SPML Infra Q2 FY26 earnings call
In brief
SPML Infra Q2 FY26 revenue ₹199 cr (+2% YoY), EBITDA margin 10%; BESS Pune Phase I on track for Q1 FY27; ₹5,000 cr FY26 new order inflow target.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Low
- Stock, next session
- +3.07% (Nifty 50 +0.12%)
- Q2 FY26 standalone revenue ₹199 cr (+2% YoY), EBITDA ₹20 cr (10% margin), PAT ₹15 cr (7.7% margin); old lower-margin orders still in mix, new >10% margin orders to drive H2.
- H1 FY26 secured new water orders worth ₹3,772 cr; ₹1,125 cr L1 pipeline pending; ₹5,000 cr new order inflow target for FY26 reiterated and ₹5,000 cr+ signalled for FY27.
- BESS Pune MIDC Phase I (2.5 GWh) on track for Q1 FY27 commissioning, FAT in January 2026 and site SAT April 2026; Phase II to 5 GW by FY28.
- Sanctioned bank facilities enhanced from ₹205 cr to ₹505 cr by a public sector bank; surety bond approved; ICRA rated 'Stable'.
- NARCL debt of ₹400 cr (incl interest) to be paid from ₹647 cr arbitration awards (incl interest to Oct 2025); ₹4,600 cr further claims, historically 41% convert, ~₹1,500 cr more awards expected.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹188 cr | −0.4% | +20.4% | |
| EBITDA (excl. other income) | ₹8.8 cr | −31.4% | +21.8% | 4.7% (6.8% a year ago) |
| Net profit | ₹15 cr | +15.1% | +24.1% | 8% (6.9% a year ago) |
| EPS (₹) | ₹2.10 | −15.3% | +24.3% |
From the company's filed results for the quarter ended 30 Sept 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- EBITDA (Q2 FY26): said ₹20 cr, 10% margin (standalone); filed ₹8.80 cr, 4.7% margin (consolidated, ex other income). Management's EBITDA figure appears to include other income (filed other income ₹10.80 cr; ₹8.80+₹10.80 ≈ ₹19.60 cr). Also standalone vs consolidated basis.
- Revenue (Q2 FY26): said ₹199 cr (standalone); filed ₹187.76 cr (consolidated, -0.4% YoY). Management cites standalone basis; filed figures are consolidated, gap >3%.
What moved the numbers, as management explained it
- Old lower-margin orders (~₹1,600 cr remaining) continued to dominate H1 FY26 mix, holding EBITDA margin in the 5-7% range despite new >10% margin bookings.
- New water orders (Konar, Indore, Kekri) carry 3-6 months design/drawing approval lag before turnover, so margin lift only flows in Q3-Q4 FY26.
- Standalone vs consolidated basis: management commentary uses standalone revenue ₹199 cr vs filed consolidated ₹187.76 cr; EBITDA cited at 10% likely includes other income (filed ex-other-income margin 4.7%). (accounting)
- Monsoon and state elections delayed tendering and award conversions; Rajasthan ₹700 cr Pratapgarh award and Chennai award still pending.
- BESS pre-commercial expenses (till Pune plant commissioning) are capitalised and do not hit P&L; will move to P&L and segmental reporting once commercial production starts. (accounting)
The numbers management led with
- New order wins H1 FY26 (water infrastructure): INR 3,772 crore across Jharkhand, MP, Rajasthan, Tamil Nadu
- L1 tender pipeline: INR 1,125 crore
- FY26 order inflow target: INR 5,000 crore
- BESS market projection 2031-32: 236 GWh / ~USD 57 billion / INR 5 lakh crore+ opportunity
- Bank facility enhancement: From INR 205 crore to INR 505 crore with public sector bank
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY26 new order book target (Water Infrastructure (EPC)) | FY26 | Targeted new order book of roughly around INR 5,000 crore in current fiscal |
| FY27 new order book target (Water Infrastructure (EPC)) | FY27 | More than INR 5,000 crore into the subsequent year |
| BESS EPC margin once battery pack manufacturing ready | — | Once component manufacturing of battery pack unit ready, margin should be between 14% to 15% as an EPC |
| EPC margin floor (water/power/BESS) | — | We do not take any business less than 10% on EPC, including BESS |
| New order margin (Water Infrastructure (EPC)) | FY26 | All new orders carry more than 10% margin |
| BESS Phase I commissioning | Q1 FY27 | Phase I 2.5 GWh targeted commissioning by Q1 FY'27 |
| BESS Phase II capacity | FY28 | Phase II to follow by FY'28 to 5 GW |
| Revenue mix water vs power+BESS | FY30 | BESS and water and power turnover will be 50:50 by 2029 or by 2030 |
| Sanctioned bank facility limit | — | Sanctioned bank facilities enhanced from INR 205 crore to INR 505 crore |
| BESS revenue potential per GW | — | Ballpark for 1 gigawatt is INR 1,000 crore; 5 gigawatt potential INR 5,000 crore |
What changed since the Wed 20 Aug 2025 call
| What | On the Wed 20 Aug 2025 call | On this call |
|---|---|---|
| Bank facility limit (achieved) | Priority to secure additional bank lines beyond Rs 205 cr sanctioned | Bank facilities enhanced from ₹205 cr to ₹505 cr by a public sector bank |
| ICRA credit rating (achieved) | Target to secure upgraded ICRA rating by Oct 2025 | Recognised as 'Stable' firm by ICRA across facilities |
| L1 pipeline conversion (delayed) | Rs 2,200 cr L1 pipeline expected to convert by Oct 2025 hitting 75% of ₹5,000 cr target | ₹1,438 cr Rajasthan order won; ₹1,125 cr L1 still pending (Pratapgarh, Chennai); ₹5,000 cr FY26 target reiterated |
| BESS margin guidance (cut) | BESS margin guided at 15-16% once battery pack manufacturing kicks in | Margin should be between 14% to 15% as an EPC once battery pack manufacturing unit ready |
| Surety bond (new) | Not flagged as a priority on Q1 FY26 call | Surety Bond approval from a leading insurance company announced |
| BESS market scope (new) | BESS opportunity framed around renewable energy mandates | Tenders now starting for BESS in thermal power; market scope flagged as 'move changer' |
| Order inflow achievement (held) | Target ₹5,000 cr new order book FY26 (75% to be hit by Oct 2025 via ₹2,200 cr L1) | ₹3,772 cr new water orders secured in H1 FY26; ₹5,000 cr target reiterated |
| BESS localisation 60-70% in 2-3 years (not repeated) | Listed priority to achieve 60-70% localisation of BESS supply chain in 2-3 years | Not mentioned |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Revenue jump | FY26 | 30–50% (on the Q3 FY25 call) | 12.1%, below the range |
| PAT growth | FY26 | 50% (on the Q4 FY25 call) | 55.8%, above the figure guided |
| Revenue growth | FY26 | 50% (on the Q4 FY25 call) | 12.1%, below the figure guided |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Water Infrastructure (EPC)
H1 FY26 secured ₹3,772 cr of new orders across Jharkhand (Konar ₹650 cr), Madhya Pradesh (Indore ₹1,036 cr), Rajasthan (Kekri ₹385 cr) and Tamil Nadu; old ₹1,600 cr order book being run down with new orders at >10% margin expected to lift mix in H2.
H1 FY26 new orders ₹3,772 cr · Konar ₹650 cr · Indore ₹1,036 cr · Rajasthan/Kekri ₹385 cr · Old order book remaining ₹1,600 cr · New order margin >10%
Outlook: Targets ₹5,000 cr new order inflow FY26 and >₹5,000 cr in FY27; execution ~8-9% per quarter per project over 3 years; water makes up ~90% of current mix.
Power Substation / EPC
Legacy power EPC competence being redeployed; substation tender volume described as much higher than water for the first time; no orders yet in FY26 from this segment but at least one power substation order targeted this year.
Water:Power mix currently 90:10 (vs 75:25 historically)
Outlook: Targets at least one power substation order in FY26; power+BESS share targeted to rise to 50% of revenue by FY29-FY30.
BESS (Battery Energy Storage Systems)
Phase I 2.5 GWh Pune MIDC plant under construction; FAT January 2026, SAT/site April 2026, first product end Q1 FY27; EPC execution to start before own pack is ready; Energy Vault IP licensed for India/global; cell imports from China/Indonesia.
Phase I 2.5 GWh by Q1 FY27 · Phase II 5 GW by FY28 · Revenue potential ₹1,000 cr per GW · 2 containers/day manufacturing capacity · Cell cost $40-45/kWh · Cell share of BOM 28-30%
Outlook: EPC margin floor 10%, 14-15% once battery pack manufacturing operational; ₹5,000 cr BESS tender pipeline this year; thermal BESS tenders now opening up.
Balance sheet, capex and funding
- Sanctioned bank facilities enhanced from ₹205 cr to ₹505 cr by a public sector bank; surety bond approved for bidding.
- NARCL debt ₹400 cr (incl interest) to be settled from ₹647 cr arbitration awards (incl interest to Oct 2025).
- ICRA rated 'Stable' across financial and banking facilities.
- Promoter warrants expected to bring ~₹150 cr of liquidity by March.
- Pune BESS capex progressing (₹175 cr preferential-allotment funding noted earlier); pre-commissioning BESS costs being capitalised.
- No working capital shortage cited; management cites 'enough liquidity'.
The industry, as management sees it
Management sees INR 17 lakh crore water infrastructure pipeline and a 236 GWh / ~USD 57 bn BESS opportunity by 2031-32 driven by Jal Jeevan Mission, AMRUT 2.0, Namami Gange, river-linking, renewable energy storage mandates, 500 GW RE target by 2030, and Energy Storage Obligations. BESS tendering is now expanding from renewables to thermal power — expected to multiply volume — with ~INR 25,000 cr of FY26 tenders including INR 5,000 cr of BESS. Government policy changes (75% deposit to challenge awards, Vivad Se Vishwas settlement scheme) are accelerating arbitration resolution for infrastructure contractors.
Q&A
Q&A spanned 8 distinct analyst engagements covering BESS operational readiness (manufacturing, sourcing, EPC economics), water-segment growth and margin trajectory, arbitration realization timing, and balance-sheet liquidity. Hardik Gandhi drove the most probing thread on BESS execution readiness and import risk; Darshil Jhaveri pushed twice on arbitration risk and warrant funding. No topic was visibly deflected — management answered each with specifics (container-per-day capacity, cell cost %, INR 1,500 cr arbitration visibility, 14-15% BESS margin target). The dominant undercurrent was execution credibility: converting INR 3,772 cr new wins, INR 1,125 cr L1 and a 2.5 GWh plant into the guided >10% margin and 50:50 mix trajectory.
Asked for a number, answered without one
- FY26 top-line target: Manoj Digga: 'By that calculation, it should happen more than that' - cited per-quarter execution model (~₹85-90 cr/month on new project) without stating a specific FY26 revenue number.
- BESS order inflow FY27: Manoj Digga redirected to ₹5,000 cr water order book target; no consolidated FY27 revenue or BESS revenue target given.
Every question, with its answer
1. BESS manufacturing status
Hardik Gandhi, HPMG Shares and Securities
Question. What is the status of BESS manufacturing progress? Are you on timeline? Any major market changes given many new entrants?
Answer, Samir Patel, Chief of Technology and Operations – BESS. Operationally on track to set up infrastructure by Q1 FY27; first product ready by end of Q1. Market dominated by China LFP cells, especially 314Ah; planning 5.015 MW DC block systems. No major import challenges — SPML is 'Make in India'; only cells and PCS imported, rest localized at Pune.
Follow-up. Any import challenges for battery blocks from China? When does sampling complete? What's the customer audit process? And what about BESS — is SPML doing only EPC, or assembly + EPC for others as well?
Answer. Samir: No import challenges — only cells and PCS imported. FAT scheduled January 2026; SAT for Supa site April 2026. Audit protocols depend on client — listed clients like NTPC/PGCIL have own protocols and certifications. SPML's model is end-to-end turnkey integration: design → manufacturing → site install → commissioning → O&M.
2. BESS execution timeline
Hardik Gandhi, HPMG Shares and Securities
Question. For a 100 MWh order, what's the manufacturing, design, install and commissioning timeline?
Answer, Samir Patel, Chief of Technology and Operations – BESS. Manufacturing capacity is 2 containers/day post-April. For 100 MW — roughly 2 months to deliver products to site; commissioning itself 45-60 days. So 3-4 months from order placement to commissioning. Also noted: BESS tenders are now opening for thermal power too, which will multiply volume.
Follow-up. Anything on the NARCL preferential allotment notification? How much warrant quantum?
Answer. Manoj: Per NARCL understanding, we need to keep their holding at ~12.5% on expanded capital. Warrants already issued; ~INR 150 cr expected by March, coming monthly for liquidity.
3. Water segment growth and margin trajectory
Hardik Gandhi, HPMG Shares and Securities
Question. On the water side, what growth are we expecting this year given the monsoon/election delays? With higher-margin new orders, can we expect EBITDA uptake? What about top line — INR 850-900 cr or higher?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. Focus is water + power substation + BESS. Power substation tender volume higher than water; sizable water tenders from MP, Maharashtra, Karnataka, Odisha coming. EPC + design drawing contracts need 3-6 months for approvals — Konar (Kekri) revenue visible from Q3 FY26, plus Indore. New order revenue ~8-9% of project cost per quarter. By calculation, total revenue should be more than INR 850-900 cr.
Follow-up. What closing order book do you expect for FY26 given no major wins post-Q1?
Answer. Manoj: New orders INR 3,772 cr taken + INR 1,125 cr L1 (expected in Q3 FY26) + tender pipeline INR 25,000 cr (incl. INR 5,000 cr BESS) where we expect ~INR 2,000 cr share. Target INR 5,000 cr new order book this year, higher next year.
4. H2 execution and margin guidance
Darshil Jhaveri, Crown Capital
Question. What execution are you targeting in H2 FY26? And any guidance on EBITDA/PAT margins given higher-margin orders flow in?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. Old orders continue. Sizable turnover from three new orders expected Q3/Q4: Rajasthan INR 385 cr, Jharkhand INR 650 cr, Indore INR 1,036 cr. New orders carry margins >10%. Q3 and Q4 should see reasonable execution from new orders.
Follow-up. What is the FY27 revenue target? And once BESS plant starts (e.g. April), how does bidding work?
Answer. Manoj: Water target INR 5,000 cr order inflow per year, executed over 3-3.5 years. SPML not waiting for own battery pack — already bidding on INR 5,000 cr BESS EPC orders. Once plant is ready, will use own battery pack within EPC. Samir: Customer demand peaks mid-2026 (June-August); SPML will be ready by March/April — 3-4 months ahead of customer commissioning needs.
5. Opening order book
Darshil Jhaveri, Crown Capital
Question. What was the opening order book at start of FY26?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. April 2025 opening order book was INR 2,000 cr; INR 400 cr already executed; ~INR 1,600 cr old order book + INR 3,772 cr new + INR 1,125 cr L1 + INR 25,000 cr tender pipeline. Targeting INR 5,000 cr new order book closure this year.
6. Arbitration claims and liquidity deployment
Sanaya, Unknown
Question. Can you provide an update on the awarded or pending arbitration claims? What inflow seems likely over the next 3-4 years and how do you plan to deploy these?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. Currently INR 647 cr arbitration award (incl. interest to October 2025) — value rises monthly. Expecting receipt over 4-5 years; out of this, INR 400 cr goes to NARCL, rest adds to company liquidity. Additionally, INR 4,600 cr of claims being fought. Historically 41% of claim value converts to award — visibility on another INR 1,500 cr of awards in next 2 years, further adding to liquidity.
7. Arbitration timeline risk and warrant funding
Darshil Jhaveri, Crown Capital
Question. Can the government delay arbitration indefinitely? Is there a specific timeline? Also, how is the promoter group funding INR 125 cr for warrants?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. Arbitration Act timelines: 34-37 months from claim to award; 4-5 years from award to cash due to challenge forums. Key changes: courts now require challengers to deposit 75% of award amount; government's Vivad Se Vishwas scheme allows settlement at 65%. SPML seeing settlement discussions on 1-2 awards already. Promoter warrant funding is from family office.
8. Order conversion and FY26 margin outlook
Suraj Shinde, Yes Securities
Question. How much of the L1 pipeline has converted to firm orders, and how does the bid pipeline look? With legacy/new mix, where do FY26 margins settle and when does operating leverage unlock?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. Since last call, INR 1,438 cr Rajasthan order won. Pratapgarh INR 700 cr + Chennai L1 still pending — slight election-driven delay. INR 1,125 cr pipeline expected Q3 or partially Q4. From INR 25,000 cr tender pool, SPML expects ~INR 2,000 cr share to meet INR 5,000 cr target. Margin clarity: orders only taken if criteria (funding, >10% margin, pass-through) met; design-drawing approval 3-6 months; average execution ~3 years; one-twelfth revenue per quarter.
Follow-up. What is the revenue mix outlook for water vs BESS in 2-3 years?
Answer. Manoj: Internal target — BESS + water/power revenue mix 50:50 by 2029-30. Currently water ~90%, historically 75:25 water:power. Power includes BESS in this calculation.
9. BESS plant expansion plans
MM Merchant, Unknown
Question. An article mentioned SPML will set up more BESS plants in Rajasthan and MP. Can you share details?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. Not at the moment. Current focus is Supa plant readiness, expansion to 5 GWh capacity at Supa, then further. Parallel options kept open but no final plans for Rajasthan/MP. Will announce to exchanges/investors when finalized.
10. BESS revenue and margin economics
Satyam Agarwal, Unknown
Question. What is per gigawatt revenue and margin SPML can generate in BESS — pure EPC vs assembly+EPC? And why would a customer choose a pure EPC over a battery-integrated provider?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. EPC margin guideline is minimum 10%; with battery pack assembly, margin should rise 4-5% to 14-15%. Ballpark: 1 GWh = INR 1,000 cr revenue; 2.5 GWh = INR 2,500 cr; 5 GWh = INR 5,000 cr. Samir: It depends on tendering — Adani may want full project or split EPC + battery integrator; SPML positioned for either. Cell is $40-45/kWh industry standard; ~28-30% of total BOM. Cells sourced from China or Indonesia.
11. Energy Vault partnership
Rajesh Naik, Unknown
Question. What exactly is Energy Vault's role in SPML's BESS business?
Answer, Samir Patel, Chief of Technology and Operations – BESS. Energy Vault is SPML's strategic JV partner — has given licensing agreement under IP ownership to use their systems design under SPML trademark for Indian and global markets. Covers EMS, electrical architecture for BESS, thermal management and container safety IP.
12. EBITDA margin outlook and modeling
Yash Modi, Ashika Group
Question. If I remove other income, EBITDA margins have come down in H1/Q2. When do you see margins rising? How much old order book is yet to execute? How should we model EBITDA going forward — BESS costs also coming in?
Answer, Manoj Digga, Executive Director and Chief Financial Officer. BESS is part of SPML Infra itself; all BESS expenses till commercial production will be capitalized (not in P&L). Post-launch, segmental P&L will show BESS separately. Old order book INR 1,600 cr (low margin) + INR 3,772 cr new orders (all >10% margin). Design-drawings finished despite rains. Profit margins to keep rising from Q3 to Q4 and into Q1 next year. BESS EPC margin ~10%, with battery pack margin uplift post-assembly.
What was said
Topic by topic, in the order it was spoken
Strategic Overview & Market Opportunity · Manoj Digga (Executive Director & CFO)
- H1 FY26 framed as a defining period with strong order inflows and strategic progress across water, power, and BESS
- Company focuses on water, power substation, and BESS — all three seen as high-growth sectors
- Water infrastructure pipeline of INR 17 lakh cr identified across Jal Jeevan Mission, AMRUT 2.0, Namami Gange, river-linking
- BESS market projected to reach 236 GWh by 2031-32, ~USD 57 bn investment, INR 5 lakh cr+ opportunity
- Selective bidding discipline: fully funded, technically feasible projects with >10% margin and pass-through clauses
Order Inflows & FY26 Target · Manoj Digga (Executive Director & CFO)
- H1 FY26 new order wins of INR 3,772 cr across Jharkhand, MP, Rajasthan, Tamil Nadu
- L1 position on tenders worth INR 1,125 cr expected to convert in FY26
- Existing order book of INR 1,600 cr to be executed swiftly
- FY26 order inflow target INR 5,000 cr; expected to exceed in FY27
- FY26 sectoral tender pipeline ~INR 25,000 cr including INR 5,000 cr of BESS tenders
Balance Sheet & Financial Position · Manoj Digga (Executive Director & CFO)
- Sanctioned bank facility enhanced from INR 205 cr to INR 505 cr with public sector bank
- Surety Bond approval received from leading insurer — additional bidding flexibility
- ICRA 'Stable' rating reaffirmed across financial and banking facilities
- NARCL legacy debt INR 400 cr (incl. interest) to be cleared via INR 647 cr arbitration award
- No operating cash flow pressure; expected to move to leaner balance sheet
BESS Manufacturing & Energy Storage Strategy · Manoj Digga (Executive Director & CFO) and Samir Patel (CTO BESS)
- Phase I 2.5 GWh facility at Supa, Pune MIDC on track for Q1 FY27 commissioning
- Phase II expansion to 5 GWh planned by FY28
- LFP cell technology; 5.015 MW DC block systems targeted for launch
- Turnkey integration model: design, manufacture, install, commission, O&M
- Cell sourcing from China/Indonesia; rest of BOM to be localized within Pune facility
- FAT planned for January 2026; SAT for site planned for April 2026
H1 FY26 Standalone Financial Performance · Manoj Digga (Executive Director & CFO)
- H1 FY26 standalone: Revenue INR 363 cr, EBITDA INR 35 cr, PAT INR 27 cr
- H1 margins: EBITDA 9.8%, PAT 7.6% — in line with guided margin range
- Q2 FY26: Revenue INR 199 cr (+2% YoY), EBITDA INR 20 cr, PAT INR 15 cr
- Q2 margins: EBITDA 10%, PAT 7.7% — seasonal headwinds from monsoons, state elections, tendering delays
- New order contribution expected to scale materially in Q3-Q4 FY26
Margin Trajectory & Order Mix · Manoj Digga (Executive Director & CFO)
- Legacy low-margin orders (5-7%) winding down; new orders carry >10% margins
- Three key new projects: Rajasthan INR 385 cr, Jharkhand INR 650 cr, Indore INR 1,036 cr
- Strong empaneled supplier/contractor network supports working capital management
- New order revenue contribution expected to lift blended profitability from Q3 FY26 onwards
- BESS expenses capitalized till commercial production; segmental P&L post-commissioning
In their words
BESS and water and power turnover will be 50:50 by 2029 or by 2030. That is our target.
our margin should be between 14% to 15% as an EPC, our margin should not be less than 10%.
SPML's entire model is to do an end-to-end turnkey integration. So, we will be one-stop solution provider for the clients.
To check next time
What management committed to on this call, or the dates they gave.
- BESS Pune MIDC Phase I FAT in January 2026 and site SAT in April 2026
- Commercial commissioning of Pune BESS Phase I 2.5 GWh by end Q1 FY27
- Execution kick-in from new water orders Konar (Jharkhand), Kekri (Rajasthan) and Indore in Q3-Q4 FY26
- Conversion of remaining ₹1,125 cr L1 pipeline (Pratapgarh, Chennai)
- EBITDA margin lift in H2 FY26 as new >10% margin order share rises
- Arbitration award inflow vs NARCL ₹400 cr outstanding
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Fri 14 Nov 2025 | ₹215.30 | +3.07% | +0.12% |
| 5 sessions Thu 20 Nov 2025 | ₹204.70 | −2.00% | +1.21% |
| 20 sessions Thu 11 Dec 2025 | ₹173.14 | −17.11% | +0.07% |
From the close of Thu 13 Nov 2025, ₹208.88: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
SPML Infra's other calls
- Q2 FY27Mon 16 Nov 2026Tone: Mixed
- Q1 FY27Mon 17 Aug 2026Tone: Confident
- Q4 FY26Mon 1 Jun 2026Tone: Confident
- Q3 FY26Tue 17 Feb 2026Tone: Confident
- Q1 FY26Wed 20 Aug 2025Tone: Confident
- Q4 FY25Mon 2 Jun 2025Tone: Optimistic
- Q3 FY25Mon 17 Feb 2025Tone: Mixed
- Q2 FY25Tue 12 Nov 2024Tone: Mixed
- Q1 FY25Tue 13 Aug 2024Tone: Mixed