Electrosteel Castings Q2 FY26 earnings call
In brief
Q2 FY26 sales volume fell 28% YoY to 1.39 lakh tons on delayed JJM funds; CY 2026 recovery seen; T.I.S valve integration underway.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- −3.17% (Nifty 50 +0.32%)
- Q2 FY26 sales volume fell 28% YoY to 1.39 lakh tons; H1 down 25% YoY to 3.02 lakh tons on JJM-driven domestic slowdown.
- Q2 PAT at ₹78 cr (margin 5.3%); consolidated EBITDA excluding ₹64 cr one-time Entry Tax write-back stood at ₹124 cr.
- Management sees demand rebound from CY 2026 once JJM scrutiny concludes; targets double-digit EBITDA/kg and ₹150 cr PAT/quarter from Q2 FY27.
- FY26 sales volume guidance cut to 5.5-6 lakh tons (vs 8.3-8.5 lakh tons prior); FY26 CAPEX now ~₹300 cr for sustenance and debottlenecking.
- T.I.S Italian valve business acquired for ₹120 cr; contributed ₹55 cr in 2 months; India manufacturing planned from FY27.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,396 cr | −23.6% | −10.4% | |
| EBITDA (excl. other income) | ₹92.9 cr | −65.3% | −45.5% | 6.7% (14.6% a year ago) |
| Net profit | ₹78.3 cr | −49.5% | −12.1% | 5.6% (8.5% a year ago) |
| EPS (₹) | ₹1.27 | −49.4% | −11.8% |
From the company's filed results for the quarter ended 30 Sept 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Revenue (Total income): said Total income ₹1,491 cr Q2 FY26 consolidated; filed Revenue ₹1,395.79 cr. Transcript reports 'total income' ₹1,491 cr; filed shows revenue ₹1,395.79 cr (excludes other income); difference reflects other income inclusion
- EBITDA excluding other income: said EBITDA including other income ₹188 cr; excluding write-back ₹124 cr; filed EBITDA excluding other income ₹92.85 cr. Transcript reports 'EBITDA including other income' ₹188 cr and 'EBITDA excluding write-back' ₹124 cr; filed uses 'EBITDA excluding other income' ₹92.85 cr
What moved the numbers, as management explained it
- Q2 sales volume fell 28% YoY to 1.39 lakh tons, the dominant driver of revenue and margin contraction; domestic JJM funding freeze cited as the primary cause.
- Export volume grew 8% YoY in Q2, partially offsetting domestic weakness but not enough to prevent consolidated revenue contraction.
- Downward pressure on DI pipe pricing in Q2 cited as contributing to margin compression alongside lower absorption of fixed costs.
- Raw material prices fell in H1, broadly preserving gross margin at ~48%, while fixed costs were not fully absorbed given lower volumes.
- Other income inflated by ₹64 cr one-time write-back of Entry Tax provision for West Bengal (settled FY13-18 dispute) and corresponding ₹21 cr deferred tax reversal - both non-recurring. (one-off)
- T.I.S Italian valve business contributed ₹55 cr revenue in 2 months of consolidation; standalone net debt rose ~₹230 cr QoQ due to ₹120 cr acquisition outflow.
The numbers management led with
- Q2 FY26 DI pipe + fittings + CI pipe sales volume: 1.39 lakh tons, down 28% YoY
- FY26 volume guidance: 5.5-6 lakh tons
- FY27 volume guidance: 8-8.5 lakh tons
- 4-year sustenance CAPEX plan: ~Rs 500 crores over next 4 years
- T.I.S valve acquisition cost: ~Rs 120 crores fully paid
- T.I.S valve FY25 revenue: ~EUR 36-37 million (~Rs 350 crores)
Guidance
Guidance on this call
| What | For | What management said | Filed |
|---|---|---|---|
| Sales volume | FY26 | FY26 sales volume guided at 5.5-6 lakh tons | — |
| Sales volume | FY27 | FY27 sales volume guided at 8-8.5 lakh tons | — |
| FY26 CAPEX | FY26 | FY26 CAPEX ~₹300 cr (sustenance and debottlenecking; no major expansion) | — |
| Sustenance CAPEX plan | — | Sustenance CAPEX plan ~₹500 cr over next 4 years (capacity additions over and above) | — |
| DI pipe expansion CAPEX (DI Pipes) | — | DI pipe capacity expansion (850k to 1M tons): CAPEX ~₹60 cr, currently on hold | — |
| EBITDA per kg | Q2 FY27 | Double-digit EBITDA per kg achievable starting Q2 FY27 | — |
| Quarterly PAT | Q2 FY27 | Quarterly PAT returning close to ₹150 cr by Q2 FY27 | ₹51 cr, below the figure guided |
| T.I.S valve revenue growth (Valves (T.I.S)) | FY26 | T.I.S valve revenue expected ~10% growth in FY26 over ₹350 cr base | — |
| Coal block compensation inflow | FY26 | Coal block compensation ₹498 cr approved for one asset; hopeful of inflow this FY | — |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
What changed since the Mon 12 May 2025 call
| What | On the Mon 12 May 2025 call | On this call |
|---|---|---|
| FY26 sales volume guidance (cut) | FY26 sales volume guided at 8.3-8.5 lakh tons | FY26 sales volume guided at 5.5-6 lakh tons |
| FY27 sales volume guidance (cut) | FY27 to cross 9 lakh tons | between INR 8-8.5 lakhs MT, in that range |
| FY26 CAPEX plan (restated) | FY26 CAPEX ~Rs 200 cr (Rs 165 cr regular + Rs 35 cr maintenance) | FY26 CAPEX ~₹300 cr (sustenance + debottlenecking; no major expansion) |
| DI pipe capacity 1 million tons (delayed) | DI pipe capacity 1 million tons targeted by FY26-27 (from 9 lakh tons) | DI capacity at 850,000 tons; expansion to 950k-1M tons on hold |
| EBITDA margin band 15-18% (not repeated) | EBITDA margin 15-18% maintained for medium to long term; hopeful of upper end for FY27/FY28 | Not mentioned |
| Coal block compensation (restated) | Hopeful of 'very large degree' of settlement on Rs 1,200 cr claim this fiscal | ₹498 cr valuation approved for one asset; two more big assets to be valued; hopeful this FY |
| T.I.S valve business (new) | Not featured as a separate business | Acquired for ₹120 cr; ₹55 cr in 2 months; India manufacturing from FY27; markets India, Middle East, Southeast Asia |
| Greenfield expansion in Odisha (not repeated) | Pursuing greenfield expansion in Odisha (land acquired) within Rs 1,500-2,000 cr net debt envelope | Not mentioned |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| EBITDA margin | FY25 | 17–18% (on the Q4 FY24 call) | 14.2%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
DI Pipes
Core segment at 75-80% of revenue. Volume fell 28% YoY to 1.39 lakh tons in Q2 on JJM funding delays; pricing under downward pressure; export markets partially offset with 8% volume growth.
Sales volume 1.39 lakh tons Q2 (-28% YoY) · 75-80% of revenue mix · Installed DI capacity 850,000 tons · Domestic JJM ~60% of order book
Outlook: FY26 volume 5.5-6 lakh tons, FY27 8-8.5 lakh tons; recovery expected from CY 2026 as JJM scrutiny resolves; capacity expansion to 1M tons on hold
Cast Iron Pipes
Supporting segment at ~5% of revenue; bundled with DI pipes in the 1.39 lakh ton Q2 consolidated volume; capacity 50,000 tons.
~5% of revenue mix · Capacity 50,000 tons
DI Fittings
Specialized segment at ~5% of revenue; capacity 25,000 tons; included in Q2 consolidated sales volume of 1.39 lakh tons.
~5% of revenue mix · Capacity 25,000 tons
Ferroalloys
Mentioned in opening remarks as one of the segments supporting overall performance; no separate Q2 disclosure.
Exports
Volume grew 8% YoY in Q2, partially offsetting domestic weakness; Middle East (largest DI exporter), Europe via Singardo Singapore; non-JJM/export ~40% of order book.
Export volume +8% YoY Q2
Outlook: Geographic hedging maintained; aggressive export push to Middle East, Europe and Vietnam continues
Valves (T.I.S)
NEW acquisition - Italian valve maker T.I.S merged for ₹120 cr; contributed ₹55 cr revenue in 2 months of Q2; full-year revenue ~€36-37M (₹350 cr); EBITDA margin 15-16%, profit margin 8-10%.
Acquisition cost ₹120 cr paid · ₹55 cr revenue in 2 months Q2 · Full-year revenue ~₹350 cr expected · EBITDA margin 15-16% · Profit margin 8-10% · Plant utilization 70-75%
Outlook: India manufacturing from FY27; markets India, Middle East, Southeast Asia; ~10% revenue growth expected this year; aggressive expansion plans in place
Balance sheet, capex and funding
- Net debt (standalone) at ₹1,626 cr as on Sep 30, 2025, up ₹230 cr from June 2025 due to ₹120 cr T.I.S acquisition outflow and other business requirements.
- FY26 CAPEX guided at ~₹300 cr (predominantly sustenance, including battery rebuild at Srikalahasthi and debottlenecking); no major expansion CAPEX in FY26 or FY27.
- Sustenance CAPEX plan of ~₹500 cr over next 4 years; any future capacity addition (e.g. 850k to 950k-1M tons at ~₹60 cr) would be over and above this envelope.
- Receivables backed 99%+ by bank guarantees and letters of credit; clean credit exposure less than 1%.
- Interest cost stable in Q2 despite higher borrowings, supported by lower borrowing cost.
- Cash and bank balances up ~₹400 cr QoQ on Ind AS reclassification: fixed deposits earlier in non-current assets moved to current assets upon maturity.
The industry, as management sees it
Management frames the DI pipe industry as being in a temporary government-driven slowdown (28% volume decline in Q2) tied to Jalene Mission fund-flow freeze, but expects a strong rebound from CY2026 as central-government scrutiny of project execution concludes and disbursements restart. Medium-term demand drivers - JJM extension to 2028, river interlinking projects, irrigation, AMRUT and pipeline replacement - remain intact and underpin conviction that the current phase is cyclical rather than structural.
Risks management named
- Government fund flow delays tied to JJM scrutiny of project execution, financials and water quality
- Delays in receivables from EPC contractors pending fund disbursement
- Capacity underutilisation and cash absorption until JJM restarts (net debt up ~Rs 230 cr QoQ)
- Two more large coal block assets still pending valuation and realisation
- Integration risk on T.I.S valve business over next 6-9 months
Q&A
Q&A dynamics were dominated by analyst probing on the timing and conviction behind the JJM recovery thesis - Pujan Shah, Sailesh Raja and the first follow-up by Rudraksh Raheja all tested whether the CY2026 restart was realistic. Rajesh Agarwal (Moneyore) ran a marathon 9-question turn covering order mix, non-JJM traction (irrigation, AMRUT), alternative demand drivers (Indus Water, Naxalite areas), receivable delays and valuation math - management answered each substantively. Pushback was strongest on precise international revenue targets beyond FY27 and on the remaining coal block asset timeline, both of which were deferred. The most concrete hard commitments came on volume (5.5-6 lakh tons FY26, 8-8.5 lakh tons FY27) and PAT recovery (~Rs 150 cr/quarter from Q2 FY27).
Not answered directly
- Specific 3-5 year international revenue mix targets
- Detailed FY27 valve revenue growth number
- Timing of remaining coal block asset valuations beyond the Rs 498 cr
Asked for a number, answered without one
- International revenue share (3-5 years): Madhav said he would be equipped to answer by end of FY26 once doubly/triply certain about market potential; declined to share an educated guess
- T.I.S valve FY27 revenue: Madhav said he would only be able to give concrete numbers next FY Q4 after integration; FY26 expected ~10% growth on ₹350 cr base, FY27 growth described as 'decent'
- Coal block compensation ₹498 cr inflow timing: Madhav said it would be incorrect to deduce timing; active persuasion from new allottee JSW and the ministry, hopeful within this financial year
Every question, with its answer
1. JJM demand recovery timing
Pujan Shah, Molecule Ventures
Question. What makes management confident that DI pipe demand will rebound from CY2026, given JJM has been slow for 12-15 months and fund flow is a challenge? Second, has the government concluded its review of non-timely project completion, or is it still under purview? Third, given the government claims ~81% physical progress, what is the actual percentage of work done on the ground?
Answer, Madhav Kejriwal, Whole-Time Director. On the first, order book in the market is adequate; the issue is dispatch-ability because of funding constraints. Central government is actively seeking clarities on highlighted issues and intends to complete the program, evidenced by the JJM extension with enhanced budget. On the second, multiple issues - non-timely completion, funding constraints, operational and administrative delays - are being reviewed; being a state subject, administration is distributed and conclusions will take time, after which restart is expected. On the third, functioning household tap connections are closer to 50%-60%; from a pipe supply perspective ~40% of work remains, while ground execution progress is around 50%-55%.
2. Volume guidance and EBITDA per kg outlook
Sailesh Raja, B&K Securities
Question. The Indian Express reported central-government action against officials and contractors on financial irregularities and poor-quality JJM work, with several states yet to share full details. Does this mean fund deployment will resume only after the review is complete? Second, can management give volume guidance for the year, and is the current Rs 6-6.5/kg EBITDA the floor or could it correct further? Can double-digit EBITDA per kg be expected next year?
Answer, Madhav Kejriwal, Whole-Time Director. Based on the progress and further inquiries shared with states, Kejriwal is fairly confident that starting next calendar year, the government will reach conclusions and start opening up funds; with the usual 2-3 month lag, this reflects in company books from Q1 FY27. Starting Q2 next year (Q2 FY27), he expects a dramatic improvement in production levels and margins per ton - double-digit margin per ton is very much achievable. Sunil Katial added FY26 volumes of ~5.5 lakh tons and FY27 guidance of 8-8.5 lakh tons. FY26 CAPEX is around Rs 300 crores - sustenance plus debottlenecking - with no major expansion planned for this year or next.
3. Margins, employee costs and maintenance capex
Rudraksh Raheja, Ithought Financial Consulting
Question. Despite revenue contraction in H1, gross margins appear to have expanded - what is the driver? Second, what drove the higher other income in H1? Third, are employee expenses now at a steady-state Rs 150-160 cr per quarter, with capacity additions already absorbed? Fourth, can the company confirm FY26 volume of ~5.5 lakh tons and disclose FY26 first-half volumes? Fifth, is there a sustainable annual maintenance CAPEX number, separate from expansion CAPEX?
Answer, Gaurav Somani, General Manager, Finance. Gaurav Somani: Gross margin at ~48% in H1 was broadly in line with last year because raw material prices fell alongside product prices; revenue contraction is purely a volume effect. Ashutosh Agarwal: Other income increase is driven by reversal of the Rs 64 cr West Bengal entry tax provision on case settlement. Madhav Kejriwal on employees: marginal increase expected as the valves portfolio expands, possibly to Rs 165 cr/quarter. On volumes: H1 FY26 stood at 2.7 lakh tons; FY26 total guided at 5.5-6 lakh tons. Sunil Katial on maintenance CAPEX: sustenance CAPEX is ~Rs 500 crores planned over the next 4 years; any capacity addition would be over and above this.
4. Capacity, cash and diversification update
Deepesh Agarwal, ICICI Prudential AMC
Question. Consolidated cash and bank balances have increased by over Rs 400 cr - is this from subsidiaries? Second, where does current capacity stand given plans to scale to 1 million tons, and are any further additions planned? Third, what is the update on diversification moves - Singardo, the Vietnam acquisition, gaskets, etc.?
Answer, Gaurav Somani, General Manager, Finance. On cash: Gaurav clarified the increase is a reclassification of fixed deposits (>12 months) from non-current to current as they near maturity; the funds were always in the books. On capacity: installed capacity remains 850,000 tons of DI pipes; expansion to 950,000-1,000,000 tons has been put on hold until inventory clears and capacity ramps to 850,000 tons. On subsidiaries: Singardo has shown positive results with 40%-45% of revenue now from other product portfolio; T.I.S valves has been merged for 2 months and integration is in progress, expected to be complete by FY26 end; aggressive expansion plans are in place and the valve business will play a big role in geographic and customer diversification.
5. Order mix, non-JJM traction, payments and acquisition contribution
Rajesh Agarwal, Moneyore
Question. Of the 6-7 months pending order book, how much is JJM government vs private/export? Second, what is the traction in non-JJM orders - AMRUT, irrigation? Third, can the Indus Water treaty project be a big opportunity for DI pipes? Fourth, are Naxalite-cleared areas also an opportunity? Fifth, are payments stuck with EPC contractors? Sixth, what is the reason for the central government having spent only 4% of allocated JJM budget this year? Seventh, can Brahmaputra hydroelectricity projects be an opportunity? Eighth, does Q2 consolidated revenue include the Italian acquisition, and at what EBITDA level is it? Ninth, what is the net effect of the Rs 60 cr other income item, isolating the entry tax reversal?
Answer, Madhav Kejriwal, Whole-Time Director. Order mix: ~60% JJM of total order book, ~50%-55% domestic including JJM, balance non-JJM and export. Non-JJM: AMRUT a little slow, irrigation has picked up well; the industry is largely running on irrigation and AMRUT. Indus Water: a good opportunity similar to River Linking - canal diversion first, then piped distribution for irrigation/drinking water. Naxalite areas: expected to fructify even before River Link. Payments: slight increase in receivable delays, but well-disciplined and backed by BGs/LCs; clean credit exposure under 1%. Fund stoppage: government is conducting a check-back on delays and complaints - course correction, not abandonment. Hydro: minor push to pipes, very good push to valves. Acquisition (Ashutosh): 2 months revenue of Rs 55 crores consolidated in Q2; more than break-even at EBITDA. Other income (Ashutosh): Rs 64 cr entry tax reversal plus FD interest and a Rs 6 cr refund - net effect on other income is ~Rs 65 cr; FD interest is recurring so the incremental other income is the Rs 64 cr entry tax reversal.
6. Receivables, coal compensation and valve business roadmap
Saket Kapoor, Kapoor Company
Question. Are receivables in line with deliveries or is there a stress? How much of receivables are backed by BG/LC? Any update on the coal compensation - have all asset valuations cleared, or are some still pending? What is the INR 120 cr cash outflow for business acquisition - is it the full payment for the valve company? When will the valve business start contributing meaningfully, and what is the FY26 revenue/roadmap?
Answer, Madhav Kejriwal, Whole-Time Director. Receivables are largely fine; some delays but all backed by BGs/LCs - 99%+ of receivables are against BG or LC, clean credit exposure under 1%. Coal compensation: on the previously valued asset (~Rs 498 cr approved) JSW has sought clarifications which Electrosteel has answered; hopeful of progress within this financial year; half of the ~Rs 1,200 cr outstanding has been cleared so far (Rs 80 cr earlier plus Rs 500 cr now), with two more large assets and smaller assets remaining. Acquisition outflow: Rs 120 cr is fully paid for T.I.S valve. For the valves business, this year will look similar to last year - revenue ~EUR 37-38 million (~Rs 350 cr) with 8%-10% profit margin and 15%-16% EBITDA margin; concrete next-year growth numbers only by Q4 FY26.
7. Valve outlook, PAT recovery and shareholders
Rajesh Bhandari, NAKODA Engineers
Question. What gives management confidence on FY27 volumes going to 8.5 lakh tons, including realisation? Second, what is the expected annual revenue from the valve business? When will T.I.S become active in India? What is the 5-7 year outlook for valves plus DI pipes combined? When can the company get back to ~Rs 150 cr quarterly PAT? Is Blackrock still a shareholder at the same level?
Answer, Madhav Kejriwal, Whole-Time Director. FY27 confidence is based on the demand freeze opening and Electrosteel being ready to ramp production - both together imply 8-8.5 lakh tons. Valves: last-year was ~EUR 36-37m (~Rs 350 cr), of which India presence is negligible; FY26 may see 10% growth on that. From FY27, India, Middle East and Southeast Asia will be opened up for the valve business alongside continued Europe focus; India manufacturing and approvals are in process. Combined outlook: combined pipes + fittings + valves package is a clear USP that no Indian player offers - sentimentally already playing out in Europe per water expos. PAT recovery to ~Rs 150 cr/quarter expected from Q2 FY27 (with pickup starting Q1 FY27). Ashutosh Agarwal confirmed Blackrock shareholding is at almost the same level as before.
8. Coal compensation flow, capacity reconciliation and product split
Vipul Kumar Shah, Sumangal Investments
Question. On the Rs 498 cr coal compensation - when is it likely to flow and is this the final verdict, or will Electrosteel appeal? If not challenged, should the money accrue reasonably quickly? How many more assets remain to be valued? Presentation Slide 5 says capacity is 10,11,000 tons while on the call 850,000 tons was mentioned - what is the discrepancy? Roughly, what is the revenue split between DI pipes, CI pipes and DI fittings?
Answer, Madhav Kejriwal, Whole-Time Director. On coal: the Rs 498 cr is the valuation for one previously unvalued asset, close to the company's estimate; Electrosteel will not challenge and active persuasion is on with JSW and the ministry, with hope of payment within FY26. Remaining: two more large assets plus smaller assets still pending. Capacity: 850,000 tons is DI pipes only; total adds 50,000 tons CI pipes plus 25,000 tons DI fittings, taking overall to ~10,11,000 tons. Revenue split (Gaurav Somani): DI pipes 75%-80%, DI fittings ~5%, CI pipes ~5%.
9. Scrutiny pattern, capacity expansion, international targets and valve integration
Rudraksh Raheja, Ithought Financial Consulting
Question. On government scrutiny - is there any pattern to the complaints (product segment, region, type of player)? When the 1 lakh ton DI pipe expansion is taken up, how long will installation take? What is the CAPEX for that expansion? Is there a 3-5 year target for share of international revenues in the broader mix? For valve manufacturing, will India-source from Italy or set up an Indian plant? What was the utilisation level of the Italian plant at ~Rs 350 cr revenue?
Answer, Madhav Kejriwal, Whole-Time Director. Pattern: three broad issues - incorrect physical implementation of pipelines, financial mismanagement, water quality - across states, with some focus on UP irregularities. No specific product/contractor/state issue. Expansion (850k->950k tons): 6-8 months installation plus ~3 months ramp-up, CAPEX ~Rs 60 crores. International targets: defer to end of FY26 once plans are firmer; today would be an educated guess. Valve strategy: a new plant will be set up in India for day-to-day products; very high-value, low-volume, specialised products continue to be imported for now, with India eventually also exporting some valves. Italian plant utilisation: ~70%-75% at the ~Rs 350 cr revenue level.
Not answered directly.
10. International market and export competitiveness
Hari Kumar S, Unknown
Question. On the international market for DI pipes - is there a total lack of demand or is it increased competitive intensity causing fewer export orders than earlier?
Answer, Madhav Kejriwal, Whole-Time Director. Electrosteel has historically exported more than the rest of the industry; the domestic slowdown has allowed the company to be more aggressive on exports to soften the blow. No explicit acknowledgement of new competition - tone is that exports remain a structural hedge.
Partly answered.
What was said
Topic by topic, in the order it was spoken
Industry Environment & Demand Headwinds · Madhav Kejriwal (Whole-Time Director)
- DI pipe industry environment has been challenging for past several quarters and Q2 reflects the same
- Demand slowdown driven by delays in government spending; production moderated, costs up, pricing under downward pressure
- Other segments - cast iron pipes, ferroalloys, DI fittings, exports - and higher other income supported overall performance
- Balance sheet remains strong; treats the phase as temporary adjustment, not structural
- Medium-to-long-term outlook optimistic given continued government commitment to drinking water and sewage networks
Long-term Demand Drivers & Strategic Initiatives · Sunil Katial (Whole-Time Director and CEO)
- Jal Jeevan Mission extended to 2028, coupled with river interlinking projects, irrigation via pipe networks and pipeline replacement work underpin long-term confidence
- Pace of recovery may take a quarter or two; strong rebound expected from CY2026
- T.I.S valve business in Europe acquired and progressing to integrate valves into India and overseas portfolio
- Frames challenges as transitional and opportunities as transformational
Q2 & H1 FY26 Financial Performance · Ashutosh Agarwal (Whole-Time Director and CFO)
- Q2 sales volume (DI pipes, fittings and CI pipes) 1.39 lakh tons, down 28% YoY; H1 3.02 lakh tons, down 25% YoY
- Export volumes grew 8% YoY, partially offsetting domestic weakness
- Entry tax provision of West Bengal Rs 64 cr reversed; corresponding deferred tax reversal Rs 21 cr; interest cost stable despite higher borrowings
- Net debt Rs 1,626 cr at standalone, up ~Rs 230 cr from June 2025 - largely T.I.S acquisition and business needs
- Consolidated Q2 total income Rs 1,491 cr; EBITDA Rs 188 cr (12.6% margin); EBITDA ex-writeback Rs 124 cr; PAT Rs 78 cr (5.3%); H1 EBITDA Rs 386 cr (12.6%); H1 PAT Rs 167 cr
In their words
We are certain that the current phase is a temporary adjustment rather than a structural shift.
While the challenges we face are transitional, the opportunities ahead are transformational with robust demand drivers, government initiatives gaining momentum and our expanded product portfolio.
Starting quarter 2 next year, we can start seeing a dramatic improvement in the production levels and also in the margins per ton.
To check next time
What management committed to on this call, or the dates they gave.
- JJM funding resumption and order disbursement pace - key catalyst cited for CY 2026 recovery
- Coal block compensation ₹498 cr inflow timing - management hopeful within FY26
- T.I.S valve India manufacturing setup progress - planned from FY27
- FY26 volume run-rate towards 5.5-6 lakh tons guidance; H1 at 3.02 lakh tons
- Production pickup signs in Q1 FY27 leading to Q2 FY27 double-digit EBITDA/kg and ₹150 cr PAT/quarter targets
- Decision on resumption of 1M ton DI pipe capacity expansion (₹60 cr CAPEX, 6-8 months install)
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 10 Nov 2025 | ₹85.64 | −3.17% | +0.32% |
| 5 sessions Fri 14 Nov 2025 | ₹80.63 | −8.83% | +1.64% |
| 20 sessions Fri 5 Dec 2025 | ₹69.00 | −21.98% | +2.72% |
From the close of Fri 7 Nov 2025, ₹88.44: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Electrosteel Castings's other calls
- Q2 FY27Fri 13 Nov 2026Tone: Mixed
- Q1 FY27Fri 7 Aug 2026Tone: Cautious
- Q4 FY26Mon 18 May 2026Tone: Cautious
- Q3 FY26Tue 10 Feb 2026Not read
- Q3 FY26Fri 6 Feb 2026Not read
- Q1 FY26Wed 6 Aug 2025Not read
- Q4 FY25Mon 12 May 2025Tone: Mixed
- Q2 FY25Wed 30 Oct 2024Tone: Mixed
- Q1 FY25Thu 1 Aug 2024Tone: Confident
- Q4 FY24Mon 13 May 2024Tone: Confident