Electrosteel Castings Q4 FY26 earnings call
In brief
Electrosteel Q4 FY26 volume drops 21% YoY; guides 7 lakh ton FY27 dispatch and 13-14% EBITDA margin on JJM 2.0 pickup
- Management's tone
- Cautious
- What was said
- Mixed
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −4.88% (Nifty 50 +0.03%)
- FY26 sales volume fell 25% YoY to 5.84 lakh tons; Q4 FY26 volume down 21% YoY on Jal Jeevan Mission fund blockages hitting domestic demand.
- Q4 FY26 consolidated EBITDA (incl. other income) INR 99.3 cr at 6.5% margin; full year FY26 EBITDA INR 573.6 cr at 9.4% margin.
- JJM 2.0 approved with INR 8.69 lakh crore outlay through Dec 2028; central share raised to INR 3.59 lakh crore; demand recovery expected from early Q2 FY27.
- FY27 guidance: ~7 lakh ton pipe dispatch and consolidated EBITDA margin 13-14%; domestic market share 20-25% with order book at 4-5 months.
- Standalone gross debt cut by INR 598 cr YoY to INR 1,202 cr; dividend cut from 140% to 90%; Paint + Valve CAPEX INR 200-250 cr over 2 years planned.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,493 cr | −12.2% | +1.4% | |
| EBITDA (excl. other income) | ₹61.8 cr | −61.3% | — | 4.1% (9.4% a year ago) |
| Net profit | ₹16 cr | −90.5% | — | 1.1% (9.9% a year ago) |
| EPS (₹) | ₹0.26 | −90.4% | — |
From the company's filed results for the quarter ended 31 Mar 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Q4 FY26 EBITDA: said EBITDA including other income INR 99.3 cr at 6.5% margin; filed EBITDA excluding other income ₹61.79 cr at 4.1% margin. Definition difference: management's figure includes other income of INR 37.48 cr; filed EBITDA is before other income.
What moved the numbers, as management explained it
- Domestic sales volume fell sharply on Jal Jeevan Mission fund blockages; total FY26 volume down 25% to 5.84 lakh tons and Q4 down 21% to 1.48 lakh tons.
- Export volume +7% in FY26 partially offsetting domestic weakness, contributing 23% of Q4 FY26 revenue; Middle East ~50% of exports now under pressure from US-Iran conflict.
- Cost pressure from freight, coking coal (overseas) and energy (up 70-80%); diesel/petrol also rising. Cost-to-realization delta reduced.
- Q4 FY26 consolidated EBITDA margin compressed to 6.5% from lower absorption and squeeze on cost-realization delta.
- Standalone Q4 FY26 booked a one-off exceptional cost of INR 38-40 cr on new labour rules, contributing to a standalone loss of INR 10.7 cr. (one-off)
The numbers management led with
- Cash and investments: Cash and bank balance plus investments total ~₹800 crore
- FY26 full-year volumes: FY26 full year sales volume 5.84 lakh tons, down 25% from previous year
- Order book: Order book at 4-5 months; JJM pending tender volume ~3-3.5 million tons; Electrosteel domestic market share 20-25%
- JJM 2.0 budget: JJM 2.0 total outlay ₹8.69 lakh crore; central contribution ₹3.59 lakh crore; extended to December 2028; FY27 budget ₹67,670 crore
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Consolidated EBITDA margin | FY27 | approximately 13%-14% is achievable on consolidated basis |
| FY27 pipe dispatch | FY27 | dispatch of around 7 lakh tons approximately this financial year (pipes only) |
| Paint and Valve plant CAPEX | FY27-FY28 | Between INR 200 to 250 crores for Paint and Valve plants over 1.5-2 years |
| Paint plant revenue (5-year) (Paints) | FY27-FY31 | five-year roadmap by which we will go to a business revenue topline of around INR 600 crores |
| T.I.S. Italy 4-year revenue doubling | FY27-FY30 | we will double up our revenue in the next four years. That is approximately a 20% growth rate |
| T.I.S. Italy revenue | FY27 | around INR 440 -INR 450 crores for T.I.S. Italy in FY27 |
| T.I.S. Italy growth | FY27 | we should probably hit a 14%-15% growth rate for T.I.S. Italy |
| T.I.S. Italy margin | FY27 | T.I.S. Italy margin profile of 14%-15% |
| Maintenance CAPEX | FY27 | Around INR 25-30 crores maintenance CAPEX in FY 2026-'27 |
| Export share of revenue | FY27 | this will come down to probably 17%-18% |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| EBITDA margin | FY25 | 17–18% (on the Q4 FY24 call) | 14.2%, below the range |
| Quarterly PAT | Q2 FY27 | ₹150 cr (on the Q2 FY26 call) | ₹51 cr, below the figure guided |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
DI Pipes (Domestic + Exports)
FY26 sales volume fell 25% YoY to 5.84 lakh tons; Q4 down 21% YoY to 1.48 lakh tons. Domestic weak on Jal Jeevan Mission fund blockages; exports +7% in FY26 but Middle East impact from March 2026 onwards.
Q4 FY26 sales volume 1.48 lakh tons (-21% YoY) · FY26 sales volume 5.84 lakh tons (-25%) · FY26 export volume +7% · Q4 FY26 exports ~23% of revenue
Outlook: FY27 dispatch ~7 lakh tons, consolidated EBITDA margin 13-14%; demand recovery from early Q2 FY27 on JJM 2.0; export share likely to dip to 17-18%.
T.I.S. Italy
Calendar Year 25 revenue grew 15% to EUR 41 million; EBITDA margins also improved. FY27 target ~INR 450 cr revenue and 14-15% margin.
CY25 revenue EUR 41 million (+15%)
Outlook: FY27 revenue ~INR 450 cr (14-15% growth), margin 14-15%; expect double in 4 years (~20%); supply chain and freight costs to pressure.
Paints (planned)
Industrial paint segment with 5-year roadmap to INR 600 cr topline. Initial outlay INR 200 cr over 1.5-2 years; bottom-line positive from FY29.
5-year target revenue INR 600 cr · Initial outlay INR 200 cr
Outlook: 5-year target INR 600 cr revenue; positive bottom-line from FY29.
Valves (planned)
India valve plant in design and development stage; T.I.S. Italy valves business being developed. Expects product diversification to cushion domestic undulations.
Outlook: India valve plant production soon; will help diversify revenue and cushion against demand volatility.
Balance sheet, capex and funding
- Standalone gross debt INR 1,202 cr as of Mar 2026, down INR 598 cr YoY; long-term INR 352 cr, short-term INR 464 cr.
- Investments of INR 531 cr (almost liquid); cash + investments ~INR 800 cr.
- FY27 maintenance CAPEX guided at INR 25-30 cr; Paint + Valve CAPEX INR 200-250 cr over 1.5-2 years.
- No significant overdue receivables; collections mostly on time from EPC players.
- Dividend cut from 140% to 90% subject to shareholder approval.
- Positive cash flows maintained; nominal long-term debt.
The industry, as management sees it
The domestic DI Pipe industry is at the bottom of a demand cycle due to JJM fund freeze over the past 1.5 years. JJM 2.0 approval provides strong medium-to-long-term visibility with ₹8.69 lakh crore outlay through December 2028. Industry-wide JJM tender volume of 3-3.5 million tons is pending allocation. River linking and irrigation projects will drive demand post-2028. Geopolitical tensions (US-Iran conflict) and cost inflation (freight, coking coal, energy) are near-term headwinds for both demand and supply chains.
Risks management named
- US-Iran conflict impacting Middle East exports (50% of export revenue)
- Cost inflation: freight surge, overseas coking coal prices, Indian energy costs up 70-80%, diesel/petrol hikes
- State government elections in Kerala, Tamil Nadu, Bengal causing temporary administrative delays
- Potential drought conditions could reallocate government spending toward relief measures
- New labour law costs adding ~₹38-40 crore exceptional charge in Q4 FY26
Q&A
Q&A was dominated by questions on JJM 2.0 fund disbursement timelines, order book visibility, and margin recovery prospects. Analysts pushed back on whether current demand weakness is structural (Madhav Kejriwal firmly rejected this notion). Multiple questions probed the gap between PPT fund figures and actual disbursements — management corrected a ₹15,000 crore figure to ₹1,500 crore. Cost headwinds (freight, coking coal, energy) were raised by several analysts; management acknowledged the impact and confirmed ~1 quarter lag in price pass-through. Geopolitical risk from US-Iran conflict on Middle East exports was a recurring concern. Analysts also showed interest in the T.I.S. Italy acquisition, paint plant capex, and promoter stake purchase rationale. Overall tone was probing but not adversarial — management engaged at length on each question.
Asked for a number, answered without one
- Quantum of orders in metric tons: Management gave an industry-wide estimate of 3 to 3.5 million tons but did not break out the order pipeline for Electrosteel specifically.
- T.I.S. Italy order book: Management discussed FY27 revenue and growth targets but did not share the order book for the Italy business.
- CAPEX split between Paint and Valve plants for FY27: Management gave a combined 2-year Paint + Valve CAPEX of INR 200-250 cr but said the FY27 split is not yet determined as plants are in design stage.
Every question, with its answer
1. Industry demand outlook
Riddhesh Ram Gandhi, Discovery Capital
Question. Is the current demand environment the new normal given the structural decline in DI Pipe volumes and rise in industry capacity?
Answer, Madhav Kejriwal, Whole-Time Director. JJM fund freeze caused the sudden demand drop; this is the rock bottom, not the new normal. The industry operating at 50% capacity cannot be the new normal. Management is confident of returning to 15-16% EBITDA levels once JJM 2.0 disbursements accelerate.
2. Jal Jeevan Mission 2.0
Pinaki Banerjee, AUM Capital Pvt Ltd
Question. How optimistic are you on JJM 2.0 given that JJM 1.0 faced scrutiny and fund freezes?
Answer, Madhav Kejriwal, Whole-Time Director. All scrutiny is complete and JJM 2.0 has cabinet approval with strict state-level prerequisites for fund disbursement. The government's sustained focus confirms it remains a priority; the PM's pet project will be seen through to the end.
Follow-up. With exports providing a cushion, how will you cope with Middle East headwinds?
Answer. Middle East accounts for ~50% of exports; domestic recovery from Q2 and product diversification into valves will provide some cushioning against the geopolitical impact.
3. Capital allocation
Pinaki Banerjee, AUM Capital Pvt Ltd
Question. Investments of ₹531 crore shown in balance sheet — are they liquid? How will funds be deployed?
Answer, Ashutosh Agarwal, CFO. Investments are almost fully liquid. Funds will be deployed for paint plant setup, valve plant in India, and interest income generation.
4. JJM fund flow
Pujan Shah, Molecule Ventures
Question. Clarification on ₹15,000 crore fund release mentioned in PPT — how much is pending? What is the expected pace of fund disbursement and new tender flow?
Answer, Madhav Kejriwal, Whole-Time Director. Correction: disbursement was ₹1,500 crore not ₹15,000 crore (cabinet approval came at year-end). West Bengal announced ₹2,700 crore post-election; MOUs being signed with states. Q2 FY27 onwards will see steady incremental demand over 3-6 months, not sudden floodgate release. Inquiries from customers have started — not nascent but not yet at full potential.
Follow-up. Are new tenders actually flowing or is it still early stage?
Answer. Inquiries are serious and not nascent; serious customer interest for supplies within this quarter, but not at full potential yet.
5. Long-term demand drivers
Pujan Shah, Molecule Ventures
Question. What are the post-2028 demand drivers beyond JJM for sustainable growth?
Answer, Madhav Kejriwal, Whole-Time Director. Post-2028, irrigation and river linking project will be the two largest demand drivers. Urban sector and tier 2-3 city infrastructure will also contribute. Valves and paints diversification will cushion against DI Pipe cyclicality.
Follow-up. How much receivables are stuck due to JJM fund delays?
Answer. No significant stuck funds — collections are on time as Electrosteel supplies to EPC players; debtors are regular, not overdue.
6. Coal block development
Pujan Shah, Molecule Ventures
Question. What is the status of the coal block (hard costs and soft costs)?
Answer, Madhav Kejriwal, Whole-Time Director. Hard costs announced and roughly similar to estimates. Soft costs (for shaft and inclines) are yet to be announced by the Ministry. It is a long-run process but numbers are strong.
7. Order book and JJM
Rajesh Agarwal, Moneyore
Question. Current order book? Difference between JJM 1 and JJM 2? Will released funds translate into fresh orders given large pending order book?
Answer, Madhav Kejriwal, Whole-Time Director. Order book is 4-5 months. JJM tenders have been released but not yet allocated to EPC contractors and then to manufacturers — these are the main pending demand drivers. JJM 2 has stricter state-level prerequisites making it a more foolproof funding mechanism vs the floodgate release of JJM 1.
Follow-up. What is the quantum of pending tender volumes?
Answer. Total JJM tender volume around 3-3.5 million tons; Electrosteel has ~20-25% domestic market share.
8. Margin recovery
Rajesh Agarwal, Moneyore
Question. When demand returns, will EBITDA margins return to 15-16% immediately?
Answer, Madhav Kejriwal, Whole-Time Director. Margins will recover steadily, not immediately. Management is fairly certain of returning to 15% EBITDA once JJM 2.0 execution scales up.
Follow-up. Are there cost pressures that could limit margin recovery?
Answer. Freight costs have risen significantly; overseas coking coal is substantially impacted; Indian energy costs up 70-80%; diesel/petrol hikes adding further pressure. Ship movement delays are disrupting supply chains. These are all having an adverse impact on cost.
9. Cost pass-through
Rajesh Agarwal, Moneyore
Question. Can cost increases be passed on to customers?
Answer, Madhav Kejriwal, Whole-Time Director. Input costs reflect in selling prices with approximately one quarter's lag. After that lag, cost increases are passed through.
Follow-up. What was the export contribution in Q4 FY26?
Answer. Q4 FY26 exports contributed ~23% of revenue. With Indian market picking up and Middle East muted, FY27 export contribution expected at 17-18%.
10. FY27 guidance
Saket Kapoor, Kapoor & Co.
Question. What are the FY27 deliverables — volume and EBITDA margin trajectory?
Answer, Madhav Kejriwal, Whole-Time Director. FY27 dispatch target ~7 lakh tons (consolidated, pipes only; 7.4 lakh tons including fittings). EBITDA margin ~13-14% achievable assuming slower Q1-Q2 and better Q3-Q4 under JJM 2.0.
Follow-up. On T.I.S. Italy, what is the order book and revenue target?
Answer. T.I.S. Italy CY25 revenue ~₹400 crore; FY27 target ~₹440-450 crore (14-15% growth rate, below 20% initial target due to supply chain pressures). Valves business also faces freight cost headwinds. Vision to double revenue in 4 years (~20% CAGR) across India, Middle East, Europe.
11. Q4 loss analysis
Saket Kapoor, Kapoor & Co.
Question. What led to the Q4 standalone loss despite 4-5 months order book?
Answer, Madhav Kejriwal, Whole-Time Director. Three major factors: loss of tonnage (volume decline), ~₹38-40 crore exceptional cost from new labour rules, and margins squeezed due to demand shortfall. Realisation per pipe also declined due to overcapacity and weak EPC stock uptake.
Follow-up. Will Q1 FY27 have similar trends given no change in environment?
Answer. Nothing substantial has changed; Q1 FY27 will likely reflect similar trends given 45 days into the quarter with no shift in operating conditions.
12. Promoter stake purchase
Saket Kapoor, Kapoor & Co.
Question. Have promoters finished their open market purchases or is there scope for more?
Answer, Madhav Kejriwal, Whole-Time Director. At this moment, promoters have invested what they are capable of from a personal financial standpoint. If they could, they would invest further — confidence is there.
13. Order pipeline
Rajesh Bhandari, Nakoda Engineers
Question. After 4-5 months order book expires, will contractors have orders to sustain demand?
Answer, Madhav Kejriwal, Whole-Time Director. Contractors have substantial orders and tenders for which contractors have not yet been selected. Management is optimistic that after 4-5 months, things will improve, not worsen.
Follow-up. Is the ₹8.69 lakh crore budget only for JJM or does it include irrigation, river linking, urban infra and sewage?
Answer. The ₹8.69 lakh crore budget is only for Jal Jeevan Mission, with ₹3.59 lakh crore from central government. This does not include irrigation, river linking, urban infra, or sewage.
14. Post-JJM demand
Rajesh Bhandari, Nakoda Engineers
Question. After December 2028 when JJM ends, are we only dependent on river linking and irrigation?
Answer, Madhav Kejriwal, Whole-Time Director. JJM will not disappear entirely — rural demand will fall to ~25% of total demand from current 50-60%. Even Haryana (100% tap connectivity) continues to have rural tenders. Old pipelines need replacement; repair work continues. Rural India demand for pipes will persist under state-level programs post-2028.
Follow-up. When can we expect past glory EBITDA levels of 19-20% to return?
Answer. Those were glory years similar to once-in-ten-years steel cycles. Management cannot pinpoint exact timing but expects stable EBITDA at 14-16% from next financial year depending on geopolitical situation. Historical average EBITDA pre-COVID and pre-JJM was 15%.
Not answered directly.
15. State government impact
Ankit Puri, Individual Investor
Question. Does the change in state governments (Kerala, Tamil Nadu, Bengal) affect project execution, order inflows and payment cycles?
Answer, Madhav Kejriwal, Whole-Time Director. There is a small administrative slowdown during election periods of about a month. Bengal quickly announced disbursement allocation. The slowdown is administrative in nature, not policy-driven — new governments have no intention to deprioritise JJM.
Follow-up. If drought conditions lead to government spending reallocation, how will project execution be affected?
Answer. Energy security is the bigger near-term threat, but drought could cause temporary delays of a quarter or two. It may also accelerate piped irrigation focus as a climate-resilient solution.
16. Geopolitical risk
Ankit Puri, Individual Investor
Question. If Iran conflict escalates into prolonged energy disruption, what is the impact — demand, supply chain or exports?
Answer, Madhav Kejriwal, Whole-Time Director. All three — demand, supply chain, and input costs — will be impacted. The supply chain and cost impact will be higher; demand impact will be lesser.
Follow-up. Please elaborate on the industrial paints and protective coatings business roadmap.
Answer. Paint plant: ₹200 crore initial outlay over 1.5-2 years. Five-year roadmap targets ₹600 crore revenue. Bottom-line impact expected from FY28-29.
17. River linking project
Hari Kumar, Individual Investor
Question. Out of Ken-Betwa ₹40,000 crore, how much could be pipeline work? When will river projects reach execution stage?
Answer, Madhav Kejriwal, Whole-Time Director. Pipe component of Ken-Betwa is ~10-15% of the project. Ken-Betwa is the most advanced river linking project; others are at earlier stages (Rajasthan-MP, Tamil Nadu, Maharashtra). DPRs are at different stages across multiple projects. River linking as an overall subject will take 5-7 years to execute at country level.
Follow-up. Is the policy to use pipes or open canals for river linking?
Answer. Main connecting veins must be open canals due to mass of water. All subsidiary pipelines from the main vein will be DI pipes — for irrigation, rural water supply, and some urban supply. These subsidiary lines will drive DI Pipe demand.
18. Working capital
Rajesh Agarwal, Moneyore
Question. JJM 2.0 condition that last-mile connectivity must be achieved before payment release — will this elongate EPC payment cycles and affect Electrosteel's working capital?
Answer, Madhav Kejriwal, Whole-Time Director. This will make demand more steady rather than cause delays. EPC contractors have become more stable in operations. Working capital cycle elongation is not expected as JJM is only 35-40% of Electrosteel's demand and the company is hedged across multiple states.
Follow-up. What is the FY27 capex and maintenance capex?
Answer. Maintenance capex ~₹25-30 crore for FY27. Paint plant and valve plant in India are in design stage; total capex for both plants estimated at ₹200-250 crore over two years (timing across FY27 and FY28).
What was said
Topic by topic, in the order it was spoken
FY26 Performance & Demand Context · Madhav Kejriwal (Whole-Time Director)
- FY25-26 was challenging for domestic DI Pipe sector; slower JJM execution due to fund disbursement delays.
- Export volumes grew 7% in FY26, largely driven by Middle East; US-Iran conflict impact from March 2026 onwards.
- T.I.S. Italy (acquired August 2025) delivered 15% revenue growth to EUR 41 million with improved EBITDA margins in Calendar Year 2025.
- Company vision to double T.I.S. Italy revenue in 4 years (~20% CAGR) via India, Middle East, Europe markets.
Jal Jeevan Mission 2.0 Opportunity · Madhav Kejriwal (Whole-Time Director)
- JJM 2.0 cabinet approved with ₹8.69 lakh crore total outlay and ₹3.59 lakh crore central contribution through December 2028.
- Enhanced central contribution from ₹2.08 lakh crore to ₹3.59 lakh crore; stricter state-level prerequisites for fund disbursement.
- Government scrutiny of JJM 1.0 is complete; program revived as PM's priority project with improved funding mechanism.
- Company expects domestic demand recovery from early Q2 FY27 with steady incremental improvement through Q3-Q4 FY27.
Q4 & Full Year Financial Performance · Ashutosh Agarwal (CFO)
- Q4 FY26 standalone total income: ₹1,228 crore (down ₹372 crore YoY); EBITDA margin at 4.7%; Q4 standalone loss of ₹10.7 crore.
- Full year standalone: total income ₹5,228 crore; EBITDA margin 9.6%; PAT ₹131.3 crore.
- Consolidated Q4 FY26: total income ₹1,530 crore; EBITDA margin 6.5%; PAT ₹15.9 crore. Full year EBITDA ₹573.6 crore (9.4% margin).
- Gross debt reduced by ₹598 crore to ₹1,202 crore (long-term ₹352 crore + short-term ₹464 crore). Dividend cut to 90% from 140%.
Post-JJM Demand Drivers & Capacity Utilisation · Madhav Kejriwal (Whole-Time Director)
- Post-2028 demand to be driven by irrigation and river linking project (10-15% pipe component of Ken-Betwa INR 40,000 crore project).
- Urban infrastructure and tier 2-3 cities will contribute alongside ongoing rural replacement and repair work.
- JJM will continue at reduced scale post-2028 (maintaining ~25% of total demand) as states retain central funding.
- Company capacity: 8.5-9 lakh tons; FY27 dispatch target ~7 lakh tons; historical EBITDA normalised at 15% (vs optimistic 19-20% of peak years).
Diversification Strategy — Valves & Paints · Madhav Kejriwal / Sunil Katial (Whole-Time Directors)
- Valve business (via T.I.S. Italy and Valvecastings India) provides diversification beyond DI Pipes; valves used regardless of pipe material.
- T.I.S. Italy revenue ~₹400 crore in CY25; FY27 target ₹440-450 crore at 14-15% EBITDA margin despite supply chain pressures.
- Paint plant: ₹200-250 crore capex over 1.5-2 years; targeting ₹600 crore revenue in 5 years; bottom-line impact from FY28-29.
- Promoter open market stake purchases signal management confidence; deployment of ~₹800 crore cash balance across paint, valve plants.
Cost Pressures & Input Pass-Through · Sunil Katial (Whole-Time Director and CEO)
- Freight costs have risen significantly; coking coal (overseas) and Indian energy costs up 70-80%; diesel/petrol price hikes adding third wave of pressure.
- Ship movement delays disrupting supply chain cycles; input cost passthrough to selling price takes approximately one quarter.
- Competitive market limits ability to fully offset cost inflation in the near term.
Geopolitical & Macro Risks · Madhav Kejriwal (Whole-Time Director)
- US-Iran conflict impacting Middle East exports (50% of export revenue); Q4 FY26 export contribution at 23% of revenue; FY27 expected at 17-18%.
- Drought conditions (IMD prediction) may cause temporary government spending reallocation but could also accelerate piped irrigation focus.
- Energy security is the bigger near-term government priority; river linking as climate-resilient irrigation solution may gain policy emphasis.
In their words
Most definitely this is not the new normal, this is the rock bottom. I am fairly certain that we will go back to our older days of earning 15%-16% EBITDA level.
Being the pet project of the Honorable PM, this is going to be something that he is going to see to the very end.
Freight has gone up. Coking coal from overseas is substantially impacted. Energy cost in India has already gone up by almost 70%-80%. Diesel and petrol prices are going up. These are all having an adverse impact on cost.
To check next time
What management committed to on this call, or the dates they gave.
- Q2 FY27 JJM 2.0 demand restoration from early Q2 FY27 as guided.
- Progress toward FY27 dispatch of ~7 lakh tons pipes.
- T.I.S. Italy revenue trajectory to INR 440-450 cr FY27 target.
- Paint + Valve plant CAPEX quantum and execution timeline.
- Coal block soft cost announcement by Ministry.
- Standalone Q1 FY27 results vs Q4 FY26 standalone loss of INR 10.7 cr.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 18 May 2026 | ₹77.96 | −4.88% | +0.03% |
| 5 sessions Fri 22 May 2026 | ₹78.13 | −4.67% | +0.32% |
| 20 sessions Mon 15 Jun 2026 | ₹78.19 | −4.60% | +0.89% |
From the close of Fri 15 May 2026, ₹81.96: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Electrosteel Castings's other calls
- Q2 FY27Fri 13 Nov 2026Tone: Mixed
- Q1 FY27Fri 7 Aug 2026Tone: Cautious
- Q3 FY26Tue 10 Feb 2026Not read
- Q3 FY26Fri 6 Feb 2026Not read
- Q2 FY26Mon 10 Nov 2025Tone: Mixed
- Q1 FY26Wed 6 Aug 2025Not read
- Q4 FY25Mon 12 May 2025Tone: Mixed
- Q2 FY25Wed 30 Oct 2024Tone: Mixed
- Q1 FY25Thu 1 Aug 2024Tone: Confident
- Q4 FY24Mon 13 May 2024Tone: Confident