Godawari Pow & Isp Q4 FY25 earnings call
In brief
GPIL Q4 EBITDA ₹318 cr (+44% QoQ), PAT ₹221 cr; FY26 mining & pellets guided at 3 mt each with ~₹1,000 cr capex.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- First guidance issued
- Analyst pushback
- Medium
- Stock, next session
- −1.82% (Nifty 50 +0.52%)
- Q4 FY25 consolidated revenue ₹1,464 cr, EBITDA ₹318 cr (+44% QoQ) and PAT ₹221 cr (+53% QoQ); EBITDA margin 22%, PAT margin 15%.
- FY26 volume guidance: 3 mt each for iron-ore mining and pellets; sponge iron 5.94 lakh tons, billets 5 lakh tons, rolled 3.75 lakh tons, ferro alloys 90,000 tons.
- Net cash stood at ₹863 cr on March 31, 2025 with Board recommending ₹1/share dividend (100% on paid-up capital).
- Pending capex of ₹950-1,000 cr for FY26: pellet plant ₹334 cr, solar ₹380 cr, beneficiation ₹150 cr and energy efficiency ₹56 cr.
- Q4 sponge iron output fell 39% QoQ on planned kiln modification after already hitting 5.94 lakh ton annual capacity; pellet sales surged on inventory clearance.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹1,468 cr | −4.0% | +13.1% | |
| EBITDA (excl. other income) | ₹318 cr | −3.1% | +43.9% | 21.7% (21.5% a year ago) |
| Net profit | ₹221 cr | +0.8% | +52.8% | 15.1% (14.3% a year ago) |
| EPS (₹) | ₹3.61 | −79.5% | +53.0% |
From the company's filed results for the quarter ended 31 Mar 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Q4 sponge iron production fell 39% QoQ on planned kiln modification and turbine upgrade after already achieving 5.94 lakh ton full-year capacity by mid-February — management said planned, not a breakdown. (one-off)
- Pellet sales volume jumped in Q4 because Q3 inventory was cleared and captive consumption fell to ~40% during the 45-day sponge iron kiln shutdown; management called this a one-time effect. (one-off)
- Realization dropped 1-8% YoY across most products in FY25 (ferro alloys excepted), offsetting volume growth and pulling consolidated Q4 revenue down ~4% YoY.
- Pellet realization softened to ~₹9,400-9,500/t in Q1 FY26 from ₹10,000 in Q3, driven by weaker secondary market demand ahead of monsoon.
- Q4 EBITDA and PAT rose 44% and 53% QoQ on higher pellet, galvanized and rolled product sales volume combined with a relatively stable cost base.
The numbers management led with
- 5-year financial CAGR: Revenue 10% CAGR, EBITDA 14% CAGR, PAT 36% CAGR over last 5 years
- Net cash position: INR 863 crores net cash as on March 31, 2025
- Jammu Pigments stake: 43.96% on fully diluted basis (down from 51% due to promoter loan-to-equity conversion)
- Solar power capacity: 125 MW under construction, total captive solar rising to 290 MW
- FY26 capex plan: INR 950-1,000 crores: pellet INR 334 cr, beneficiation INR 150 cr, solar INR 380 cr, energy efficiency INR 56 cr
Guidance
Guidance on this call
| What | For | What management said | Filed |
|---|---|---|---|
| Iron ore mining | FY26 | Iron ore mining of 3 million tons in FY26 | — |
| Pellet production (Pellets) | FY26 | Pellet production of 3 million tons in FY26 | — |
| Sponge iron | FY26 | Sponge iron production of 5.94 lakh tons in FY26 | — |
| Steel billets | FY26 | Steel billets 500,000 tons in FY26 | — |
| Rolled products | FY26 | Rolled products 375,000 tons in FY26 | — |
| Ferro alloys | FY26 | Ferro alloys around 90,000 tons in FY26 | — |
| FY26 capex outflow | FY26 | Capex outflow of about ₹850 crores in FY26 | — |
| FY26 EBITDA margin | FY26 | Confident of achieving FY25's ~20%+ EBITDA margin in FY26 | 22.9%, within the range |
| FY26 revenue growth | FY26 | 5% to 7% additional top-line growth in FY26 from new pellet plant and rolling mill | 0.1%, below the range |
| Iron ore (Ari Dongri) FY27 (Iron ore mining) | FY27 | FY27 iron ore target of 4 million tons from Ari Dongri | — |
| BMQ FY27 (Iron ore mining) | FY27 | FY27 BMQ target of 1.5 million tons from Ari Dongri | — |
| Pellet prices going forward (Pellets) | — | Pellet prices expected in ₹9,000 to ₹11,000/t range going forward | — |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| FY25 EBITDA margin | FY25 | 24–25% (on the Q4 FY24 call) | 22.2%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Iron ore mining
FY25 production grew YoY helped by Boria Tibu start-up; Ari Dongri EC expansion to 6 mt pending third-party report, expected by Q3 FY26.
FY25 production 2.4 mt (Ari Dongri)
Outlook: FY26 target 3 mt; FY27 4 mt iron ore + 1.5 mt BMQ from Ari Dongri + 0.5 mt Boria Tibu; ramp-up from Q4 FY26.
Pellets
Q4 sales volume jumped on Q3 inventory clearance and lower captive consumption; realizations softened to ₹9,400-9,500/t in Q1 FY26.
Pellet realization -4% QoQ, -6% YoY
Outlook: FY26 target 3 mt (incl. 0.5-0.6 mt from new 2 mt plant commissioning Q2 FY26); prices expected in ₹9,000-11,000/t range.
Sponge iron
Q4 production fell 39% QoQ on planned kiln modification and turbine upgrade after hitting 5.94 lakh ton full-year capacity by mid-February.
FY25 production 5.94 lakh tons · Q4 production -39% QoQ
Outlook: FY26 target 5.94 lakh tons; both modified kilns restarted first week of May; Q1 FY26 volume will be subdued.
Steel billets & rolled products
New structural steel rolling mill commissioned in Q4; PGCIL approval for HT/E350 grade billets awaited after inspection.
FY25 rolled products 106% of guidance
Outlook: FY26 rolled 3.75 lakh tons (wire rod 2.25-2.3 lakh + structural 1.5-1.75 lakh); steel melting expansion 50,000 tons to 5.75 lakh by Q4 FY26.
Ferro alloys
FY25 record production; Q4 realizations rose 9% YoY and 5% QoQ bucking the steel price trend; Hira Ferro FY25 EBITDA ₹80 cr.
Hira Ferro FY25 EBITDA ₹80 cr · Q4 ferro alloy realization +9% YoY
Outlook: FY26 target 90,000 tons (vs ~1 lakh tons in FY25) due to planned energy-efficient modifications.
Power
FY25 record power generation; MOU signed with Siemens Energy for waste heat recovery; carbon capture pilot with IIT Mumbai.
Solar under construction 125 MW · total captive 290 MW planned
Outlook: Additional 30 MW solar; waste heat recovery and 5 tpd carbon capture unit by March 2026.
Jammu Pigments (43.96% stake)
FY25 net sales ₹860 cr, EBITDA ₹79 cr, PAT ₹37 cr; Q4 net sales ₹237 cr, EBITDA ₹34 cr, PAT ₹14 cr; margin expansion under way.
FY25 net sales ₹860 cr · FY25 EBITDA ₹79 cr · FY25 PAT ₹37 cr · Q4 net sales ₹237 cr · Q4 EBITDA ₹34 cr · Q4 PAT ₹14 cr
Outlook: Management confident of volume growth but declined FY26 specific numbers; productivity improvements expected to lift margins over time.
Balance sheet, capex and funding
- Net cash: ₹863 cr as on March 31, 2025.
- Pending capex for FY26: ₹950-1,000 cr (pellet plant ₹334 cr + solar ₹380 cr + beneficiation ₹150 cr + energy efficiency ₹56 cr).
- FY26 capex outflow envisaged: ~₹850 cr (Abhishek Agrawal).
- Board approved ₹300 cr borrowing for cash flow management; actual draw may be lower.
- Inter-corporate loan exposure: ₹200-250 cr total (long-term ₹118 cr; rest short-term treasury).
- Credit rating: CRISIL AA- Stable (long-term) and A1+ (short-term) reaffirmed.
The industry, as management sees it
Domestic iron-ore prices are on an upward trend (NMDC 64Fe at ~INR 5,500/ton) supported by rising steel demand and government infrastructure push (INR 11.2 trillion capex in Union Budget 2025-26, up 10% YoY). Globally, iron-ore is expected to range $90-105 in FY26 with China's stimulus and post-decline housing stabilisation supporting prices, though monsoon and weak secondary demand have already softened pellet realisations by 5-7% from the Q4 peak.
Risks management named
- Ari Dongri EC further delayed 6-8 weeks pending third-party composite report, though management expects clearance by Q3 FY26
- Boria Tibu mine temporarily suspended for IBM renewal; expected back in full flow by end-May
- FY25 realisations fell 1-8% across most products (ex-ferro alloys) on weak steel demand
- Pellet realisations have softened 5-7% from the Q4 peak on subdued demand and monsoon onset
- Geopolitical tensions and China housing weakness continue to weigh on global iron-ore dynamics
Q&A
Q&A was dominated by iron-ore mining (Ari Dongri EC, Boria Tibu ramp-up, sourcing mix), the FY26 volume guidance, and pricing dynamics for pellets and coal. Pushback was moderate, with one analyst pressing for a plan B on the EC (management firmly rebuffed) and another pressing on the sponge iron Q4 drop (explained as a planned maintenance shutdown). The Jammu Pigments Q&A was notably deflected, with management declining to give FY26 guidance or commit to the sustainability of Q4 margins. Capex disclosure was concrete: INR 950-1,000 cr for FY26, plus a INR 300 cr Board-approved standby borrowing facility. The new Tilda greenfield was confirmed but conditional on land/EC approvals.
Not answered directly
- Jammu Pigments FY26 volume and margin guidance
- Jammu Pigments sustainability of Q4 margins
- FY27 capex quantum pending new steel plant Board approval
Asked for a number, answered without one
- Jammu Pigments FY26 guidance: we'll not be able to give you the guidance on Jammu Pigment... a lot of things we are trying to get hold on it before we can give any guidance
- Tilda greenfield steel plant capex: we're waiting for the EC to get approved. Once we have the approvals, we will definitely share with you. But it's going to be a greenfield complex
- FY27 capex: if that happens, then of course, the numbers has to change. But still it will be difficult to give you a right number right now
Every question, with its answer
1. Iron-ore mining guidance and Ari Dongri EC
Manav Gogia, Yes Securities
Question. Does the FY26 iron-ore mining guidance of 3 MT factor in any volumes from the expanded Ari Dongri mine? And if the EC is delayed further, what is the plan B?
Answer, Abhishek Agrawal, Executive Director. FY26 mining guidance of 3 MT includes a small ramp-up from Q4 onwards (January). The 3 MT comprises 2.4 MT from Ari Dongri old capacity, 0.35-0.4 MT from Boria Tibu, and 0.2-0.25 MT from EC ramp-up. On the EC, the state government issued the LOI but a new condition (third-party composite report) emerged, pushing the timeline by another 6-8 weeks; report expected by first half of June, after which public hearing and mining plan filing will follow. 'We are very confident, and there is no need for plan B. I can assure you that.'
Follow-up. Confirming Boria Tibu mine is back in production after the April temporary suspension?
Answer. There were some lapses in the Boria Tibu renewal as per IBM; all formalities now completed and clearance expected this week, with full operations resuming from end-May.
2. Sponge iron volume drop and plant shutdown
Manav Gogia, Yes Securities
Question. Sponge iron production fell 39% QoQ. Was this planned? Did the company meet captive billet needs or did it source from the market?
Answer, Abhishek Agrawal, Executive Director. Sponge iron capacity is 5.94 lakh tons and was already achieved by mid-February. The company then deliberately undertook kiln modification along with a turbine upgrade to a more efficient model, with the shutdown planned. Both kilns restarted in the first week of May. Q1 FY26 volumes will also be lower but full-year target of 5.94 lakh tons is achievable.
Follow-up. On pellets, market sales jumped sharply; was this due to Q3 inventory clearance and reduced captive consumption?
Answer. Yes, there was a pellet inventory pile at end of Q3 due to subdued market; for 45 days in Q4, captive consumption of pellets was only 40% due to the sponge iron shutdown. The inventory plus the 60% non-captive volume were both sold in Q4, explaining the one-time spike. One pellet vessel was exported in January; all subsequent volumes were domestic.
3. Safeguard Duty impact on pellet pricing
Rakesh Roy, Boring AMC
Question. Post the government Safeguard Duty, has GPIL taken a pellet price hike in Q1? What is the pellet price level currently?
Answer, Abhishek Agrawal, Executive Director. Duty imposed for 6 months with a minimum pricing mark, but applies to HR coil/value-added primary steel products. There was a sentiment-driven 10% price increase from mid-March to early May, but since second half of May the market has reversed back to Q4 levels. Q1 vs Q4 pellet prices are more or less the same, supported by weak monsoon demand.
Follow-up. What margin and revenue growth does GPIL target for FY26 given the volatile commodity backdrop?
Answer. Based on current guidance volumes and market conditions, GPIL is confident of achieving similar EBITDA margin to FY25 (~20% plus). Revenue should grow 5-7% from the new 2 MT pellet plant (commissioning Q2 FY26) and ~1 lakh tons from the newly commissioned rolling mill.
4. Iron-ore sourcing mix for FY26
Sahil Sanghvi, Monarch Networth Capital
Question. If mining target is 3 MT and pellet target is 3 MT, GPIL will need more than 3 MT of ore. Can you break down the iron-ore requirement between Ari Dongri, Boria Tibu and external purchases?
Answer, Abhishek Agrawal, Executive Director. Of the 3 MT mining target, 2.4 MT will come from Ari Dongri, 0.35-0.4 MT from Boria Tibu, and 0.2-0.25 MT from Ari Dongri EC expansion (Q4 onwards). The remaining 0.7-0.8 MT of fines requirement (including for the new pellet plant) will be sourced from the market.
Follow-up. Any on-ground demand slowdown visible, and is the company targeting 4 MT mining from Ari Dongri in FY27?
Answer. Secondary market demand has dropped since April, pulling down sponge iron, domestic coal and pellet pricing; pellets softened 5-7% from INR 10,000 to INR 9,400-9,500. For FY27, the company targets full EC capacity: 4 MT iron-ore and 1.5 MT BMQ from Ari Dongri alone, with Boria Tibu ramping to 0.5 MT.
5. Tilda greenfield and PGCIL approvals
Sahil Sanghvi, Monarch Networth Capital
Question. Update on the Tilda structural steel project land approval and on PGCIL HT-grade billet approval?
Answer, Abhishek Agrawal, Executive Director. Tilda land file has started moving; land expected in 4-6 weeks and EC within a couple of months thereafter, targeted by Q2 FY26. For PGCIL, the MS grade is approved and supplies have begun; HT/E350 grade inspection was done by PGCIL last week with approval expected by end-June, enabling full PGCIL product range from July onwards.
Follow-up. Any growth and margin guidance for Jammu Pigments in FY26, given the strong Q4?
Answer. Management declined to give specific JPL guidance citing ongoing productivity work, but said JPL is on the right track. Q4 margins may not be fully sustainable due to product mix volatility (lead, tin, cadmium, zinc); focus is shifting to higher-margin value-added products.
Not answered directly.
6. Ferro alloys pricing and volume
Aditya Welekar, Axis Securities
Question. Ferro alloys realisations have bucked the trend. What's the outlook and why is the FY26 volume guidance at 90,000 tons slightly below FY25's 1 lakh tons achievement?
Answer, Abhishek Agrawal, Executive Director. Ferro alloys margins improved in Q4 as the broader steel market recovered; Q1 levels are expected to be similar. The slightly lower FY26 volume guidance reflects planned modifications to energy-efficient systems and new polishing equipment/norms; if modifications are completed on time, last year's volume can be matched.
Follow-up. Did the company sell pellets externally in Q4 because of the sponge iron shutdown?
Answer. Yes, that is the primary reason pellet sales jumped in Q4.
7. Pellet realisation trend and export market
Divya Agrawal, Ficom Family Office
Question. Pellet realisations declined 4% QoQ and 6% YoY. Will realisations improve from here? And how do domestic pellet realisations compare with international markets?
Answer, Abhishek Agrawal, Executive Director. The export market has been subdued for most of the year; domestic realisations are $15-20 higher than international. A 4-5% realisation move is acceptable for a commodity and tied to steel demand. April was good, May was better, but June onwards demand and pricing are weaker. 5% +/- range guidance remains intact.
Follow-up. How is the demand-supply situation in the domestic pellet market?
Answer. Region-wise, Eastern market (Bengal/Odisha) faces oversupply due to new capacities and limited fines availability. In Raipur, demand is much stronger owing to DRI capacity additions over the last 2-3 years; pellet selling pressure arises only once every 4-5 months.
8. Loans and intercorporate deposits
Hitesh Popat, Investor
Question. Details on the loans reflected on the balance sheet and whether GPIL has any intercorporate loans given or taken?
Answer, Dinesh Gandhi, Executive Director. On the long-term side there are loans to two parties totalling INR 118 crores. On a short-term basis, intercorporate deposits are part of treasury management to earn higher interest than bank deposits. Total exposure including long-term is INR 200-250 crores.
Follow-up. Is a fresh borrowing planned for the expansion?
Answer. A INR 300 cr borrowing has been Board-approved as a standby facility for cash flow management; the actual drawdown will depend on requirements since existing cash is tied up in current expansions.
9. FY26 volume build-up and monsoon preparedness
Rakesh Roy, Boring AMC
Question. Confirming FY26 contributions of 0.5 MT from new pellet plant and 50,000 tons from new rolling mill? Any monsoon-related operational risk?
Answer, Abhishek Agrawal, Executive Director. Two expansions: new pellet plant 0.5-0.6 MT plus additional 50,000 ton steel melting expansion (taking total to 575,000 MT). New structural rolling mill (commissioned last quarter) targets 1.5 lakh tons in FY26. Total rolled products 3.75 lakh tons, with 2.25-2.3 lakh wire rod and 1.5-1.75 lakh structural. GPIL has invested in monsoon-resilient infrastructure based on Raipur's July-mid-October monsoon pattern; track record of meeting production guidance reflects readiness.
Follow-up. Confirming Ari Dongri EC by Q3 FY26 and ramp-up from FY27?
Answer. Yes, EC by Q3 FY26; minor ramp-up from Q4 FY26 but material volume increase from FY27 onwards.
10. High-grade pellet premiums
Manav Gogia, Yes Securities
Question. Are high-grade pellet premiums getting impacted by the recent pellet price drop?
Answer, Abhishek Agrawal, Executive Director. Premiums are maintained on top of commercial pellets; the INR 500 absolute premium remains constant year-round. For example, if commercial pellet is INR 9,500, high-grade is INR 10,000-11,000; the differential stays similar.
Follow-up. Landed cost of imported coal in Q4 and Q1 outlook? And capex expectations for FY26 and FY27?
Answer. Imported coal landed cost in Q4 was ~INR 11,750/ton; Q1 ~INR 11,500/ton. Q2 onwards sharp ~10% drop expected. Capex for FY26 estimated at INR 850 cr (range INR 800-900 cr). The CFO added that the presentation capex sheet shows ~INR 1,000 cr remaining for in-flight projects: pellet INR 334 cr, beneficiation INR 150 cr, solar INR 380 cr, energy efficiency INR 56 cr. FY27 capex depends on the new steel plant Board approval.
11. New steel plant scope
Manav Gogia, Yes Securities
Question. Will the new steel plant be a greenfield or brownfield expansion? And will it be for flat or long products?
Answer, Abhishek Agrawal, Executive Director. The new complex will be a greenfield expansion, not brownfield. Plan is to set up a medium-to-heavy structural mill to complement the light-to-medium structural mill already commissioned, enabling GPIL to offer the full range from light to heavy structural steel in the long term. Awaiting EC before approaching the Board and the market.
12. Global vs domestic iron-ore pricing linkage
Aditya Welekar, Axis Securities
Question. What is the current differential between CFR China iron-ore prices and domestic prices? At what level of differential would domestic pellet prices start getting pinched?
Answer, Abhishek Agrawal, Executive Director. The correlation between international iron-ore and domestic pellet pricing has diluted over the last couple of years because of rising Chhattisgarh DRI capacity. GPIL has hardly exported any vessels in the last 18 months. Per agency guidance (including Goldman Sachs), FY26 iron-ore at $90-100; major changes in iron-ore should not significantly impact pellet pricing barring a drastic shift in economics.
What was said
Topic by topic, in the order it was spoken
FY25 Performance and 5-Year Track Record · Dinesh Gandhi (Executive Director)
- GPIL delivered 10% revenue CAGR, 14% EBITDA CAGR and 36% PAT CAGR over the last 5 years.
- FY25 saw highest-ever production in sponge iron, steel billets, ferro alloys and power.
- FY25 production guidance fully met in iron-ore mining, pellets and sponge iron; surpassed in ferro alloys (126%) and rolled products (106%).
- FY25 realisations fell 1-8% across most products (ex-ferro alloys); ferro alloys realisations rose 9% YoY and 5% QoQ.
- Hira Ferro Alloys division achieved EBITDA of INR 80 crores in FY25.
Q4 FY25 Consolidated Financials · Dinesh Gandhi (Executive Director)
- Q4 consolidated revenue at INR 1,464 crores (up QoQ, slightly down YoY due to realisation drop).
- Q4 EBITDA up 44% QoQ to INR 318 cr; PAT up 53% QoQ to INR 221 cr on higher pellet, galvanised and rolled product volumes.
- FY25 EBITDA margin 22% and PAT margin 15%, demonstrating resilience despite realisation headwinds.
- Net cash position of INR 863 cr as on March 31, 2025; Board recommended INR 1 per share dividend (100% on paid-up capital).
FY26 Volume Guidance · Dinesh Gandhi (Executive Director)
- Iron-ore mining 3 MT (2.4 MT from Ari Dongri, 0.35-0.4 MT from Boria Tibu, 0.2-0.25 MT from EC ramp-up).
- Pellet production 3 MT including 0.5-0.6 MT from the new 2 MT plant; remaining 0.7-0.8 MT iron-ore to be sourced from market.
- Sponge iron 5.94 lakh tons, steel billets 5 lakh tons, rolled products 3.75 lakh tons, ferro alloys 90,000 tons.
Capacity Expansion Pipeline · Dinesh Gandhi (Executive Director)
- Ari Dongri iron-ore EC expansion from 2.35 to 6 MT (4.5 MT iron-ore + 1.5 MT BMQ) expected by Q3 FY26; delay attributed to third-party composite report requirement (6-8 weeks further).
- 2 MT pellet plant expansion on track for Q2 FY26 commissioning.
- Steel melting shop capacity to rise from 525,000 to 575,000 MT by Q4 FY26.
- 30 MW additional solar plant approved, taking under-construction solar to 125 MW and total captive solar capacity to 290 MW.
- New structural rolling mill commissioned in Q4 FY25 with FY26 production target of 1.5 lakh tons.
Decarbonisation and ESG Initiatives · Dinesh Gandhi (Executive Director)
- MoU signed with Siemens Energy for waste heat recovery project, targeted completion March 2026.
- Letter of intent issued to IIT Mumbai for 5 TPD carbon capture technology transfer, also targeted March 2026.
- Diesel/petrol internal transport vehicles being replaced with electric ones as part of net-zero 2050 goal.
- CARE ESG rating of 3 with a score of 51; CRISIL reaffirmed AA-/Stable for long-term and A1+ for short-term credit facilities.
Jammu Pigments Acquisition Update · Dinesh Gandhi (Executive Director)
- Stake reduced from 51% to 43.96% on fully diluted basis as promoter loans were converted to equity via additional share allotment.
- FY25 financials: net sales INR 860 cr, EBITDA INR 79 cr, PAT INR 37 cr; Q4: sales INR 237 cr, EBITDA INR 34 cr, PAT INR 14 cr.
- Final consent to operate received for capacity expansion from 495,000 to 594,000 tons.
- Management declined to give specific FY26 guidance for JPL citing ongoing productivity initiatives; expected improvements in product mix (tin, cadmium, zinc) should lift margins.
Market Outlook and Pricing · Dinesh Gandhi (Executive Director)
- Global iron-ore prices in $95-105 range so far in 2025, currently ~$100; FY26 expected range $90-105, average ~$100.
- Domestic NMDC 64Fe fines at ~INR 5,500/ton, pellet prices in INR 9,000-11,000 range (currently INR 9,400-9,500).
- Government capex of INR 11.2 trillion in FY26 (up 10% YoY) plus Safeguard Duty supportive of domestic steel demand.
- Q4 pellet realisations have already softened 5-7% from the Q4 peak of INR 10,000 on weak secondary demand and approaching monsoon.
In their words
We are very confident, and there is no need for plan B. I can assure you that.
GPIL is confident towards moving a future of sustainable and enduring success.
For Raipur market, the demand is much more because of the DRI capacity, which has been added in last 2, 3 years since COVID. Abnormal capacities of DRI has been added in the Raipur market in the last 2, 3 years, because of which, for us, the pressure of selling is very seldom. Probably once in 4, 5 months, we will feel the pressure of selling the pellets. Otherwise, it's a cakewalk for us.
To check next time
What management committed to on this call, or the dates they gave.
- IBM clearance for Boria Tibu mine restart (expected end-May 2025) and ramp-up to full flow.
- PGCIL approval for HT/E350 grade steel billets (expected by end June 2025).
- Third-party mining report and Ari Dongri EC progress (report due first half June 2025).
- Q1 FY26 production: sponge iron kilns restarted first week of May, volume expected subdued.
- Land allotment and EC for Tilda greenfield structural steel complex (target Q2 FY26).
- Imported coal landed cost trajectory (sharp drop expected from Q2 FY26).
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Wed 21 May 2025 | ₹194.35 | −1.82% | +0.52% |
| 5 sessions Tue 27 May 2025 | ₹197.19 | −0.39% | +0.58% |
| 20 sessions Tue 17 Jun 2025 | ₹182.71 | −7.70% | +0.69% |
From the close of Tue 20 May 2025, ₹197.96: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.
Godawari Pow & Isp's other calls
- Q2 FY27Mon 16 Nov 2026Tone: Mixed
- Q1 FY27Mon 10 Aug 2026Tone: Mixed
- Q4 FY26Wed 20 May 2026Tone: Confident
- Q3 FY26Wed 11 Feb 2026Not read
- Q3 FY26Mon 9 Feb 2026Not read
- Q2 FY26Mon 17 Nov 2025Tone: Confident
- Q1 FY26Wed 6 Aug 2025Tone: Optimistic
- Q3 FY25Thu 13 Feb 2025Tone: Cautious
- Q2 FY25Thu 19 Dec 2024Tone: Confident
- Q2 FY25Mon 28 Oct 2024Tone: Mixed
- Q1 FY25Thu 8 Aug 2024Tone: Confident
- Q4 FY24Wed 22 May 2024Tone: Confident