Electrosteel Castings Q2 FY25 earnings call
In brief
- Management's tone
- Mixed
- What was said
- Even-handed
- Guidance
- Guidance cut
- Analyst pushback
- Medium
- Stock, next session
- +1.27% (Nifty 50 −0.51%)
- Q2 FY25 revenue Rs 1,849 cr (-4.6% YoY) hit by 7-7.5 day Srikalahashti blast furnace shutdown; ~12,000 tons lost, Rs 13-14 cr expense booked
- FY25 DI volume guidance cut to lower end of 8-8.5 lakh ton range; 1 million ton capacity target retained for FY26-end
- H1 FY25 EBITDA Rs 666 cr (+31.8% YoY), margin expanded 329 bps to 17.2% on coking coal tailwind; PAT up 52.8% to Rs 381 cr
- India Ratings upgrades long-term credit rating to AA; net debt-equity improves to 0.27x; long-term borrowing Rs 450 cr
- Singardo International (Singapore) acquisition closed at Rs 49 cr; SE Asia tonnage seen up 5-7%; Greenfield project nearing disclosure
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,828 cr | −4.8% | −9.2% | |
| EBITDA (excl. other income) | ₹268 cr | −10.9% | −24.3% | 14.6% (15.6% a year ago) |
| Net profit | ₹155 cr | −11.1% | −31.3% | 8.5% (9.1% a year ago) |
| EPS (₹) | ₹2.51 | −14.6% | −31.2% |
From the company's filed results for the quarter ended 30 Sept 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
The numbers management led with
- Capex spent (cumulative): Rs 440 crore spent till September 2024
- DI pipe capacity target: 1 million tons by end of FY26
- FY25 DI volume guidance: 8-8.5 lakh tons; now expected at lower end of range
- Long-term credit rating upgrade: India Ratings upgraded to 'AA' from 'AA Minus'
Guidance
Guidance on this call
FY25 DI pipe volume guided to lower end of 8-8.5 lakh tons (down from upper-end expectation). Installed capacity of 9 lakh tons targeted for FY26; 1 million ton capacity target retained for end-FY26. H2 FY25 EBITDA margin range of 16-18% indicated as the medium-term band. Balance capex of Rs 260 cr to complete ongoing projects — H2 FY25 spend Rs 150-160 cr, residual Rs 100 cr in FY26. Net debt seen at ~Rs 1,300 cr (incl. working capital) at year-end. Singardo expected to add 5-7% to SE Asia tonnage. Fittings share targeted to rise from 4% to 5-10% over two years via Greenfield.
Said on the Q1 FY25 call, not repeated on this one (7)
- DI pipe sales volume: ~8.5 lakh tons in FY25
- DI pipe manufacturing capacity: 9 lakh tons by end-FY25; 1 million tons by FY26
- Capex: ~₹700 cr ongoing programme; ₹410 cr spent till Q1 FY25
- EBITDA per ton: Sustained in ₹15,000–18,000 ballpark
- Export share: To revert to ~20% of volume
- Fittings volume: 22,000–24,000 tons in FY25; installed capacity 24,000 tons
- Cast iron pipe volume: ~36,000 tons in FY25
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| EBITDA margin | FY25 | 17–18% (on the Q4 FY24 call) | 14.2%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
The industry, as management sees it
Management sees the post-election JJM recalibration as a temporary pause and expects order inflow to pick up from the start of the next quarter. AMRUT (~20-25%) and irrigation (~20-25%) are highlighted as the two key demand drivers, with inter-state river linking projects (Ken-Betwa being the lead) emerging as a multi-year incremental demand source, though DI demand quantification for Ken-Betwa is premature. Global water infrastructure modernisation is flagged as a tailwind.
Risks management named
- Srikalahashti blast furnace stability not yet fully restored; another shutdown possible
- JJM order inflow slowdown expected to persist into Q3 before pickup
- Coking coal price stability after current tailwind could compress FY26 EBITDA per ton
- Ocean freight volatility could continue to cap export realizations
- Equipment supply delay from China by ~1 month impacting capex timeline
Q&A
Q&A was dominated by margin sustainability questions — three analysts separately probed whether coking coal tailwinds and volume growth would carry into FY26, with management repeatedly deflecting to 'percentages, not absolute numbers'. Order book and JJM demand dynamics was the second-most-discussed topic, where management framed the post-election pause as a temporary recalibration with pickup expected from next quarter. The most heavily deflected topics were Greenfield project specifics, Singardo turnover/margins quantification, the coal block case, and the Ken-Betwa project's DI demand outlay.
Not answered directly
- Greenfield project details and capacity mix
- Singardo turnover and margin specifics
- Ken-Betwa project DI demand quantification
- Order book split between AMRUT and irrigation
- Average JJM project order sizes
- FY26 absolute EBITDA per ton guidance
- Blast furnace stability — whether another shutdown needed
Every question, with its answer
1. Gross margin and coking coal
Vikash Singh, PhillipCapital
Question. Gross margin improved sequentially but lower than expected. What was the coking coal and iron ore benefit in Q2 and what is expected in Q3?
Answer, Gaurav Somani, General Manager, Finance. Q2 gross margin ~50.7% vs 49.4% YoY, ~130 bps improvement. Coking coal prices fell during the quarter and are lower as we speak, so further benefit expected. Iron ore was volatile between Q1 and Q2 (upper side), now more stable. Raw materials expected to support margins going forward.
Follow-up. Can you quantify the benefit for Q3 — was the majority captured in Q2 or will it come in Q3?
Answer. Good amount of coking coal already booked in inventory; some more benefit expected in Q3 from coking coal.
2. EBITDA per ton post-shutdown
Vikash Singh, PhillipCapital
Question. How much was EBITDA per ton impacted by the shutdown and what steady-state EBITDA per ton should we assume for H2?
Answer, Madhav Kejriwal, Whole-time Director. About half a percentage impact on EBITDA per ton from the shutdown. Stability in EBITDA per ton is envisaged for the short to mid-term; no specific per-ton number given.
Partly answered.
3. Order book and JJM demand
Vikash Singh, PhillipCapital
Question. Some peers have flagged slower order inflow from the government. Is order inflow slowing and what is the current order book in months/tonnage and pending DI tonnage for 18-24 months?
Answer, Madhav Kejriwal, Whole-time Director. Slowdown is essentially because the new term has started and the government is collating and recalibrating progress. Not concerned on long-term perspective; outlook for demand remains the same — temporary pause. Order book stands at ~9 months; ~6.5 million tons worth of orders pending in the industry, refilled constantly; 6-6.5 million tons will constantly be in the pipeline over 18-24 months.
4. FY26 EBITDA sustainability
Radha, B&K Securities
Question. On FY25 EBITDA per Kg of Rs 19 and FY26 volume of 9.3 lakh tons with 10-11% growth, won't stable coking coal offset volume growth — is FY26 EBITDA flat vs FY25?
Answer, Sunil Katial, Whole-time Director and CEO. Stability of EBITDA going forward. Growth from here is not something we are looking at in terms of percentages, not in absolute numbers. Madhav Kejriwal added: volume growth will deliver decisive variable and fixed cost advantage to partly offset the coking coal normalisation.
Follow-up. If FY25 closes at Rs 19/Kg EBITDA on DI, should FY26 EBITDA per Kg be slightly lower?
Answer. Difficult to give absolute numbers; will stick to percentages. If both coking coal and iron ore prices fall, mid-term impact on per-ton selling price is expected. Highly confident of maintaining these percentage points.
Partly answered.
5. Bidding realizations and pricing
Radha, B&K Securities
Question. What were the bidding realizations at the start of FY25 and how have they moved in the current bidding cycle?
Answer, Madhav Kejriwal, Whole-time Director. Very minor downward correction in realizations; a couple of percentage points drop on the order book front. With robust demand and falling raw material prices, no major correction in selling price expected. Come Q4 with demand pickup, we may see the opposite. Minor 2-4% range movement.
Follow-up. What is the current bid book size for AMRUT and other irrigation projects?
Answer. Need to get back with the exact split. On industry level, AMRUT ~20-25% and irrigation ~20-25% of demand.
Not answered directly.
6. JJM order inflow pickup
Prathamesh Dhiwar, Tiger Assets
Question. From when are we seeing the pickup in JJM order inflow? From Q3? What are average order sizes?
Answer, Madhav Kejriwal, Whole-time Director. By the beginning of next quarter, we should start seeing JJM order book pick up again. Order sizes vary by such a huge margin that giving a particular answer would be incorrect.
Partly answered.
7. Realization movement
Rakesh Roy, Omkara Capital
Question. Volumes fell sequentially/YoY but realizations improved. Was there a price increase in Q2 or H1?
Answer, Madhav Kejriwal, Whole-time Director. Pricing is stable; no real major improvement in realization per ton — it is similar.
Follow-up. Iron ore pricing is down vs H1. Will realization stay the same or come down?
Answer. Very minor reduction in realizations on the order book front; reflects temporary JJM slowdown. Maybe come Q4, when JJM picks up, realizations improve again. Range 2-4%.
8. State vs central project mix
Rakesh Roy, Omkara Capital
Question. Are you supplying to state-funded projects, and how much of Jal Jeevan is state funded?
Answer, Madhav Kejriwal, Whole-time Director. Yes, supplying to state-funded and foreign-funded projects. Jal Jeevan is part state-funded. Independent state projects, most irrigation, and a few foreign-funded direct loans to states. ~30% of demand independent of central schemes.
Follow-up. What is the export share and any impact from increased shipping cost?
Answer. Exports at 13% — softer than usual due to ocean freight and because domestic markets are more interesting on margins. If freight improves, export realizations can recover. Q3 may be slightly better but not substantial; depends on geopolitics.
9. Shutdown duration and nature
Rakesh Roy, Omkara Capital
Question. How many days of shutdown and was it annual maintenance or one-off?
Answer, Madhav Kejriwal, Whole-time Director. ~7-7.5 days shutdown. Part of annual maintenance but extended a bit to try a few more things. Stability post-shutdown did not come as quickly as expected; now seeing better stability at the blast furnace.
10. Greenfield project update
Niraj, Ashika
Question. Update on the Greenfield project and how will it be funded?
Answer, Madhav Kejriwal, Whole-time Director. At this point cannot share too much — not at that stage. Things are on plan; getting closer to finalizing and disclosing. Largely internal accrual funding; minor leveraging possible if required, but overall leverage will not go up as loans are also being repaid.
Follow-up. How do you see opportunities from river interlink projects (Ken-Betwa etc.) and incremental order book in FY26?
Answer. River linking at nascent stage for orders; Ken-Betwa progressing with good speed. Will eventually be part of Jal Jeevan for sustainable raw water. Excited about it. Yes, seems incremental order book from river interlinks in FY26.
Not answered directly.
11. Future shutdown risk
Rajesh Agarwal, Moneyore
Question. Is the shutdown over or will there be more shutdowns in H2?
Answer, Madhav Kejriwal, Whole-time Director. Stability of SW blast furnace not yet at exact level. Will do whatever required; difficult to say whether another shutdown needed or can be managed operationally. Will communicate if anything comes up.
Follow-up. Quantify the production/sales/EBITDA lost from the shutdown
Answer. Approximately 12,000 tons lost.
Partly answered.
12. JJM election impact and margin path
Rajesh Agarwal, Moneyore
Question. Is the JJM outgo slow because of elections, and will it improve? And can efficiency/scale/margins improve further?
Answer, Madhav Kejriwal, Whole-time Director. Yes, because of elections. New government recalibrating; first phase ended with the term. Dashboard shows 78-79% completion; 20% remaining plus some pending within the 78% and new work being added. Going by a stable margin at this level would be a better way to look at it.
13. FY25 volume achievability
Muskan, B&K Group
Question. With H1 volume at 3.69 lakh tons and full-year guidance of 8.5 lakh tons, can Q4 do 2.8 lakh tons?
Answer, Madhav Kejriwal, Whole-time Director. Due to slower stabilisation of blast furnace and a one-month delay in Chinese equipment supply, range revised to 8-8.5 lakh tons. Was hopeful of upper end; now expecting lower end of the range.
Follow-up. Fittings currently 4% of mix, target 5-10% in two years — any capacity expansion planned?
Answer. Part of the Greenfield project; exact tonnages not clear but being considered.
Partly answered.
14. Capex schedule
Muskan, B&K Group
Question. Out of Rs 700 cr capex, Rs 440 cr spent — what is the capex for this year and next year?
Answer, Ashutosh Agarwal, Whole-time Director and CFO. Rs 260 cr still to spend for completing the running projects; H2 spend Rs 150-160 cr; subsequent financial year balance Rs 100 cr.
15. Singardo acquisition and coal block case
Ankit Puri, Investor
Question. Vision behind the Singardo International acquisition, and update on the coal block settlement case?
Answer, Madhav Kejriwal, Whole-time Director. Singardo was authorised distributor for Electrosteel pipes/fittings in southeast market; opportunity to expand into Vietnam etc. Also leveraging Singardo's other traded products to grow water industry trade. Coal block case is in Delhi High Court; next hearing in November — judge not available last time, matter pushed to a date in November.
Follow-up. When will Singardo numbers start showing and what kind of turnover/margins?
Answer. Numbers on traded products not finalised. Expect SE Asia tonnage improvement of 5-7%.
Not answered directly.
16. Singardo financials
Saket Kapoor, Kapoor & Co.
Question. Singardo financials for last three years — turnover, profitability, and rationale for the Rs 49 cr valuation?
Answer, Gaurav Somani, General Manager, Finance. Singardo revenue ~13 million Singapore dollars for FY23-24 and similar for FY22-23. EBITDA margins between 10-13%. Acquisition cost based on book value of Singardo.
Follow-up. EBITDA margin range for H2 FY25 given Q1 ~18% and Q2 ~16%?
Answer. 16-18% range is what we are looking at — and that range is the medium-term band.
17. H2 volume and shutdown cost
Saket Kapoor, Kapoor & Co.
Question. With H1 at 3.69 lakh tons, can H2 be 4-4.3 lakh tons? And any one-off expenses from the shutdown, in which month?
Answer, Ashutosh Agarwal, Whole-time Director and CFO. H2 of 4-4.3 lakh tons envisaged. Shutdown happened in August; Rs 13-14 cr incurred as expense (for long-term benefit); shutdown was 7 days plus few hours.
Follow-up. Will you spend more this quarter on top of the Rs 13-14 cr already spent?
Answer. Will decide in 10-15 days. May involve another shutdown, but not very capital-intensive.
18. Capacity and long-term borrowings
Saket Kapoor, Kapoor & Co.
Question. FY25 capacity — 8 lakh tons or 9 lakh tons? And have you repaid all long-term borrowings?
Answer, Madhav Kejriwal, Whole-time Director. Still hopeful of 9 lakh tons capacity by FY25. Post the expansion capex, installed capacity will be 9 lakh tons for FY26 manufacturing. Long-term borrowing as of 30 Sep 2024 ~Rs 450 cr with similar cash on the books.
Follow-up. What is the absolute net debt level at year-end? And blended cost of funds post the rating upgrade?
Answer. Net debt including working capital ~Rs 1,300 cr. Term loan ~8%, working capital ~7.5% — fluctuating nowadays.
19. Shutdown accounting and Ken-Betwa DI demand
Radha, B&K Securities
Question. Has the Rs 14 cr shutdown expense already been accounted for this quarter? And how much of the Ken-Betwa Rs 54,000 cr project cost could create DI demand?
Answer, Madhav Kejriwal, Whole-time Director. Yes, expense already accounted for. On Ken-Betwa: too early to answer — DPRs not yet finalised. Pipeline uses steel, ductile iron and plastics depending on the distributor requirement. Nascent to comment on exact DI demand outlay.
Follow-up. Historically project delays — can we expect higher thrust in inter-state river linking projects from FY26?
Answer. Relatively certain that at least inter-state/intra-state river linking projects with same-party governments will see good thrust.
Partly answered.
20. Depreciation, gasket plant, fittings capex
Saket Kapoor, Kapoor & Co.
Question. Depreciation at Rs 36 cr (+20% YoY) — what was capitalised in H1, and update on the captive gasket plant and fittings debottlenecking?
Answer, Ashutosh Agarwal, Whole-time Director and CFO. Depreciation up due to capitalisation of some Kalahasthi projects; project pipeline ongoing. Gasket plant being set up at Punganur (~125 km from Kalahasthi) primarily for captive use; surplus to be sold. No debottlenecking exercise on fittings at the moment.
Follow-up. Why has the Srikalahashti blast furnace historically faced issues — what is the disconnect?
Answer. South plant has raw material quality issues — particularly silica and alumina impurities in iron ore going very high, changing blast furnace flow behaviour. Engaged with designers, suppliers and external experts; working on charge mix improvements and small blast furnace corrections.
21. Renewable energy and direct tax
Saket Kapoor, Kapoor & Co.
Question. Renewable/green power investments to reduce carbon footprint? And direct tax paid Rs 130 cr in H1 — is it inclusive of TDS?
Answer, Ashutosh Agarwal, Whole-time Director and CFO. Greenfield project is taking green initiatives in a big way; existing operations also working on green power project and tie-ups. Direct tax paid is inclusive of TDS deducted. On blast furnace raw material linkage, taking up the project in the new setup, plus existing operations to take up green power project and a green power tie-up under the open access scheme.
What was said
Topic by topic, in the order it was spoken
Welcome and Forward-Looking Statements Disclaimer · Vikash Verma (EY LLP)
- Introduced Q2 and H1 FY25 earnings call on behalf of Electrosteel Castings
- Management team introduced: Madhav Kejriwal (WTD), Sunil Katial (WTD and CEO), Ashutosh Agarwal (WTD and CFO), Gaurav Somani (GM Finance)
- Forward-looking statements disclaimer issued; call being recorded
Q2 and H1 FY25 Financial Overview · Madhav Kejriwal (WTD)
- Q2 FY25 total income Rs 1,849 cr, down 4.6% YoY, due to planned MBF shutdown at Srikalahashti
- H1 FY25 total income Rs 3,885 cr, up 6.5% YoY; production stabilising, expect improvement in volumes and profitability
- DI pipe sales volume: 1.76 lakh tons in Q2, 3.68 lakh tons in H1; exports contributed 13% of H1 DI volumes
Balance Sheet Strength and Credit Rating · Madhav Kejriwal (WTD)
- Net debt-equity improved further to 0.27x as of 30 September 2024
- India Ratings upgraded long-term credit rating from 'AA Minus' to 'AA' during the quarter
- Highlighted ECL as a pure-play global leader in DI pipes and fittings
Industry Demand and Capex Plan · Madhav Kejriwal (WTD)
- Government of India's Viksit Bharat Vision, Jal Jeevan Mission and AMRUT 2.0 cited as robust demand visibility drivers
- Global water infrastructure modernisation called out as a multi-year demand tailwind
- Ongoing capex progressing as planned; aim to scale DI pipe capacity to 1 million tons by end of FY26
Consolidated Financial Performance Q2 and H1 · Ashutosh Agarwal (WTD and CFO)
- Q2 FY25 consolidated: total income Rs 1,849 cr; EBITDA Rs 289 cr at 15.6% margin (-82 bps YoY) on lower volumes; PAT Rs 155 cr at 8.4% margin
- H1 FY25 consolidated: total income Rs 3,885 cr (+6.5% YoY); EBITDA Rs 666 cr (+31.8% YoY) at 17.2% margin (+329 bps); PAT Rs 381 cr (+52.8% YoY) at 9.8% margin
Standalone Financial Performance Q2 and H1 · Ashutosh Agarwal (WTD and CFO)
- Q2 FY25 standalone: total income Rs 1,712 cr; EBITDA Rs 270 cr at 15.7% margin; PAT Rs 152 cr at 8.9% margin
- H1 FY25 standalone: total income Rs 3,564 cr (+4.3% YoY); EBITDA Rs 623 cr (+21% YoY) at 17.5% margin (+242 bps); PAT Rs 364 cr (+37.2% YoY) at 10.2% margin
Capex Plan and Capacity Roadmap · Ashutosh Agarwal (WTD and CFO)
- Capex of Rs 440 cr spent till September 2024; balance progressing per schedule
- Target to scale DI pipe manufacturing capacity to 1 million tons by FY26
- Confirmed capex funded via internal accruals; no material leverage uptick expected as loan repayments continue
In their words
I'm not very concerned about this on a long-term perspective and I'm very hopeful that the outlook for demand remains the same, it's a temporary pause.
Stability of EBITDA going forward will be there. Growths beyond this point will not be... barring that from what we can envisage further growth from here is not something that we are looking at, in terms of percentages, not in terms of absolute numbers of course.
We were talking about a range of 8 to 8.5 lakh tons. We were hopeful to hit the upper end of that spectrum. I think we might be at the lower range of that number.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Wed 30 Oct 2024 | ₹176.59 | +1.27% | −0.51% |
| 5 sessions Tue 5 Nov 2024 | ₹164.30 | −5.78% | −1.04% |
| 20 sessions Thu 28 Nov 2024 | ₹153.92 | −11.73% | −2.26% |
From the close of Tue 29 Oct 2024, ₹174.38: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Electrosteel Castings's other calls
- Q2 FY27Fri 13 Nov 2026Tone: Mixed
- Q1 FY27Fri 7 Aug 2026Tone: Cautious
- Q4 FY26Mon 18 May 2026Tone: Cautious
- Q3 FY26Tue 10 Feb 2026Not read
- Q3 FY26Fri 6 Feb 2026Not read
- Q2 FY26Mon 10 Nov 2025Tone: Mixed
- Q1 FY26Wed 6 Aug 2025Not read
- Q4 FY25Mon 12 May 2025Tone: Mixed
- Q1 FY25Thu 1 Aug 2024Tone: Confident
- Q4 FY24Mon 13 May 2024Tone: Confident