Electrosteel Castings Q1 FY27 earnings call
In brief
Q1 EBITDA margin at 9.5% on cost actions despite 27% volume drop; FY27 pipe dispatch cut to 5.75 lakh tons, recovery in H2.
- Management's tone
- Cautious
- What was said
- Mixed
- Guidance
- Guidance cut
- Analyst pushback
- Medium
- Stock, next session
- +3.18% (Nifty 50 +0.05%)
- Q1 consolidated EBITDA margin at 9.5% (Rs 139 cr) despite 27% YoY volume decline to 1.20 lakh tons on structural cost optimization.
- FY27 DI pipe dispatch target cut to ~5.75 lakh tons (from ~7 lakh tons) on slower JJM releases; recovery pushed to H2 FY27.
- JJM 2.0 outlay Rs 8.69 lakh crore approved; Rs 67,670 cr central FY27 allocation with Rs 10,344 cr already sanctioned vs Rs 1,560 cr prior year.
- Industrial paints foray raised to Rs 800-1,000 cr revenue target in 5 years (from Rs 600 cr) with Rs 250-300 cr phased capex.
- Net debt at Rs 876 cr; term debt to fall from Rs 340 cr to Rs 230 cr via scheduled repayments; ~Rs 700 cr capital available for investment.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q1 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,426 cr | −8.5% | −4.5% | |
| EBITDA (excl. other income) | ₹100 cr | −41.3% | +61.8% | 7% (10.9% a year ago) |
| Net profit | ₹48.3 cr | −45.7% | +202.4% | 3.4% (5.7% a year ago) |
| EPS (₹) | ₹0.78 | −45.8% | +200.0% |
From the company's filed results for the quarter ended 30 Jun 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Consolidated EBITDA: said Rs 139 cr with EBITDA margin 9.5%; filed Rs 100 cr ex-other income, margin 7.0%. Stated EBITDA of Rs 139 cr includes other income of Rs 39.24 cr; filed EBITDA excludes other income, creating a Rs 39 cr gap and a 250 bps margin gap.
What moved the numbers, as management explained it
- DI/CI pipe sales volume fell 27% YoY to 1.20 lakh tons in Q1 on slower domestic execution and Middle East tensions.
- Structural cost optimization programme across operations supported consolidated EBITDA margin at 9.5% despite the volume decline.
- T.I.S. Italy delivered EUR 10 mn revenue at ~13% EBITDA margin with 18.4% sequential growth, supporting consolidated performance.
- Net realizations on DI pipes rose to Rs 55,000/ton in Q1 FY27 from Rs 50,500/ton in Q4 FY26, partly offsetting volume decline.
- Overseas subsidiaries in UK, Europe, USA performed better than expectations; management called FY26 'rock bottom' for the industry.
- EBITDA margin improved from 6.5% in Q4 FY26 to 9.5% in Q1 FY27 on a similar revenue base — driven by cost actions, not a base effect.
The numbers management led with
- DI pipe + CIP sales volume Q1 FY27: 1.20 lakh ton, down 27% YoY
- Net debt as on 30 June 2026: Rs 876 crore (vs Rs 1,100 cr reduction in FY26)
- Industrial paints capex (phased): Rs 250-300 crore over 5 years
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 DI pipe dispatch (DIP+CIP) (DI Pipes & Fittings (Domestic)) | FY27 | FY27 dispatch target ~575,000 tons (DI pipes + fittings + CI pipes combined). |
| Consolidated EBITDA margin | Q3 FY27-Q4 FY27 | Q3-Q4 FY27 EBITDA margin expected at 12-13% on consolidated basis. |
| Industrial paints revenue (5-year) (Industrial Paints & Protective Coatings) | FY27-FY31 | Target annual revenues of around Rs 800 crores to Rs 1,000 crores in the next five years. |
| Industrial paints capex (5-year) (Industrial Paints & Protective Coatings) | FY27-FY31 | Phased CAPEX of around Rs 250 crores to Rs 300 crores for industrial paints business. |
| T.I.S. Italy revenue (T.I.S. Service S.p.A. Italy) | FY27 | T.I.S. Italy revenue expected to reach EUR 42-45 million in FY27. |
| T.I.S. Italy EBITDA margin (T.I.S. Service S.p.A. Italy) | FY27 | T.I.S. Italy EBITDA margin at 14-15% level for FY27. |
| T.I.S. Italy PAT margin (T.I.S. Service S.p.A. Italy) | FY27 | T.I.S. Italy PAT margin of 8% or so for FY27. |
| Term debt reduction | FY27 | Term debt scheduled to reduce from Rs 340 cr to Rs 230 cr. |
| Consolidated revenue (5-year) | FY30-FY31 | Revenue target of Rs 7,000-8,000 crores by FY30-FY31. |
| Consolidated EBITDA margin (5-year) | FY30-FY31 | EBITDA margin target of 13%-13.5% by FY30-FY31. |
| Valves revenue (4-year doubling) | FY27-FY31 | Valve segment revenue expected to double from ~Rs 400 cr to Rs 800-1,000 cr in next 4 years. |
| Export share of total volumes | FY27 | Export volumes expected at 22-25% of total volumes for FY27. |
| DI pipes from irrigation project volumes | — | Around 5-7% of irrigation project volumes to translate into DI pipes demand. |
| Industrial paints Phase 1 capex (Industrial Paints & Protective Coatings) | FY27 | Initial investment of Rs 100 crores for brownfield expansion adding 17,000 kiloliters capacity in West Bengal. |
| JJM outlay share for DI industry (DI Pipes) | FY27 | Approximately 12-13% of JJM outlay expected for the DI industry. |
What changed since the Mon 18 May 2026 call
| What | On the Mon 18 May 2026 call | On this call |
|---|---|---|
| FY27 DI pipe dispatch volume (cut) | ~7 lakh tons pipe dispatch (standalone) for FY27; total including fittings ~7.4 lakh tons. | ~575,000 tons (DIP+CIP combined) for FY27 on slower H1; recovery pushed to H2 FY27. |
| Industrial paints revenue target (5 years) (raised) | Rs 600 cr revenue target in 5 years; bottom-line impact from FY28-29. | Rs 800-1,000 cr revenue target in 5 years; commercial production from Q1 FY28. |
| Industrial paints capex (raised) | Rs 200-250 cr for Paint and Valve India plants over 1.5-2 years. | Rs 250-300 cr phased over 5 years for paints alone, plus Rs ~200 cr for India valve plant in West Bengal. |
| Export share guidance (restated) | 17-18% of revenue for FY27 (from 23%). | 22-25% of total volumes for FY27. |
| T.I.S. Italy revenue target (restated) | ~Rs 440-450 cr in CY26 at 14-15% EBITDA margins; ~20% CAGR to double in 4 years. | EUR 42-45 million in FY27 at 14-15% EBITDA and ~8% PAT margin. |
| JJM market share guidance (new) | Customer inquiries resumed — not nascent but not yet at full potential. | Approximately 12-13% of JJM outlay expected for the DI industry. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Quarterly PAT | Q2 FY27 | ₹150 cr (on the Q2 FY26 call) | ₹51 cr, below the figure guided |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
DI Pipes & Fittings (Domestic)
Volume fell 27% YoY to 1.20 lakh tons in Q1 on slower domestic execution and Middle East tensions; net realizations rose to Rs 55,000/ton from Rs 50,500/ton in Q4 FY26.
Sales volume 1.20 lakh tons (-27% YoY) · Net realization Rs 55,000/ton (Q1 FY27) · Net realization Rs 50,500/ton (Q4 FY26) · Standalone EBITDA margin 6.3%
Outlook: FY27 dispatch target cut to ~5.75 lakh tons (DIP+CIP); recovery from H2 FY27 as JJM 2.0 orders convert; management said pricing has bottomed.
Exports
Q1 FY27 export volume ~21,000 tons; Middle East tensions impacted quarter; Western markets (UK, Europe, USA) subsidiaries performed better than expectations.
Export volume 21,000 tons (Q1 FY27) · Export share 60-70% from Western markets
Outlook: FY27 export share targeted at 22-25% of total volumes; balance to Middle East, Africa and Southeast Asia; Saudi exposure ~2-3% of sales.
T.I.S. Service S.p.A. Italy (Valves)
Q1 FY27 revenue EUR 10 million with EBITDA margin ~13% and PAT margin ~7%; sequential growth of 18.4% over Q4 FY26.
Revenue EUR 10 million (Q1 FY27) · EBITDA margin ~13% (Q1 FY27) · PAT margin ~7% (Q1 FY27) · Sequential growth 18.4%
Outlook: FY27 revenue target EUR 42-45 million at 14-15% EBITDA and ~8% PAT; India valve plant to commence operations by end FY27; double revenue in 4 years.
Industrial Paints & Protective Coatings
New diversification; target raised to Rs 800-1,000 cr revenue in 5 years (from Rs 600 cr) with Rs 250-300 cr phased capex; Phase 1 brownfield in West Bengal.
5-year revenue target Rs 800-1,000 cr · Phased capex Rs 250-300 cr · Phase 1 capex Rs 100 cr · Phase 1 capacity 17,000 kiloliters
Outlook: Commercial production from Q1 FY28; Rs 250-300 cr revenue in first two years, then doubling to Rs 500-600 cr and Rs 800-1,000 cr.
Railway Rubber Components
New product category approved by Board; will leverage existing gasket plant in Andhra Pradesh with some additional equipment under installation.
Outlook: Railway registration to take 4-6 months; additional equipment to be installed within three months; capex not separately disclosed.
Ferroalloys
Currently a small-sized player; looking to expand capacity by adding another plant adjacent to existing unit (brownfield).
Outlook: Brownfield expansion planned to utilise additional energy; aimed at diversifying from DI pipes where dependence will drop from ~85% to ~55% in 4-5 years.
Balance sheet, capex and funding
- Gross debt Rs 1,658 cr; net debt Rs 876 cr as on 30 June 2026 (down ~Rs 1,100 cr in FY26).
- Term debt Rs 340 cr scheduled to fall to Rs 230 cr via repayments.
- Working capital debt dependent on volumes; net debt reduction is a continuous process.
- Capex plan: Rs 25-30 cr maintenance (FY27) plus Rs 250-300 cr phased for paints and ~Rs 200 cr for India valve plant.
- Rs ~700 cr capital available on books for investment (organic + inorganic).
- Coal mine receivables: ~Rs 98 cr received so far; balance per Ministry-approved amounts, within 5-10% of assumed values.
The industry, as management sees it
Management views long-term DI pipe demand as strongly supported by Rs 8.69 lakh crore JJM 2.0 outlay, irrigation projects (Ken-Betwa, PKC link) and Urban Challenge Fund; however, near-term execution remains gated by state-level disbursement speeds, with H1 FY27 materially weaker than H2. Industrial protective coatings market growing 10% annually; valves market growing 20%+.
Risks management named
- Slow JJM 2.0 disbursements delaying volume recovery; H1 FY27 materially weaker than H2
- Q1 FY27 DI pipe volumes down 27% YoY at 1.20 lakh ton on muted domestic demand
- Middle East tensions impacted export volumes in Q1
- Saudi anti-dumping duties of 17% on Electrosteel (30% on other Indian players); 2-3% sales exposure at risk
Q&A
Q&A was dominated by questions on the volume guidance cut (575k tons vs 650-700k earlier) and management's confidence in JJM 2.0 disbursement pickup in H2 FY27. Several analysts pressed on the disconnect between strong government outlays and weak realised demand, with management attributing it to a 1-2 month restart lag. New business lines — industrial paints, valves, railway rubber components — drew significant probing on capex phasing, competitive moats, and West Bengal investment rationale. T.I.S. Italy performance and debt trajectory received constructive scrutiny. Buyback inquiry was politely deflected. No hostile pushback; Q&A was largely information-seeking.
Not answered directly
- Buyback consideration — referred to correct communication channels
Asked for a number, answered without one
- Order inflow conversion from JJM sanctioned amount: Said it is difficult to establish exactly what quantity has gone into order book directly; speed of order booking expected to pick up substantially in next month or two.
- Tactical buyback consideration: Declined to comment; said would go through correct channels of communication if anything is finalized; noted it is 'something on our minds'.
- Saudi duty impact quantification: Stated Saudi was 2-3% of total sales; expected to come down to 1.5%, with the 1-1.5% loss divertable to other GCC and Africa markets.
Every question, with its answer
1. JJM 2.0 order inflow
Pritish Urumkar, ICICI Securities
Question. Jal Jeevan Mission 2.0: recently around Rs 6,000 crores have been sanctioned. How much is translating into orders for Electrosteel?
Answer, Madhav Kejriwal, Whole-Time Director. Sanctioned amount is around Rs 10,000 crores (Rs 6,000 cr released). Speed of order booking is going to pick up substantially in the next month or two. Difficult to establish exactly what quantity has gone into our order book directly.
Follow-up. What is the impact of Saudi Arabia anti-dumping duties on DI pipe imports on Electrosteel? Can you quantify?
Answer. Saudi Arabia is 2-3% of our total sales; can be easily diverted to GCC countries and Africa. Anti-dumping duty is 17% on Electrosteel vs 30% on other Indian manufacturers. Expect sales to Saudi to come down to ~1.5%; the 1-1.5% loss can be diverted.
2. Volume guidance & export mix
Anand Darshan, 360 ONE Capital Market
Question. What is the estimated DI pipe volumes for FY27? What were export volumes in FY26 and FY27 outlook? Region focus?
Answer, Madhav Kejriwal, Whole-Time Director. Erstwhile indicated volume was 650,000-700,000 tons; now expect around 575,000 tons due to slower initial JJM release. Q1 export was ~21,000 tons; expect exports to be 22-25% of total volumes by year-end. 60-70% of exports to Western markets (Europe, UK); balance to Middle East, Africa, Southeast Asia.
Follow-up. JJM volume breakdown and what drove EBITDA improvement at 50% utilization? Pig iron volumes? Valve business production shift to India?
Answer. Cost optimisation and inventory moderation drove EBITDA improvement despite low volumes; pig iron was ~45,000 tons; not shifting all valve production to Italy — high-value products stay in Italy; Asian subcontinent to contribute 40-45% of valve business in 3-4 years.
Partly answered.
3. Industrial paints expansion
Nachiket Kale, Independent
Question. Industrial paints expansion: capacity going ~4x. What is status, capex and timeline? First commercial production timing?
Answer, Madhav Kejriwal, Whole-Time Director. Initial investment Rs 100 cr adding 17,000 kiloliters via brownfield in West Bengal. Long-term target Rs 1,000 cr revenue at Rs 300 cr capex. First 2 years slower (Rs 250-300 cr), then doubling yearly to Rs 500-600 cr then Rs 800-1,000 cr. Commercial production starts post Q1FY28 (next year).
Follow-up. Capital outlay confirmation and timeline to first commercial production?
Answer. Confirmed; four to five year timeline; commercial production starts post Q1FY28.
4. Realisation & order book
Sajan V, Green Portfolio
Question. DI pipe realisation per ton in Q1 FY27 and QoQ/YoY trends? Current executable order book and active states?
Answer, Madhav Kejriwal, Whole-Time Director. Net realisation: ~Rs 50,500/ton in Q4 FY26; ~Rs 55,000/ton in Q1 FY27; revenue realisation ~Rs 62,000/ton. Last 1-1.5 years extremely muted — FY26 was rock bottom for DI industry since 1994. Order book ~3 lakh tons (5 months); ~50% from JJM.
Follow-up. Which states showing best traction under JJM 2.0?
Answer. Odisha, Andhra Pradesh doing well; Kerala, Tamil Nadu active; UP and Rajasthan to pick up under JJM 2.0.
5. Volume guidance explanation
Dhruv Joglekar, MNCL
Question. FY27 volume guidance now ~5.5 lakh tons vs 7 lakh tons earlier, despite JJM spend rising from Rs 1,500 cr to Rs 70,000 cr. What's the disconnect? H2 pickup or Q1 FY28 boost?
Answer, Madhav Kejriwal, Whole-Time Director. Reason for muted numbers: H1 FY27 substantially slower; growth to come in H2 FY27. Last year H1 had leftover JJM demand; H2 ran out of steam. Q1 last year was 1.8 lakh tons vs 1.0-1.10 lakh tons this year. If Rs 70,000 cr gets consumed this year, Q4 FY27 and Q1 FY28 will see significant up-tick.
6. T.I.S. performance & debt
Charchit Maloo, Genuity Capital
Question. T.I.S. Services Italy: revenue, EBITDA and PAT in Q1 FY27? FY27-28 outlook? Debt repayment plans for FY27?
Answer, Madhav Kejriwal, Whole-Time Director. T.I.S. revenue close to EUR 10 mn; EBITDA margin ~13% in Q1. Expect FY27 revenue EUR 42-45 mn (20% above last year's EUR 38 mn average); EBITDA 14-15% and PAT ~8%. Term debt to reduce from Rs 340 cr to Rs 230 cr via scheduled repayments; working capital debt depends on volumes.
7. Industry sentiment & govt execution
Arun Chulani, First Water Capital
Question. Other DI players not excited even going forward — pausing or looking to export. What is your view? Is it binary wait-and-see or are you seeing on-ground traction?
Answer, Madhav Kejriwal, Whole-Time Director. In Q1 itself, government spent 5x-6x of last financial year's entire JJM outlay (which was spent only in last 10 days of FY26). Wheels are turning faster. Centre has 2029 election pressure to finish projects; end FY28 is the target. Confidence in execution is high.
8. JJM market share
Kunal Gandhi, Yashwi Securities
Question. Out of Rs 10,000 cr sanctioned JJM, what is our market share? And for the remaining Rs 50,000-55,000 cr, what is revenue visibility for FY27?
Answer, Madhav Kejriwal, Whole-Time Director. Approximately 12-13% of JJM outlay will go to DI industry (not just Electrosteel). This applies to both current sanctioned and incremental orders.
9. Paints R&D, valves approvals, coal mines
Rajesh Bhandari, Nakoda Engineers
Question. Industrial paint unit: in-house R&D or collaboration? Anti-rust/marine paint plans? Nuclear power valve approvals? Coal mine compensation received?
Answer, Madhav Kejriwal, Whole-Time Director. In-house R&D team already makes paints for pipe linings/coatings; Phase 1 done independently; marine paints in Phase 2 from next FY. Not yet approved for nuclear power plants; approved for small-scale hydro; developing valves for large hydro and nuclear. Coal mine compensation received ~Rs 98 cr so far; numbers close to assumed levels.
Partly answered.
10. Long-term outlook
Rajesh Bhandari, Nakoda Engineers
Question. Prospects for next 2-3 years and when can we reach past glory?
Answer, Madhav Kejriwal, Whole-Time Director. Will ride JJM and irrigation tailwinds; expansion in valves and paints will diversify business. Reduce DI dependence from 85% to 55% over 4-5 years. Looking at expanding ferroalloy capacity. Improvement in financials will start showing up.
Partly answered.
11. Long-term growth & capital allocation
Koushik Sekhar, Vermillion Value Advisors
Question. Irrigation projects: 5-7% converting to DI pipe orders? Transit-oriented demand in urban areas? Tactical buyback opportunity? AMRUT 2.0 scope? FY30 vision?
Answer, Madhav Kejriwal, Whole-Time Director. 5-7% of irrigation project volumes convert to DI pipes; Ken-Betwa started; PKC Rs 90,000 cr moving forward. Urban Challenge Fund Rs 4 lakh cr akin to AMRUT 3.0. Buyback will go through correct communication channels if decided. FY30-31 revenue target Rs 7,000-8,000 cr at 13-13.5% EBITDA. Industrial coatings market growing 10% YoY; valves 20%+ growth; Q1 valves 18% growth.
Follow-up. Right to win in paints business? West Bengal investment post regime change? Ferroalloy expansion in West Bengal? Orissa greenfield update? Bolt-on M&A opportunity?
Answer. Paints: leveraging existing R&D team and Alvarez & Marsal consulting. Paints and valve Phase 1 both in West Bengal; ~Rs 200 cr capex in Bengal next year. Ferroalloy brownfield expansion next to existing plant. Orissa greenfield put on hold; brownfield priority. Rs 700 cr capital on books for bolt-on acquisitions in adjacencies.
Not answered directly.
12. Paints guidance raise & railway products
Jojo Shaju, Tirthan Capital
Question. Paints target raised from Rs 600 cr (Q4 FY26 call) to Rs 800-1,000 cr. What drove the raise? Already secured external customers? Railway rubber product approvals needed? Capex?
Answer, Madhav Kejriwal, Whole-Time Director. Dipstick market tests and consultant engagement showed larger scope; capex raised to Rs 250-300 cr; exploring inorganic options. For railway rubber products: Board approval taken today; 4-6 months for registration; bulk equipment same; additional equipment procurement under installation; 3 months to install.
13. Volume mix, margin trajectory, railway products
Saket Kapoor, Kapoor & Co.
Question. DI pipe volume 5.75 lakh tons is DI+CIP or just DI? Volume flat YoY? EBITDA margin trajectory to 12-13%? Q2 FY27 deliverables and margins? Railway products & gasket plant interlink?
Answer, Madhav Kejriwal, Whole-Time Director. Volume is DI+CIP combined; YoY volumes flat but better revenue and margins/ton from cost optimisation. EBITDA margin Q1 9.5% vs prior quarter 6.5%; Q3-Q4 FY27 target 12-13%. Q2 FY27 won't be worse than Q1, hopefully better. Railway rubber products: Board approved today; registration 4-6 months; gasket plant captive use with additional equipment being procured.
What was said
Topic by topic, in the order it was spoken
Welcome & Participant Introductions · Hiral Keniya (Moderator, EY LLP)
- Welcome to Q1 FY27 earnings call; standard SEBI safe-harbour disclaimer on forward-looking statements
- Management team introduced: Madhav Kejriwal (WTD), Sunil Katial (WTD & CEO), Rajesh Daga (CFO), Gaurav Somani (GM Finance)
- Format: opening remarks followed by interactive Q&A
Industry Context & Government Tailwinds · Madhav Kejriwal (Whole-Time Director)
- DI pipe industry challenged by slow project execution, delayed fund disbursements, and state/municipal liquidity constraints
- Structural cost optimization programme implemented to support profitability and operating leverage as volumes recover
- JJM 2.0 approved with Rs 8.69 lakh cr total outlay (Rs 3.59 lakh cr central support vs Rs 2.08 lakh cr earlier)
- River linking projects highlighted: Ken-Betwa (Rs 44,000 cr) and Parbati-Kalisindh-Chambal (Rs 90,000 cr)
Pipeline of Govt Infrastructure Schemes · Madhav Kejriwal (Whole-Time Director)
- Urban Challenge Fund of Rs 4 lakh cr to address rapid urbanization (akin to AMRUT 3.0)
- MCAD scheme with Rs 1,300 cr initial outlay for pressurized irrigation pipe networks
- Higher budgetary allocations and faster fund releases expected to improve execution momentum in H2 FY27
- Piped irrigation systems increasingly adopted by states to improve water efficiency and reduce transmission losses
Overseas Subsidiaries & T.I.S. Acquisition · Madhav Kejriwal (Whole-Time Director)
- Subsidiaries in UK, Europe, USA doing better than expectations, evident in consolidated performance
- Deepening presence in Africa and Southeast Asia
- T.I.S. Service S.p.A. Italy acquisition expanded product portfolio to integrated water transmission solutions
- T.I.S. delivered EUR 10 mn revenue in Q1 with sequential growth of 18.4% QoQ and mid-teen EBITDA margins
Valves & Industrial Paints Diversification · Madhav Kejriwal (Whole-Time Director)
- India valves manufacturing facility to commence by end of FY27; target to double valves revenue in 4 years
- New industrial paints & protective coatings business announced leveraging existing paint R&D
- Paints target: Rs 800-1,000 cr revenue in 5 years with phased Rs 250-300 cr capex
- Initially focused on high-value industrial/protective coatings for railways, structural, angles/channels
CFO Transition Introduction · Rajesh Daga (CFO)
- Rajesh Daga takes over as CFO from Ashutosh Agarwal; joined Electrosteel in 1989 as qualified CA
- Previously headed domestic marketing function for 25 years — brings customer/industry insight
- Acknowledged Ashutosh Agarwal's contribution to financial discipline and governance
- Speaker introduced himself and thanked predecessors before walking through Q1 numbers
Q1 FY27 Consolidated Financial Performance · Rajesh Daga (CFO)
- Q1 DI pipes & fittings + CI pipes sales volume: 1.20 lakh ton, down 27% YoY on slow domestic demand
- Consolidated gross debt Rs 1,658 cr; net debt Rs 876 cr vs Rs 1,100 cr reduction in FY26
- Consolidated total income: Rs 1,465 cr; EBITDA Rs 139 cr (9.5% margin); PAT Rs 48.4 cr
- Export volumes in Q1 impacted by Middle East tensions (~21,000 tons in current quarter)
Q1 FY27 Standalone Financial Performance & Outlook · Rajesh Daga (CFO)
- Standalone total income Rs 1,119 cr (down 21% YoY); EBITDA Rs 70.6 cr (6.3% margin); PAT Rs 5.9 cr
- FY27 JJM budget allocation Rs 67,670 cr; Rs 10,344 cr sanctioned YTD vs Rs 1,560 cr in prior year
- Long-term DI pipe sector outlook remains strong on government thrust; recovery expected H2 FY27
- Focus on operational efficiency, balance sheet strengthening, financial discipline for domestic recovery leverage
In their words
the last one, one and a half years has been extremely muted, especially the last particular financial year was probably rock bottom for the industry. Since it's been there since 1994, I think, at least from my understanding is the worst year Ductile Iron has seen in India. So, most definitely this is rock bottom.
Without that in the picture, I am very certain that we can look at a growth of revenue to around Rs. 7,000-8,000 crores with EBITDA level of 13%-13.5% by FY30 & FY31.
During the last financial year, the net debt had reduced by nearly Rs. 1,100 crore and we are focusing on optimization, utilization of the funds.
To check next time
What management committed to on this call, or the dates they gave.
- Pace of JJM 2.0 order conversion (Rs 10,344 cr sanctioned vs prior year Rs 1,560 cr).
- FY27 dispatch volume achievement against target ~5.75 lakh tons DIP+CIP.
- EBITDA margin trajectory — Q3-Q4 FY27 target 12-13% on a consolidated basis.
- Industrial paints Phase 1 brownfield progress in West Bengal (Rs 100 cr capex, 17,000 kiloliters).
- T.I.S. Italy quarterly progression toward EUR 42-45 mn FY27 revenue target.
- Term debt reduction from Rs 340 cr toward Rs 230 cr via scheduled repayments.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 10 Aug 2026 | ₹74.27 | +3.18% | +0.05% |
| 5 sessions Fri 14 Aug 2026 | ₹70.74 | −1.72% | −0.83% |
| 20 sessions Fri 4 Sept 2026 | ₹83.71 | +16.30% | −2.74% |
From the close of Fri 7 Aug 2026, ₹71.98: the call began at 16:00 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.