potential
- Two upcoming milestones in Kolkata plus additional projects bring handover-ready units to 1,490-1,500, taking Q4-eligible units to 1,900+ with INR800 cr revenue potential
- FY26 handover target of 3,200-3,300 homes and 4 mn sqft reaffirmed
Cash Flow Generation and Capital Investment · Gopalakrishnan J (CEO)
- 9M operating inflows INR787 cr (+27% YoY); OCF INR193 cr (+23% YoY); capital commitments to new projects INR246 cr in 9M, doubling prior year
- Over FY23 to 9M FY26, cumulative operating inflow ~INR3,000 cr, OCF over INR840 cr and capital commitments over INR600 cr
- Pipeline additions of 2.8 mn sqft in 9M with GDV INR2,900 cr; another 3-4 mn sqft likely before FY26 close
FY26 Guidance and Confidence · Gopalakrishnan J (CEO)
- FY26 recognized revenue guidance of INR1,300-1,500 cr and PAT of INR90-100 cr maintained; management stated 80-90% confidence
- Bangalore registration portal stability flagged as key swing factor for delivery; management expects current stable trend to continue
- Sales volume likely to fall short of earlier 5 mn sqft target due to launch slippage but should exceed FY25
Pipeline Additions and Unlaunched Inventory · Gopalakrishnan J (CEO)
- Six projects added in 9M FY26 totalling 2.8 mn sqft with GDV INR2,900 cr; 5 more projects with 6+ mn sqft potential at advanced closure stage
- Close to 20 mn sqft under evaluation at different stages; pipeline composition balanced between JDA, JV, DM and outright
- Unlaunched pipeline of 18.5 mn sqft with GDV INR11,670 cr provides strong forward visibility across Bangalore, Pune and Chennai
Recent Launches and Product Strategy · Gopalakrishnan J (CEO)
- Six launches in FY26 including 4 new products and 2 new phase launches; Skybloom villas in Uttarpara (West Bengal) exceeded expectations with INR1.5-1.8 cr ticket size
- Bangalore launch 'Shriram The One Codename' (Songs of the Earth) at Anekal achieved 75%+ sales in 3.5-4 months at INR7,350-7,400 per sqft
- Pune project progressing well, 40% sold; commercial space monetization initiated in Kolkata
CFO: Q3 Financial Performance · Ravindra Kumar Pandey (CFO)
- Q3 revenue INR203 cr (+13% YoY); gross profit INR41 cr (+19% YoY); EBITDA INR13.1 cr impacted by lower revenue base and higher Kolkata launch opex; loss INR7 cr vs profit PY
- Shriram Sunshine project in Kolkata reported at relatively low margin, impacting consolidated margin profile in Q3
- Loss characterised as timing issue from revenue deferment, not structural margin erosion
CFO: 9M Financial Performance · Ravindra Kumar Pandey (CFO)
- 9M revenue from operations INR627 cr (+51% YoY); total revenue INR694 cr (+27% YoY); gross profit INR184 cr (+40% YoY) at ~29% margin
- EBITDA INR82.9 cr vs INR113.7 cr PY; finance costs down 16% YoY on disciplined capital management; PAT INR22.4 cr
- Management indicated both top line and profitability would have been meaningfully higher had E-Khata process moved on schedule
CFO: Cash Flow and Liquidity · Ravindra Kumar Pandey (CFO)
- Q3 collections INR302 cr; Q3 OCF INR117 cr with sequential jump; INR67 cr debt repaid and INR100 cr invested in new business development
- 9M operating inflow INR787 cr; 9M OCF INR193 cr; INR250 cr invested into new projects; closing cash balance INR217 cr
- Healthy cash flow generation with no equity dilution and ample liquidity to support construction launches and new opportunities
CFO: Debt Profile and Balance Sheet · Ravindra Kumar Pandey (CFO)
- Net debt INR418 cr; net debt-equity at 0.3x, among the lowest in the sector; significant headroom for growth
- Cost of debt at 11.1% reflecting improved credit profile; CRISIL A-minus rating with positive outlook reaffirmed
- Strong balance sheet supports confident execution of growth pipeline
CFO: FY26 Outlook and Closing · Ravindra Kumar Pandey (CFO)
- FY26 sales volume above 4.5 mn sqft, sales value around INR2,600 cr, collections above INR1,700 cr; 4 mn sqft handovers expected
- Pune deal closure and additional pipeline additions expected to add INR4,500-5,000 cr GDV in FY26
- Q3 numbers reflect temporary external disruptions; fundamentals intact, cash flows robust, balance sheet conservative, pipeline expanding
In their words
We believe the Kolkata site has the potential to unlock cash flows in excess of INR1,500 crores in the next five years.
This is a timing issue, not a structural issue. On a 9-month basis, the underlying strength of the business is clearly visible.
We are not seeing a slowdown in the market. Whatever we are launching is getting sold. Market has misunderstood the trend because I saw for the last 4 weeks there's a lot of talk about demand slowdown. We are not seeing it on the ground.
To check next time
What management committed to on this call, or the dates they gave.
- Q4 FY26 revenue recognition execution: ~₹800 cr from 1,900+ unit handovers across Bangalore, Kolkata, Chennai
- Achievement of full-year FY26 revenue ₹1,300-1,500 cr and earnings ₹90-100 cr
- FY26 handover delivery 3,200-3,300 units; sales value ~₹2,600 cr; collections >₹1,700 cr
- Pipeline closure of 5 projects (6+ mn sqft potential) at advanced diligence stage
- Granular timeline for monetizing 90-100 acres of Kolkata surplus land (CEO committed to share by year-end call)
- Stabilisation of Karnataka e-Khata and Kaveri registration portal and Q4 handover velocity in Bangalore
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 16 Feb 2026 | ₹81.82 | −3.01% | +0.83% |
| 5 sessions Fri 20 Feb 2026 | ₹83.75 | −0.72% | +0.39% |
| 20 sessions Mon 16 Mar 2026 | ₹68.57 | −18.72% | −8.10% |
From the close of Fri 13 Feb 2026, ₹84.36: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Shriram Properties's other calls
- Q2 FY27Fri 20 Nov 2026Not read
- H1 FY27Fri 13 Nov 2026Not read
- Q1 FY27Thu 13 Aug 2026Tone: Confident
- Q4 FY26Mon 25 May 2026Tone: Cautious
- Q2 FY26Wed 12 Nov 2025Tone: Mixed
- Q1 FY26Tue 12 Aug 2025Tone: Confident
- Q4 FY25Tue 27 May 2025Tone: Confident
- Q3 FY25Wed 12 Feb 2025Tone: Mixed
- Q2 FY25Thu 14 Nov 2024Tone: Confident
- Q1 FY25Wed 14 Aug 2024Tone: Mixed
- Q4 FY24Thu 30 May 2024Tone: Confident