Solex Energy Q2 FY27 earnings call
In brief
Solex resumed 24/7 operations, expects a 4.5-month FY27 catch-up and guides FY29 revenue to ₹4,000 crore at 23%-24% EBITDA margin.
- Management's tone
- Mixed
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −0.42% (Nifty 50 +0.58%)
- FY29 guidance was revenue of about ₹4,000 crore, EBITDA margin of 23%-24% and PAT margin of 12%-14%.
- Solex resumed 24/7 module operations, said its order book was intact and expected to recover FY27 revenue, EBITDA and PAT margins over 4.5 months.
- The cell project cleared land, pollution-control and EC issues; equipment and service providers were aligned for December 2027 execution.
- BESS documentation and order placement were expected within a couple of months, with assembly-line start targeted for September 2027.
- Freight rose from a planned $900-$1,000 per container to $3,500, which Solex absorbed to protect customer delivery commitments.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹273 cr | +75.8% | +4.5% | |
| EBITDA (excl. other income) | ₹26.7 cr | +43.5% | −7.9% | 9.8% (12% a year ago) |
| Net profit | ₹3.8 cr | −33.9% | −52.1% | 1.4% (3.7% a year ago) |
| EPS (₹) | ₹3.54 | −87.0% | −52.1% |
From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- ALMM-2 was implemented before adequate cell capacity, disrupting the last three months, reducing production and leaving installed-capacity utilization much lower.
- Lower production did not reduce fixed costs, and management called this a major reason for higher expenses in the quarter.
- Converting non-fund-based limits to fund-based limits increased the company's cost of funds.
- Geopolitical freight costs rose from a planned $900-$1,000 per container to $3,500, which Solex absorbed to meet customer delivery commitments.
The numbers management led with
- First-phase 2030 investment: INR 4,500 crore, or about US$1 billion, for the first phase
- TOPCon cell-line capex: INR 500 crore to INR 600 crore per GW, including land and building
- FY29 revenue ambition: Around INR 4,000 crore
- FY29 profitability ambition: PAT margin of 12-14%; EBITDA margin stated as both 23-25% and 23-24%
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY29 revenue guidance | FY29 | FY29 revenue was guided at somewhere about ₹4,000 crore. |
| FY29 EBITDA margin guidance | FY29 | FY29 EBITDA margin guidance was 23%-24%; management had earlier stated a 23%-25% range. |
| FY29 PAT margin guidance | FY29 | FY29 PAT margin guidance was 12%-14%. |
| Revenue guidance | FY27 | Management expects to cover the existing FY27 revenue guidance over the next 4.5 months. |
| PAT margin | FY27 | FY27 PAT margin will be below earlier expectations, with a catch-up targeted over 4.5 months. |
| EBITDA margin | H2 FY27 | Management expects to catch up on H2 EBITDA margin over the next 4.5 months. |
| TOPCon cell line execution | FY28 | The TOPCon cell line is targeted for execution by December 2027. |
| BESS assembly execution | FY28 | Documentation and orders were due within a couple of months, with line start targeted for September 2027. |
| TOPCon cell line capex | — | Cell-line capex is estimated at ₹500 crore to ₹600 crore per gigawatt, including land, building and machinery. |
| BESS total capex (BESS assembly) | — | Total BESS capex was stated at ₹250 crore. |
| Gujarat MOU investment (Solar cell and BESS assembly) | — | The Gujarat MOU covers ₹4,000 crore for 5 GW of solar cell and 10 GW of BESS assembly. |
| Solar cell capacity under Gujarat MOU (Solar cell manufacturing) | — | The Gujarat MOU covers 5 GW of solar cell capacity. |
| BESS assembly capacity under Gujarat MOU | — | The Gujarat MOU covers 10 GW of BESS assembly capacity. |
| 2030 investment vision first phase | FY26-FY30 | Management described ₹4,500 crore as the first phase of the $1 billion 2030 investment vision. |
| 2030 investment vision | FY26-FY30 | The stated 2030 investment vision is $1 billion. |
What changed since the Mon 17 Aug 2026 call
| What | On the Mon 17 Aug 2026 call | On this call |
|---|---|---|
| FY27 revenue guidance (held) | FY27 revenue guidance was maintained on the prior call. | Management expects to cover the existing FY27 revenue guidance over the next 4.5 months. |
| FY27 PAT margin (cut) | The FY27 PAT margin target was maintained at 5%-6%. | Management said PAT margin would be below the earlier level and expects a catch-up over 4.5 months. |
| Module utilization (restated) | FY27 average utilization was assumed at ~55% on a 4 GW module base. | Operations returned to 24/7 and current installed-capacity utilization was described as much higher. |
| Cell commissioning (held) | The 2.2 GW N-type TOPCon+ cell line was targeted for commissioning by end-CY2027. | Management again said the cell line would be executed by December 2027. |
| Cell land clearances (achieved) | Closing land sign-offs was an open priority for the cell project. | Management said land, Pollution Control and EC clearances had been cleared. |
| Cell capex and funding (restated) | Cell project cost was ₹1,050 crore, funded as ₹700 crore debt and ₹350 crore equity. | Management cited ₹500-600 crore capex per GW and a signed ₹50 crore CCD term sheet; total funding was not restated. |
| BESS assembly (new) | No BESS assembly capex or commissioning target was stated on the prior call. | BESS capex was put at ₹250 crore, with line start targeted for September 2027. |
| FY29 financial targets (new) | No FY29 revenue or margin targets were stated on the prior call. | Management gave FY29 revenue of about ₹4,000 crore, EBITDA margin of 23%-24% and PAT margin of 12%-14%. |
The business
By business
Solar modules
Operations returned to 24/7 after ALMM-2 and supply-chain disruption; utilization was much higher, supply chains were in order and the order book remained intact.
Outlook: Management expects the order book to be executed over the next 4.5 months and said FY27 revenue, EBITDA margin and PAT margin would be recovered.
TOPCon cell line
Land, pollution-control and EC clearances were resolved, while equipment and service providers were aligned; execution remains targeted for December 2027.
Capex ₹500 crore to ₹600 crore per gigawatt · Execution December 2027
Outlook: Production is planned to start by December 2027; management said FY28 would not reflect cell-line numbers and gave FY29 consolidated margin guidance.
BESS assembly
Management is pursuing a BESS assembly line, has appointed a consultant for documentation and EPRL, and will focus on manufacturing rather than project tenders.
Total capex ₹250 crore · Line start September 2027
Outlook: Documentation and order placement were expected within a couple of months, with the line targeted to start in September 2027.
Tapi RQ product
The newly introduced Tapi RQ product is in certification; an existing line is being converted, with commercial production and an Indian launch planned after certification.
Outlook: Management said it would have not much impact on module price versus TOPCon G12R and, if productivity held, margins and cost would remain the same.
Exports and U.S. manufacturing
Solex regularly exports to the Middle East, Africa and Europe and is studying U.S. manufacturing options after tariffs limited earlier U.S. consignments.
Outlook: Management said the U.S. market would receive greater focus and it would return with a concrete manufacturing plan once its evaluation became positive.
Balance sheet, capex and funding
- The cell line's estimated capex was ₹500 crore to ₹600 crore per gigawatt, including land, building and good-technology machinery.
- A ₹50 crore CCD term sheet was signed for the cell-line subsidiary; further documentation was in progress.
- BESS assembly capex was stated at ₹250 crore; a consultant was appointed for documentation, EPRL and order preparation.
- The company converted non-fund-based limits to fund-based limits, which increased its cost of funds.
- Management planned to raise structured debt first and convert it to equity later once valuation was sufficient, limiting dilution.
- Cell inventory was generally bought against orders, aside from stock kept for last-moment orders.
The industry, as management sees it
Management expects a short consolidation phase because nameplate module capacity far exceeds effective utilisation, while arguing the sector is not structurally overcapacity once obsolete Mono PERC and other proprietary lines are excluded. It sees solar demand expanding materially through green-grid and BESS initiatives, with especially high BESS volumes but margins below some industry expectations.
Risks management named
- ALMM-II timing caused a three-month industry disruption and lower plant utilisation
- Near-term EBITDA and PAT margins are expected to remain below earlier expectations
- DCR cells remain scarce, costly and inconsistent in quality
- Shipping costs rose from a planned $900-$1,000 to about $3,500 per container and were absorbed
- Large expansion capex may require debt and later equity conversion, diluting shareholders
- Chinese technology-transfer restrictions may delay the domestic cell ramp-up
Q&A
Policy-transition stress, effective industry capacity and price pass-through dominated the early questions, while the cell line, BESS roadmap and funding structure dominated later discussion. Management was firm on execution dates and order-book visibility, but pushed back on the overcapacity and valuation framings and declined to quantify BESS margins, R&D, licensing costs or FY30 revenue and PAT. The most persistent unresolved issue was how INR 4,500 crore of first-phase capex and the wider investment roadmap would be financed without excessive dilution.
Not answered directly
- BESS revenue and margin contribution
- US manufacturing plan and timing
- ISC Konstanz licensing cost
- R&D expenditure
- Revenue and PAT targets through FY30 and beyond
Asked for a number, answered without one
- Module warranty provision: Management said no warranty claims have arisen; most supply is insured by Munich Re, which covers the 30-odd-year module warranty.
- OEM versus Solex-brand revenue mix: Management said it was not an OEM arrangement and that the modules carried the Solex brand, although LONGi standards and supervision applied.
- H2 FY27 profitability: Management called the year challenging, said PAT margin would be below earlier expectations, and promised a catch-up over 4.5 months without giving a range.
- BESS revenue and profit contribution: Management said it was too early to guide BESS margins, while expecting very high demand and volume but not very high margins.
- ISC Konstanz licensing cost: Management confirmed a cost exists and said it was negotiated for the long term and not very high, but gave no amount.
- Cell sourcing mix: Management said DCR volume was very small and this year's majority supply would be non-DCR; it did not state Solex's procurement percentages.
- Cell-specific margin uplift: Management gave consolidated FY29 EBITDA and PAT margin ranges and said it was being conservative, without isolating a cell-specific uplift.
- R&D expenditure: Management described need-based testing and product work, said there was no focused R&D budget, and declined to provide a figure.
- Revenue and PAT beyond FY29: Management said it could not provide numbers through FY30 or beyond and repeated the FY29 revenue and margin guidance instead.
Every question, with its answer
1. Warranty, LONGi supply and H2 margins
Vinita F, Credence Investments
Question. How much warranty provision is carried? Also, was the roughly 200 MW supplied to Welspun and Zelestra under the LONGi arrangement OEM revenue, and what is the H2 EBITDA-margin and profitability outlook given module price pressure?
Answer, Chetan Shah, Chairman and Managing Director. No warranty claims have emerged; minor leakages were handled, and the 30-odd-year module warranty is insured by Munich Re against premiums paid. The LONGi-linked volume was produced under LONGi supervision and standards but sold under the Solex brand, so management said it was Solex supply, not OEM revenue. Chetan said the year has been challenging since May and near-term PAT margin will be below earlier expectations, but the intact order book and restored conditions should allow revenue, EBITDA margin and PAT margin to recover within 4.5 months.
Partly answered.
2. BESS economics, Tapi RQ and exports
Mayuresh Rao, Invest for Value
Question. What revenue and profitability should Solex expect from BESS, what is the commercial significance of Tapi RQ and how does it differentiate the company, and what are the export plans and rationale for manufacturing outside India?
Answer, Chetan Shah, Chairman and Managing Director. BESS demand is expected to be very high as states issue captive and utility incentives, but management said it is too early to guide margins and does not expect very high margins; imported-container demand should shift toward domestic assembly as capacity develops. Tapi RQ is under certification and requires line conversion; it should materially lower BOS cost with little module-price impact, and management is working to avoid quarter-cut productivity dilution. Solex already exports regularly to the Middle East, Africa and Europe. A small US consignment was affected by tariffs, but management now wants to focus on the US and is studying manufacturing, manpower and costs, with no concrete plan yet.
Not answered directly.
3. Cost structure and price pass-through
Manan Dalal, Dalal Family Office
Question. Are the quarterly reductions in other expenses sustainable, and how does Solex manage module and cell price volatility through contractual clauses and customer price pass-through?
Answer, Chetan Shah, Chairman and Managing Director. Management attributed higher other expenses to low production against fixed costs, the policy and supply-chain disruption, and conversion from non-fund-based to fund-based borrowing, which raised funding cost, but gave no firm sustainability forecast. For larger contracts, cell-price exposure is linked to dollar benchmarks with bandwidths or immunity, hedges are used, and some customers participate in cell procurement; smaller orders are generally bought against orders. Shipping risk is not passed through: planned freight of $900-$1,000 per container became about $3,500, and Solex absorbed the increase to preserve delivery commitments.
Partly answered.
4. ALMM-II, capacity, sourcing and valuation
Gunesh Wagh, Aavya Advisors
Question. After July's ALMM list, what has become clear and how is Solex positioned for DCR? Is the industry overcapacity? What is domestic-versus-imported cell sourcing, and does the valuation discount reflect China-related risk?
Answer, Chetan Shah, Chairman and Managing Director. DCR projects are delayed by scarce, low-quality cells; management has sought extensions and expects capacity to improve in about six months. It disputes overcapacity: 230 GW nameplate at 50% utilisation equals 115 GW; removing 30-35 GW of Mono PERC leaves 75-80 GW of TOPCon versus roughly 60 GW of last-year demand, plus 7-8 GW of HJT and thin-film. Weak players may consolidate. About 30 GW of grandfathered import projects supports current demand, but most FY27 supply remains non-DCR; domestic cells are tied up for next year. On valuation, management emphasised sustainable long-term investment over share-price performance and did not substantively answer the China-risk point.
Not answered directly.
5. TOPCon roadmap, patents and licensing
Mandira A., Investo
Question. How will TOPCon and next-generation technologies shape the product portfolio, what IP or licensing risk follows from global patent disputes, and what licensing costs are involved in the ISC Konstanz collaboration?
Answer, Chetan Shah, Chairman and Managing Director. TOPCon is expected to remain India's long-term platform because of installed investment; back-contact and HJT should follow, with TOPCon and HJT providing a base for tandem technologies. Management sees no TOPCon patent issue in India and said the US dispute has been resolved. ISC Konstanz is helping develop rear-contact technology and set up and operate the cell line; management said licensing has a cost but is negotiated for the long term and not high relative to the know-how, without disclosing the amount.
Not answered directly.
6. Cell-line capex, CCD and margins
Dhanraj Tolani, Kuber Advisors
Question. What is the progress and per-GW capex for the TOPCon cell line, what is the proposed INR 50 crore CCD for, and what margin uplift is expected from backward integration?
Answer, Chetan Shah, Chairman and Managing Director. The cell line remains on the committed timeline after land and environmental issues were resolved and service and equipment providers aligned. New-line capex is estimated at INR 500-600 crore per GW, including land and building, rather than cheaper refurbished equipment. The INR 50 crore CCD was raised through the subsidiary building the cell line; documentation is progressing after a term sheet. FY28 will not reflect the line because production starts in December 2027. For FY29, management guided EBITDA margin of 23-25% and PAT margin of 12-14%, while describing the ramp and margin assumptions as conservative.
Partly answered.
7. R&D and Gujarat investment
Gunjan Shah, Family Office
Question. How much is annual R&D spending, and what is the status of the proposed INR 4,000 crore Gujarat investment MOU?
Answer, Chetan Shah, Chairman and Managing Director. Management did not disclose an R&D amount, saying the 24/7 lab is primarily a testing and product-development facility and R&D is need-based without a focused budget. It also clarified that Tapi RQ was an existing global technology introduced to India rather than an internally developed product. The Gujarat MOU remains on track and covers 5 GW of solar-cell capacity and 10 GW of BESS assembly.
Not answered directly.
8. DCR supply, ALMM extension and BESS opportunities
Krunal, HNI
Question. Is there a DCR-cell shortage; would an ALMM-II extension help; does Solex plan to bid for BESS EPC tenders; which power-sector opportunities are most attractive; and why is MNRE slow to approve commissioned cell lines?
Answer, Chetan Shah, Chairman and Managing Director. Management confirmed a DCR-cell and quality shortage. It expects an ALMM-II extension to benefit roughly 150 manufacturers and improve utilisation after industry representations to ministries and the PMO. Solex will stay manufacturing-focused and supply BESS bidders, not bid for EPC projects. It identified solar cells, BESS assembly and BESS cells as the three major opportunities; assembly is advanced, with lithium-ion, sodium and aluminium emerging for cells, but no comparative profitability was offered. It disputed that MNRE is slow, saying the ministry is proactively supporting DCR and PM Surya Ghar capacity and checks site productivity before approval.
Partly answered.
9. PM KUSUM 2
Unidentified analyst, Unknown
Question. What is Solex's plan for PM KUSUM Phase 2?
Answer, Chetan Shah, Chairman and Managing Director. Management said Solex does not participate in tenders and has a very small EPC business. It is ready to supply modules for government and non-government schemes but has no plan for PM KUSUM 2 and no view on which states would benefit.
Not answered directly.
10. BESS financing and fundraise structure
Rachel, Unknown
Question. When will BESS manufacturing be financed, are the cell and BESS lines being built in parallel, and how should the fundraise be handled after the valuation decline?
Answer, Chetan Shah, Chairman and Managing Director. BESS assembly capex is INR 250 crore; consultants have been appointed for documentation and EPRL, and management expects to close financing within a couple of months, place orders and start the line by September 2027. The cell line is targeted for December 2027, so the programs are being pursued in parallel. For funding, management said it signed a CCD because it did not want the lower valuation to delay the project; it plans to use structured debt first and convert it to equity when valuation improves, then service the debt.
11. Capital funding, competition and FY30 targets
Mahender Manral, Unknown
Question. How will Solex structure INR 4,500 crore of near-term and INR 12,500 crore of long-term capex while limiting dilution, how does it compare with Premier, and are there revenue or PAT targets through 2030?
Answer, Chetan Shah, Chairman and Managing Director. Management confirmed the first phase of the 2030 vision is INR 4,500 crore, or about US$1 billion, including the Gujarat MOU, followed by wafer, additional cell, BESS assembly and cell, and potential US manufacturing investments. Fundraises will be timed and staged in pieces to reduce dilution, with equity conversion dependent on valuation. Premier was described as an old leader and early mover in cells, but management offered no comparable margin data before more capacity exists. Management refused revenue or PAT targets through FY30 and beyond, citing only FY29 revenue of around INR 4,000 crore, EBITDA margin of 23-24% and PAT margin of 12-14%.
Not answered directly.
What was said
Topic by topic, in the order it was spoken
Solar Policy and Industry Outlook · Chetan Shah (Chairman and Managing Director)
- Management said India had roughly 6 GW of module manufacturing capacity when ALMM-I began and now has almost 250 GW of nameplate capacity.
- ALMM-II was introduced before adequate cell capacity existed, contributing to a difficult three-month phase for the industry.
- The National Green Grid, BESS and other initiatives were expected to expand India's solar deployment roughly threefold over the longer term.
- Management characterized the recent disruption as temporary turbulence rather than a structural impairment to the sector.
Order Book and Operations Recovery · Chetan Shah (Chairman and Managing Director)
- Management said the order book was intact despite the policy-driven disruption.
- The company had returned to round-the-clock operations and installed-capacity utilisation was materially higher.
- The supply chain had returned to order after geopolitical disruption.
- Management expected the existing revenue guidance to be covered over the coming 4.5 months.
TOPCon Cell-Line Execution · Chetan Shah (Chairman and Managing Director)
- Land availability, pollution-control requirements and environmental-clearance issues had been addressed.
- Groundbreaking for the cell line was expected soon.
- Management had prepared plans A, B and C to address emerging technology challenges.
- Discussions with equipment suppliers were described as progressing in line with the agreed schedule.
- The cell-line execution timeline remained December 2027.
In their words
fortunately we are back to our 24/7 operations, which was there earlier
sometimes losing customer is something which is more harmful than the paying higher cost for the shipping cost
we are doing it in pieces so that we don't end up diluting so much of equity and running to the capex
To check next time
What management committed to on this call, or the dates they gave.
- The promised 4.5-month catch-up in FY27 revenue, EBITDA margin and PAT margin.
- Sustained 24/7 module operations and installed-capacity utilization after the ALMM-2 disruption.
- Cell-line ground-breaking following resolution of land, pollution-control and EC clearances.
- Equipment and service-provider alignment against the December 2027 cell-line execution date.
- BESS documentation closure, order placement and progress toward the September 2027 line start.
- Tapi RQ certification, production-line conversion and commercial launch in India.
Transcript
Read along with the recording
The whole call, 557 lines from 8 speakers over 58:44. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 16 Nov 2026 | ₹601.90 | −0.42% | +0.58% |
From the close of Fri 13 Nov 2026, ₹604.45: the last close before the call, which began at 11:00 IST. Adjusted daily closes; the move includes everything else that happened in those sessions.