Capacity expansion
Companies spending real money on capacity inside the window: capex announcements above 10% of net worth, greenfield plants commissioned, or expansions disclosed to the exchanges. Each row links the filing; the mirror view shows capex that slipped.
| Company | Why it’s here — the filing | vs sector · Next day / 1w / 1m | Price | Mcap |
|---|---|---|---|---|
| QMPL to inaugurate NdFeB magnet facility in Vasai on December 8 | pending | ₹1,130 | 972 Cr | |
| Additional battery storage capacity commissioned in Rajasthan | pending | ₹405 | 28,614 Cr | |
| Trial production begins at Kathua BOPP film plant | pending | ₹308 | 1,077 Cr | |
| 108.50 MWp solar component commissioned at hybrid project | pendingraw +2.4% reaction day | ₹249 | 14,157 Cr | |
| Second Kalinganagar furnace begins hot metal production | -0.3% — —raw -1.6 — —vs Ferro & Silica Manganese peers | ₹1,028 | 5,544 Cr | |
| HZL approves INR 80,000 crore plan to double metal capacity | -1.9% — —raw -3.0 — —vs Metals & Mining peers | ₹237 | 92,546 Cr | |
| Board approves HZL 2.0 plan to double metal production capacity | -0.2% — —raw -0.7 — —vs Non - Ferrous Metals peers | ₹522 | 2.21 L Cr | |
| IFGL subsidiary starts new tap hole clay plant in China | +1.9% — —raw +0.9 — —vs Electrodes & Refractories peers | ₹178 | 1,286 Cr | |
| New Tarapur plant adds 525 MT annual capacity | -1.5% — —raw -2.9 — —vs Pharmaceuticals peers | ₹79.38 | 796 Cr | |
| Waaree subsidiary commissions 5.15 GWh battery pack line | -1.3% — —raw -3.6 — —vs Other Electrical Equipment peers | ₹2,458 | 70,704 Cr | |
| Additional 15,000 MTPA R32 capacity begins commercial operations at Surat | +0.8% — —raw -1.1 — —vs Specialty Chemicals peers | ₹10,038 | 51,495 Cr | |
| Trial production begins for Phase I SSP plant in Dhule | -0.2% — —raw -0.9 — —vs Fertilizers peers | ₹120 | 424 Cr | |
| Mangaon Pickling hot trial completed; GP Line cold trials begin | +0.2% +0.8% —raw +1.7 -0.4 —vs Iron & Steel Products peers | ₹75 | 2,948 Cr | |
| JSW Energy expands installed capacity to 15.2 GW | -4.2% -0.8% —raw -1.0 -1.9 —vs Power Generation peers | ₹515 | 94,336 Cr | |
| Kanpur Plastipack inaugurates new non-woven fabric plant | +4.7% +2.6% —raw +4.9 +1.6 —vs Packaging peers | ₹237 | 583 Cr | |
| 3.15 MW windmill project commissioned at Bhimguda in Gujarat | +4.7% -0.7% —raw +5.2 -0.5 —vs Other Textile Products peers | ₹36 | 144 Cr | |
| Board approves Rs 185 crore Phase-3 capacity expansion | +1.9% +9.1% —raw +1.9 +8.1 —vs Aluminium Copper & Zinc Products peers | ₹1,011 | 6,850 Cr | |
| UAV facility premises ready at 60 percent owned joint venture | +0.6% -4.7% —raw +0.1 -1.9 —vs Computers - Software & Consulting peers | ₹23.11 | 1,361 Cr | |
| Trident approves INR 4,650 crore capacity expansion and modernisation | +5.6% +2.1% —raw +7.0 +5.7 —vs Other Textile Products peers | ₹23.4 | 11,925 Cr | |
| 1.20 MW captive solar plant commissioned in Nanded | +0.8% +12.0% —raw +2.3 +17.5 —vs Industrial Products peers | ₹1,172 | 1,502 Cr | |
| ₹500 crore greenfield specialty chemicals expansion approved | -8.3% +3.6% —raw -8.2 +6.5 —vs Specialty Chemicals peers | ₹1,159 | 12,017 Cr | |
| Commercial production begins at Manufacturing Facility V | -1.4% -0.7% —raw -1.4 +3.5 —vs Auto Components & Equipments peers | ₹413 | 1,625 Cr | |
| 95.6 MW Kalasar solar unit begins commercial operation | +4.3% +0.8% —raw +4.0 +5.3 —vs Power Generation peers | ₹321 | 3.11 L Cr | |
| 68 MW wind-solar hybrid project fully commissioned | -1.9% -2.5% —raw -2.3 -0.3 —vs Diversified peers | ₹882 | 13,749 Cr | |
| Greenply approves Rs 30 crore Sandila capacity expansion | -14.0% -12.5% —raw -12.8 -9.2 —vs Plywood Boards/ Laminates peers | ₹268 | 3,351 Cr | |
| Subros begins production at new Kharkhoda greenfield plant | -0.8% +0.5% —raw -2.2 +3.5 —vs Other Industrial Products peers | ₹645 | 4,209 Cr | |
| New Reengus plant commissioned, lifting installed capacity by about 20% | -7.3% -6.9% —raw -3.6 -0.0 —vs Cables - Electricals peers | ₹342 | 1,658 Cr | |
| Karnataka renewable transmission project fully commissioned | -1.3% -2.4% —raw +1.8 +5.4 —vs Power peers | ₹268 | 2.49 L Cr | |
| JSW Steel approves 5 million tonne Sambalpur expansion and UAE unit | +4.2% +10.7% —raw +1.9 +8.0 —vs Iron & Steel peers | ₹1,330 | 4.06 L Cr |
A company appears when an NSE/BSE filing inside the last 30 days carries one of these classifier signals (minimum importance: Medium): Capex above 10% of net worth, Greenfield plant commissioned, Expansion. Each row shows the latest qualifying filing; the reaction columns are the stock’s measured move from the close before that filing to the close of the next day (one session after the reaction day), 1 week and 1 month later. vs market subtracts the move of the company’s size index (Nifty 100, Nifty Midcap 150, Nifty Smallcap 250, or Nifty Microcap 250 for smaller and SME companies) over the same two closes; for filings before June 2026 that is the index membership as recorded later (tracked since Jun 2026). vs sector subtracts the median move of its industry peers. Both are differences in percentage points, not a measure of what the filing did. A benchmark that has not landed yet reads “pending”: the index close arrives a session after the stock’s.
MarketPing publishes facts, filings and measured history only — nothing on this page is investment advice, a recommendation or a rating.