Vikram Solar Q1 FY26 earnings call
In brief
Vikram Solar Q1 FY26: revenue ₹1,134 cr (+79.7% YoY), PAT ₹133 cr (~5x); 89% utilisation, 17.5 GW module and 12 GW cell plan by FY27.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- +5.05% (Nifty 50 +0.42%)
- Q1 FY26 revenue grew 79.7% YoY to ₹1,134 cr; PAT nearly 5x to ₹133 cr on 89% effective capacity utilisation.
- Order book stood at 10.96 GW as of June 30, 2025, with 38+ GW pipeline; new wins include 336 MW from L&T, 326 MW from GIPCL, 250 MW from Bondada.
- Plans to scale module capacity 4x to 17.5 GW and add 12 GW of solar cell capacity, both by FY27, requiring ₹6,000+ cr capex.
- Vallam 5 GW module facility targets commissioning in Q3 FY26; 1 GWh BESS manufacturing (expandable to 5 GWh) also planned for FY27.
- Produced 750+ MW of modules in Q1 FY26 on 4.5 GW base; current order book is 100% non-DCR, capping margins versus DCR peers at ~30%.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q1 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,134 cr | — | — | |
| EBITDA (excl. other income) | ₹242 cr | — | — | 21.4% |
| Net profit | ₹133 cr | — | — | 11.8% |
| EPS (₹) | ₹4.21 | — | — |
From the company's filed results for the quarter ended 30 Jun 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Effective capacity utilisation at 89% on 4.5 GW (rated 67%); last quarter's 1 GW addition is now fully ramped up, lifting output.
- Economies of scale brought overhead and manufacturing cost per unit down; CFO cited reduced cost of manufacturing as a key margin lever.
- Polysilicon supply normalised after July 2025 China industry self-regulatory meeting, reducing raw material volatility.
- Optimised finance cost and efficient tax planning aided PAT; low Q1 FY25 base of just ₹22.8 cr PAT magnifies the ~5x growth optically.
- Order book is 100% non-DCR, capping margins versus DCR peers at ~30%; 14% export mix in book, but no exports shipped this quarter.
The numbers management led with
- Order book: 10.96 GW as of 30 June 2025
- Order pipeline: More than 38 GW under active working
- Capacity expansion: 4.5 GW to 17.5 GW module + 12 GW cell by FY27
- Total capex envelope: INR6,000+ crores
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Total capex for module and cell expansion | FY27 | ₹6,000+ cr capex for module and cell expansion by FY27 |
| Module capacity | FY27 | Module capacity of 17.5 GW by FY27 (4x current 4.5 GW) |
| Cell capacity | FY27 | Solar cell manufacturing capacity of 12 GW by FY27 (largest TOPCon in India at single location) |
| BESS manufacturing capacity | FY27 | BESS manufacturing of 1 GWh, expandable to 5 GWh, by FY27 |
| Vallam facility commissioning | Q3 FY26 | 5 GW Vallam module facility to commission in Q3 FY26 |
| Falta plant capacity | FY27 | 2 GW Falta plant to come up in FY27 |
The business
By business
Module manufacturing
Existing 4.5 GW module capacity ramped to 89% effective utilisation; produced 750+ MW in Q1 FY26; order book of 10.96 GW is 100% non-DCR with 14% export mix (no exports shipped this quarter).
Revenue ₹1,134 cr · Operating EBITDA ₹242 cr · PAT ₹133 cr · Order book 10.96 GW · Production 750+ MW · Effective capacity utilisation 89%
Outlook: Q3 FY26 commissioning of 5 GW Vallam module facility; 17.5 GW total module capacity targeted by FY27.
Solar cell manufacturing (planned)
Backward integration plan announced; 12 GW TOPCon cell capacity targeted by FY27, to be the largest single-location TOPCon capacity in India. Equipment contracts in negotiation stage.
Planned capacity 12 GW · Capex for module + cell ₹6,000+ cr
Outlook: 12 GW cell capacity targeted by FY27; equipment contracts in negotiation, targeted to close in September 2025.
Battery energy storage (BESS)
New BESS manufacturing announced; 1 GWh integrated cell+module BESS capacity, expandable to 5 GWh, both targeted for FY27; will be a manufacturer with proprietary BMS module, not an IPP or EPC.
Planned initial capacity 1 GWh · Expandable to 5 GWh
Outlook: 1 GWh BESS facility (expandable to 5 GWh) targeted for FY27 commissioning.
Distribution
Pan-India retail and C&I distribution network: 98 authorised distributors, 375+ dealers, 76+ system integrators across 19 states and 2 UTs; supplies DCR modules into retail.
98 authorised distributors · 375+ dealers · 76+ system integrators · 19 states and 2 UTs
Outlook: Distribution continues to drive retail segment demand, including DCR module supply.
EPC
EPC customer base active (utility-scale, C&I, retail mix) but no EPC revenue booked in Q1 FY26; supplies to EPC contractors and utility-scale projects vary quarter to quarter.
No Q1 FY26 EPC revenue
Outlook: Q1 FY26 had no EPC revenue; EPC and utility-scale supplies to vary quarter to quarter.
Balance sheet, capex and funding
- Capex plan of ₹6,000+ cr to expand module capacity from 4.5 GW to 17.5 GW and add 12 GW of cell capacity by FY27.
- Capex funding mix: IPO proceeds, debt from PSU and private banks, and internal accruals; no further equity raise planned currently.
- Per-GW module capex indicated at ~₹200 cr; 12 GW cell capex and 1-5 GWh BESS plant capex not separately quantified.
The industry, as management sees it
India has crossed 50% non-fossil installed power capacity, originally a 2030 target achieved five years early. Solar is at 119 GW installed (July 2025) with a 280 GW 2030 roadmap, and the National Green Hydrogen Mission plus PM-Kusum and PM Surya Ghar add ~200 GW of incremental demand. Round-the-clock and storage-co-located tenders are scaling fast. Solar cell industry capacity is projected to roughly triple from 30 GW currently to 100+ GW by FY27, which may pressure pricing but is supportive of the ALCM regime kicking in from June 2026.
Risks management named
- US tariff overhang on export market — current shipments near 100% domestic; monitoring policy
- Capex of INR6,000+ crores for module + cell expansion; no further equity raise planned currently
- Raw material (polysilicon) price volatility — China supply discipline is supportive but not guaranteed
- Industry-wide capacity build-out: solar cell capacity projected to triple to 100+ GW by FY27, may pressure pricing
- Government contracts have no price variation clause — cost increases must be absorbed by the company
Q&A
Q&A was dominated by capacity, capex funding and margin questions — reflecting investor focus on the 17.5 GW module + 12 GW cell plan announced. Management held firm on no further equity raise and was specific on the ~INR6,000+ cr capex envelope. The most-asked-but-softly-answered topic was margin sustainability; the company declined to commit to the FY26 spread range, calling it forward-looking. There was clear pushback on why Vikram's 20%-odd EBITDA lags DCR-heavy peers at 30%, with management attributing the gap entirely to the non-DCR mix and tying the solution to FY27 cell commissioning. BESS drew detailed follow-ups but the team kept responses directional, calling commercial modelling premature. The DCR question came back twice in the session and was answered cleanly: zero DCR orders in the current book.
Not answered directly
- Sustainability of INR5–5.5/watt gross spread for FY26 — asked to revisit in a month
- Per-unit margin benefit from in-house cells vs market purchase — described as premature given volatility
- BESS commercial model, per-MW cost arbitrage — declined as too early
- Detailed breakup of 10.96 GW order book by segment and contract type — to be shared later
Asked for a number, answered without one
- FY26 spread sustainability: CFO said this is forward-looking; will reconnect after a month and share numbers then.
- Per-GW module fixed cost: CFO said it keeps fluctuating; only gave an overall cost of ~₹11 per watt peak, which includes variables.
- Cell manufacturing margin benefit: CFO said it is too premature to comment; margins are expected to improve but no specifics given.
- BESS business model and per-MW economics: Rinal Shah said too premature; Vikram will only be a manufacturer with proprietary BMS module, no IPP or EPC.
- Order book 10.96 GW detailed breakup: CEO said most contracts have liquidated damages clauses for delays; detailed breakup will be shared later.
Every question, with its answer
1. Module execution and order book
Nidhi Shah, ICICI Securities
Question. What was module execution in megawatt terms this quarter? And on the order book, are we hoping for incremental large orders this year or working with the current book?
Answer, K. K. Maskara, Chief Executive Officer (Interim). Produced more than 750 MW of modules in the quarter. Order pipeline of more than 38 GW under active working. Historically strong conversion ratio. New order book will be a mix across utility scale, C&I and retail — not just large orders.
Follow-up. Assuming module realisation flat YoY at INR18/watt, spread has increased this quarter — is that right and why? Can this INR5–5.5/watt spread sustain for FY26?
Answer. Ranjan Jindal: Yes, spread has increased due to economies of scale on overhead cost per unit and favourable raw material cost impact. On sustainability for FY26 — this is forward-looking, can reconnect in a month.
Not answered directly.
2. Cell plant progress
Nidhi Shah, ICICI Securities
Question. What is the progress on the cell plant development? Have equipment orders been placed?
Answer, Ranjan Jindal, Chief Financial Officer. Projects are in line with the original schedule; most execution contracts are in negotiation to be closed this month. On track.
3. Capex plan
Ketan Jain, Avendus Spark
Question. What is the capex plan over the next 2–3 years to build to the targeted capacity?
Answer, Ranjan Jindal, Chief Financial Officer. Total effective deployment ~INR6,000+ crores for the 4.5 to 17.5 GW module expansion and 12 GW cell line, to be completed by FY27.
Follow-up. On DCR vs non-DCR realisations, and once cell capacity comes in, will cells be 100% captive or exported? Export strategy — what is the target mix?
Answer. K. K. Maskara: DCR/non-DCR realisations are a function of cell prices; healthy gross margin maintained in all contracts. 17.5 GW modules and 12 GW cells — cells will be captively consumed for modules; open to export opportunities if they arise. Currently 14% export mix in order book, watching US policy.
4. Module cost structure
Ketan Jain, Avendus Spark
Question. For modelling — what is the fixed cost to operate a 1 GW module capacity? What is the breakeven sales?
Answer, Ranjan Jindal, Chief Financial Officer. Capex of ~INR200 cr per GW of module. Operating cost keeps fluctuating with efficiencies. On an overall level, current cost is at INR11 per watt peak (including variable).
Partly answered.
5. Exports and price pass-through
Deepak Purswani, SVAN Investments
Question. What was the export market contribution in Q1? Any pre-buying from US? Is the $0.18 realisation sustainable? And do contracts have pass-through on raw material hikes?
Answer, K. K. Maskara, Chief Executive Officer (Interim). No exports in this quarter. Realisation is a function of cell prices. Short-term delivery contracts have no price variation clause; long-term (8–12 month) contracts have variation clauses; government orders have no variation clause — so the company absorbs raw material increases in those cases.
Follow-up. Timeline for Vallam 5 GW, rest of capacities, and the cell plant? ALCM implementation from June 2026 — how are we positioned?
Answer. Vallam on track, Q3 FY26 commissioning. Cell capacity in next fiscal (FY27). ALCM applicable for net metering and open access from June 2026; solar cell capacities coming up adequately. Interim procurement from DCR cell manufacturers.
6. Margin levers
Bala Murali Krishna, Oman Investment Advisors
Question. Why are our margins at 20% when some listed players selling 100% domestically achieve 30%? What levers improve margins to that level and when?
Answer, Ranjan Jindal, Chief Financial Officer. The 30% EBITDA margin players are in DCR; we are in non-DCR, hence the gap. Setting up cell manufacturing (next fiscal) is the lever to access DCR margin pool.
Follow-up. Are current gross margins sustainable? When will 5 GW Vallam commission — Q2 or Q3?
Answer. Gross margin depends on order mix — contracts with vs without price variation. 5 GW Vallam expected to come up in Q3 FY26.
Partly answered.
7. Capex funding and revenue mix
Yash Gadia, Ambit Wealth
Question. How do you plan to fund INR6,000 cr+ capex on cell capacity given IPO proceeds are only ~INR1,500 cr? Will you raise additional equity? And what is the split between manufactured modules, traded modules and EPC?
Answer, Ranjan Jindal, Chief Financial Officer. Combination of IPO equity, debt from PSU and private banks, and internal accruals. No further plans to raise additional equity. K. K. Maskara: No EPC revenues in Q1; modules are all manufactured (in-house or at OEM facilities).
Follow-up. Quarter-on-quarter improvement in module efficiency / capacity utilisation?
Answer. Average TOPCon module wattage went from ~585W (last fiscal) to ~590W (Q1 FY26). Rated capacity utilisation at 67% on the manufacturing facility; effective capacity utilisation at 89% in Q1 (vs lower last quarter, when 1 GW of incremental capacity was ramping).
8. Cell self-sufficiency
Saloni, ValQ Investment Advisory
Question. By FY27 we will have 12 GW cell and 17.5 GW module — will we need additional cells from outside, or will the 12 GW suffice?
Answer, K. K. Maskara, Chief Executive Officer (Interim). Will depend on order book mix. We foresee a large market for non-DCR, where the balance of module capacity can be served. Cell-to-module ratio is 1:1.
Partly answered.
9. BESS strategy
Aman Soni, Nvest Analytics Advisory
Question. What is the strategy around BESS — partnerships, in-house solutions, integrated solar+storage?
Answer, Rinal Shah, General Manager, Corporate Finance. Vikram has announced BESS plans. 1 GWh initial manufacturing, expandable to 5 GWh, both commissioned in FY27. Storage is the single most influential factor for faster solar adoption especially in C&I (>50% of country's energy consumption).
Follow-up. Size of opportunity, competitors, expected order inflows in next 1–2 years? Current BESS installed base and incremental opportunity?
Answer. Current BESS capacity under 200 MW; CEA estimates 236 GWh over five years. Energy storage at an inflexion point similar to solar in 2017. Too premature to size in INR/USD. 40% VGF offered by government; tenders ranging Rs 2,00,000–2,20,000 per MW per month.
10. Cell margin benefit and order book detail
Balasubramanian, Arihant Capital
Question. What kind of gross margin benefit (INR/watt or bps) from in-house cells vs purchase, given 40% BCD on imports? Industry cell capacity going from 30 GW to 100+ GW by FY27 — price risk? And breakup of 10.96 GW order book — utility, C&I, residential, fixed price vs commodity-linked, plus penalty clauses?
Answer, Ranjan Jindal, Chief Financial Officer. On margins: with domestic cells, margins expected to increase; too premature to give numbers given market volatility. K. K. Maskara: Most contracts have liquidated damages clauses if delays are on our side. Detailed breakup to be shared later.
Follow-up. Key risk on execution/timeline for expansion given industry-wide delays?
Answer. Ranjan Jindal: On track as of now; will provide update in subsequent months if needed.
Not answered directly.
11. BESS business model and economics
Prince Choudhary, PINC Wealth
Question. BESS business model — EPC or IPP? Arbitrage between per MW annual cost vs revenue? What % of BESS cost is funded by VGF? Per MW cost of BESS?
Answer, Rinal Shah, General Manager, Corporate Finance. Manufacturing-only; will supply proprietary BMS module to IPPs/EPC consumers. BESS commercial model discussion is premature — declined. VGF is provided to IPPs, not to manufacturers (40% offered, varies by state bid). Current tenders Rs 2,00,000–2,20,000 per MW per month.
Not answered directly.
12. DCR exposure
Ketan Jain, Avendus Spark
Question. Do we have any DCR exposure in our order book? Will we take DCR orders before our own cell capacity comes in?
Answer, K. K. Maskara, Chief Executive Officer (Interim). Supplying into DCR distribution/retail. No DCR on the large-scale order book. Open to DCR orders; cell tie-ups available. In the current 10.9 GW order book, there is no DCR order.
What was said
Topic by topic, in the order it was spoken
India Energy Transition Context · Gyanesh Chaudhary (CMD)
- More than 50% of India's installed power capacity now from non-fossil sources — target originally set for 2030, achieved five years early
- Over 119 GW solar installed as of July 2025; roadmap of 280 GW by 2030
- National Green Hydrogen Mission, PM-Kusum, PM Surya Ghar Muft Bijli Yojana add ~200 GW of demand over coming years
- LCOE for utility-scale solar has fallen 80–90% globally since 2010; storage costs trending down too
Supply Chain, Technology and Policy Setup · Gyanesh Chaudhary (CMD)
- Almost all current shipments are domestic; US orders being monitored amid tariff overhang
- Polysilicon prices spiked post July MIIT meeting with 14 Chinese PV manufacturers, but have now normalised; supply discipline reducing volatility
- TOPCon has emerged as dominant standard — low-cost, low-risk PERC retrofit vs HJT; meets efficiency mandates without heavy capex/silver
- MNRE notifications reinforce onshore supply chain; integrated cell+module players to command sizeable market share
Company Journey and Growth Strategy · Gyanesh Chaudhary (CMD)
- Started in 2009 with 12 MW module line; today at 4.5 GW installed, on course to 17.5 GW by FY27
- Entering solar cell manufacturing with 12 GW capacity by FY27 — largest TOPCon capacity in India in a single location
- Operates in capital goods — customers value long-term performance and bankability over upfront cost
- Three guiding principles: expand with discipline, compete through quality/innovation, build for markets of tomorrow
Execution Capability and Manufacturing Footprint · K. K. Maskara (CEO)
- Daily throughput scaled from 100–120 modules/day to 15,000+ (150x); all current capacities TOPCon-capable
- 70%+ repeat business from marquee customers in top 10 list; 8x Kiwa PVEL top-performer since 2017
- 200-member R&D and quality team; NABL + ILAC-MRA accredited lab; value engineering cut cost of poor quality by 53.33%
- 5 GW Vallam facility in Tamil Nadu to commission next quarter; 2,000+ workforce for 4.5 GW, only +800 needed for 5 GW Vallam — major operating leverage
Distribution and Market Reach · K. K. Maskara (CEO)
- Catered to 39 global markets since inception; utility, C&I and retail segments covered domestically
- Pan-India presence across 19 states and 2 union territories via 98 authorised distributors, 375+ dealers, 76+ system integrators
- Investing in global brand equity to position made-in-India solar as benchmark for excellence and sustainability
Q1 FY26 Financial Performance · Ranjan Jindal (CFO)
- Revenue INR1,134 cr vs INR630 cr in Q1 FY25 (+79.7%); EBITDA INR242 cr vs INR111 cr (>2x); PAT INR133 cr vs INR22.8 cr (~5x)
- Order book at 10.96 GW as of 30 June; key wins include 250 MW Bondada, 336 MW L&T, 326 MW GIPCL
- Profitability supported by reduced manufacturing cost, optimised finance cost and efficient tax planning
- One of the largest capex programs in the sector: 4x module capacity + 12 GW cell line in FY27; supported by central and state incentives
In their words
This call is not just about quarterly numbers. It is about the larger story we are all a part of, the story of India's energy transition.
This quarter marks a clear shift in the quality of our earnings.
We are not doing either [EPC or IPP for BESS]. We will be in the manufacturing space. We will be providing a proprietary BMS module to the IPPs or to the EPC consumers of energy storage.
To check next time
What management committed to on this call, or the dates they gave.
- Vallam 5 GW module facility commissioning status (Q3 FY26 target)
- Cell plant equipment contracts closure (planned for September 2025)
- Order book update and any DCR segment entry
- Capacity utilisation trajectory post-89% effective base
- Export order book evolution as US policy clarifies
- Falta 2 GW plant progress (FY27 target)
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Wed 10 Sept 2025 | ₹378.80 | +5.05% | +0.42% |
| 5 sessions Tue 16 Sept 2025 | ₹356.20 | −1.22% | +1.49% |
| 20 sessions Wed 8 Oct 2025 | ₹320.20 | −11.20% | +0.71% |
From the close of Tue 9 Sept 2025, ₹360.60: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.